Loading...
HomeMy WebLinkAbout25-10 OVERSIZE PLANS0 VICINITY MAP —NOT TO SCALE S 67'34'52"W \ 31.24' '7/E" d NEW MAG NAIL CIL PAVEMENT 18 MOORING PILING o 12' EDGE OF MARSH(11 o 20' HARLOWE CREEK cn 32' ti 30' MOORING PILING Curve Radius Length Chord Chord Bear. Cl 260.00' 1 68.91 ' 68.71 ' N 31 'S7'34 W NORMAL HIGH WATER / EASEUENjAGE / E.I.P. NORMAL HIGH WATER 30' CAMA SETBAC 40' CAMA SETBACK V 3 PROPOSED 48.0 SCALE: 1 " = 20 ' N 8432'12"E 1 PUBLIC DOMAIN 5' WIDE PROPOSED PIER 750' TO EDGE OF MARSH / 6 j 875' AEC LINE HOUSE / o SETggCK / / y !c PUBLIC DOMAIN 20' UTILm 5.35 Ac. 78.0' *0 s /'ICOASTAL WETLAND LINE EASEMENT V ,E.I.P. ANAEROBIC w � 960.72' DRIP FILL AREA o o ^� $ 85' 10'42 "W i EPAIR AR o — I I , j 60.0 10' M.B.L. — 47.4' E.I.P. �_--- S 87'19'53'W 289.14' /.P. NORMAL HIGH WATER N 24'21'57"W—�( 26.26' �� \ 1 • - S 65'38'03 "W 50.00' N N NEW MAG NAIL CIL CUL-DE-SAC ■ NOTES: 1)REF.: LOT 78, CHADWICK SHORES PLANTATION, M.B. 31, PG. 563, CARTERET COUNTY REGISTRY 2)NORMAL HIGH WATER LINE FLAGGED BY DCM 3)PROPOSED SEPTIC LOCATION AS PER APPROVED SEPTIC PERMIT #A-930 F-1 E.I.P. _/ �40' r,v CORRj'0 I 31E 11.9' 3, x { 4/. .5' S 09 28.3,3 "W 199. 15 , 12.0 A 4,3' l WATER DEPTHS WERE EDGE OF MARSHMEASURED AT NORMAL ' DEEP IN LOW WATER ENTER CK.AT EDGE MARSH ' * 12.0' 3' AT EEP AT PIER tom-- EDGE OF MARSH 3K 4.4'31E 12.0' 3.0IAN CORRIDOR ..\ HARLOWE CREEK A 4.4' WATER DEPTH WATER DEPTHS, OPEN WATER WIDTH, PROPOSED PIER LOCATION, PROPOSED PIER DIMENSIONS PROVIDED BY OTHERS. I CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK ___=, PAGE OR OTHER REFERENCE SOURCE M.B. 31, PG. 563 ) S • THAT THE BOUNDARIES NOT SURVEYED ARE INDICATED ASDRAWN FROM INFORMATION IN BOOK _ PAGE OR OTHER REFERENCE SOURCE ; THAT THE RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1:10,000+; AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING VNRTH CAROLINA (21 NC C 56. 1600).DAY OF /'C�C�2009. LEGEND O E.I.P.-EXISTING IRON PIPE O N.I. P. -NEW IRON PIPE + NON MONUMENTED POINT CIL -CENTERLINE EOP-EDGE OF PAVEMENT M.B.L.-MINIMUM BUILDING LINE R/W-RIGHT OF WAY C O N . O ro Date 02102110 1 Project 09329 _ y Cogo 09329_ `J * Dro wn TL W/CAB C 100 0 100 200 300 TO Scale 1 = 100 GRAPHIC SCALE - FEET ALAN X Sheet 1 0 f I