HomeMy WebLinkAbout129-11 OVERSIZE PLANS 7/2011Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD
CREEK 230KV
TRANSITION
STATION
NEW
HANOVER
COUNTY,
NORTH
CAROLINA
NEW
HANOVER COUNTY ZONING DISTRICT
-
1-2
4311
RIVER ROAD, WILMINGTON, NORTH
CAROLINA
N 34.1537
f
I a
TO WIL M/NC N &
I a
1 g
i
• 0•
CAPE FEAR
RIVER
EXISTING 2JOKV
BARNARD CREEK
f
i SUBSTATION
�i
e �
i
o
a
z
CD
Z \o �
c�
U �
Z
CAPE FEAR
R/ VER \
I
W 77,09397
SITE
VICINITY MAP
NOT E) SALE
r�•••,,Dewberry
.,.•.,.
DewLerry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881,9923
NCBELS # F-0679
421
421
132
TO CAROL INA' BEACH
DRAWING LIST
COVER SHEET
RDC-57701SHT
1
OF
13
EXISTING
CONDITIONS
RDC-57701 SHT
2
OF
13
OVERALL
SITE
LAYOUT
RDC-57701 SHT
3
OF
13
CLEARING PLAN
RDC-57701 SHT
4
OF
13
SITE PLAN
RDC-57701 SHT
5
OF
13
EROSION
CONTROL PLAN
RDC-57701 SHT
6
OF
13
GRADING
AND
DRAINAGE PLAN
RDC-57701 SHT
7
OF
13
DETAILS
SH 1
OF 6
RDC-57701 SHT
8
OF
13
DETAILS
SH 2
OF 6
RDC-57701 SHT
9
OF
13
DETAILS
SH 3
OF 6
RDC-57701 SHT
10
OF
13
DETAILS
SH 4
OF 6
RDC-57701 SHT
11
OF
13
DETAILS
SH 5
OF 6
RDC-57701 SHT
12
OF
13
DETAILS
SH 6
OF 6
RDC-57701 SHT
13
OF
13
l2CI - k1
RDC-57701 SHT 1 OF 13
NOTES:
EXISTING STRUCTURE DATA
(EAST LINE)
1. THIS SURVEY WAS PROVIDED TO DEWBERRY BY PROGRESS ENERGY CAROLINAS, INC., SURVEY BY
1288A(EAST)-WOOD POLE
120
(EAST) -CONCRETE POLE
STEWART ENGINEERING.
CPL
NO
DATA
FL-74
119
(EAST) -WOOD POLE
2. STRUCTURAL LABELS PROVIDED ON CHART ARE FROM SURVEY PROVIDED. NOT ALL LABELS ARE SHOWN
DFC
3-8
-80
NO
DATA
ON SURVEY PROVIDED. CONTACT PROGRESS ENERGY CAROLINAS, INC. FOR QUESTIONS.
118
(EAST) -WOOD POLE
w
EXISTING STRUCTURE DATA (WEST LINE) 00414
128 (WEST) -CONCRETE POLE 117 (WEST) -CONCRETE POLE
TYPE - HFRAME NO DATA '
LENGTH - 80FT
WEIGHT 13500 116 (WEST) -WOOD POLE
CLASS 321 NO DATA
FABR NO.1258-2-2
DATE 12-21-88
115 (WEST) -WOOD POLE
127 (EAST) -CONCRETE POLE
NO
DATA
CPL
NO
DATA
•
THE 2 OUTSIDE POLES READ:
•• ; ;;;', �, ' ,
SURVEY NOTES PROVIDED BY STEWART ENGINEERING ARE AS FOLLOWS:
CPL
117
(EAST) -WOOD
POLE
127 (WEST) -CONCRETE POLE
114
(WEST) -WOOD
POLE
,
a, ' • ;"
LGH-80
NO
DATA
THE 2 OUTSIDE POLES READ:
NO
DATA
CLASS-485
CPL
1. THIS SURVEY IS INTENDED TO REPRESENT A TOPOGRAPHICAL SURVEY FOR THE PEC CAPE RIVER
THE INSIDE MIDDLE POLE READS:
116
(EAST -WOOD
POLE
LGH-80
113
(WEST) -WOOD
POLE
CROSSING, ALSO KNOWN ASTHE EAST AND WEST CIRCUITS OF THE " BRUNSWICK-CASTLE HAYNE 230
CPL
LGH-70
NO
DATA
CLASS-485
THE INSIDE MIDDLE POLE READS:
NO
DATA
eq/Ck eR!
KV LINE (BRUNSWICK-BARNARDS CREEK SECTION)"
CLASS-485
11
POLE
112
(WEST) -WOOD
POLE
F ;.,
�• ' ,cF'VCFCkC04
DATAT)-WOOD
LCPL
GH-70
NO
DATA
;CO<OMr�'�Ckdf
*s
126 (EAST) -WOOD POLE
CLASS-485
2. HORIZONTAL DATUM IS NAD-83(2007) AND VERTICAL DATUM IS NAVD88.
STAMP UNCLEAR
114
(EAST) -WOOD
POLE
111
(WEST) -WOOD
POLE
•�'
-' •os4,�y •,:•, •,
NO
DATA
POLE
STAMPEUNC
NO
DATA
125-STEEL FRAME
EARD
3. CONTROL FOR THIS PROJECT WAS ESTABLISHED BY VRS-GPS METHODS AND IS TIED TO NCGS GRID
NO DATA
MONUMENT "HARDEES".
118 (WEST) -WOOD POLE
124-STEEL FRAME TOWER
TYPE HFRAME
s,
NO DATA
LENGTH 75'
NCGS HARDEES
WEIGTH 12000 16
r' j*4
N 165,782.12
E 165,7 2.12
123-STEEL FRAME TOWER
NO DATA
CLASS 302 FT KIPS
FABR. NO 1258-1-2
MFG 12-25-88
<!N /
;
122-STEEL FRAME CUSTOMER CPL
ELEV.40.35' NO DATA 75/1
4. EXISTING CONTROL BY MCKIM AND CREED WAS LOCATED AS SHOWN. NO (EAST) -WOOD POLE
NO DATA •-.. .,
5. ALL DISTANCES ARE HORIZONTAL GROUND. ALL MEASUREMENTS AND COORDINATES ARE IN U.S. J
VEY FEET � � ` s ' ••
0.9
6. PROPERTY CORNERS ARE SHOWN, HOWEVER, A FULL BOUNDARY CONFIRMATION IS NOT COMPLETE
AT THE TIME OF THIS SURVEY.
C�a si(
I 4�
7. THIS MAP DOES NOT CONFORM TO GS 47-30 MAPPING STANDARDS.
\
:,
8. UNDERGROUND UTILITIES WERE LOCATED USING SUBSURFACE UTILITY ENGINEERING TECHNIQUES. , _I
F<o,,.
`/ y 99
4.
9. A PORTION OF THE SUBJECT AREA LIES WITHIN THE FLOOD HAZARD ZONE X AS DEFINED BY THE
FIRM #S 3720312400K, 3720311400K, AND 3720310400J, EFFECTIVE DATE JUNE 2, 2006.
r \
J
S
`:
En
10. WETLAND WERE DELINEATED BY ENVIRONMENTAL SERVICES, INC. ON DECEMBER 21, 2010.
? r
WETLAND FLAGS WERE LOCATED BY CONVENTIONAL SURVEY METHODS EXCEPT WHERE SHOWN IN
PARENTHESIS, IE. (GPS).
11. TOPOGRAPHIC SURVEY IS DATED OCTOBER 15, 2010. WETLANDS SURVEY IS DATED JANUARY 13, r • • • • • ' 44D,2011.
114
\ \ / OS j Nor NT Cj/o
C o S/Oh � ! y`,ft y y Fq N�00
iv 4, ;
%
4.
!�•�► . / _ �� � t — -, �' � •, ', ;', ,,• •, \o.� •.,� "• �, �' Sig ', � •:•'�I,gq' •
of
--•-••• Ste• .:�;,.�; f
/y f
00 ' \ / o/C, ; ' • \ S0/Ct/ ' `.... _ . p • ` ... �"Ft�q ��►.. ,zV III
. 14 g, ` ,.
/NF l' r /a- • ,o y' ��, `., t. ` '"KO !►'Ft� �V I • • f' Ire
I, ,'• _ ' • • •, '', •,�` • '. '', ` ,;, ' 11!\ `� •+�I) gHps � ` �• ,,./�• 1� 'A, Y!. ` - �i� " / 1' s!
pOS �r•/`e,?y4.oOOV - �•• ��', •r •1 5' "� �' .`' •a \ • : �•` p0CD
0 v�. '� •, - - ` "• GUY,• NN '�;S .a'Ij;�;
m V a ..F -_ "\ r r / >r, ° y GUY `k
�'..�• -� �r,�._- _ - - .�• �_!. - r--. t'� - r'-? l .O • • /�I _ , - - _ - - - - 4. _ ` , .. . ••' . _ . _ _ r . . . . . . . . . . . . . . - _ ' . . . . . . . _ . . . . •. _ _ - *"'' . + �' '
�544;
' ( r r!80
. —_ i _—i-----——�'`�— _ r' / A/' - u GUY. ''F0CD
8 'GUY a EXISTING — — — — -- —
f I
; ,�� ,
J - �_ •
•l a
} '
%y. �/. -� _ �_
GUY'wIR(; a. , CAPACITOR
ANK
18'*
�' i+l'g•/
r
52+00` -�•853.00 ,,/•BB
! ''IT i. �• e
,
857+00
`� /� : r ;
58+09 859+ +
a I
•00 "4• '88f+N j1 86200 H- r969.80
E
•00
j6,g s tD
6LB69�ME �dg
jS
+ s�
!s•1
} N
U W / f n-
F
..�; `
GUY wiRE
@�
,
EAST WE5T BASELINE N
86fi•E8 +
j�22
'
! G Y
_
: -'
LN WIRE i
*
wRgV
. 9)
a
!
■ --------------
■ ■ ■
— ---------
x b.f
■
} it
29 2 +, ,. \'� 4/R4y. j �. Y ''F FO / ' • ! ■ ■ ■ '" F F
v.- E J s 4, S I s I Q ` _ _ _ �• so EXISTING
2 ■ , ! !� ■ } !$ s q
` GUY WJR O� f _ n. g / 9 A Y EXIj'TING 4 EXISTING 23¢KV ■ ■ ■ •6 Q�
/ * a N �.. s w vw GUY WIRE •�Ina " _ �' ► Y WIRE BANK
4108
ml
h.,lY r h k` GUY 'WIRE
ti _ T ... ` r' "� /'} �"■ t ! ■ ■ ■ ■ +
I I 8�+ . + - I '' I •3 , 1 GUY WIRE ., ■ ! : !�9
-/•--.• T� _ r. ; - _-N••J• �,-� _ fir- • - - ALL - `- r� •r' - - - r Lri'- - r - -,T •%+-..-- :I,+.:_. r..e.T•_ +_-'w.L�'- ate, , - -- - - - _ - - ^yT - • y - -,� . ' ' • . • '� - _ '7- - , _ _
Ik
�' ` • •\ • • • • ". ' ' • �' 's!�'T .• • • , " .' - . - • r' • . . . . . _ �- - .. '; • �'- -'�- - - _ r'.. - r �� - - - - _ - _iL - - _� _ _ '�; ' 00' YI .K. _ _ • ••
a,. A •... ... _ — ----- �_-- --•-- ti
le
/ S 11000
0 O ( 9? J' T&
O IS I ` � A- a �Y% !S k! N T l��At
EXISTING CONDITIONS LEGEND: �. 1� 4 r
• r t � 's; ' a - - SUBSTATION 8' FENCE
pVlll�
PROPERTY LINE-
4l
\ \ ` /► ry
AREA UNDERWATER
W1
r'�''Dewberry
►����,.
Dev/berry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
.............................................
oEIP
®P832
x 15.g
30'RCP
ECM
15'CMP
WETLAND LINE
.2% FLOOD LINE
.1% FLOOD LINE
SILT FENCE
RIGHT OF WAY
WOODLINE
EXISTING IRON PIPE
WETLAND FLAG
SPOT ELEVATION
REINFORCED CONCRETE PIPE
EXISTING CONCRETE MONUMENT
CONCRETE METAL PIPE
m
Progress Ener40
� gy
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
GRAPHIC SCALE
so 0 3o so 120 240
5
07/12/2011
CONSTRUCTION 00:-YENTS FC= = -=:'.G & PERMITTING
CONSTRUCTION DOCUMENTS FF - -=:'•G & PERMITTING
CONSTRUCTION DOCUMENTS FC= _:=_:'•G & PERMITTING
FVR
SFP
TFB
EXI STI NC CONDI TI ONS
4
05/10/2011
FVR
SFP
TFB
3
02/18/2011
FVR
FVR
SFP
SFP
TFB
TFB
LOCATION NEW HANOVER COUNTY, NORTH CAROLINA
SCALE 1- = 60' SCALE RATIO 1:1
DRAWN FVR CHK. SFP APP. TFB
DATE 07/12/11 DWG. NO. RDC-57701 SHT 2 OF 13
2
02/03/2011
95% SUBM' _ - _
50% SUP--'_
( IN FEET)
1 inch = 60 ft.
1
12/30/2010
FVR
SFP
TFB
NO„
DATE
REVISIC,',
BY
CK.
APP,
LEGEND
LIMITS OF DISTURBANCE
SEASONAL HIGH WATER LEVEL BORING LOCATIONS
NEW TREE LINE
Dewberry
�` ,
fife,
Dewberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE; 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
NOTES:
1. SEE SHEET 2 FOR TOPOGRAPHIC SURVEY NOTES.
2. PROGRESS ENERGY CAROLINAS, INC. EQUIPMENT PLAN
SHOWN FOR CLARITY ONLY. THIS EQUIPMENT LAYOUT SHALL
NOT BE USED FOR CONSTRUCTION.
GRAPHIC SCALE -
N FEET
1 inch = 6111
LIMITS OF
JURISDICTIONAL
WETLANDS, TYP
t
\j
'i
Ab3.\'vN\
,.
4--ZZ
Progress Energy�
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
/1 /2011 CONSTRUCTION DOCUMENTS FOP =_= 3 & PERMITTING FVR SFP TFB OVERALL SITE LAYOUT
}0 4 05/10/2011 CONSTRUCTION DOCUMENTS FOP 3 & IERMITTING FVR SFP TFB
3 02/18/2011 CONSTRUCTION DOCUMENTS FOP _ _ .; & PERMITTING FVR SFP TFB LOCATION NEW HANOVER COUNTY, NORTH CAROLINA
2 02/03/2011 =% SUP'--=_ FVR SFP TFB SCALE 1' = 60' SCALE RATIO 1:1
1 12/30/2010 _ ?% SUBN'----- FVR SFP TFB DRAWN FVR CHK. SFP APP. TFB
N0, DATE PEV1S1L- , BY CK, APP, DATE 07/12/11 DWG. NO. RDC-57701 SHT 3 OF 13
NOTES:
1. SEE SHEE f 2 FOR EXISTING CONDITIONS.
2. SEE SHEET 6 FOR EROSION AND SEDIMENT CONTROL MEASURES.
3. CONTRACTOR SHALL RESTORE THE DISTURBED AREA TO EXISTING GRADE
UNLESS OTHERWISE SHOWN ON THE DRAWINGS.
4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS
OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES,
GUY WIRES, OR ANCHORS WITHOUT PERMISSION FROM PROGRESS ENERGY
CAROLINAS, INC.
5. CONTRACTOR SHALL SEED, MULCH, AND TACK ALL DISTURBED AREAS NOT
RECEIVING STONE PER EROSION CONTROL PLAN.
6. CONTRACTOR SHALL COORDINATE ALL UTILITY RELOCATION OR DISRUPTION
WITH PROGRESS ENERGY CAROLINAS, INC.
7. CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS WITHIN THE LIMITS OF
DISTURBANCE.
8. CONTRACTOR SHALL REMOVE AND LEGALLY DISPOSE OF ALL
CONSTRUCTION WASTE AND EXCESS MATERIALS AS WELL AS ALL
UNSUITABLE MATERIALS OFF SITE, CONTRACTOR SHALL PROVIDE
PROGRESS ENERGY CAROLINAS, INC. WITH PROOF OF DISPOSAL AT
PERMITTED LOCATION.
:.E
.`2020,Dy
ewberr
►4®•t?
De aberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
m
CLEARING LIMITS COORDINATE TABLE
POINT #
NORTHING
EASTING
1
149078.2913
2321161.4110
2
148988.2799
2320983.4945
3
148967.7727
2320832.9347
4
148853.8070
2320607.6699
5
NOT USED
6
148753.2479
2320516.9826
7
148596.0340
2320596.5201
8
'148590.6454
2320585.8690
9
148579.8697
2320600.8197
10
148565.3296
2320553.9859
11
148556.2218
2320558,5937
12
148497.7740
2320443.0658
13
148529.1912
2320427.1713
14
148529.1324
2320407.1197
15
148537.8041
2320386.1510
16
148546.9774
2320374.6658
17
148565.9119
2320285.3517
18
148444.3540
2320249.3284
19
148382.6022
2320360.4652
20
148533.8421
2320659.4060
21
148480.1925
2320686.5483
LEGEND
CLEARING LIMITS/LIMITS OF DISTURBANCE NEW TREE LINE
LIMITS OF
JURISDICTIONAL
WETLANDS. TYP.
23
CLEARING LIMITS COORDINATE TABLE
POINT #
NORTHING
EASTING
22
148433.0305
2320593.3279
23
148373.6192
2320623.3852
24
148378.7078
2320771.6035
25
1 148327.7111
2320797.4037
26
148445.1321
2321029.4982
27
148515.0182
2320994.1414
28
148564.7278
2321021.4550
29
148588.0260
2321067.5062
30
148724.4954
2320998.4637
31
148762.2406
2321073.0708
32
148787.9134
2321060.0825
33
148809.2290
2321103.0415
34
148877.3422
2321071.3449
35
148922.0979
2321159.8090
36
148890.4686
2321175.8108
37
148893.3102
2321181.4276
38
148917.3674
2321178.6938
39
148938.2889
2321180.4957
40
148970.8373
2321195.0112
41
149013.2665
2321192.3113
42
149050.9319
2321178.1479
rd
5
07/12/2011
4
05/10/2011
3
02/18/2011
2
02/03/2011
12/30/2010
�N0.
DATE
3
CONSTRUCTION 130CUMENTS FOR BIDDING & PERMITTING
CONSTRUCTION I30CUMENTS FOR BIDDING & ;MITTING
CONSTRUCTION 30CUMENTS FOR BIDDING & °ERMITTING
95% SUBMITTAL
50% SUBN'-TAL
REVISION
C4 0 Q
Progress Energyell
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
FVR SFP TFB CLEAI�I NG PLAN
FVR SFP TFB
FVR SFP TFB LOCATION NEW HANOVER CCwNTY, NORTH CAROLINA
FVR SFP TFB SCALE 1' = 40' SCALE RATIO 1:1
FVR SFP TFB DRAWN FVR CHK. '•I=P APP. TFB
BY CK, APP. DATE 07/12/11 DWG. Noy: RDC-57701 SHT 4 OF 13
NOTES: sl
COORDINATE TABLE
LESS ENERGY CAROLINAS INC
6. DRILL PATH ENTRY POINTS ARE BASED ON
1. PROC�
EQUIPMENT PLAN NOT SHOWN FOR CLARITY. DRAWINGS PROVIDED BY PROGRESS ENERGY
CAROLINAS, INC. REFER TO DRAWINGS TITLED
2. ALL UTILITIES NOT SHOWN FOR CLARITY. "BARNARD CREEK - TOWN CREEK 230KV
UNDERGROUND TRANSMISSION LINE - PROJECT
3. 6" STONE NOT INCLUDED IN INITIAL GRADING NO. 20071377" FOR UNDERGROUND
lnfnw IAICIMM TI..IC I ITII ITV C1=nlrrr: TRANSMISSION LINE LOCATION AND PROFILE.
r-�
Veto-
Dewberry
Dewberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
LEGEND
LIMITS OF DISTURBANCE
FENCE
NEW TREE LINE
EDGE OF STONE (BY OTHERS)
POINT #
NORTHING
EASTING
1
148536.5387
2320306.8937
2
148465.2852
2320285.7779
3
148516.5770
2320401.0529
4
148452.1315
2320433.6571
5
148419.2409
2320368.6455
DRY POND, SEE
NEW TREE LINE, TYP. ` I I SHEET 12 FOR i
DETAIL I I / r
I I I i
:r
LEVEL SPREADER AND I ( I I ••,,.•••• ,• ;`
ENGfNEE�ERED FILTER STRIP, — — — — — — — — — — — — -- — — I �•••.,
. • /��
SHEET 11 FOR DETAIL / 5,�•
I`-----------————— — — — — —— •� •,�
�36210 2.
I
•, dip ••......• 5 ��.
40
:,PAPHIC SCALE
20 40 80
( IN FEET )
1 inch = 40 ft.
Progress Energy�
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
5 07/12/2011 CONSTRUCTION =- -MENTS FC= & PERMITTING FVR SFP TFB SITE PLAN
4 05/10/2011 CONSTRUCTION DOCUMENTS FC=----`�G & PERMITTING FVR SFP TFB
16o 3 02/18/2011 CONSTRUCTION DOCUMENTS FF & PERMITTING FVR SFP TFB LOCATION NEW HANOVER COUNTY. NORTH CAROLINA
2 02/03/2011 95% SUBM:--=_ FVR SFP TFB SCALE 1' = 40' SCALE RATIO 1:1
1 12/30/2010 50% SUBM: '_ FVR SFP TFB DRAWN FVR CHK. SFP APP, TFB
NO. DATE REVISI-`, BY CK. APP. DATE 07/12/11 DWG. NO. RDC-57701 SHT 5 OF 13
NOTES: STORM DRAINAGE SCHE ULE
1. DISTURBED AREA = 7.48 ACRES 8. DRILL PATH ENTRY POINTS ARE BASED ON DRAWINGS PROVIDED BY PROGRESS
ENERGY CAROLINAS, INC. REFER TO DRAWINGS TITLED "BARNARD CREEK - TOWN I
2. SEE SHEET 2 FOR EXISTING CONDITIONS. CREEK 230KV UNDERGROUND TRANSMISSION LINE - PROJECT NO. 20071377" FOR
UNDERGROUND TRANSMISSION LINE LOCATION AND PROFILE. UNDERGROUND
3. CONTRACTOR SHALL INSTALL ALL MEASURES NECESSARY FOR EROSION AND SEDIMENT CONTROL. TRANSMISSION LINE DRAWINGS HAVE BEEN SUBMITTED UNDER SEPARATE
PACKAGE BY OTHERS.
4. CONTRACTOR SHALL MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE
NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
5. CONTRACTOR SHALL RESTORE THE DISTURBED AREA TO EXISTING GRADE UNLESS OTHERWISE NOTED ON Z
DRAWINGS. CONTRACTOR SHALL SEED AND MULCH ALL AREAS NOT RECEIVING STONE.
w •> ,
WHE
::::�Dewberry
Dewberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
STRUC.
TOP ELEV.
OS-1
14.50
FES-2
--
FES-3
--
MH-4
15.00
FES-5
--
11 STABILIZED OUTLET FOR SILT FENCE, TYP., SEE
CLASS B ".:RAP LILLL��11 12SHEET 9_ FOR DETAIL
FOREBAY,�EESHEET 11 , X 1 .2515"TEMPORARY SILT FENCE,
FOR DETAIL -------- -- —SEE SHEET 9 FOR bETAIL
LEGEND SF <:� SF _
LIMITS OF DISTURBANCE - � -
DRY POND OUTLET, SEE PERMANENT BAFFLE, EMERGENCY WEIR, 30'
TEMPORARY SILT FENCE I SEE SHEET 12 FOR LONG AT EL SF SHEET 12:FOR DETAIL ELEVATION C40Z
DETAIL 13.5', LINE WITH Prouress Fnp-rnvTEMPORARYCHANNEL�
PIPE NO.
PATH
FROM TO
SIZE
(INCHES)
LENGTH
(FEET)
PIPE
INV UP INV DOWN
SLOPE (%)
MATERIAL
P-1
OS-1 LS FOREBAY
12
56
11.00 10.72
0.5
DIP
P-2
FES-2 FES-3
18
49
10.52 10.28
0.5
CLASS V RCP
P-3
FMH-4 FES-5
30
101
10.51 10.00
0.5
CLASS V RCP
LEGEND
CB = CATCH BASIN
P = PIPE
MH = STORM MANHOLE
FES = FLARED END SECTION
OS = OUTLET STRUCTURE
DP = DISSIPATOR PAD
RIP RAP DISSIPATOR PAD/OUTLET PROTECTION
TEMPORARY STABILIZED OUTLET FOR SILT FENCE _
DIRECTION OF FLOW
TEMPORARY DONUT INLET PROTECTION
TEMPORARY ROCK CHECK DAM
40 0 1
(2RAPHIC SCALE
20 40 80
( IN FEET)
1 inch = 40 ft.
EXCELSIOR MATTING
LIMITS OF EXCELSIOR
MATTING
160
5
07/12/2011
4
05/10/2011
3
02/18/2011
2
02/03/2011
1
12/30/2010
NO.
DATE
CONSTRUCTION DOCUMENTS FOP & PERMITTING
CONSTRUCTION DOCUMENTS FOR RIDDING & PERMITTING
CONSTRUCTION DOCUMENTS FCF ,; & PERMITTING
957. SUBMI-
;-;2% SUBMI-
REVISIO
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
FVR
SFP
TFB
EROSION CONTROL PLAN
FVR
SFP
TFB
FVR
SFP
TFB
LOCATION NEW HANOVER COUNTY, NORTH CAROLINA
SCALE 1" = 40' SCALE RATIO 1:1
DRAWN FVR CHK. SFP APP. TFB
DATE 07/12/11 DWG. N0: ROC-57701 SHT 6 OF 13
FVR
SFP
TFB
FVR
SFP
TFB
BY
CK.
APP.
ri••,,
�`6,•••90Dewberry
,,.�.,.
Dewberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
LEGEND
LIMITS OF DISTURBANCE NEW SPOT SHOT ELEVATION >, 5
SHWL BORING LOCATION
t:AUt:LJIUK MA1 I INN
- LIMITS OF EXCELSIOR
MATTING
TOTAL PROJECT AREA
7.48 ACRES
TOTAL DISTURBED AREA
7.48 ACRES
EXISTING IMPERVIOUS
(EXCLUDES OPEN WATER)
0 ACRES
PROPOSED IMPERVIOUS AREA
1.46 ACRES
% OF PROJECT AREA IMPERVIOUS
19.5%
vif%L.rl1I\VLLv/'%ir
TOTAL PARCEL AREA
55.01 ACRES
APPROX. EXISTTNG IMPERVIOUS AREA
3 ACRES
PROPOSED IMPERVIOUS AREA
1.46 ACRES
APPROX. TOTAL IMPERVIOUS AREA
4.46 ACRES
APPROX. % TOTAL IMPERVIOUS AREA
8%
NU i t: 1 U I AL h'AK(al_ AKtA UA IA IS APPROXIMATE.
5 07/12/2011 CONSTRUCTION DOCUMENTS FOR BODING & PERMITTING
4 05/10/2011 CONSTRUCTION DOC&E'.- FOR B�CDING & PERMITTING
3 02/18/2011 CONSTRUCTION DOCU\= FOR BIDDING & PERMITTING
2 02/03/2011 SJBMITTAL
1 12/30/2010 ": SUBMITTAL
NO. DATE =-VISION
0 210
- Zt G 1 '•. '••goof..•• .
Prouress Fnp-rnu�2A
Progress Energy Carolinos, Inc. Raleigh, NC
BARNARD CREEK 230KV i'RANSI TI ON STATION
FVR SFP TFB GRADING AND DROI NAGE PLAN
FVR SFP TFB
FVR
SFP
TFB I
LOCATION NEW
HANOVER COUNTY, NORTH CAROLINA
FVR
SFP
TFB
SCALE 1" = 40'
SCALE RATIO 1:1
FVR
SFP
TFB
DRAWN FVR
CHK. SFP APP. TFB
BY I
CK.
I APP.
DATE 07/12/11
DWG. NO. RDC 57701 SHT 7 OF 13
EROSION AND SEDIMENT CONSTRUCTION SEQUENCE
1. THE CONTRACTOR SHALL POST THE SEDIMENTATION CERTIFICATE OF APPROVAL AT THE CONSTRUCTION ENTRANCE AND MAINTAIN COPIES OF THE PROJECT EROSION
PERMITS IN THE PERMITS BOX. ANY CHANGES IN THE PROJECT DESIGN THAT RESULT IN ADDITIONAL DISTURBANCE, OR CHANGE THE DRAINAGE PATTERNS SHALL BE
SUBMITTED TO NCDENR FOR PERMIT MODIFICATION.
2. NOTIFY THE STATE LAND QUALITY SECTION AT 910-796-7215 (WILMINGTON REGIONAL OFFICE) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES.
3. NO CLEARING, CONSTRUCTION, OR LAND DISTURBANCE ACTIVITIES MAY BEGIN ON THE SITE UNTIL ALL EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN
INSTALLED IN LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS. IF CLEARING IS REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE, ALL OTHER MEASURES SHOWN
SHALL BE INSTALLED FIRST. THE NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE MAY THEN PROCEED.
4. INSTALL GRAVEL CONSTRUCTION ENTRANCE IN LOCATION SHOWN ON THE DRAWINGS.
5. INSTALL SILT FENCE AND STABILIZED OUTLETS FOR SILT FENCE IN LOCATIONS SHOWN ON DRAWINGS.
6 INSTALL TEMPORARY LINING/MATTING IN LOCATIONS SHOWN ON DRAWINGS. GRADE THE TEMPORARY DRILLING PAD. INSTALL 6" ABC STONE ON TEMPORARY DRILLING
PAD.
7. PRIOR TO AUGUST 2, 2011 - PROVIDE TEMPORARY SEEDING AFTER CLEARING AND GRUBBING OPERATION IF THE AREA IS TO REMAIN INACTIVE FOR MORE THAN 15 WORKING
DAYS OR 60 CALENDAR DAYS, WHICEVER IS LESS. PROVIDE PERMANENT SEEDING WITHIN 15 WORKING DAYS OR 60 CALENDAR DAYS, WHICHEVER IS LESS, OF ESTABLISHING
FINAL GRADES, SLOPES SHALL BE SEEDED WITHIN 21 CALENDAR DAYS.
AUGUST 2, 2011 OR LATER - PROVIDE TEMPORARY SEEDING AFTER CLEARING AND GRUBBING OPERATION IF THE AREA IS TO REMAIN INACTIVE FOR MORE THAN 14
CALENDAR DAYS. PROVIDE PERMANENT SEEDING WITHIN 14 CALENDAR DAYS OF ESTABLISHING FINAL GRADES, SLOPES SHALL BE SEEDED WITHIN 14 CALENDAR DAYS.
8. BEGIN SITE STRIPPING AND EXCAVATION WITHIN THE LIMITS OF CONSTRUCTION.
9. INSTALL PERMANENT STORMWATER DEVICES TO BY-PASS OFF SITE FLOW PRIOR TO BEGINNING GRADING.
10. INSTALL INLET/OUTLET PROTECTION AS SHOWN ON THE DRAWINGS.
11. GRADE THE SITE TO DIMENSIONS AND ELEVATIONS SHOWN ON DRAWINGS. INSTALL RIP RAP DISSIPATORS. REMAINING PERMANENT STORMWATER DEVICES SHALL BE
INSTALLED CONCURRENT WITH SITE GRADING. INSTALL DRY POND, OUTLET STRUCTURE, PERMANENT BAFFLE, LEVEL SPREADER, AND ENGINEERED FILTER STRIP.
12. INSTALL FENCE.
13. INSTALL EQUIPMENT.
14. INSTALL STONE ON PAD.
15. STORM DRAINAGE INLETS AND OUTLETS SHALL BE PROTECTED WITH THE APPROPRIATE EROSION CONTROL MEA4�URES AT ALL TIMES. RIP RAP OUTLET PROTECTION PADS
SHALL BE INSTALLED AT THE LOCATIONS AND DIMENSIONS SHOWN AS SOON AS EACH STORM DRAIN CHANNEL OR PIPE RUN IS COMPLETE.
16. PROGRESS ENERGY CAROLINAS, INC. SHALL CONDUCT PROJECT NPDES INSPECTIONS OF EROSION CONTROL MEASURES AND STORMWATER OUTLETS ONCE EVERY SEVEN
CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT 1/2 INCH OR GREATER. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFICED IN THE NCDENR
EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. THE
CONTRACTOR SHALL MAINTAIN THESE RECORDS IN THE PERMIT BOX FOR AUDIT BY REGULATORY AGENCIES.
17. PROGRESS ENERGY CAROLINAS, INC. SHALL CONDUCT SELF INSEPCTIONS FOR EROSION AND SEDIMENTATION CONTROL AND COMPLETE THE SELF -INSPECTION REPORT
FOR LAND DISTURBING ACTIVITY FORM AS REQUIRED BY NCGS 113A-54.1 AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN.
PROGRESS ENERGY CAROLINAS, INC. SHALL MAINTAIN THE REPORTS ON SITE TO BE AVAILABLE TO THE EROSION CONTROL INSPECTOR AT ALL TIMES.
18. AFTER SITE IS STABILIZED, REMOVE ALL TEMPORARY MEASURES, AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND
GROUNDCOVER IS NOT ADEQUATE.
METAL POSTS
1.5' INTO GROUND
MAX. 1.5' APART
GRASS J
GALVANIZED HARDWARE WIRE
EXTENDS TO TOP OF BOX
(3/8" MESH)
GRASS)
#57 WASHED
STONE
GRASS J
,<
.� 6"
GRASS
/100
12"
GRASS
............................ .. . . ....... . . . ..
GRASS
MAINTENANCE: F _j
1. CONTRACTOR SHALL INSPECT THE GRAVEL FILTER EVERY 7 DAYS AND AFTER EACH SIGNIFICANT (1/2 INCH OR
GREATER) RAINFALL AND MAKE REPAIRS AS NEEDED.
2. CONTRACTOR SHALL. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR
SUBSEQUENT RAINS.
3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, THE CONTRACTOR SHALL
REMOVE ALL MATERIALS AND UNSUITABLE SOIL. CONTRACTOR SHALL BRING THE DISTURBED AREA TO PROPER
GRADE, THEN SMOOTH AND COMPACT IT AND APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET.
TYPICAL CATCH BASIN PROTECTION (TEMPORARY)
NTS
TYPICAL SEEDING SCHEDULE FOR COASTAL AREAS
CLASS B RIP RAP, 18" MINIMUM THICKNESS
1. LIME, 'SEED, AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS
OF MATERIALS TO BE APPLIED PER ACRE:
TEMPORARY SEEDING -' SMOOTHLY BLEND CONTACT AREA
F
DATE TYPE PLANTING RATE FERTILIZER LIMESTONE STRAW MULCH
10-10-10 BLEND
DEC. 1 -APR. 15 RYE (GRAIN) 120 LBS/ACRE 750 LBS/ACRE 2000 LBS/ACRE 4000 LBS/ACRE 1 1 FILTER FABRIC
KOBE LESPEDEZA* 60 LBS/ACRE
M B _...
M
APR. 15 - AUG. 15 GERMAN MILLET 40 LBS/ACRE 750 LBS/ACRE 2000 LBS/ACRE 4000 LBS/ACRE
RIP RAP LINED
AUG. 15 - DEC. 30 RYE (GRAIN) 120 LBS/ACRE 1000 LBS/ACRE 2000 LBS/ACRE 4000 LBS/ACRE
1' I
PERMANENT SEEDING
DATE TYPE PLANTING RATE FERTILIZER*** LIMESTONE' STRAW MULCH
10-10-10 BLEND
APR. 1 - JULY 15 PENSACOLA- 50 LBS/ACRE 1000 LBS/ACRE 6000 LBS/ACRE 4000 LBS/ACRE
FEB. 1 - MAR. 31 BAHIA GRASS
CENTIPEDEGRASS 20 LBS/ACRE
COMMON BERMUDAGRASS 20 LBS/ACRE
SERICEA LESPEDEZA 30 LBS/ACRE (OUTSIDE EDGE OF GRADE & NON -TRAVELED AREAS)
TRIPLE A TALL FESCUE 80 LBS/ACRE
*OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE.
**QUANTITY OF FERTILIZER AND LIME SHALL BE COMFIRMED BY SOILS TEST.
2. THE SURFACE SHALL BE MADE SMOOTH AND TRUE TO GRADE. THE AREAS SHALL BE: PREPARED BY MEANS OF DISKING AND CROSS -DISKING,
HARROWING, OR OTHER APPROVED METHOD OF PREPARATION SHALL BE CONTINUED UNTIL A FRIABLE AND THOROUGHLY PULVERIZED FOUR -INCH
DEEP SEEDBED IS OBTAINED. CARE SHALL BE EXERCISED IN PREPARATION OF SEEDBEDS ON SLOPES TO KEEP LOOSE SOIL IN PLACE RATHER THAN
PERMIT IT TO ACCUMULATE AT THE FOOT OF THE SLOPE. SEEDBED SHALL BE APPROVED PRIOR TO PLANTING THE SEED. PRIOR TO THE LAST
TILLAGE OPERATION, LIME AND FERTILIZER SHALL BE BROADCAST WITH AN APPROVED SPREADER OVER THE SEEDBED IN ACCORDANCE WITH THE
SCHEDULE.
3. AFTER THE SEEDBEDS HAVE BEEN PREPARED AND APPROVED, THE MIXTURE OF GRASS SEED, AS SPECIFIED, SHALL BE SOWED BY MEANS OF AN
APPROVED SEEDER AT THE APPROPRIATE RATE, THE SEED WORKED INTO THE SOIL TO A DEPTH APPROXIMATELY 1/2 INCH AND THEN COMPACTED
BY MEANS OF A CULTIPACKER ROLLER OR OTHER APPROVED EQUIPMENT.
4. GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND
SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATIONS ARE: ACHIEVED, THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS
A UNIFORM COVERAGE IS EXPECTED.
5. MULCHED AREA SHALL BE TACKED WITH ASPHALT (APPLICATION RATE OF 0.10 GALLON PER SQUARE YARD / 10 GALLONS PER 1000 SQ. FT / 436
GALLONS PER ACRE), ROVING, OR NETTING. ON STEEP SLOPES, NETTING IS PREFERRED.
6. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE. DITCH EROSION. USE OF EXCELSIOR MATTING OR
FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION.
7. PRIOR TO AUGUST 2, 2011 - VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 15 DAYS OF COMPLETION OF ANY PHASE OF
GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE THAN 60 CALENDAR DAYS.
AUGUST 2, 2011 OR LATER - VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF
GRADING ACTIVITIES.
8. SOIL AMENDMENT SHALL INCLUDE A COMPOST OR TOPSOIL BLEND. APPROXIMATELY 3 INCHES OF AMENDMENT SHALL BE ADDED TO THE: SITE.
COMPOSE SHALL BE DISKED/TILLED INTO THE TOP 6 INCHES OF EXISTING SOIL,
Dewberry
DE.Nberry & Davis, Inc.
2301 REMOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE 919,881.9939
FAX: 919.881.9923
NCBELS # F-0679
PROVIDE TEMPORARY CHANNEL LINING PRIOR TO
ESTABLISHING PERMANENT GROUND COVER
Yyyyyyxx
x I
x
1 x
1XXXXxxxxxxxxxxxxx M
M
GRASS LINED
CONSTRUCTION SPECIFICATIONS:
1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE
FOUNDATION AREAAND DISPOSE OF PROPERLY.
2. EXCAVATE THE CHANNEL. AND SHAPE IT TO NEAT LINES AND DIMENSIONS AS SHOWN ON THE
PLANS PLUS A 0.2 FOOT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING
DURING SEEDBED PREPARATIONS-
3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER
THE CHANNEL FREELY.
4. ESTABLISH GRASS IN THE CHANNEL ACCORDING TO THE SEEDING SPECIFICATIONS ON SHEET 9.
PROTECT THE CHANNEL WITH TEMPORARY LINERS AS SHOWN IN THE SCHEDULE.
MAINTENANCE:
FOR PERMANENT CHANNELS: INSPECT EVERY 7 DAYS AND AFTER EACH SIGNIFICANT (1/2 INCH OR
GREATER) RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK IT
AFTER EVERY RAINFALL EVENT. MAKE ANY NEEDED REPAIRS. CHECK THE CHANNEL OUTLET FOR
BACK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SEDIMENT
ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP ALL GRASS AT HEALTHY
VIGOROUS CONDITION AT ALL TIMES.
PERMANENT DIVERSION CHANNEL SCHEDULE
CHANNEL
NUMBER
DEPTH
BOTTOM
WIDTH (B)
SIDE
SLOPE
`M)
BOTTOM
SLOPE
LENGTH
LINING TYPE
MINIMUM SHEAR STRESS
(LB/FT SQ)
1
12"
3 3
1.15%
347
CLASS B RIP RAP
1.50
2
12"
3 3
2.22%
180
EXCELSIOR MATTING
1.50
3
12"
3 3
1.97%
152
EXCELSIOR MATTING
1.50
TYPICAL DIVERSION CHANNEL (PERMANENT)
NTS
?-3" COARSE
HASHED AGGREGATE
NOTES:
WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT WILL NOT BE REMOVED
BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN
AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL
AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE.
CONSTRUCTION SPECIFICATIONS:
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL
PROPERLY TO GRADE IT.
2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT.
3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET.
4. USE GEOTEXTILE FABRIC TO IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR
HIGH WATER TABLE.
MAINTENANCE:
MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION
SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EVERY RAINFALL, INSPECT ANY
STRUCTURE, USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. REMOVE ALL OBJECTIONABLE MATERIALS
SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.
TYPICAL CONSTRUCTION ENTRANCE (TEMPORARY)
NTS
5 07/12/2011 CONSTRUCTION [DOCUMENTS FF PERMITTING
4 05/10/2011 CONSTRUCTION CDOCUMENTS FG= -_- & =FRMITTING
3 02/18/2011 CONSTRUCTION "�'OUMENTS FC= -:3 & PERMITTING
2 02/03/2011 95% SUBM _-=_
1 12/30/2010 50% SUBMI--=-
NO. DATE REVISIT__"
�goo *000
1/0 NEE**�.•C3���
NIA KU
C, Progress Energy
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
DETAILS SH 1 OF 6
FVR
SFP
TFB
FUR
SFP
TFB
FVR
SFP
TFB
LOCATION NEW HANOVER COUNTY, NORTH CAROLINA
SCALE AS SHOWN SCALE RATIO 1:1
DRAWN FVR CHK. ;FP APP. TFB
DATE 07/12/11 DWG. NO. RDC-57701 SHT 8 OF 13
FVR
SFP
TFB
FVR
SFP
TFB
BY
CK.
APP.
�j®®40
TYPICAL SURFACE ROUGHENING
NITS
CONSTRUCTION SPECIFICATIONS:
1. DRIVE STEEL POST 18" INTO THE GROUND AND EXCAVATE A 6"X6" TRENCH UPHILL ALONG THE
LINE OF THE POSTS. MAX. 8' BETWEEN POSTS.
2. ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 6" INTO THE
EXCAVATED TRENCH.
3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND THE BOTTOM OF THE FABRIC 8"
INTO THE TRENCH.
4. BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF -F Ih SILT
FENCE SO THAT RUNOFF IS FORCED TO GO THRU THE FENCE AND CANNOT GO UNDER I I
FILTER FABRI(
CROSS SECTION
FILTEf
1.5' MIN.
MAINTENANCE
INSPECT THE DAMS AND CHANNELS FOR DAMAGE AFTER
EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL.
ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE
CHECK DAM AND EROSION FROM HIGH FLOWS AROUND
THE EDGES OF THE DAM. CORRECT ALL DAMAGE. IF
SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A
PROTECTIVE RIP RAP LINER IN THAT PORTION OF THE
CHANNEL.
REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS
NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION,
ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE
CHECK DAM, AND PREVENT LARGE FLOWS FROM
CARRYING SEDIMENT OVER THE DAM. ADD STONES TO
DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS
SECTION.
STONE S=CTION
CONSTRUCTION SPECIFICATIONS
1. PLACE STONE TO THE LINES AND DIVENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION.
2. KEEP THE CENTER STONE SEC -LION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL
BANKS.
3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANKS TO KEEP OVERFLOW WATER FROM UNDERCUTTING THE DAM AS IT
RE-ENTERS THE CHANNEL.
4, SET SPACING BETWEEN DAMS 10 ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME ELEVATION AS THE TOE
ELEVATION OF THE UPPER DAN1
1 n 5. PROTECT THE CHANNEL DOWNSTREAM FROM THE LOWEST CHECK DAM, CONSIDER THAT WATER WILL FLOW OVER AND AROUND THE
WIRE FENCE DAM.
STEEL POST I"
FILTER FABRIC 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE.
TYPICAL ROCK CHECK DAM (TEMPORARY)
NTS
X �
E E
m m '4EACKFILL TRENCH WITH SOIL
c� ATERIAL AND TAMPING TO
' ABOVE GROUND
��� I—,— BRIC
MIN. ANCH8RDEEPT&R4�FORWAI�D
00
ALONG THE TRENCH
MAINTENANCE:
1. INSPECT SILT FENCE EVERY SEVEN DAYS AND AFTER EVERY 112 INCH OF RAINFALL.
2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR DAMAGE TO FENCE.
TYPICAL SILT FENCE (TEMPORARY)
NTS
NO. 57 WASHED STONE ON UPSTREAM SIDE OF
WIRE MESH. TOP OF SILT FENCE MUST BE AT
LEAST V ABOVE THE TOP OF THE WASHED STONE
8' MAX
4' MAX
V MAX - % IN.
WIRE MESH
V-:5" DEEP BED OF CLASS "B" RIP -RAP
SPLASH PAD CONSTRUCTED ON
DOWNSTREAM SIDE OF SILT FENCE
5' MIN (USE FABRIC UNDER RIP RAP),
MAINTENANCE:
1. INSPECT SILT FENCE EVERY SEVEN DAYS AND AFTER EVERY 1/2 INCH OF RAINFAL_
2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR DAMAGE TO FENC
TYPICAL STABILIZED OUTLET FOR SILT FENCE (TEMPORARY)
NTS
Dewberry
Dewborry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
CONSTRUCTION SPECIFICATIONS:
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZE
AND SEED.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE
TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH AN 18" OVERLAP. USE A DOUBLE RC
OF STAGGERED STAPLES 4" APART TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHOTED IN A 6"DEEP
6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS IN SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAF_ L
(2" FOR C350 MATTING).
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO
FOOT INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL
PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN,
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
TYPICAL INSTALLATION OF NETTING AND MATTING (PERMANENT)
NTS
#57 FILT
STONE
z~
2�
CV �'
2
SECT ON
CLASS "B"
RID PAD
RIP RAP PLACED
AROUND Plf
FI
S1
PLAN
TYPICAL RIPRAP DONUT INLET PROTECTION (TEMPORARY)
NTS
CONSTRUCTION DOC �IXENTS FOR = _- - ; & rE:'',`-TING
5
07/12/2011
FUR
SFP
TFB
4
05/10/2011
CONSTRUCTION DOCUMENTS FOR - _- - _ ,; & PERMITTING
CONSTRUCTION DOCUMENTS FOR = __ - _ & PERMITTING
=�'/, SUBMI---_
FUR
SFP
TFB
3
02/18/2011
FVR
SFP
TFB
2
02/03/2011
FVR
SFP
TFB
1
12/30/2010
_ = SUBMIT- -_
FVR
SFP
TFB
N0.
DATE
VISIOr,
BY
CK.
APP.
••• ••••�\\C.1 ,#81111100eo
NIA V
MIA Progress Energy
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
DETAILS `3H 2 OF 6
LOCATION NEW HANOVER COLIN I Y, NORTH CAROLINA
SCALE AS SHOWN SCALE RA I I0 1:1
DRAWN FVR CHK. SFF APP. TFB
DATE 07/12/11 DWG. NO. viDC-57701 SHT 9 OF 13
GRATE
GRADE F
MAXIMUP
PRECAE
DESIGN
C.I. FRAME & GRATE FOR
36"x36" DROP INLET
SIMILAR TO US FOUNDRY FINISHED
USF-4156 FRAME & USF-6241 GRADE
GRATE OR APPROVED EQUAL,
H.D. CASTING
PRECAST CONCRETE ---
WAFFLE BOX
TRUCTURES OVER 4' DEEP
PROVIDE STEPS CAST IN WALL OF
RISER STRUCTURE
TYPICAL CATCH BASIN
NTS
CI RING & COVER, SIMILAR TO US
TYPICAL PRECAST STORM MANHOLE
NTS
7 :0011
:�. Dewberry
.
DE)wberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, INC 27612
PHONE 919 881.9939
FAX: 919.881.9923
NCBELS # F-0679
CONCRETE
COLLAR
SEEDED SLOPES
(TYPICAL)
09
SHOULDE
N
wom
24'-0"
-GEOTEXTILE FABRIC
ACCESS DRIVE
1-6" COMPACTED ABC STONE
10'-01, 2'-0"
ROADBED SHOULDE
114 INCH PER FOOT (2%) SIDE
SLOPE (TYPICAL)
--I I F-1 � E F17E FEE � 1-111-11
TYPICAL ACCESS DRIVE SECTION FOR FILL AREA
NTS
COMPACTED SOIL
TO -
SEEDED SLOPES
(TYPICAL)
J
Q
U_
FINISHED GRADE 24' - 0
i ACCESS DRIVE 0
NI'ACTED SOIL i 12'- 0 " GEOTEXTILE FABRIC' 6" COMPACTED ABC STONE v~i
"" 10-'-0" /_101-0" U
2'-02' _ " Q
SEEDED SLOPE VARIES SHOULDER ROADBED ROADBED SHOULDER
io
(TYPICAL) DITCH 1/4 INCH PER FOOT (2%) SI E GLDITCH
SLOPE (TYPICAL)
FINAL UNDISTURBED SOIL 3 - —
BACKFILL I _ _ _ _ _ _ _
— _ _1 _ I —I I
2.OI'COMPACTED SOIL
INITIAL �••�•'•�� �'• � � � .• ;:;"' TYPICAL ACCESS DRIVE SECTION FOR CUT AREA
BACKFILL ;';: ',;• ~ NTS NOTES:
1. ALL CUT & FILL SLOPES SHALL BE GRADED TO A 3:1
HORIZONTAL TO VERTICAL SLOPE OR FLATTER UNLESS
OTHERWISE NOTED ON THE GRADING PLAN.
xm MINIMUM SIDE TYPICAL ACCESS DRIVE SECTION
#67 STONE 6 O.D. OF PIPE 6
CLEARANCE 2. ALL SLOPES AND DITCHES SHALL BE SEEDED & MULCHED
WHEN ROCK IS 12" O.D. OF PIPE 12" MAXIMUM SIDE NTS UNLESS OTHERWISE NOTED ON THE GRADING PLAN.
ENCOUNTERED CLEARANCE
NOTES:
1. FOR TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE
INSIDE FACE OF THE SHORING AND BRACING.
2. NO ROCKS OR BOULDERS 4" OR LARGER TO BE USED IN INITIAL BACKFILL.
3. ALL BACKFILL MATERIAL SHALL BE SUITABLE NATIVE MATERIAL.
4. BACKFILL SHALL BE TAMPED IN 6" LIFTS IN TRAFFIC AREAS, 12" IN NON -TRAFFIC AREAS.
5. ACHIEVE 80% COMPACTION IN NON -TRAFFIC AREAS AND 95% IN TRAFFIC AREAS.
6. NO BOULDERS 8" IN DIAMETER OR GREATER ALLOWED.
TRENCH BOTTOM DIMENSIONS & BACKFILLING REQUIREMENTS FOR RCP & DIP
NTS
3
SEEDED SLOPES
(TYPICAL) -7
qtto
NIA
't888111r11tos
&43 Progress Energy
Progress Energy Carolinas, Inc, Raleigh, NC
B 1RNARD CREEK 230KV TRANSI TI ON STATI ON
5
07/12/2011
CONSTRUCTION OOCUMENTS FC-_ - _- - = .3 & _ _� �"�" T TING
CONSTRUCTION OOCUMENTS FL' =:--_ ; & ?ERMIT-ING
FVR
SFP
TFB
DETAIL ") :� SH 3 OF 6
4
05/10/2011
FVR
SFP
TFB
3
02/18/2011
CONSTRUCTION [DOCUMENTS F:- - __ _ _ 3 & PERMITTING
FVR
I SFP
TFB
LOCATION NEW HANOVER COUNTY, NORTH CAROLINA
SCALE AS SHOWN SCALE RATIO 1:1
DRAWN FVR CHK. SFP APP. TFB
DATE 07/12/11 DWG. NO. RDC-57701 SHT 10 OF 13
2
02/03/2011
�% SUBS". --
=L% SUBS_ -_
FVR
SFP
TFB
1
12/30/2010
FVR
BY
SFP
CK,
TFB
APP,
NO.
DATE
REVIS_ _ '.
CLASS B RIP RAP FOREBAY
Z50'X 25' ENGINEERED FILTER STRIP.
PROVIDE 6" TOPSOIL WITH MINIMUM 2%
ORGANIC CONTENT. SOD WITH COMMON
BERMUDA.
DOWNSTREAM LIP MUST BE LEVEL
THE ENTIRE LENGTH OF SPREADER,
LIP ELEVATION 10.5'
CONCRETE RIBBON WEIR, FLOW
SEE DETAIL BELOW
36"
-IAMFER (TYP.)
WEL WITH STANDARD
GREE HOOK AT 12" OC
I BARS CONT.
(2) #4 BARS CONT.
#4 BARS AT 36" OC
NOTE: USE 3000 PSI
CONCRETE RIBBON WEIR
�1•_•�Dewberry
1@99p
,111110111111,
Dewr-)erry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE 919.881.9939
FAX: 919.881.9923
NCBELS # F-0679
LEVEL SPREADER LIP,
AT ELEV. 10.5'
GRASS LINED CHANNEL 6 INCHES DEEP 4' WIDE.
EXCELSIOR MATTING TO BE INSERTED AND
SECURED IN GRASS LINED CHANNEL.
OUTLET PIPE FROM
DRY POND
4' WIDE GRASS LINED CHANNEL,
CENTER ELEV. AT 10.0'
LEVEL SPREADER LIP, CONCRETE RIBBON
WEIR PARALLEL TO CONTOUR LINES.
LENGTH = 25'
#57 STONE ON FABRIC
STABILIZED UNDISTURBED AREA
CLASS B RIP RAP FOREBAY (4' WIDE X 6' LONG X 18" DEEP) ON TOP OF FILTER FABRIC
END OF PIPE
%r7/P.Q4PFOr5'EB.4YSh.9LL COl/Ef�F/LTEf�
�Bf�/LEDGES ,V0,9,ESh14PE0 70- Rg0X1,nF
UNDISTURBED GROUND'�OEQU�ITEPf�OTECT/O/1/AROUNOThEP/PE
0647259LL, //i/CLUO/NG TfiETOPOTTh'EP/PE.
CONSTRUCTION SPECIFICATIONS:
1. ENSURE THAT THE SPREADER IS LEVEL, FOR UNIFORM SPREADING OF STORM RUNOFF.
2. CONSTRUCT THE LEVEL SPREADER LIP ON UNDISTURBED SOIL TO UNIFORM HEIGHT AND ZERO GRADE OVER THE
LENGTH OF THE SPREADER.
3. CONSTRUCT A SMOOTH TRANSITION FROM THE PIPE OUTFALL TO THE LEVEL SPREADER.
4. DISPERSE RUNOFF FROM THE SPREADER ACROSS A PROPERLY STABILIZED SLOPE. MAKE SURE THE SLOPE IS
SUFFICIENTLY SMOOTHED TO KEEP THE FLOW FROM CONCENTRATING.
5. AFTER ITS CONSTRUCTION, APPROPRIATELY SEED AND MULCH THE ENTIRE DISTURBED AREA.
6. THE LEVEL SPREADER DESIGN AND CONSTRUCTION SHALL BE BASED ON CURRENT NCDENR DIVISION OF WATER
QUALITY DESIGN STANDARDS.
MAINTENANCE:
1. INSPECT THE LEVEI SPREADER AFTER EVERY SEVEN DAYS AND 1/2 INCH OF RAINFALL UNTIL VEGETATION IS ESTABLISHED Al`�D
PROPERLY MAKE ANY NEEDED REPAIRS. AFTER THE AREA HAS BEEN STABILIZED, MAKE PERIODIC INSPECTIONS AND KEEP
VEGETATION IN A HEALTHY, VIGOROUS CONDITION.
Z MAINTAIN THE ENGINEERED FILTER STRIP WITH REGULAR MOWING AND RESODDING IF NECESSARY. MAINTAIN A DENSE,
VIGOROUS STAND OF TURF. RECOMMENDED GRASSES INCLUDE COMMON BERMUDA.
5
07/12/2011
CONSTRUCTION DOCUMENTS FOR & ___ =--:NG
CONSTRUCTION DOCUMENTS FOR :=_:',; &
CONSTRUCTION DOCUMENTS FOR :__:'.; & ___'':--:NG
957.SUBMI---_
FVR
SFP
TFB
4
05/10/2011
FVR
SFP
TFB
3
02/18/2011
FVR
SFP
TFB
2
02/03/2011
FVR
SFP
TFB
1
12/30/2010
507 SUBMIT- =_
FUR
SFP
TFB
NO.
DATE
REVIST^
BY
CK,
APP.
NIA
•.Bill
C, Progress Energy
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
DETAI L�" SH 4 OF 6
LOCATION NEW HANOVER COUNTY, NORTH CAROLINA
SCALE AS SHOWN SCALE RATIO 1:1
DRAWN FVR CHK. SFP APP. TFB
DATE 07/12/11 DWG. NO. ROC-57701 SHT 11 OF 13
NOTE:
PERMANENT BAFFLE SHALL BE
3/16" FIBERGLASS PLATES.
2" GALVANIZED POST, SPACED 4' O.C. AND
AT ENDS, BOLT BAFFLE ONTO POST WITH
GALVANIZED HARDWARE, PROVIDE A WATER
TIGHT CONNECTION DRILL 2" ORIFICE IN BAFFLE,
INVERT ELEVATION AT 11.0'
3:1
uewnerry & uavls, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE 919.881,9939
FAX: 919.881.9923
NCBELS # F-0679
NTS
II II LA
II
II II II
II II II
u U U
TOE OF SLOPE..........:..........................................I
11
10
0
8
11+60 11+70 11+80 11+90 12+00 12+10
PERMANENT BAFFLE. EMBED BAFFLE V MINIMUM
INTO BANKS ON BOTH SIDES ON ALONG BOTTOM
LINE WITH
MATTING, CREST ELEV. 13.5'
EMERGENCY SPILLWAY
TOP = 14.5' ---`
10" DIA. CORED HOLE,
INV. = 12.8'
4" PVC, CAP 4" PVC WITH
WATER TIGHT SEAL AND DRILL
A 2" DIAMETER ORIFICE IN THE 4' X 4'
CAP, DRILL HOLE SO NEW �.� PRECAST
INVERT MATCHES INVERT OF 4" CONCRETE
BOX
PVC AS CLOSELY AS POSSIBLY
12" DIP TO
-�
INV. = 11.0' BOTTOM OF POND APPROX. 3", LEVEL
(BEYOND)
SPREADER
INV. = 11.c
POUR 4" THICK
CONCRETE SUMP, 3' '
LONG X V WIDE EXTENDED BASE, TYP.
NOTES
BOTTOM 9.0'
1. PROVIDE MANHOLE STEPS AT HATCH OPENING
(13" 0.C.).
CONCRETE FILL (BALLAST)
2. PROVIDE FLANGED CAST IRON GATE VALVE SECTION
WITH SQUARE NUT OPERATOR ON EMERGENCY
[)RAIN. PROVIDE OPERATOR EXTENSION TO
WITHIN 18" OF THE TOP OF STRUCTURE, 2' X 2' ALUMINUM HATCH BILCO MODEL
SECURED TO THE WALL, SUPPLY EXTENDED J-AL OR EQUAL, W/ PADLOCK HASP
REACH EXTENSION AND HAND WHEEL OF
ADEQUATE LENGTH TO OPERATE VALVE FROM 6" GATE VALVE (NORMALLY
TOP OF STRUCTURE. VALVE SHALL BE KEPT CLOSED)
CLOSED. 6" DIP
EMERGENCY
DRAIN
77
3' E EP
4" THICK CONCRETE I
12" DIP TO
SUMP, T LONG X V WIDE LEVEL
SPREADER
4" PVC
NORMAL DRAIN
1'
30' - I TOP OF POND
V. 14.25'
PLAN VIEW
DRY POND OUTLET STRUCTURE DETAIL
NTS
II II II II II
II II II II II CONSTRUCTION SPECIFICATIONS
II II It II II 1 FILL MATERIAL SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE
II II II II II 2" x 2" GALVANIZED MATERIAL, PLACE FILL MATERIAL ACCORDING TO CONSTRUCTION SPECIFICATIONS.
U U U U U ANGLE (POST TO
POST) 2 SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL CONNECTION.
BOTTOM OF BAFFLE, ELEV. 10.0' -� BOTTOM OF POND SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE RISER IN
2" ORIFICE CONCRETE ANTIFLOTATION BLOCK.
BAFFLE SECTION
6 ONCE THE SITE IS STABILIZED AND ALL TEMPORARY MEASURES HAVE BEEN REMOVED, REMOVE ALL SEDIMENT DEPOSITED
FLOW DURING CONSTRUCTION, REPAIR EROSION, AND RESTORE THE VEGETATED SHELF. RESTORE RISER TO FINAL DRY POND
12" x 12" x 4" DEEP CONCRETE DESIGN. INSTALL PERMANENT BAFFLE AS SHOWN. PLACE 4" CAP ON THE 4" PVC AND CREATE A WATER TIGHT SEAL. DRILL A 2"
PERMANENT BAFFLE DETAIL BLOCK, ON BOTH SIDES OF THE DIAMETER ORIFICE IN THE CAP.
NTS BAFFLE 7, STABILIZE THE DRY DETENTION POND WITHIN 14 DAYS AFTER THE END OF CONSTRUCTION. PERMANENT VEGETATION FOR THE
2" GALVANIZED POST DRY DETENTION POND SHALL BE PER THE SEEDING SCHEDULE PROVIDED ON SHEET 9. THE LEVEL SPREADER AND FILTER
STRIP SHALL BE INSTALLED PER THE PLANS.
SECTION A -A
NEW HANOVER COUNTY STORMWATER CERTIFICATIONS:
DESIGNER'S PLAN CERTIFICATION PROPERTY OWNER CERTIFICATION:
"I hereby certify that this plan has been prepared in accordance with "I (we) hereby certify that I (we) am (are) the current owner of the
the latest New Hanover County Ordinances and Storm Water Design property and that upon receipt of "Authorization -To -Construct" any
Manual." clearing, grading, construction or development, will be performed in
accordance with this plan and that the applicable ordinances and rules
Signature: of New Hanover County, the State of North Carolina and the Federal
Government and its agencies which are hereby made part of this plan.
Printed Name and Title: F. VIRGINIA RUSSELL, PE As the owner, I (we) accept full responsibility for the construction and
operation and maintenance of the proposed facilities. I (We) will not
Date: attempt to transfer of this responsibility without the written authorization
of New Hanover County."
Registration Number: 036210
Signature: _
Printed Name and Title:
Date:
FNC IN EEC ••••c�\'o
/NIA
�
Progress Energy
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
DETAILS SH 5 OF 6
5
07/12/2011
CONSTRUCTION DOCUMENTS FOR =:_-_ 8 =- :-SING
CONSTRUCTION DOCUMENTS FOR - :- _ : ,; & __-'': TING
FVR
SFP
TFB
4
05/10/2011
FVR
SFP
TFB
3
02/18/2011
CONSTRUCTION DOCUMENTS FOR = __ ; & --- TTING
FVR
FVR
SFP
SFP
TFB
TFB
LOCATION NEW HANOVER COUNrY,NORTH CAROLINA
SCALE AS SHOWN SCALE RATIO 1:1
DRAWN FVR CHK. SFP APP. TFB
DATE 07/12/11 DWG. NO. ROC-57701 SHT 12 OF 13
2
02/03/2011
95'/. SUBMI -_
50% SUBMI---_
1
12/30/2010
FVR
BY
SFP
I CK.
TFB
APP,
NO.
DATE
REVIS _
NOTE: LOW POINT STA. = 2+31.00
1. PROFILE SHOWN IS FOR CENTERLINE OF PVI STA. = 0+66.00 LOW POINT ELEV. = 12.75
PVI STA. = 3+96.00
NEW STONE ACCESS DRIVE. SEE SHEET PVI ELEV. = 15.00 PVI STA. = 2+31.00
PVI ELEV. = 15.00
o A.D. = 1.52 0 o PVI ELEV/. = 12.50' o o A.D. = 1.52 0
10 FOR ACCESS DRIVE DETAIL. o 0 0 0
y _ r-, n n
ffl
17
16
1
14
SMOOTH TRANSITION TO 13
PUMPING STATION PAD, SEE
SHEET 8 FOR GRADING PLAN
9
8
7
6
0+00
Dewberry
Dewberry & Davis, Inc.
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 27612
PHONE: 919,881.9939
FAX: 919.881.9923
NCBELS # F-0679
0+50
1+00
1+50 2+00 2+50
ABC STONE ACCESS DRIVE PROFILE
3+00
5
07/12/2011
4
05/10/2011
3
02/18/2011
2
02/03/2011
1
12/30/2010
NO.
DATE
3+50
0 4+00 4+26
CONSTRUCTION DOCUMENTS FOR RMITTING
CONSTRUCTION DOCUM=',-S FOR & :�7RMITTING
CONSTRUCTION DL:-'.'_',-S FOR & PERMITTING
. SUBMITTr_
3MITTA
REVISION
QC
2
i•
2
i ,
HORIZONTAL GRAPHIC SCALE
0 10 20 40
( IN FEET)
1 inch = 20 ft.
VERTICAL GRAPHIC SCALE
0 1 2 4
( IN FEET)
1 inch = 2 ft.
EXISTING GRADE AT CENTERLINE OF EXISTING
DIRT ROAD UNKNOWN BASED ON LIMITED SURVEY
INFORMATION. CONTRACTOR SHALL PROVIDE A
SMOOTH TRANSITION FROM TOP OF STONE OF
NEW ABC STONE ACCESS DRIVE AND TOP OF
EXISTING DIRT ROAD
GRADE
�
Progress Energy
Progress Energy Carolinas, Inc. Raleigh, NC
BARNARD CREEK 230KV TRANSITION STATION
FVR SFP TFB DETAI LS SH 6 OF 6
FVR SFP TFB
FVR SFP TFB LOCATION NEW HANOVER COUNTY. NORTH CAROLINA
FVR SFP TFB SCALE AS SHOWN SCALE RATIO 1:1
FVR SFP TFB DRAWN FVR CHK. SFP APP. TFB
BY CK, APP. DATE 07/12/11 DWG. No. RDC-57701 SHT 13 OF 13
We
D.