HomeMy WebLinkAbout37-10 OVERSIZE PLANS 1/10REVISIONS
1104
N.C. 56
1106
1109
1107
4�
1108
N
1114
f,13
SWANSBORO
1202
1214
11
}�
INTpACOASTAL
CROATAN
"9
1118�p"'d
1119227
S.C.eret
_e_C
SITE 1
N•C se
A7LW77C OCEAN
VICINITY MAP -NOT TO SCALE
W-7.9 t4.3
Yacht I
Club
NOTES:
Stabilize all disturbed areas
Contractor responsibility to
(temporarily or permanently as
inspect site and identify field
appropriate) w/ seed and crimped
conditions and related project
mulch or sod, rolled erosion
cost implications thereof.
All Construction w/ P.T. Lumber
control products or any means
with Treatment & HDG or Better
necessary to minimize erosion
Project area entirely within
Fasteners Appropriate For Use &
and prevent sediment transport.
ORW AEC
Location
This plan document is for CAMA
permitting purposes. Owner &/or
Contractor responsible to insure
all project construction is
TYP PIER SECTION
consistent with owner's intended
NTs
uses. Owner &/or contractor
responsibility for project
compliance with all applicable
codes, ordinances and
regulations including building
codes, setbacks, on -site
wastewater system specifications,
built upon area requirements, et
cetera.
Bogue Sound
W -3.2 W -3.4
W -3.2
-3.8 31f -3.2 -3.,
W -6.6
W -7.5 W -3.2
)K--4.4 � 31E 1 -3 1 3)K-3.3
31E -8.0 -3.
31E -6.3
-3 s WATER DEPTHS AT -3.2
e )K-2.9 NORMAL LOW WATER
ilE -3.1
W -7.8 -3.0 3R -3.2
W
W -7.5 _ �.8 W -2.9
-4.0 )K-3.0
31E -2.9
-7.3
31E -7. _5.3
-6.0 W-3.3
5.3 -3.6 W -3.1
� O
O n �
D =
)K-3.1
i4E -3.1
W -3.0
)K-3.4
-3.5
W -3.2
A -2.9
W -3.1
A -3.1
v z NOTE /NTRACOASTAL WATERWAY LOCATION IS BASED ON
M r rz*_e N.C. GRID INFORMATION FOUND ON THE ARMY CORP. OF
n ENGINEERS WEB SITE. THIS SURVEY WAS TIED INTO THE
-3.2 N.C. GRID SYSTEM TO DETERMINE THE LOCATION OF THE
z -4.2 INTRACOASTAL WATERWAY CHANNEL AS SHOWN.
r
31E -5.9
I
D
�
� n
� Z
D
Z
A �
t-
z�
�
�
m
NORTH PER
M.B. 21, PG. 8
Bogue Sound
Survey Date 01/7 9/7 0
Job 10357
Cogo 10357
Drawn TL W/CAB
Scale
Survey / Existing Conditions
T = C)
okw
WooCL
o -�ppU
co
0 Z
zm�
w
>
-1.8
31E-1.4 )1E-1.2
W -1.7 # -2.3
W -2.3 31E 1 2.2
W -1.9 -1.6
#-1.7
X -3.4
31E -3.1 31E -2.0
31E -2.5
X -2.8
A -2.1
31E -2.4 )K-2.5
\ WATER DEPTHS AT
-3.4
-3.3A-3,2
CHANNEL
MARKER -2 6 NORMAL LOW WATER
of�NN
C NTER-3.5
X -2 1
31E -3.4-3.6W -3.0
-3 CHANNEL -2.7
11E -2.4
31E -1.5
31E -3.3
ilE -3.4
-22 MARKER
31E -1.9
-3.5
CHANNEL
MARKER -3.1
31E -2.1 W-2.1
W -2.9
31E -2.5
Bogue
Sound
31E-3.0
31E -2.9
60 0 60 120 1.80
GRAPHIC SCALE - FEET
CENTEOF
_-
Edge of 3.5'
Channel (Typ)
+5
0(NLW)
-3.5
-5
-10
Proposed Boat Lift Piles
(Beyond Section)
Boat Lift Area Section
Scale 1" = 10'
Proposed 1.5ft x 20ft
Proposed Boat Lift Finger Piers (Typ)
Piling Layout per \
9,000/12,000 Ib
"Hi Tide" Boat Lift
(or Equal)
12,5 to-- r
I Center to Center
Typ 12.5
Out to Out
Typ
TY. ARCHIE PAGE, Jr.
D.B. 10 (►8, PG. 265
NORMAL HIGH WATER
CHANNEL
,MARKER �-----
__\
1 3 1.0 0'0
31E -0.8
-, 3 1.4 2.3 -0.5
A - 7.COASTAL WETLANDS LINE1
1
A-2. 6 A -2. 6 W -2.1 � - 34E -1.0
31E -2.3 -3.4 _J.1 v -3.0 iK -2.8 W -1.1
3 # -3.7 A -2.9 *-2.1 ilE 31E1.31.3
X-2.5 A -2,1 W -2.3 W -2. 6 -3.4 A -3.1 W -1.7 �shc
Enlarged Plan View
Proposed Slips, lifts &
Finger Piers
Scale 1" = 10'
0 o LOWELL A. FREDEEN
41 D.B. 618, PG. 176
y
N O6,UI',54.r /
-2.2 ^HANNEL+-1.2 -0`9 A -0.8 3If _1e4 -2.9 ilE �31E 31E_3.2 � -2.2 p�Yy� .. WOOD LINE 15.E
MARKER -1.0 _ 1.0 2.5 31E -2.9 3K - .2 O
3-1.2 -1.5 31E-3.0 -L8
.61 '2 31E 3-2 9 3 08 c COASTAL WEfLAAOS UNE , ;GRAVEL, QRIVE
COVEREI .RIP RAP - 311.Ep-1.9 3� -1.9 � 31E-1.4`�O
DOCK 3!E -1.3 .73 -2.8 �2 0 RIP RAF
-0.4 3fE X1.0 0 31E - 6 3.3 -3.2 31E -1.4Sy ���,� ��....���� , -3.6 - I
--- NORMAL HIGH WATER -0.2 W -1.1 A -3.7 2.8 / �� )E-2. 6 90.6
DOCK -0.5 -1.4 31E-3.7 _3.2 A 31E_2•� ---�_�/N�„�•�---�Yzz..,4aa3�-3.5 -3.8 -2
31E -1. 6 31E -3.6 -2.5 W 34E -1.6 0.0 M.B. I
-0.5 A -1.6 X -3.6 31E -2.0 BULKHEAD \�-2 B -3.5
WATERWARD EDGE OF MARSH-�1'31Ei� g -3.7IE 3 0 -2 3-2 6 I M. 9. WOOD WALK Ot�R \ �Q ''`� 5 -3. 1 -3 CI
COASTAL WETLANDS LINE -0 6 9 )K -3.8 ■ C I M B �o 0 0 �o Et A g 4 �, I
t' -3.231E Iv. ' ' 2• 2. .3,33-3.4
RIP RAP -0.5 3�E W W -4.2 -2. \ \ ` ��' -3.1 9 2. - -3.6 _3 O
EC.M, �, �0 �2V A31E ilE 31E 31E-3.6 - .E o o c o o �`? ® ®® -40 - .6 31E 3- 534E 3.8 31E M.B.
�25s'30 3 31E -3.7 J. m '� '' �V o °� -3.3,9 31E -3.5 -3.1 -3.5 I
-0.3 s�' ZiIE *.1 -J.A 2 J.J )K 4.0 \R # J7 31E-4.5-334E5 3K-3.L 3 3
t7N -0.6 �3' 3 31E "'a _,� ® ® ® ® -3.6- .5 .� `39 �lE `36' 6 -3.7 N
r1 -1.0 �3• -3.•, s 31E� 31f #-4.2 -2.7 +�
Curve Rodius Length Chord Chord Bear. �3' 8 31E -3. 1 `3) �?9 �� _5'2 -3.6 4i w
CE -0.6 i3 31F 3K \ 31E ?) t 39 �j8 -3.9 2.6' I w �
C 1 263. f 0 81.36 81.03 S 02'42 01 E r 31E 2. � 5'.3 - '� 8,
i�.7 -3.le -3.3 31E - 9 - -4.5' µ� q
-0.5
-3.9-J.9 - 5J.-1.2' -2, PUMP
-�J5 ! �o ` ��5 -1.4 0.3 HOUSE °� I
190�, �0 1 ' S' 3 -5.2 O w
4�g s9 5 3 ,. -1. 9 rjY00D WALX OVER 5U3 HEAD + 5. 6 5.2 M.S. + 5. 4 r BLOCK ; OJ I 10
M. B. 5.2 J BUILDING
1 3 GATE
�t7p 5.
NOTES: F ✓c, + 6.3 X
CL
1) WOOD WALK IS LANDWARD SIDE OF BULKHEAD 5.9 + 5.8 + s.1
2) WATER DEPT-S AND UPLAND ELEVATIONS ARE
a
RELATIVE TO Ni:YS(AL LOW WATER AT 0.0
3) THERE ARE -0 EXISTING BOAT SLIPS AND/OR
BOAT LIFTS PPE ENT AS OF THE DATE OF THIS
SURVEY.
4)1.8' DIFFERENCE BETWEEN NORMAL HIGH WATER
AND NORMAL LOW WATER
5)THERE IS A CISCREPANCY IN THE. NORTH LINE AS
PER BK, 7J4, P3 247 AND THE EXISTING IRON PIPE
AND POSSES510'! LINE AS SHOWN,
E(4000'
pen Water Impact Area "02"
Channel wlin Bogue Sound)
0.21 Acres
400' ---
Section Station
(Typ)
Section Line
Bogue Sound
60 0 60 120 180
GRAPHIC SCALE - FEET
r. ain �anaunci
/F. Partial Racinl
WATERWARD EDGE OF MARSH---�
COASTAL WETLANDS LINE E.C.M.
O
HELEN C. BECHTOLD
BOGUE SOUND YACHT CLUB, SECTION 1
M.B. 21, PG. 8
Begin
S r''7 p3 �i3
Southern Limit of New 4jBs9•
Boat Slips - To be
Verified by NCDENR
Shellfish Sanitation
Serve 17 for. LEGEND
l SITE OAK T 0 WNSHIP o E.I.P. - EXISTING IRON PIPE
Boo- u e Sound Yacht Club by. M.B. - Mk -TER BOX
� 1�'TERET COUNTY, 1V N.C. � E.C.M. - EX. CONC. MONUMENT
)K - (-3.2) WATER DEPTHS AT
NORA4AL LOW WATER
]%� + 6.1 SPOT ELEVATION
T T - - f T a .11E .1/LJ Jlt � C m ®- PILINGS
><_
- DENOTES BOAT LIFT
604E Cedar Point Blvd. Swansb oro, _V. C. (252)393 - 6101
License No.: P-0391 Email: a bellsurveying(( cp2. corms
+6.4 +6.6 +6.7 o
+ 7.1 � in
+6.J F2
7 y 8. 5 E. I. P.
E. C. V. 8.4
/ 5 83'31 '36 E S 06'3 >
\\--
� � YA CHI^
N 05'30 09 E 465.10 TO EXISTING AC P'UB c,U1i1 DRIVE
P-K NAIL CIL YACHT CLUB DR, R,/ry
/ OVER CULVERT
Boat Slips, wl Lifts &
Finger Piers
C. M. S v83'31 '36'E S 06'32 L9-�,
29.96' 162.18
YACHT
h 05'30'09 E 465. 10' TO EXISTING CLilB DRIV
P-K NAIL CIL YACHT CLUB DR. (60 %'UREIC R/W
/ OVER CULVERT
I
..4. E.I. P�
LOiWELL A. FREDEEN
D.B. 618„ PG. 176
O6'•37 54"�' /
35.00 /
I
I
I
I
8 I
�O
h I A
I
E.I.P.
ID
a NOT RELEASE® FOR CONSTRUCTION
J
Uj
Q
�
CL
a�
C
�C�
•�
W N
0
N o
Lh
C U_
V M
VJ
C2
Z p
LLn
(n
C
co<
U
U
L. J
z°
z 1
V /
d
fu
0
U
C
° ELU,?
Cul
O V
UUl
o
C
LL
W
co LLI
(�
-0 Z
~ O
Vl
Cl) a
>�
U
U
u
F,
MAR 2 9 2010
MC(9h9Cld Cih,
0
.�
-
co
..�
E
L
//^a�)
ILL.
r�n
�/
1
DATE: 1-22-10
:1ROJ ECT: 09-047
)RAWN BY: JF
SHEET: 1 of 3
REVISIONS
Area to be Scale: 1 �� - 10'
Dredged Existing Bottom
NLW =0
-3.5
-5
Section 0+0
Basin
NLW
Section 0+12
Basin
NLW =0
-5
Section 0+24.50 p 10
Basin
NLW =0-
-3.5-
-5
Section 0+43.70 0 10
Basin
NLW =0
-3.5
-5
Section 0+57.89 p 10
Basin
NLW =0
-
-3.5.
Section 0+81.98 0 10
Basin
NLW =0
-3.5
-5
Section 1 +03.26
Basin
NLW =0
48 sf
3.5
-5
Section 1 +15.57 0
Basin
NLW =0
-3.5
-5
Section 1 +28.26
Basin
NLW =0
-3.5
-5
Section 0+00
Main Channel
NLW =0
-3.5
-5
Section 0+29.26
Main Channel
0
Xf
(All Sections)
70
X
[�7
0 70
NLW =0
-3.5
-5
Section 0+54.26
Main Channel
NLW =0
-3.5
-5
Section 0+79.49
Main Channel
NLW =0
-3.5
-5
Section 1 +04.26
Main Channel
NLW =0
sf -3.5 s 22 sf
-5
Section 1 +29.26 0
Main Channel
NLW =0
-3.5
-5
Section 1 +54.26
Main Channel
NLW =0
-3.5
-5
Section 1+79,37
Main Channel
-3.5
-5
Section 2+03.60
Main Channel
NLW =0
LEE
sf
42 sf -3.5
-5
Section 2+28.78 0
Main Channel
0
w
C�]
u
NLW =0
-3.5-
-5
Section 3+11.71 0 10
Main Channel
NLW =0
�, 52 sf
-3.5-
-5
Section 3+36.71 0 10
Main Channel
NLW =0
10 sf
-3.5 ... _. _... -
-5
Section 3+67.53 0 10 20 30
Main Channel
NLW =0
2 sf
-3.5-
-5
Section 3+97.88 0 10 20 30
Main Channel
NLW =0
3
-3.5 sf
-5
Section 4+47.90 0 10 20 30
Main Channel
NLW =0
- 31 sf, 14 sf
-3,5.
-5
0 50 60 70 80 Section 4+97.92 0 10 20 30
Main Channel
0 70
NLW =0
17 sf
-3.5-
-5
Section 7+98.51 p 10 20 30
Main Channel
NLW =0
33 sf t; 25 sf NLW =0
-3.5 M 13 sf
-5 -3.5-
0 20 30 40 50 60 70 80 Section 5+47.92 0 10 20 30 -5
Main Channel Section 8+48.52 p 10 20 30
Main Channel
NLW =0
t� 32 sf 11 sf
77 __ �=
-5
0 20 30 40 50 60 70 80 Section 5+98.21
0 10 20 30
Main Channel
NLW =0
-3.5-
-5
Section 2+53.60 0 10
Main Channel
NLW =0
-3.5-
-5
Section 2+72.74 0 10 20
Main Channel
NLW =0
-3.5
-5
Section 2+86.71
Main Channel
0 60
1
NLW =0
R 26 sf 22 sf
y
-3.5-
-5
0 80 Section 6+48.43 0 10 20 30
Main Channel
NLW =0
17 sf
-3.5
-5
0 Section 6+98.21 0 10 20 30
Main Channel
NLW =0
16 sf
-3.5-
-5
Section 7+48.51 0 10 20 30
Main Channel
NLW =0
12 sf
-3.5-
-5
Section 8+98.60 0 10 20 30
Main Channel
NLW =0
9 sf
-3.5-
-5
Section 9+48.71 0 10 20 30
Main Channel
w
Q
a
N N
4-2
C
C C
CIO,C
'
W LJ
o0
C
N N
^W
W
CM
Z p
LLn
u) C
F
.�
C -C
C
0 O
m
W
z
cv
_D�
t
N
CWao�
c
�
/u
O
J
C
E
0 N
U
°
° >
w^
X�
c �
U-�-
W N
M ui
CZ
z
C
"o
U
C
C
Cu
C
U
in
O
j
C)
0
�
G
>
vJ
Q
V
U
'
X
:
W
U
O
op
0
NLW =0
7 sf
-3.5
-5
Section 9+98.61 0 10 20 30
Main Channel
d�(
DATE: 1-22-10
P� PROJECT: 09-047
lf"EWUVu���uV� SEU ONLY DRAWN BY: JF
NOT RELEASED FOR CONSTRUCTION SHEET: 2 of 3