HomeMy WebLinkAbout85-23 Town of Murfeesboro Permit Class Permit Number
NEW 85-23
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
1crmit
for •
X Major Development in an Area of Environmental Concern •
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229 •
•
-0
Issued to Town of Murfreesboro, PO Box 6, Murfreesboro, NC 27855 a
Authorizing development in Hertford County at adj.to the Meherrin River, at the termination
of Hart Street, in Murfreesboro , as requested in the permittee's application dated 2/8/23(MP-1,3),
2/7/23(MP-2),and 4/3/23(MP-4),including attached workplan drawings(13),Drawings 1-7 of 14 dated 1/18/23,and 9-14 of 14 dated 11/21/22.
This permit, issued on August 8,2023 , is subject to compliance with the application (where 1
consistent with the permit),all applicable regulations, special conditions and notes set forth below. Any violation I
of these terms may be subject to civil or criminal penalties; or may cause the permit to be null and void.
Fishing Pier and Kayak Facility
1) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no
in-water work shall be permitted between February 15 and June 30 of any year without the prior
approval of the Division of Coastal Management, in consultation with appropriate resource agencies.
2) This permit authorizes only the docks, piers, and other structures and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, shall become a permanent part of this fishing pier and kayak facility $
without permit modification. No non-water dependent uses of structures shall be conducted on, in or $
over Public Trust waters without permit modification.
(See attached sheets for Additional Conditions) I
• This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the Chair
qualified persons within twenty(20)days of the issuing date. of the Coastal Resources Commission.
•
• This permit must be accessible on-site to Department / •
• personnel when the project is inspected for compliance.
4-7444/4.64i
Any maintenance work or project modification not covered (for) Braxton C. Davis, Director
hereunder requires further Division approval.s Division of Coastal Management
$
° All work must cease when the permit expires on
1 This permit and its conditions are hereby accepted.
6
I August 8,2028 $
In issuing this permit,the State of North Carolina agrees that 8
your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
d0-0dd-004 448004{440806-0L9-0fi-0-0-0-0494444449�9d4-09'4-0-04C-0.9-09b-0-0-04-0.6-004,9444
Town of Murfreesboro Permit No. 85-23
Page 2 of 3
ADDITIONAL CONDITIONS
I 3) No portion of the authorized fishing pier and kayak facility, shall extend more than one quarter of the
width of the water body. Measurements to determine width of the water body shall be made from the
normal water level or the waterward edge of any coastal wetland vegetation which borders the water body,
whichever is more restrictive.
4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent •
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or •
•
inclement weather.
5) This permit does not authorize any formalized boat slips.
6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable •
1 yy¢
waters at or adjacent to the authorized work.
7) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
•
Upland Development
8) If the crossing of wetlands with mechanized construction equipment is necessary, temporary
• construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed
immediately upon completion of construction. •
9) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the roadbed grading and
parking area, and walkways, all as expressly and specifically set forth in the attached permit application
and workplan drawings.
-0
Sedimentation and Erosion Control
10) In order to protect water quality, runoff from construction shall not visibly increase the amount of
• suspended sediments in adjacent waters. •
11) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
$ 13) All construction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location.
14) The permittee and/or their contractor shall meet with a representative of the Division prior to project
initiation.
00 0-00-000-0000o000a00-00-0-0004000 000000.>-044-Xe a �
oo440004o400-00 a0000aao•04- aaanoacaanaas-04-x E
Town of Murfreesboro Permit No. 85-23
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit
197800291 (Action ID SAW-2023-00851).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
•
Quality Certification 4501 and assigned the project DWR Project No. 2023-0520.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at(252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: An application processing fee of$400 was received by DCM for this project. This fee also s
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
•
•
p p�p
8 QRaQb
SSI
000-0044-080000 89-394 .959999tr
DCM Coordinator: wet(4 aT Permit#: ?)6 -Z3 NtctP
MAILING DISTRIBUTION SHEET
Permittee: 1O(,00 v r f(CU RiesZo .o
Agents:
DCM Field Offices
Elizabeth City Washington (with revised work plan drawings)
Morehead City Wilmington (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland(Beaufort, Camden, Chowan,Craven, Hertford,Hyde, Perquimans,
Tyrrell)
Josh Pelletier(Bertie, Currituck, Dare, Gates, Pamlico,Pasquotank, Washington)
Tom Steffans (NC DOT-Beaufort, Carteret,Craven, Pamlico)
Bill Biddlecome(NC DOT-Remainder ECity/Washington District)
Wilmington: Greg Curry(Brunswick,New Hanover)
Liz Hair(Carteret,Onslow, Pender)
Brad Shaver(NCDOT-Brunswick,New Hanover,Onslow, Pender)
Cultural Resources: Renee Gledhill-Earley at Environmental.Review@ncdcr.gov
Public Water Supply: Heidi Cox(WIRO) Clif Whitfield(WARO)
Marine Fisheries: Kim Harding Jimmy Harrison
NC DOT: David Harris
Shellfish Sanitation: Shannon Jenkins/ Sharon Gupton/Andy Haines Set DI51
(I
l(N
State Property: Tim Walton/Mike Moser DAM I -
DEMLR/DWR: Sheri Montalvo/Shelton Sullivan
Washington: Robert Tankard—401
Glenn Stewart-401
Roger Thorpe-Stormwater
Garcy Ward-(NCDOT-Beaufort,Bertie, Camden,Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico,Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: Holley Snider—401 (Pender,Brunswick,New Hanover)
John Perry—401 (Onslow,Carteret)
Christine Hall- Stormwater
Joanne Steenhuis-401 (NCDOT-Brunswick,New Hanover, Onslow,Pender)
Wildlife Resources: Maria Dunn(WARO) (NCDOT)Travis Wilson
Natural Heritage Program Rodney Butler
LPO:
Weychert, Curtis R
From: Weychert, Curtis R
Sent: Wednesday, August 9, 2023 9:26 AM
To: Carver, Yvonne; robert.mizelle@hertfordcountync.gov; Christenbury, Mike;
Josh.R.Pelletier@usace.army.mil; Padrick, Lee; Gledhill-earley, Renee; Whitfield, Clif;
Harrison, James A; Harris, David B;Jenkins, Shannon; Haines, Andrew; Moser, Mike;
Hilliard, Wanda; Montalvo, Sheri A; Dumpor, Samir;Thorpe, Roger; Stewart, Glenn A;
Dunn, Maria T.; Butler, Rodney A
Cc: Cannon, Amanda J; Cynthia Rountree
Subject: Distribution for CAMA Major Permit 85-23-Town of Murfreesboro
Attachments: 85-23_Town of Murfreesboro Pier, Kayak Launch, Upland Development.pdf
Hello all,
Please reference the attached Permit for the Town of Murfreesboro. Thank you for all your assistance with this project.
Best,
Curt Weychert
Curtis Weychert
DCM Assistant Major Permit Coordinator
North Carolina Division of Coastal Management
North Carolina Department of Environmental Quality
252-515-5413
Curt.Weychert(a�deq.nc.gov
Find a Field Rep (arcgis.com)
v
0
•
-111EC),1)
NORTH CAROLINA
OkprtkAnl a EnYkuknwMkl 0.01;
400 Commerce Avenue
Morehead City, NC 28557
http://portal.ncdenr.orq/web/cm/dcm-home
E-mail correspondence to and from thus address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties.
1
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
A) APPLICANT:Town of Murfreesboro County: Hertford
LOCATION OF PROJECT: at the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin River
DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: 04/03/23
FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES
CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES
FIELD REPRESENTATIVE: Cynthia Rountree DISTRICT OFFICE: Elizabeth City
DISTRICT MANAGER REVIEW: Ron Renaldi Date:04/10/23
B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $400(60/40%)
PUBLIC NOTICE REC'D: Advertise: 04/15/23 END OF NOTICE DATE: Comments due: 05/05/23
ADJ. RIP. PROP NOTICES REC'D: DEED REC'D:
APPLICATION ASSIGNED TO: ON:
C) 75 DAY DEADLINE: 06/17/23 150 DAY DEADLINE:
MAIL OUT DATE: Circulation: 04/12/23 STATE DUE DATE: Comments due: 05/03/23
FEDERAL DUE DATE: FED COMMENTS REC'D:
PERMIT FINAL ACTION: ISSUE DENY DRAFT ON
AGENCY DATE OBJECTIONS: NOTES
COMMENTS YES NO
RETURNED
•
Coastal Management-Regional Representative y•Z14•t3 Coin A51
Coastal Management-LUP Consistency II tit Lg
Division of Community Assistance '&(�3 �c
Land Quality Section--DEMLR
DWR/ A 'C°I u 23 x ZOZS—C•S1D
`r�/� 115V1
D W R/D W Q-Storm Water yl UJ Z3 IVIJ IT nW O'D
D W R—Public Water Supply u l(?t'L3
State Property Office 5`5'Z3
Division of Archives& History—Cultural Res.
Division of Env. Health—Shellfish Sanitation 11,0115
Division of Highways--DOT Wildlife Resources Commission 1 [5- 150 0.A�e 1Dl'l','k
Local Permit Office/Planning Dept. L y� ,��`���
DMF—DCM Fisheries Resource Specialist ITV
N f6o �J s�� bO mo.ptIocitM"
Corps of Engineers I"�"I't.- 7q1 - !O Rtra
APR 12 2023
DGM-MI '-In`
>`Mc 7A'IF,ty
0
ROY COOPER 44
Governor
2
ELIZABETH S.BISER '„n�. /.
Secretary }`gw,wv. %
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregg.bodnar@ncdenr.gov
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed, floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
RECEIv
DATE AiI:`t]HV v\as
APR 1 2 0ti I ddV
DCM-Aiii
DENorth Carolina Department of Environmental Quality I Division of Coastal Managemerht-1 3-I
Q Elizabeth City Office 1401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909
CAROLINA
°+'r"'bw1iw1iti Cl"'e�" 252.2643901
r _
Ty0, STATE co
I `
ROY COOPER 4 1
Governor � ,- '1d
ELIZABETH S.BISER
Q` ^
Secretary
/0'
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330(Courier 04-16-33)
gregg.bodnar@ncdenr.gov
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed, floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
X This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME James Harrison
AGENCY NCDMF
SIGNATURE jakKefY HA'`' 'w
DATE 28 July 2023
DE --Au North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909
Nwni Crwouna
��r �+ � /d 252.264.3901
t
�N GARo
o0_,..,_ I, ROY COOPER
2vGovernor
' ELIZABETH S. BISER
� Secretary
)'� KATHY B. RAWLS
f F i 5 Director
TO: Gregg Bodnar,NCDCM Major Permits Coordinator
FROM: James Harrison,NCDMF Fisheries Resource Specialist
SUBJECT: Town of Murfreesboro, Hertford County
DATE: 28 July 2023
A North Carolina Division of Marine Fisheries (DMF) Fisheries Resource Specialist has
reviewed the CAMA permit application submitted by the Town of Murfreesboro (applicant). The
proposed project would occur at the termination of Hart Street in Hertford County, adjacent to
the Meherrin River. The applicant proposes to construct a 6' by 102' access pier out to an 8' by
90' platform. The applicant also proposes to construct an additional 5' by 24.5' floating pier with
a 32.5' by 10' floating platform extending from an upland walkway. The waters of this area are
classified as B;NSW and are closed to shellfishing.No submerged aquatic vegetation(SAV)
was observed at this site. The waters of the Meherrin River at this location are designated as
Anadromous Fish Spawning Area(AFSA)by both the DMF and the North Carolina Wildlife
Resources Commission (WRC).
The applicant is proposing to construct a 6' by 102' pier with an 8' by 90' T-end platform on the
east side of the property. On the western side of the property,the applicant is proposing to
construct a 5' by 24.5' floating pier with a 12' by 32.5' L-shaped platform. This structure will
also include a 5' by 15' kayak launch on the southern side of the platform. The project will also
include a 5' by 251' accessway leading from the existing parking area to the proposed dock on
the west side of the property. The proposal also includes upgrades to the roadbed across the river
to mitigate flood impacts as part of the project's Conditional Letter of Map Revision (CLOMR)
requirements. The project would result in shading of 1,947 square feet(SF) of estuarine waters
and public trust area from the proposed piers and temporary turbidity increases during
construction.
As noted above,the waters of the Meherrin River in the location of the proposed project are
designated as AFSA. In areas designated as AFSA, evidence of spawning of anadromous fish has
been documented by direct observation of spawning, capture of running ripe females, or
indication of effs or early larvae. Many anadromous fish species are commercially,
recreationally, and/or ecologically important species, including herring, shad, striped bass, eels,
and sturgeon. As such, DMF would recommend that any permit issued include a 15 February
through 30 September in-water work moratorium to minimize impacts to this important habitat.
Thank you for consideration of our comments and concerns. Please contact Jimmy Harrison at
(252)948-3835 or at james.harrison@u,deq.nc.gov with any further questions or concerns.
State of North Carolina I Division of Marine Fisheries
3441 Arendell Street I P.O.Box 769 I Morehead City,North Carolina 28557
252-726-7021
if
lk
Eti North Carolina Wildlife Resources Commission
Gordon Myers, Executive Director
MEMORANDUM
TO: Courtney Spears
Division of Coastal Management
North Carolina Department of Environmental Quality
FROM: Maria T. Dunn, Coastal Coordinator
Habitat Conservation Division
DATE: November 15, 2016
SUBJECT: CAMA Dredge/Fill Permit Application for Town of Murfreesboro, Hertford
County,North Carolina.
Biologists with the North Carolina Wildlife Resources Commission(NCWRC)reviewed the permit
application with regard to impacts on fish and wildlife resources. The project site is located at the end of
Hart Street off US 158 Business in Murfreesboro,NC adjacent the Meherrin River. Our comments are
provided in accordance with provisions of the Coastal Area Management Act(G.S. 113A-100 through
113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and
Wildlife Coordination Act(48 Stat. 401, as amended; 16 U.S.C.661 et seq.).
The Town proposes to construct a fishing pier with handicap accessible ramps and stabilize the bluff
shoreline with riprap. The site was previously developed and has remnant concrete pads in the area of the
proposed parking and deteriorated bulkheads within the area of the shoreline proposed to be stabilized. A
6' concrete sidewalk will access a 6' by 102' pier ending in an 8' by 90' fishing platform. Riprap will
extend 180' along the shore,extending 5' waterward the NWL. The Meherrin River at this location is
classified B NSW by the Environmental Management Commission and is designated an anadromous fish
spawning area(AFSA)by the NC Wildlife Resources Commission and NC Division of Marine Fisheries.
The NCWRC has reviewed the permit application and does not object to the construction of the fishing
pier.To minimize impacts to important aquatic resources, all in-water work should adhere to a February
15—June 30 moratorium.
We appreciate the opportunity to review and comment on this permit application. If you need further
assistance or additional information,please contact me at(252)948-3916 or at
maria.dunn@ncwildlife.org
Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh,NC 27699-1721
Telephone: (919)707-0220 • Fax: (919)707-0028
;; -,,.STATEy';;.
ROY COOPER f ,--
Governs �.,'. ., $
, rc;
ELIZABETH S.BISER
Secretary '>*ram`� +
qu.,iv .
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330(Courier 04-16-33)
gregg.bodnarOncdenr.gov
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed,floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME -\l" ltZ t.) ,
AGENCY 'EMI-_! .,/ SC
SIGNATURE _��
DATE lii/3/Z_
RECEIVED
Q R q ^ 2023
Qom,- Nlorth Carolina Department of Environmental Quality Division of Coastal R�anagement
��j/c, Elizabeth City Office 401 South Griffin Street.Suite 300 I Elizabeth City.North Carolina 2790q
u y i u >t��,�w� o� /4' 252.2b4.3901
NIP SECTION Il
x
ROY COOPER i
Governor y� 3 17.1 -f
ELIZABETH S.BISER ti '4i
Secretary •: ,`,°abu+*- -'
BRAXTON DAVIS NORTH CAROLINA '
Director Environmental Quality
I
I
I
04/12/2023
RECEIVED
MEMORANDUM:
APR 1 7 2023
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ- Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557 ,`° T r�� �,
Fax: 252-247-3330 (Courier 04-16-33) J ION a HD
gregg.bodnar@ncdenr.gov
SUBJECT: CA MA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed, floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes -
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Clif Whitfield
AGENCY Public Water Supply Section
i
SIGNATURE
(\i�
DATE 4-17-2023 .
•
North tmQ I o
Elizabeth CityCarolina OfficeDepar i 40lent Southof GrifEnvironmentalfin Street,Suiteuality 300Divisi I Elizabethnof City
,NorthManagement Carolina 27909
Deporlmentat�.xe...+ei n..� / 252.264.3901
egf:fI174
ROY COOPER
ELIZABETH S.BISER +M .
Srcrew).
BRAXTON DAVIS NORTH CAROLINA
Nov tor Enrtronmental Quality
04/12/2023
MEMORANDUM
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ-Division of Coastal Management
400 Commerce Ave.,Morehead City,NC 28557
Fax:252-247-3330(Courier 04-16-33)
greeg.bodnar@ncdenr.gov
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro;adjacent to Meherrin
River,Hertford County
Proposed Project: Access pier to a platform,grading old roadbed,floating pier&platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Lee Pad rick
AGENCY NC Commerce
SIGNATURE A
DATE 4-13-23
UZLCLIVIZO
APR 1 ". 2023
D1E410 North CdroMw Deportment dEnuhu,r,..ntalQivahur IX+turnofCca -sfMrnt
ET+rabrth O*y Otfkr 401 South Coif NI Strret.Stmt.100 rtst3beth Co", North C.rnt,rta 77til`,
: 1 £I P SECTION MI ID
a
���� qt
ROY COOPER ' I ' �
Governorvt, � it jN�'f� ;
ELIZABETH S.BISER ,
Secretary 444%•14001
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
®,l1L�
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ - Division of Coastal Management ,, ,� ND
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregg.bodnarPncdenr.gov B A 1i014
P
SUBJECT: CAMA Review ''
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform,grading old roadbed,floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Greqq Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Christa Sanderford
AGENCY NCDMF - Shellfish Sanitation and Recreational Water Quality
SIGNATURE e/1-2,-.. -- 5G.4t6/-4Ace for Shannon Jenkins
DATE 4/20/2023
Q North Carolina Department of Environmental Quality I Division of Coastal Management
�/ Elizabeth City Office 1401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909
Nt I tAR�IDE
DeparlmentwEnvironmentalo�n� /.' 252.264.3901
ROY COOPER y
Governor e
ELIZABETH S.BISER ' '
Secretary
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
MEMORANDUM pg *5*V
TO: Gregg Bodnar, Major Permits Coordinator a
Division of Coastal Management,Morehead City`"
THROUGH: Ron Renaldi, District Manager Qpff2
Northeastern District,Division of Coastal Management
Cµ{-.
FROM: Cynthia Rountree,Field Representative
DATE: April 24,2023
SUBJECT: Town of Murfreesboro; End of Hart Street Major Permit Recommendations
The applicant proposes to construct a 6 foot by 102 foot pier with an 8 foot by 90 foot
platform,a 5 foot by 30 foot pier with 32.5 foot by 12 foot platform and a 15 foot by 5 foot
lower platform with a 251 foot by 5 foot upland accessway,and grade 1.5 feet from an 80
foot by 20 foot section of an old road bed. The property is located at End of Hart Street,
Murfreesboro, Hertford County adjacent to the Meherrin River.
The development proposal involves the Estuarine Shoreline(ES),Estuarine Waters (EW),
Public Trust Area (PTA),and Public Trust Shorelines (PTS) Areas of Environmental
Concern.
I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to
this project and my findings are as follows:
15A NCAC 07H.0208 USE STANDARDS
(a) addresses General Use Standards,and subparagraph (1) requires that uses which are
not water dependent shall not be permitted in coastal wetlands,estuarine waters,and
public trust areas. Restaurants,residences,apartments,motels,hotels,trailer parks,
private roads,factories,and parking lots are examples of uses that are not water
dependent. Uses that are water dependent include:utility crossings,wind energy facilities,
docks,wharves,boat ramps,dredging,bridges and bridge approaches,revetments,
bulkheads,culverts,groins,navigational aids,mooring pilings,navigational channels,
access channels and drainage ditches. NECEIVEU
APR 24 2023
DCM-MHD CITY
D"E
��_ North Carolina Department of Ethnv mental Quality I Division of Coastal Management
'�A Elizabeth City Office 1401 South Griffin Street,Suite 300 I h City,Nortlt Carolina 27909
=fi .rwr\ r 252.264.3901
Consistent:The applicant proposes to construct two piers and upland accessway
which are listed as water dependent.
(a)(2)(A) requires that the location,design,and need for development,as well as the
construction activities involved shall be consistent with the management objective of the
Estuarine and Ocean System AEC (Rule.0203 of this subchapter) and shall be sited and
designed to avoid significant adverse impacts upon the productivity and biologic integrity
of coastal wetlands,shellfish beds,submerged aquatic vegetation as defined by the Marine
Fisheries Commission,and spawning and nursery areas.
Consistent: The development is consistent with the intent of this rule.
(a)(2)(B) requires that the development shall comply with state and federal water and air
quality
Consistent:This development will not violate water and air quality.
(a)(2)(C) requires that the development shall not cause irreversible damage to
documented archaeological or historic resources as identified by the N.C. Department of
Cultural resources.
Consistent:There are no known archaeological or historic resources on the
property.
(a)(2)(D) requires that the development shall not increase siltation.
Consistent It does not appear that this development will measurably increase
siltation.
(a)(2)(E) requires that the development shall not create stagnant water bodies.
Consistent: It does not appear that the development will create stagnant water
bodies.
(a)(2)(F) requires that the development shall be timed to avoid significant adverse impacts
on life cycles of estuarine and ocean resources.
Consistent:The development will have minimum adverse effects on life cycles or
estuarine resources. ,
(a)(2)(G) requires that the development shall not jeopardize the use of the waters for
navigation or for other public trust rights in public trust areas including estuarine waters.
Consistent The development proposal will have minimal effects on navigation.
RECEIVED
(b) Specific Use Standards
APR 2 4 2023
DCM-MHD CITY
D E cli North Carolina Department of Environmental Quality i Division of Coastal Management
Elizabeth City Office i 401 South Griffin Street,Suite 300 1 Elizabeth City,North Carolina 27909
•rlr+...w+oneN /" Z521643901
• (b)(6)Addresses Piers and Docking Facilities.
(b)(6)(A) requires that Piers shall not exceed six feet in width. Piers greater than six feet in
width shall be permitted only if the greater width is necessary for safe use,to improve
public access,or to support a water dependent use that cannot otherwise occur;
Consistent: The proposed piers shall not exceed 6 feet in width.
(b)(6)(B) requires that the total square footage of shaded impact for docks and mooring
facilities (excluding the pier) allowed shall be eight square feet per linear foot of shoreline
with a maximum of 2,000 square feet. In calculating the shaded impact,uncovered open
water slips shall not be counted in the total. Projects requiring dimensions greater than
those stated in this Rule shall be permitted only if the greater dimensions are necessary for
safe use,to improve public access,or to support a water dependent use that cannot
otherwise occur. Size restrictions shall not apply to marinas.
Consistent: The proposed docking facility shades a total of 1,185 square feet which
is less than the 2,416 square feet allowed for the 302 foot of shoreline.
(b)(6)(F) requires that piers and docking facilities shall be single story. They may be
roofed but shall not be designed to allow second story use.
Consistent:The proposed dock and platforms will not have second story use.
(b)(6)(G) requires that pier and docking facility lengths shall be limited by:
(i) not extending beyond the established pier or docking facility length along the same
shoreline for similar use; (This restriction does not apply to piers 100 feet or less in length
unless necessary to avoid unreasonable interference with navigation or other uses of the
waters by the public);
Consistent: There is no established pier line length.
(ii) not extending into the channel portion of the water body;and
Consistent: The proposed dock will not extend into the channel portion of the
waterbody.
(iii) not extending more than one-fourth the width of a natural water body,or human-made
canal or basin. Measurements to determine widths of the water body,canals or basins shall
be made from the waterward edge of any coastal wetland vegetation that borders the
water body. The one-fourth length limitation does not apply in areas where the U.S.Army
Corps of Engineers,or a local government in consultation with the Corps of Engineers,has
established an official pier head line. The one-fourth length limitation shall not apply when
the proposed pier is located between longer piers or docking facilities within 200 feet of
the applicant's property. However,the proposed pier or docking facility shall not be longer
than the pier head line established by the adjacent piers or docking facilities,nor lou IVED
than one-third the width of the water body.
APR 24 2023
DTI-INHD CITY
DE Q North Carolina Department of Environmental Quality I Division of Coastal Management
_1 Elizabeth City office 1401 South Griffin Street,Suite 300 I Eltrzbeth City.North Carolina 27909
0..1. 2=era+r` ". 2'7264.3901
Consistent: The proposed pier will extend 40 feet out into the waterway with a'
width of the waterbody being 40 feet.
(b)(6)(I) requires that piers and docking facilities shall not interfere with the access to any
riparian property and shall have a minimum setback of 15 feet between any part of the pier
or docking facility and the adjacent property owner's areas of riparian access. The line of
division of areas of riparian access shall be established by drawing a line along the channel
or deep water in front of the properties,then drawing a line perpendicular to the line of the
channel so that it intersects with the shore at the point the upland property line meets the
water's edge.
Consistent: The proposed dock will remain outside of the 15 foot setback.
07H .0209 Coastal Shorelines
(d)Use Standards. Acceptable uses shall be those consistent with the management objectives in
Paragraph(c)of this Rule. These uses shall be limited to those types of development activities
that will not be detrimental to the public trust rights and the biological and physical functions of
the estuarine and ocean system. Every effort shall be made by the permit applicant to avoid,
mitigate or reduce adverse impacts of development to estuarine and coastal systems through the
planning and design of the development project. In every instance,the particular location,use,
and design characteristics shall comply with the general use and specific use standards for
coastal shorelines, and where applicable,the general use and specific use standards for coastal
wetlands, estuarine waters,and public trust areas described in Rule .0208 of this Section.
Consistent: The development proposal meets the intent of this rule.
(d)(1)requires that all development projects,proposals,and designs shall preserve and not
weaken or eliminate natural barriers to erosion including peat marshland,resistant clay
shorelines, and cypress gum protective fringe areas adjacent to vulnerable shorelines.
Consistent: The proposed development does not weaken or eliminate any natural barriers
to erosion.
(d)(4)requires that the development shall not have a significant adverse impact on estuarine and
ocean resources. Significant adverse impacts include development that would directly or
indirectly impair water quality standards, increase shoreline erosion,alter coastal wetlands or
Submerged Aquatic Vegetation(SAV),deposit spoils waterward of normal water level or normal
high water,or cause degradation of shellfish beds.
Consistent: The proposed development meets the intent of this rule.
(d)(5)requires that the development shall not interfere with existing public rights of access tpiaL
use of,navigable waters or public resources. RECgIV
ELP
Consistent: The proposed development meets the intent of this rule. APR 2 4 2023
DCM-MHL ciTY
..DE Q North Carolina Department
401South of EnvirorentaStreel Qt.,
uality I Division of CoastalCity.North Management
Elizabeity Office CrifBnxn Suite 300 Elizabeth Carolina 27909
.N:...r` �amei / 252264.3901
(8) requires that established common law and statutory public rights of access to the public trust
lands and waters in estuarine areas shall not be eliminated or restricted. Development shall not
encroach upon public accessways nor shall it limit the intended use of the accessways.
Consistent: The proposed development meets the intent of this rule.
(10)requires that within the Coastal Shorelines category (estuarine and public trust shoreline
AECs),new development shall be located a distance of 30 feet landward of the normal water
level or normal high water level,with the exception of the following:
(10)(A) Water-dependent uses as described in Rule 07H .0208(a)(1) of this Section;
Consistent:The proposed development of an upland accessway is listed in
07H.0208(a)(1).
Based on my review of the applicable subsections of the North Carolina Administrative
Code,the permit application,and plans,I recommend a Major Permit be issued to The
Town of Murfreesboro.
RECEIVED
APR 24 2023
DCM-MHD CITY
DEQ4 North Carolina Department of Environmental Quality 1 Division of Coastal Management
_ Elizabeth City Office 1 401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909
7572643901
Weychert, Curtis R
From: Bodnar, Gregg
Sent: Tuesday, April 25, 2023 3:04 PM
To: Weychert, Curtis R
Subject: Fwd: CAMA Major - Town of Murfreesboro - Pier access walkway and platform,
Hertford County
Sent from my Verizon, Samsung Galaxy smartphone
Get Outlook for Android
From:Thorpe, Roger<roger.thorpe@ncdenr.gov>
Sent:Tuesday,April 25, 2023 1:42:23 PM
To: Bodnar, Gregg<gregg.bodnar@ncdenr.gov>
Subject: CAMA Major-Town of Murfreesboro - Pier access walkway and platform, Hertford County
Gregg
The subject project will not require a stormwater permit.
Roger
Roger K. Thorpe
Environmental Engineer
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
252-948-3923 office
roger.thorpencdenr.gov
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
fe)
o.vr+irrm ai a,a41Zy
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1
44-0 Received: 04/17/2023 s +7s,
%" J State Historic Preservation Office at ER 16-2019 DUE: 05/01/23
ROY COOPER B 1 V10:4'.a
Governor �ir itl
ELIZABETH S.BISER , �+' No Comment —SBA
Secretary 04/26/23
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ -Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
grei?g.bodnar@ ncdenr.ggv
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed,floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Renee Gledhill-Earley
AGENCY Historic Preservation Office
SIGNATURE P"" " �" U``d IRECFIVED
DATE 04/28/23 APR 2 8 2023
DCM—MNL r ITy
.,- NorthElizab CarolinaethCityOf Deparfi t1 ment401 of EnvironmentalSouthGriffi
Quality I Division of Coastal Management
a�/� ce n Street,Suite 300 I Elizabeth City,North Carolina 27909
o PIAMOMi+r ..rewa.ur� /l" 252.264.3901
ROY COOPER ir, `',`
`
Governor * :11
ELIZABETH S.BISER
Secretary s� �
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ-Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregg.bodnar@ ncdenr.gov
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed,floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregq Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
*'`Additional comments may be attached**
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments. tt
PRINT NAME (A) Aiyt .& a.I l.i &r-Q
AGENCY S4-a4t PkAtit,y'-7 UA�.i.cs-� RECEIVED
SIGNATURE 4 q `b -t
Aupt �
DATE Si 4-1 ko at 3 MAY •Q 5 2023
DCM-MHO CITY
...
— rt rro Qa I Cot
Elizabeth City
Carolina OfficeDepa 1401ment South
orEnv Griffinnmental Street u
,Suitelity 300 IDivision Elizabethof as
City,al NorthManagement a 27909 Carolin
rcl a.m\ om' 252.2643901
Weychert, Curtis R
From: Tankard, Robert
Sent: Friday, July 28, 2023 9:37 AM
To: Weychert, Curtis R
Subject: FW: KING'S LANDING IMPROVEMENTS, DWR PROJECT#20230520 (OLD PROJECT#
20161052)
Attachments: GC4501.pdf
Please see below.
Robert Tankard
Assistant Regional Supervisor
Division of Water Resources
North Carolina Department of Environmental Quality
Office: (252) 948-3921 I Cell: (252)402-5694
Robert.tankard@deq.nc.gov
•
"I 171 E
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From:Tankard, Robert
Sent: Friday,July 21, 2023 10:25 AM
To: Brown, Carolyn A; Leggett, Michael W<michael.leggett@ncwildlife.org>
Cc: Bland,Raleigh W CIV CESAW CESAD(US) <Raleigh.W.Bland@usace.army.mil>; Scarbraugh, Anthony D CIV USARMY
CESAW (USA) <anthony.d.scarbraugh@usace.army.mil>; Cynthia Rountree<cynthia.rountree@deq.nc.gov>; Weychert,
Curtis R<curt.weychert@deq.nc.gov>; Stewart, Glenn A<Glenn.Stewart@deq.nc.gov>
Subject: KING'S LANDING IMPROVEMENTS, DWR PROJECT#20230520(OLD PROJECT#20161052)
Please find attached the documentation indicating that your project is authorized under North Carolina Division of
Water Resources General Certification 4501, with the DWR Project Number being 20230520 version 1. If you have any
other questions, please let me know how I can be of help.
The General Certification 4501 can also be found at Web Access
URL: https://edocs.deci.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2152988
Robert
Robert Tankard
1
Assistant Regional Supervisor
Division of Water Resources
North Carolina Department of Environmental Quality
Office: (252) 948-3921 I Cell: (252) 402-5694
Robert.tankard a(�decQ.nc.gov
� y
NORTH A C ROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
2
AAV+ 04 o
4401..
, 4
ROY COOPER j� ,
Governor 4r •�
ELIZABETH S.BISER lsl FFF
Secretary
BRAXTON DAVIS NORTH CAROLINA
Director Environmental Quality
04/12/2023
MEMORANDUM:
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ-Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330(Courier 04-16-33)
gregg.bodnar@ ncdenr.gov
SUBJECT: CAMA Review
Applicant: Town of Murfreesboro
Project Location: At the terminus of Hart Street in the Town of Murfreesboro; adjacent to Meherrin
River, Hertford County
Proposed Project: Access pier to a platform, grading old roadbed,floating pier& platform
Please indicate below your agency's position or viewpoint on the proposed project and return this form
to Gregg Bodnar at the address above by 05/032023. If you have any questions regarding the proposed
project, contact Cynthia Rountree at 252-264-3901, ext.234. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Rachel Love-Adrick
AGENCY DCM
�II''i) (i)\0' (i)
SIGNATURE
DATE 7/28/2023
Consistency Determination: The request is consistent with/not in conflict with
Hertford County Land Use Plan certified by the CRC on February 24, 2011.
North CarolinabethCityOf Department
fice401 South of EnvironmentalGriffinStreet.QualitySuite I300 DivisionElizabeth of CoastalCity,North ManagementCarolina 27909
NORTH GAV.Z ,
^+�� uN /..., 252.264.3901
L
June 16, 2023
Regulatory Division
ORM ID No. SAW 2023-00851
IRECFIVED
Mr. Gregg Bodnar JUL 19 2023
Division of Coastal Management
North Carolina Department of Environmental Quality ACM-MHt CITY
400 Commerce Avenue
Morehead City,North Carolina 28557-3421
Dear Mr. Bodnar:
Reference the application of the Town of Murfreesboro for a Department of the Army
permit to construct public access piers and platforms,and an upland walkway, on property
located at the terminus of Heart Street, adjacent to the Meherrin River, in the Town of
Murfreesboro, Hertford County,North Carolina.
The Federal agencies have completed review of the proposal as presented by the
application and your field investigation report.
We recommend that the following conditions be included in the State authorization:
1.All work authorized by this permit must be performed in strict compliance with the
attached plans, which are a part of this permit. Any modification to these plans must be approved
by the US Army Corps of Engineers(USACE)prior to implementation.
2. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or
if, in the opinion of the Secretary of the Army or his authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters,the
permittee will be required, upon due notice from the U.S. Army Corps of Engineers,to remove,
relocate, or alter the structural work or obstructions caused thereby, without expense to the
United States. No claim shall be made against the United States on account of any such removal,
relocation,or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE
Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910-
3282 at least two weeks prior to beginning work and upon completion of work.
3. Except as specified in the plans attached to this permit,no excavation, fill or mechanized
land-clearing activities shall take place at any time in the construction or maintenance of this
project, in such a manner as to impair normal flows and circulation patterns within waters or
wetlands or to reduce the reach of waters or wetlands.
4. Except as authorized by this permit or any USACE approved modification to this
permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in
the construction or maintenance of this project, within waters or wetlands. This permit does not
authorize temporary placement or double handling of excavated or fill material within waters or
wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project.
5. The authorized structure and associated activity must not interfere with the public's right
to free navigation on all navigable waters of the United States. No attempt will be made by the
permittee to prevent the full and free use by the public of all navigable waters at or adjacent to
the authorized work for reason other than safety.
6. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents associated with the construction or maintenance of this
project with a copy of this permit. A copy of this permit, including all conditions, shall be
available at the project site during construction and maintenance of this project.
7. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction-related discharge. Increases such that
the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by
the North Carolina Division of Environmental Management(NCDEM), 25 NTU's or less in all
saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not
considered significant.
Questions or comments may be addressed to Mr. Raleigh Bland, Washington Field Office,
Regulatory Division,telephone (910)251-4564.
Sincerely,
.2$64 SPW5
Raleigh Bland, S.P.W.S.
Regulatory Project Manager
RECEIVED
JUL 19 2023
Copies Furnished:
DCM_MI1:. CITY
N.C. Division of Water Quality, Wetlands Unit
2321 Crabtree Blvd, Parkview Building
Raleigh,North Carolina 27604
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh,North Carolina 27636-3726
Ms. Twyla Cheatwood
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort,North Carolina 28516
Mr. Kelly Spivey, District Manager
Washington Regional Office
North Carolina Division of Coastal Management
943 Washington Square Mall
Washington,North Carolina 27889
CF►VED
JUL 19 2023
DCIUM-MHL CITY
i ao==Ill!
1 kg CIVIL ENGINEER SC5N:
Rivers & Associates, Inc.
•I y':
Greenville,NC aW S a
0—Rivers I i r
`S ASSOCIATES.INCIllemilli
107 East B000nd Etro51 tS O
Oreenvlll",NC 27551 to Mu
1252)752-4135 a~
Contact: Matthew Prakop.PE •'O 5
n mprokepOrIv. .nd.nacIMo5.eom ,NO pXX r1 to
Sr to
a ,
REVISIONS:
SITE DEVELOPMENT PLANS FOR i
K
1
Murfrees Landing
p
SITE DATA
Merw nr,ry —.. Z
MR NUM—.—. ,k,,.• M� !# �."wai 7 N". Sheet List Table (�
YAM▪ * arra
moor
■ ,�WI!&MAE MI Isa Sheet 1utMx CCOOVER�2 E70371NG CONDRKMIS 2
LPr_• � �A14.�� ��_ >♦w�I rV4414141*At. .i� DeeaLmoN µsrraEF EROSION CONTROL h
6 GRADING PLAN tQ
II
e KAYAK LAUNCH R J1)o �
▪ :_�W MURFREES LANDING: 11 srrEDETAILs Q 5
MURFREESBORO,NC
NM HERTFORD COUNTY 4.W= V
PPP
11114A1 IL 2
`"Vet��e '� W
IMO
d i
111
s r-� GENERAL NOTES: I �-N e
I II i ?_I a,E
3 iii / �`11 JANIUARY 1S,20a
1/I�G—f�11�1/ - 4 MURffp50115Uri
50aeon et —
20.4 18
tt. In ■ -(-lLmn; iii11UO://��y �k. YYOED
Aa NOTED
VICINITY MAP °"
E 1:500 1
ito i l�aor
a
ma
"1w00
t'nz ti 1 dde
I.
qii
\\ \
. ) ,$
/
/a 1
ps11 i s
•
I ,f
• ._---Ao.-, a\\N\��\\' \1 ',III ',II,1 - '
,ol ,'
.ii \` \ 1'e'1 \1\IIII'11 -
i ra \_ a 1 is a. �" \'!,p,\`\}lll - $.
I i ;_ 9i ' \, I\\`,\ I II11
n / - .` •..1 ttt lltt t'I',\tl 11 Ill @; ,- a` `1' ...t ltlllllt WI ttl ',T1,1 'NS
'ts i "/ 'b _ _ a' I lLy IIIll11 1 tll tll" \t 1
a — f`p; 1,-, -ei Y—\\a` '\I .b 1PIIIIII1 Ill I'll \\ • `\\�. N
iC ' la-)
� \ —44—.1 ate- �1\t' \ 1 r- 11jlllll ll'
- —a '— l aE) 'r4p- .A.t�•- - , a: 1 ,,'rllrsrl lI F/ S:
4,_- . / RE'; °:I %1'�' r` . Y\`\;a t;;1;`,-`, \\\\g
..ti��-. _''4',/,'irr�-�1,-- k ,S1 1 \At/ k, '\\ II\�ti1llil\ ,\,F'
0 A
j✓ ,'a�';IL . ! as,{,,`/y / ;•t .e 1..\n'^\I•tl,l�t`/II I It Il ill
T 1nt - .1 1 /� I 1 i 1
�_� y. ' $Y i4 ' 9 JNI.1 i i \
A I lt 'e ,III t
y / p /7
aif ?\ i ,,Fe / e Q \ II IIIN11 q I
t .Y i g -- - _- -fl r ��.i..i:1: av ! a.r, II rrlr11 r \\ /
�_ 1I fib ) l' � �\ �. - aV ` � \1IIIj111I11��''\ �
I 4 E $ \ - :;',,,
I IIIIr/st.,.:::.:,
'\Sd } { F I3:' L ' $ \\ '.M 1'lllll lll'10:t I
�:::._ s �� - e $ $ I„tall,li'nlllnili�il i' i
›Ay.i'!.. _, ek $ llltIIIIIIIII III
\ ). $h i, jilt ltii' II„I;1111\
6 tI I1�1III lllll•I:I\\\\��\\\..\\
t} 1 I
99ii _ " "- .
.
O= I£
1
RI
1
8
4F1111111 TOWN OF MURFREESBORO
__ •'W �wMURFEES o LANDING ' Preliminary 111Yers
N t o.�. ,...... , ,.
P DO NOT USE
" i I EXISTING CONDITIONS FOR CONSTRUCTION ..\«,.:..as,ti: "" ` m
xo, oisoprv, an w t:ut n
uW.Sd Net sc.rzf�lzsi) uw HdlaCieO
quaoO.s Nocconxasr+ooaaa ' 1OW.NOO NOISOd3 O14 NV NOIL1O 40 IN301
a 8 ss . e
.w i W•° u a�' 8S11 ION OC t 4
SJiAI11 ./7
JNICINd1
04
S33di ri LAI y{ $
OHOHS33Hj HfW 10 NM01 1 8 11 Q 11 i
R
e $
'A R
1
YY
\\e;��`=1111;11;�1u;
\`l\ s`\%\111jj1111`1111`\I`1; $ ::;4
\�,,\11 II;;i,11111111'111111j11 g -" \
' i \G;,;,11„j1111;II:II1;;111; u. 4 �\,'�
% 1 1y(IIII IIIIII'I,1,11, ,I \ � w _..��. ..:.`+1B} ':.16 lei,
/ I II1 i1\/III II IIItI lill;,l,_-' °\` g _ _ 'I� ..yyam� :'':'•'.::
',, s;;',\Zi;,i ' , .4A-,4--,-1--H.-..,--F----E.:: ::•-:..1v.-..!..:,-;.P--...-.-.i.-lfizt:::•-;:,;->:,,.-iL ..:.';;;.:47 - ----\-4in Yt''''.
,\,1,I„/l I ''4 '. a 4 ___ • _ --�,�,��l,\ Ii du 1 1 1 >'� :•g..•g i , Y., i Vie__ ._iI -: /1
;4.,./ .*1,s,
/// „IL , i'# , :,.{ g �t _ �-- _y-- of
z;--7fr--"-
// 1,1� II j11'1I \`I�\ ` •~ _ 3.:,. es__-
�e4-----1.'t i g�./ ii ✓�✓ -
- 11 11,II1111 11 `\I,I' 1 4 4 j _ ,_- \ 4 - 4 / „i---'%` �+__
1/ 1 IITII II, Z ` �:... •.. e � •i6 /�. �/�- �^'R---__
/ IIII IJl�%/�:' : / .•._.Pn .���[�,-- sl�i-Y- , F� �yA�` ,f'-� --- "- ____ _-'
! // i)//'%,, VI ' -+a-- - i ff — ^g._- 7\ 1�'1i --E/--, --------
� 'ail ;;; �;'tit
; I �a� 1- \ '_•!�"=�• -- -- `_���--�%-; ;-- -_____-- --
,, cx :\,,,,,,kiii‘V‘\\ \\,, -.I ii \ . ,,' t:-----':„-;,----1::„_-K,''',,' ..„------, ,:, --7,---—--.."'-'
; \\,.11 1 1 1 1 I I,1 I;;,1;` c I -( f 1'--' - -4, I 40 ' �--'
.\ \11, ,,,I I;,1'\III'\. .1 •?4 4 = .4 4 �y ��tt / ; - - -- - ' r -�
``- ` 1 �I,�III lI�I;; 'I'‘, ‘�..- _ - i • - 564. / !6 / 44 ! / R4 -' -x-
1 or
N.,,;,\\`0,\\, ,�;i1;I,;;1 ;;I;;;011, _! e' ' Rom'! �...�=a —a— - --� moo—y4 __ 4
I II11I`1' 11�i11„11 , `'ll`11`;11i 1 ! ,R � , / 4. �`r `
II,I;, i11\1 111'1 II„1111,11;.:: M i f' a \ ,
, `\�\�I\���\,\1i(ii�//l��lii `I Sri s:\ ` a a/ * i i
---"-- 'III\, , \1;);\ `;\?;,/',//11 ; ;. - ;- r ;
It'f'-11-11111 s,‘,--‘;,;Ili‘",:\:,\,:‘\::::„\f,f4lt 'i \ \ !„. / ' (
- I I I \'11111% . — 't ..
1
1 I� e` a
' Y
1
1
/I 4 RFCFIv�DITY
s ; \ s
\ APRi
\s . .\
; OCM-M.1 .: C
r
•
0 Q r3pl,
wig
F alb °S
l
\
Cal,- X i ddb % ) \
crEAtaodb
$i 1\It1•\ I I I 1: 1 i p
a ,� . \\,,\\a\`1 \, 1 11111 1
•,,,,,6'\\\ \\\\ i I i i 11it I\ _
' ,,.\i\,fir d�\\`\„,,,,,\```\I\\\\\I ,1 I,I'\\ —— '
I \ at 1 4. rtiS a+ 1 \ N 'I\- \\\\ I111 I'I I I(is
I ,`r,
1 �-f 6NT/sr d\ / r.l p )♦�,: \\\`IIIII \\` 1 =--'p
/ 4 44'.a.13 .: -'al ,� r+l ai1 1\ \\ \\IS 11\ \ `\ I1, _'- t
i I L : ? •:N'� -..^v.�, i 1, 1 ;tlll'ff, \\fll�\\\\\\ 1 iII - -- i
/ 1. / 1: oki-ra� t',' p�.dl b 'ajt b'ti 1,\1\I I' t\- 11 III
r Y,F;'.i• a ty 0i'L I11 \ .II1,1 �
p' / !/- g Y i, 31:rr,.-•A'- — a - 1').;+ro;` 7,1 I 1 1,;I,g, ; ; \1 ;I j N.
#1•�— ex--'(7---11 ---r _ ap_ a1 br a /.4.4ittf' \iil ,ll"`\ \`\\`\\\\\r
° / - at riaR� q& 11 Ly ilili\t\1\\ -
#z`-r--y app =}-- is : iy ,, ,/.,�i ,„„,i . „II11,„, Si
/=-A. e - / i J 44 I ft '1y�' ; .1,,.`•M'i'1 ILi 11/,j1'`�Ii1 I(,. / ' I�
ak'' - ',y 1 'rE' - �. - li;di 1,\ i 1 1 1 1 t iH .�, . '`,
:\\\:\\;.
/ I ai \ \\\\i \\\
---` + , /��-----'—___ y I IIIi11I 11''.-.1 \`•` 1 aM� \`i I i i i )'�. 1 1 i i',/
- ---- — ai _ --' �/ .----== =':i � a`i A I: ' ' :1
- 77€�.4« I— 1t ` —i �, 1` -; —a \.; I I 1, I I $'.I
- ''-' .: / , ; , \ v' (i /.1// r l i i I I
--- ---- : ' ---- --:* . '''' .--'''' .4*, -
''- yam i \\\\\\\\UC -_:A ---- ,k 0 11///$'r I u i li I/ i
�_.•t.c�- /1-. / L a --- ' \[ar @ trr. '.` \ \`�,II\\.j,,11'III: '1. ' �' /
_ __ -i.�•/-/'-��-----"_ �� F� '`\� ar-�. `�" 1 rj'1\\ 1I1 III.II 1 1: 1
a- a �-- s—_p,.. y a / y _� % -\ F 9 ..V ,` \\`:' j 1I I I I I I I::•'li:
9 ----5' _-1-''- •/ a..:L... _ " . �..:' ,I a:F,1111�i\'rrli' \\
—I; \ _-�-- - ---'- II>e: ..,y`,p.'�r�•_��'... ;1. 1.��, ',`) '+A'1I1\rtri�llJ 1.v� `\
\___-__ •.6�: _ ,sq'A - 4. _ - 4iy `\ '1 ` ` \1•\I.\11�111 / /
y�''.::,.:.�.`''� � 1•��•Y-r•^•,. '•.1::,:�;.1 �a 6I 1 \ .�, _ ,•illy: T:nlllld'�� 1
iA' 'w .F :':y_,^ yrs�': Y:.'.„y ti'.!.' !__ ` YItll\ .`IIt 1111, < /
t .^ •1,..�... t.'.•>`. . F .: �F Y \\ it„1=•I�1-,IIIIII /
:; 4,;?,s. ::• .'i•.•., d 1�.�� G 1111111'.. .. III 1
: s.Y -':: � a il�tnl iyi l ttli IitiO
I1II�IIIItII11�'I11111"�;����\.ito ==.
--'--- It'\+�\\III\'\I1t1t\`�N�\�\, i
ii
i' 0 � Y\'u1\,\\
- - VY
AZ
i
is
r.
;1'
3 '
4 11 1 1 1 I° a TOWN OF MURFREESBORO
___ 4 MURFEES LANDING Preliminary 09 11lver$
TOWN Of Y4pfplas1011O - TFOMO CDYNIr - Nop2N CAIIO[NIA DO N07 USE ,:MaOOU i s'nii
N II m GRADING PLAN •
FOR CONSTRUCTION o.e..+s.ro•sl.•Y �m a.....
s on•,.ul•.uc 2 •�•
Mit aY I2v1+62•+a5 rest l••••,•I•Nru•Y
4��? ..0
I ,
,o
I4
6
a
Wn;5
e Al*as % \
I I ;ti.;t�.;
— \ r•. r• r•
—
ill , ' ;,:41:. ,0
§:;---
' Iwo*. • -1- Ailli
nuuwiunnui
�aaa�ou�a�u�
iII1\
•
r,
4w. Y
'�ummuum
liii
II
1II t �
13®I TOWN OF MURFREESBORO „�
,,' . MURFEES LANDING ( R'YjIS
A s ,�,,o.,,�»,»,,,,o� _ �,„,,,,�,. _ ,o,, ,.,�,, Preliminary
Pg ••••Tuxt MS
DO NSTUSE
,o..•.......... i-.wC
.111 11 9 E• C SITE PLAN FORcoN CONSTRUCTION o. •E..s....
4. nn. cwar1rx, WI!e MP)rss..,u ..r.r
Iil r
,,,,q, /1,"1,fl ►dill,' I I I '
'//;II',,'I!II:/, i'i/,''"; \ I /
T 1 illi(i'/�i i i / i\ ( ,------.1____ _ji
i/IIIiI \ ♦ ` 1`��-1IIIITIIII 1 /I;I I;I II;IIII'1 -P
F ' p-,'',��''''\\\\;;\; N I� ,' IIIIIII
■■■■NNIi1 NMENII11■IIN■■■NNE■■ :'i ;,'1'V�;;,`�; �O ! -
■■■■■RIIENT EEIIE111■Il\N■■■■■■■ �-'r;', �, = 1 I I �� i
■■■■■IIII NNMIEE111■11■►1■■■■MI■■ I I , I \ '
p3 ■■■■■ M EIN■IEE41I■11■-I■■■■■■■ 1 I;;;! \ I 1 3_' _ :'
■■■OGiii IIN ■111■15■Y■■■■■■■ M I ;, I—;��,
■■■E'ANNESIN II'III■1E MIN■■■■■■■ // I �. lu..
MI■■NMI NN ►HINT►■■■■■■■■■ s '%'I I I I \ •
E■■■■61INOM'dEENIMIII'i■■■■■■IIII■ ;' 1 1 ; I I W
g N■■■■IRENSI I■f MIIIIN1■■■■■MINE■ g 1 1 1 1 11 \^ 11 ae �, q
■■MI■■sIElIIINEEIlI1I1Ef1.■■MIEN■MIN . I 1 1 1 I ` 1 I 1\ ` !
■■■■■II■q■�■F■�■■EIIIIIIIII■■■■■■■■ / ; ; i ;ag, ,1 i \- II «
■■■■NIIINNNIEI�E>II1r1i I■■N■■■■■ I i / i 111V \ ie I 1 / 4'
■■■■■IUI Ei0[NEIF>BN11IMM 1■■■■■■■■ 1 I ; I i r•' ‘)..L..,)! /
■■■■■III■111111■■1P'111111EI1■■■MIN■■■ I 1 1
- ■■■■■rliu■E. -'1111RE11■■■■■■■■ 1 I 1 ' �; 1
■■MIN■IIUr7:A mi'llliUl I■■■■MINE■ 1 1 ___��a V
■■■■■III■'llII!IINIIiIi9liiiii� `III!!■■■■■■■E , 1 e/"�qll'1►11111►�111111111�_=!IIII!NOd111►U11!
■■MI■■uII■J£®I■I1■■., iii ■MIN■■■■■ I 1 1 -
$ ■■■■■IIII II► �■■Ei01,I■I E■■■■■■MI - 1 1 =1'
■E■N■rINEME>tEM IIMIN I■ENE■■■ I Ij 'I� �� a = = 1
■EN■■ /■\I,\■■IPlll\`■■IMENN■■■ I if! l�I,�
N■■■■ ■■►�1■■i/IIMIINI3NEEMINE■ 1 ij 1 " = _=
■■■■■ ■■19\I�E11■►\■111E■■■■■ I . ; 1
3 ■■■■■P1' 'EM'kli&ANIIE EIIMEMI■■■■ e= ;=
■■■■■:I i!lFEIls1■11■■.I■IEMI■■■■ A\ ` .11 i— , ' ;l:.:
■■■NI I RNIEJ■11■rI►IIII■■■■■■ \\ I 1 ;u ' ,*I!!liil11111111II
MINIM l RN ENIIN11■=I■IIIN■MIN■■ , I i 1‘, '1 `
■■■r N:Ab�MINNEN■11■-I■\'I U•UU■■ / ; / 1 1 a ,:!�► I'�J„ F� t _ ;:.;
- ■MIN=Ifni':'''I'ICSINE 1■EMI\III■■■MIN ,' III 14acieh,, ' 1 . -
■■■i1 VIVEI UONIl■E■■►111MI■■■■ // I I I I y,Pr, N24.4 «
■■■■II4�pr1.IVE67:: I INENIILu■■■■ ' 1 1I 4 W4-'4.,.%;„
ir(11��+,�: C(1►fib / / i i 1 , = F■N■■[1MENIIIIIhr , ozW. iA \I I■,I■■EMI , / Drif=0 *VAS ' r
S ■NNE■ � I,Vric bit `u1\ I■■ 1 1 1 1 I .polio,ll ,_-;-- -- _-_,..., 1,/ _ .\ii.�." }
1► -11illin il-i,.i, 'la.' I I 1 I �' , `!
■■MI■■i • t�i�.:�: 1;(0�._+�- +.IU• ► IIII 1 N�j"11 ��,a�a�
►y ►1 1 1 1 I 1 j ,, _ i O`
■N■■■pi�,spin�'1�t11.11_Tv: i.i IE■ I i i i ; 1 ,�r ,�. i��'1 / Y u \ P...,
9 t r 1 ;Y`;j1 I AIL;. 1■■ 1 1 1 1 N ,� I , % \ \.
■■■■■,att•�, �':•t 4`/',,meiW I `,` >' I 1 I I I 11� 1 I;`(1,✓J.41,,, , I 1 \1, I: .
s ■MIN■NlIre {O lIFUI•1.ICUMI INN I I i i I I '� ��I�A` „1N , I aa..
� .�� '' I I I I 'I I
■■■■■Irlii4146.y`itiy'i�i l7.1 i� -6 11■■ I 1 I 1 1 I b A '�^ i,► N� I ! ,
■■■N■►r iamri/r AordmIr i1I ldllr biIN■ 1 1 I 1 ..�t'ng;',�i I ,-'t.-',;
_ ■■■■■��ri?skajfi?:11/li l�Eti?s/1 �u i I■■ ' ; 11 ; 1,140,q ,1 I I . � = ' - ,;:•
■■■■■:�.'i tiii;:�.'1�"Itiiii;:Ilitailiii;:Il"1i:1■■ 1 ) ,,, 1 ,.I,�4► t /�a II r-A---,�A
■■■■N.l �►ti( E1ti.(1\NI►till\ti 1� /, \ 1 I If €
■■■■■4IP.skri t,-itih ';i73i1"i'& 41= f 1 1 1 I I 1 1�,Neb9 i 1 %I ,1, -
.:. u .:. tar ... u .�. I 1 I I ' , : I /, , ,
■■■■■Ir.�l;I�d11r +;I�dllr.�1'E�dllr.�+l l� 1 I I I 1 ,�,j1;1 . I \ P
■MIN■■���InM1i�_Err?�Lfi��Eri?\Ih�EI'1= 1 1 1 I ,.tr A1t14I' 1 I j _
§■■■■■:I1ti .iliii arti�`'Iili:illir''Iii✓:Il1i!I= 1 1 11 11 11 ;I111,4tgh_ l I ; i I ,.
a y o a o N O 11 \I 1 I 11'1 III111111 ;II I -}, •
I I I1 ;II111111111I1 j - {-= , .0
11 1 1 IIII 1"I IIII III '
< I 1 1 1 1 11;1101, 11 111 ' , i kS,`r
m RI 1 1 1 1 1 IIII ,1 ,1 ;1 ,;
1, II IIII 1 I
N I II j 1111;11111111I11111 Y 1 PR ; '\
1 1 IlI , ;I1 1I1ilI /I
`te 1I11I11111\ 1110 , 11II111111,I114, I . �,VI4
\11111111�\1111;1� I _aY II ;I1;1111\1;11``(({E{ aV , r
11 1 ��I I I I , --
7 P i i®I 3 TOWN OF MURFREESBORO
=..a, MURFEES LANDING
LPiNNSOTT0.I0JCC TION Ci41{lve
rslmnaryOf a !
: iei4 KAYAK LAUNCH
NJ. R> I4. OMIT ry I2 .0l
S2I 7Sz.135 • • ••
Mil�i M8 1 ..°..__l
El
fifli
/% ! fir,.I.� N $1 :� �,AA� 1 At
i'4
sa
14
ip
...Igoe= : , i 151 I i i A L
F,':2 If I i 41 r
..,mh.111W
1 /
.b
1 V
alli
1 111
•
.� Ill
in
t Ili t
{{ I I il 1
11
F � 1
3
111 rw
PI 1
3 c2iE `F
Mtl -‘i 1,
III + ' + is
MI A
IIf I
il
e ' 1 3I)! ill - ,
B 3 p 4F3 ti K {
® l4 TOWN OF MURFREESBORO
' q l It1Yers
.., � MURFEES LANDING
yS ro OFMUgfq(F(FORO - q(gTDgD4O4Nry _ gOgTqc.qOt/q. Preliminary
DO NOT USE
FOR CONSTRUCTION +m°m I....a a..e
SITE DETAILS .....�., :..°.
L u's Na. Owa+ron WI n u°°),°:-.1 33 le*.MM..
%'
a
NORTH CAROLINA WILDLIFE RESOURCES COMMISSION:
CO ENGINEERING SERVICES SECTION a
MAIN OFFICE LAKE ROGERS DEPOT OWNER:TOWN OF MURFREESBORO
1720 MAIL SERVICE CENTER 1718 NC HIGHWAY 56 WEST PO BOX 6
RALEIGH,NORTH CAROLINA 27699-1720 CREEDMOOR,NORTH CAROLINA 27522 MUFREESBORO,NORTH CAROLINA 27855
PHONE: (919)707-0150 PHONE: (919)707-4050 PHONE: (252)398-5904
FAX:(919)707-0162
PROJECT
SITE
KINGS LANDING - IMPROVEMENTS
HART STREET
MUFREESBORO, NC 27855 VICINTYMAP
HERTFORD, NC
i ... ...),) _4,- _mi-
,,
PERMIT REVIEW PLAN SET 1 --
w- - -
GRADING LOCATION , -yc-
.u., -Iv -ii
J
SHEET INDEX PIER LOCAf-L
m
CD-8 COVER CD-9 OVERALL SITE PLANROAD ST S��CD-10 SITEPLAN(PIERPARCEL) PRELIMINARYCD-11 PIER PLAN VIEW ■r■ t�p0
CD-12 PIER PROFILE VIEW FOR DCON�RU USE
UMW
/
ail _ C
CD f3 SITE PLAN(GRADING AREA) �■ e---
CD-14 GRADING PLAN/PROFILE Murfreesboro .�► q/�
(SCALE:1"-20002
I SCO # 17282
I
�y ,.t
gay
PRLIMINARY
d ( FORT USE
3 — CONSTRUCTION
J
i
wIP
i §
7sem, y1 W
GO!S led 1�0 l
/1C 4jJ� a L�+
§W°U vA�
2W
Ili :0'
gz
Jr EX.ACLt3S PATH =sow S
NOWT'PARCEL BOCAVOARY %. (TetK7o:m SIDS) NOWT'PARC£L BOUNDARY ..
( Ara+DEL) J (cc AREA FARCE()
EX. ACCESS PATE!
f T
TE A CONSTRUCIVN ACCESS 41.. 1,*
- 1D CRAMS'AREA
Air
Itr ,.% l // PROPOSED AREA FOR GRADING
.�_vf i`Y , II Cr
At
t SMOREDNE LOo4noN ,4 Li
v)
PROPOSED PIER(NCWRC)WIN OF Z 8
IOW OF
AIONFIEEMOKI
SDfJlH PARCEL BOUNDARY Y
.., (PIER PARCEL)
,r r>>u'(,f eouNIA,0
D.b:
NC)h'M!1NA(l-HCfVlI -- -- *N,---- - �(
y� lfll/2072
Fla NGlms:
Or a .. bN6illMyb:'pC
Dawned
SCALE IN FEET ApPoved MA
� � 9NwtN. of 14
0 500 1000 9
I SCO #.t7282
1
a. PRELIMINARY
.. '- �FOTUSE
�" �-` Cdl17RUC770N
kr°.{ RGN PROP fWED PIER
•oot..`i.ai�10 cF Y
• u°3
Cp
g
��r
g Wy�
Y=Wg
a'., _ g p1FF2
E.Y. CONC t/17I J w
SXIEIYALK \ E =w $`�
\\\ I TOWN OF MURTRESSBORO k
S ao.
TOWN OFMURESSBORO EX CONCRETE (P1N: W myg
ll
.
i
1
' ' 411_, L*
EX BUILDING PAO
a GRAVEL a 13'
PARKING AREA
1
E
E /—
1✓/
EY
4% J
W U
M O
5 Cc cl-
TO ES
(PIN: 5968-19-9580) \ iQ.
f
z
I
5
1
k
PRQV RR'BiOWLMAY 5w II/aY/so?t
FM N.m.:
MKS 1..Y..%0NG
TOWN OF MURFRESSBORO O11pied
SCALE IN FEET °i`"-
(PIN: 5968-26-7524) Mnw.a: ML
IIIM---� '9h.N No. of 14
0 60 120 10
SCO / v2J NINARY
M
/t . / ...
///�� NN::: W DO NOT USE
/ / 7 �I E ° CONS? ICTION
_ \ / \ \ ME�ERRIN RI\/ R
�'o o _15 —
o :i\ I
/� WINDEX CONTOUR /5'INTERVAL(TYP) I'��Il�i�lllllllWw�---,\ IIIIIIII. :8'1:
=U ��11111111111125K' n�'b- - - � - ► 11111111111111111111111Esr,111111111Z�= ��/ SHORELIN 4 w a
8 • (NWL) 41111---1:1:
11111_
s�"iu �►�Ill to—
ji
5.---C.
-- _ % — —
`���•�� 1 i �- �_/ TREE REMOVAL AREA \is-
TOP OF RIVER
f a.� -:" —�",-. _.�. APP. 30'X 80' • �•..-... BANK(TYP) W
_i TOP BANKF RIVER L >l — .... 61 _ — — ._ — — W
o.
\ ` (TYP) — '
\ ,— 3�CAMA .•►-• >�' PROPERTY LINE 0
\ �/� BUFFER ' \ mP)
/ _ _ /• IS. ., •.. EX BLOCK WALL ` Z
1115.
l y-� \ \\ �P> Z Lail
\ \ EX. BUILDING
EX.CONCRETE PAD T(PI of"1 BORiD c�
\ v \ WALKWAY SIDEWALK • -- (PIN: 5968-26-7524)
\ • _ _ —
LEGEND
\ , / SETBACK75
°"' 7V
.� / — ..— _ AECi Fie Name:
� �{E0 IL / . Deeyr
ed
�'fNMlOGBOWY —••—••—••—••— SCALE IN FEET Onwn
APP.. . wit.
��0 slrelaw
of 14
0 20 40 I/
J SCO # 17282 C
Profile Perpendicular to Bank ': PRELIMINARY
Walkway Walking Surface `, o NaUSE
EX BLOCK WALL UR
SWITCHBACK CONSTRUCTION
LANDING PIER
(TYP) \ LANDING ELE=8.13 ELE=5.0
20
\\\\l` ELE=10.0 20
EX BUILDIG(LAPS)
10 10
CONCRETE —PIER ELE=5.0 El
—EST OHWL ELE=2.7 o
WALKWAY 0 0—NWL ELE-0.4
SWITCHBACK RAMPS \ LANDING �, o
ELE=10.0-8.13 AND ELE=625 V M
—10 ELE-8.13-6.25 ���_
EX GROUND \ —10 9ile
(TYP) §i2g $B
-20 o 0 o� 0� 0 /0T -20 W E E g
rn Ln I - V) rg36.Z 1
+ + + + + + =4n
IN hi
Profile @ CL Along Walkway 41,,
,,, 0.,
20 20
10 10 co
—PIER ELE=5.0 W
—EST OHWL ELE-2.7
0
BOTTOM OF 0—NWL ELE.0.4 j W
SUB STRUCTURECt
—10 �7. � —10
L.
(TMsP)
0
0
Ct
-20 o o o 0 0 0 ��20 0
to LL7 I� Q) EX GROUND Ct
+ + + + + + —30 (TYP) 5
10"TIP 0 0 0 CO
PILE _
(TYP) + + + k
D.
101/smi
Fie Nun:
SwwW:
D.P.:
SCALE IN FEET mow: /w.
=Mm Si." of f4
0 20 40 12
ADJACENT PROPERTY(BOUNDARY our a<N - �`�•`�' SCo # 17282,
r
CARL .WtPRrLI
AR Y
5142 OLD USX Co. O NOEI MURFREESBORO NC 27
O. FO
CONS772 ON
Gin t v '
c I
5141 OW uS tsa
M %EY,y4 AE 2Affi ;
AY
REW AREA (A✓EA HIGH NIED) ro
VIE
PR9POSED TENPC ARY z n
CONSTRUCTION ACCESS it M
� U
zw. 82
. WET WO AREA 3 v op(PER DELJNFAINW CONCURRENCE CN 07/06/2022) $&iiclo A'
z = op
11 il
{
SITE INEORMAAON r <.
1
PROPERTY OWNER: 1OWV OF AWROREESBORO STAI rr
PROJECT NAME KINGS LANDING IMPROVEMENTS(PIER) q ,/;.
PROJECT ADDRESS: 126 US 258 TAW N, COMO, NC r
PROPERTY PIN: 5968495129000 ff:
PROPERTY AREA 448.57 ACRES /i
PR. A'S7URBED AREA- (0.46 ACRES)20,121 SF ;///:
PROJECT INFORAWION: A.1,,, %'
" ' ADJAL'ENT PRCPER7Y(BOU�QNRY OUT 0 or POIEN/AL UPLANDS:: f 0.44 ACRES ,S^�d (US Hon 258)
POTENML JURISAC770NAL WE7(ANOS: ±0.02 AO72] GRADING AREA REQUIRED YA CLOMAR F///'. W Q
REVIEW AREA: f 0.46 ACRES (40'X 40") �",%%%r o c�
CC
,} ES
LEGEND V t as
EX CONTOUR(MJR) .o , .., "�- /"""�. Z
ES CONTOUR(A NR) ��---- Y
EX PARCEL BOUNDARY
NORMAL WATER LEVEL rR
30' AM BOUNDARY .�..
GAM
75"CAMA BOUNDARY s ) (MN) LOCATOR owe
C • 11/21/XM2
GRADING AREA ® 1 ,, ^ (_ j.. Name
_,----.--"-'--
I "�`' FNOICSJAa�DIN
1 MR Su J�EDmigrod
WERANDS Q X SCALE IN FEET
1 MERRINMV RIVER 0 se.A1 tr,. of 14
5 0 300 200 IJ
I SCO ># 17282
j " — &wax PROPERTY(e2UncoRr OUT c VIEW) O
S5 LANG FILL AREA i 7 OD US 258 APPROXIMATELY e.g RELIMINARY
WUREREVSBORO' "C 27855
40 X 200 I1, rA DO NOT USE
2.0 FEET DEEP CLARF� FOR
FINISH AP OXIMATf°l.Y a CONSTRUCTION
ALUICENT PROPERTY(&OtAYTMRY OUT ) / GRADE 40 X{100 L
"COOT
// 1.5 TO 2.0 FEET DEEP
(US NOY 25BJ
z
_��
_\__________
_� FINISH 7:'",-.1
L1DAR CONTOUR F 400 GRADE
Yk,y. 2'INTERVAL,TYP. \
ks \ j W
/ yC11 <<1
t.-3
FILL AREA EXISTING 111 ,a
/ APPROXIMATELY GRADE PROFILE(EX. EMBANKMENT) ���
40X200 NTS � � �e
SILT FENCE q 0 o
SILTDENCE4 ma12
40'
EXISTING \ j i o R hi
GRADE \ }
/ APP. 1.5'J
CROSS SECTION-CUT AREA ®\
1,:*
400' •&A,• / FINISH
r •
i GRADE NTS
T
CUT AREA
200 � APPROXIMATELY SILT FENCE
� 40 X 206 SILT DENCE Li10. - _- 1 j
'.,.,.'":'''L
EXISTING 10
0 ct
GRADE T
APP. 2.0'JT \ rr^^
V'
FINISH Z =
, I.v...:,(..\
.1 t # GRADE Z O
CROSS SECTION-FILL AREA cD
/�C� ryf !'�_y --� NTS Y
j } LEGEND
A ... EX CONTOUR(MJR) PROPOSED FILL AREA ® DWG II/1/
EX.CONTOUR(MNRI
_..�l1 EX PARCEL BOUNDARY PROPOSED CUT AREA ® }y Nemo
KACS_LII0NGSre
NORMAL WATER LEVEL NR ,o;
SCALE IN FEET 30'CAMA BOUNDARY o..pn.e.
a.
Ism awn �� 75'CAMA BOUNDARY Apprw.d: IA[
nom
0 100 200
Shoot No. of 14
14
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Town of Murfreesboro
2. LOCATION OF PROJECT SITE: Termination of Heart Street, Hertford County,
adjacent to the Meherrin River
Latitude: 36°26'46.77"N Longitude: - 77° 5'17.79"W
3. INVESTIGATION TYPE: CAMA & Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— Sept. 21, 2022 & March 29,
2023
Was Applicant Present— no
5. PROCESSING PROCEDURE: Application Received Complete —April 3, 2023
Office — Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Hertford County/Town of Murfreesboro
Land Classification From LUP — I-H/R-20
(B) AEC(s) Involved: Estuarine Waters (EW), Estuarine Shoreline (ES), Public Trust
Shoreline (PTS) and Public Trust Area (PTA)
(C) Water Dependent: Yes
(D) Intended Use: public/government
(E) Wastewater Treatment: Existing — none
Planned - none
(F) Type of Structures: Existing — gravel parking area, bulkhead, riprap,
concrete building pad, and roadway
Planned - 2 piers, walkways, and platforms
(G) Estimated Annual Rate of Erosion: NA
Source - NA
7. HABITAT DESCRIPTION: [AREA]
ECAVATED FILLED SHADED
(A) Wetland (EW, PTA)
(B) Shallow Bottom (EW, PTA) 1,947 sq ft
(C) High Ground (ES) 2,600 sq ft 8,000 sg ft 1,255 sqft
Outside of AEC 5,400 sq ft (outside AEC)
(D) Total Area Disturbed: 19,202 square feet
(E) Primary Nursery Area: No
(F) Water Classification: B & NSW Open to shellfishing: No RECFIVFV.
APR 12 2021
DCM.MHD ClT'v
Town of Murfreesboro
Field Investigation Report
Page 2
PROJECT SUMMARY:
The applicant proposes to construct a 6 foot by 102 foot access pier out to an 8 foot by 90 foot
platform which requires grading of the old roadbed across the river for Conditional Letter of Map
Revision (CLOMR). The applicant also proposed to construct an additional 5 foot wide by 24.5
foot long floating pier with a 32.5 foot by 10 foot floating platform all extending from a upland
walkway.
Project Setting
The property proposed for development is located at the terminus of Hart Street in the Town of
Murfreesboro in Hertford County and consists of approximately 2.41 acres adjacent to the
Meherrin River. The property currently contains approximately 57 feet of bulkhead and 80 feet
of riprap along with an existing parking area and old concrete building pad. The property to the
east and west are vacant lots.
Vegetation on the site includes, but is not limited to, indigenous yard grass, Boxelder (Acer
negundo), along with other deciduous trees and shrubs. Soil Types include Goldsboro Urban
Land Complex (GpA), Winton Soils (WT), and Dorovan Soils (DO). The property has an
elevation of approximately 12.5 feet above normal water level (NWL) along the shoreline.
The shoreline is 302 feet in length and currently has a bulkhead along approximately 27 feet
and riprap along approximately 80 feet of the shoreline. The water classification for this
area is Primary Contact Recreation, Fresh Water (B), Nutrient Sensitive Waters (NSW) and
are closed to shellfishing. The water depths within the project area average 15 feet. When
the site visit was conducted there was no Submerged Aquatic Vegetation present in the
proposed project area.
As a part of the CLOMR requirement for this project the applicant will be grading the old
roadbed on the opposite side of the Meherrin River. This property consists of approximately
98.44 acres with 4,975 feet of shoreline. The property contains the old US 258 road bed but
is otherwise undeveloped. The property to the east is NCDOT Hwy and the property to the
northwest is a residential lot.
Development Proposal
The applicant proposes construct a 6 foot by 102 foot pier with a 8 foot 90 foot"T"end platform
on the east side of the property. They also propose to construct a 5 foot long by 24.5 foot
wide floating pier with a 12 foot by 32.5 foot platform "L" end platform with lower 5 foot by 15
foot kayak launch on the southern side of the platform on the west end of the property.
There is also a proposed 5 foot by 251 foot accessway leading from the existing parking
area to the proposed dock on the west side of the property. The applicant proposes to then
grade 1.5 feet of material from the southern portion of the old existing US258 roadbed
located across the river to the northern end of the old US258 road bed by cutting a 40 foot
by 200 foot area on the southern end to be graded and relocated to a 40 foot by 200 foot
area on the Northern end to mitigate flood impacts upstream for CLOMR requirement$Ely D
APR 1 2 ?0?3
OCM-.MND CSTy
Anticipated Impacts
The proposed development will result in:
- shading of 1,947 square feet of Estuarine Waters and public Trust Area from the
proposed piers
-2,600 square feet of the Estuarine Shorelines Area for the proposed grading of the old road
bed and shading of 1,255 sq ft from the 251 foot of accessway in the Public Trust and
Estuarine Shorelines Area of Environmental Concern.
-grading of 5,400 square feet and the filling of 8,000 square feet outside of the Estuarine
Shorelines Area of Environmental Concern.
Temporary turbidity will possibly occur during construction and temporary disturbance of
800 square feet of noncoastal wetland impacts will occur when crossing wetlands, using
logging mats, for grading the old road bed.
Submitted by: Cynthia Rountree
Date: 4/6/23
b;iFCFIVED
APR 1 2 '0.3
DCM.MHD Cfl y
P�o c STATE \,
u] Y
auw
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director April 10, 2023
Michael W. Leggett
1718 Hwy 56 West
Creedmoor, NC 27522
Dear Mr. Leggett:
The NC Division of Coastal Management hereby acknowledges receipt of the
application submitted on behalf of the Town of Murfreesboro for State approval
for development of their property located at the termination of Hart Street in
Murfreesboro. It was received complete on April 3, 2023, and appears to be
adequate for processing at this time. The projected deadline for making a
decision is June 17, 2023. An additional 75-day review period is provided by
law when such time is necessary to complete the review. If you have not been
notified of a final action by the initial deadline stated above, you should
consider the review period extended. Under those circumstances, this letter
will serve as your notice of an extended review. However, an additional letter
will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from April 3,
2039, you may request a meeting with the Director of the Division of Coastal
Management and permit staff to discuss the status of your project. Such a
meeting will be held within five working days from the receipt of your written
request and shall include the property owner, developer, and project
designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the
location of the proposed development. Enclosed you will find a "Notice of
Permit Filing" postcard which must be posted at the property of the proposed
development. You should post this notice at a conspicuous point along the
property where it can be observed from a public road. Some examples would
be: Nailing the notice card to a telephone pole or tree along the road right-of-
way fronting the property, or at a point along the road right-of-way where a
private road would lead one into the property. Failure to post this notice could
result in an incomplete application.
111EQ"?.),
NORTH CAROLINA
Deparlmet aa��6.4 APR 12 2023
North Carolina Department of Environmental Quality I Division of Coastal Management n e+M—M H L I"Y
Elizabeth City Office 1401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909F�
252.264.3901
An onsite inspection will be made, and if additional information is required,
you will be contacted by the appropriate State or Federal agency. Please
contact Cynthia Rountree, Field Representative, if you have any questions
and/or if you wish to receive a copy of --field report.
Sincerely,
Ron Renaldi
District Manager,
Division of Coastal Management
/CR
Enclosure
cc: Gregg Bodnar, Major Permits Coordinator, DCM, Morehead City, NC
Cynthia Rountree, DCM, Elizabeth City, NC
Carolyn Brown, Town Administrator, Murfreesboro, NC
1
RECEIVED
APR 12 2023
DCM-MHL, ITV
N() TICIfi
LLI
a 2
CAN1A PERMIT
APPLIED FOR
PROJECT: Cor1S4.ru`ckoh O a (o' " 10Z' access pier- out- +v a
V it 90' Fla#4orm ) c'ro.d�� cF lid roadbed across +he raver)
corS}ruc toy. crn a ' x .211• S'' $(o k ?ier w+11• 10'
x 32 .5 Pottiitl n.a1 i an
Q.x r� �p fta.nd
wa 1 ICwa� -
COMMENTS ACCEPTED THROUGH 5157ES
APPLICANT FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
Town or MurPreezboru Cyrofkok IZokn+hee
CarotLr Zrowr 252- lo'12 - 3901 esf
P.o. LIM S. Givgiri S\e 300
MkrRreez born NC 213655 eivt p►be+4+ C; NC al ei oq
2S2- 3qT-51041 ' '
AGENCY REVIEW DISTRIBUTION SHEET FOR PROJECT COMMENTS-MAJOR PERMITS CIRCULATION
DCM Coordinator: Gregg Bodnar Distributed:Yes
Applicant:Town of Murfreesboro Distribution Date:04/12/23
AGENCY NAME(S)
Community Development/LPO Robert Mizzelle
DCM Planner Mike Christenbury
US Army Corps of Engineers Josh Pelletier
Community Assistance Lee Padrick
Cultural Resources Renee Gledhill-Early
Div.of Water Infrastructure Clif Whitfield
Marine Fisheries James Harrison
NCDOT David Harris
Shellfish Sanitation Shannon Jenkins&Andrew Haines
State Property Office Mike Moser&Wanda Hilliard
DEMLR/DWR Sheri Montalvo
DEMLR-Erosion&Sedimentation Control Sami Dumpor
DEMLR-tormwater Roger Thorpe
DWR-401 Glenn Stewart
WRC Maria Dunn
National Heritage Rodney Butler
REC FED
APR 12 2023
DCM-MHL CITY
***This is a word processing form to be completed in Microsoft Word***
NC Division of Coastal Management
Major Permit Application Computer Sheet
(11/01/2012)
Applicant:Town of Murfreesboro Date:3/3/23
Project Site County:Perquimans
Staff:Cynthia Rountree District: ®Elizabeth City ['Washington
DMorehead City ❑Wilmington
Project Name: Rover File:
Date of initial application submittal(EX: 1/8/2007): 9/30/22
Date application "received as complete"in the Field office(EX: 1/8/2007):4/3/23
Permit Authorization:❑CAMA DDredge&Fill ®Both
SITE DESCRIPTION/PERMIT INFORMATION
PNA: [Wes No Photos Taken: Yes CO No❑ Setback Required(riparian): El Yes No
Critical Habitat:DYes No ['Not Sure 15 foot waiver obtained:DYes No Hazard Notification Returned:
DYes ®No
SAV:❑Yes No ❑Not Sure Shell Bottom: ❑Yes No ❑ Not Sure Temporary impacts: ®Yes ❑No
Sandbags: :Wes No ❑ Not Sure Did the land use classification come from Mitigation Required(optional):
county LUP:®Yes ❑No DYes No
Moratorium Conditions: ❑Yes DNo Environmental Assessment Done:
®NA DYes ❑No®NA
SECONDARY WATER CLASSIFICATION—OPTIONAL(choose MAX of 4)
❑ Future Water Supply(FWS) ®Nutrient Sensitive Waters(NSW) ❑Swamp Waters(SW)
❑High Quality Waters(HQW) ❑ Outstanding Resource Waters(ORW)
WETLANDS IMPACTED
❑ (404) Corp. of Engineers(Jurisdictional ❑ (LS) Sea lavender(Limonium sp.) ❑ (SS) Glasswort(Salicomia sp.)
wetlands)
❑ (CJ) Saw grass(Cladium jamaicense) ❑(SA)Salt marsh cordgrass(Spartina ❑ (SY) Salt reed grass(Spartina
altemiflora) cynosuroides)
❑ (DS) Salt or spike grass(Distichlis ❑ (SC)Bullrush or three square(Scirpus ❑ (TY)Cattail(Typha sp.)
spicata) sp.)
❑ (JR)Black needlerush (Juncus ❑ (SP)Salt/meadow grass(Spartina
roemerianus) patens)
APPLICATION FEE
❑ No fee required-$0.00 ❑111(A)Private w/D&F up to 1 acre:3490 ® 111(D)Priv.public or comm w/D&F to 1
can be applied-$250 acre;3490 can't be applied-$400
❑Minor Modification to a CAMA Major ❑Major Modification to a CAMA Major ❑ IV Any development involving D&F of
permit-$100 permit -$250 more than 1 acre-$475
❑ Permit Transfer-$100 ❑11i(B)Public or commercial w/D&F to 1 ❑ Express Permit-$2000
acre;3490 can be applied-$400
❑ Major development extension request- ❑ Il. Public or commercial/no dredge
$100 and/or fill-$400 RECEIVE®
❑ 1. Private no dredge and/or fill-$250 ❑111(C)Priv.public or comm w/D&F to 1
acre;3490 can be applied;DCM needs
DWQ agreement-$400 APR 12 2023
DCM MHt .<ITV
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanaeement.net revised: Nov. 2012
1
NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3)
Applicant:Town of Murfreesboro
Date:4/3/23
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of
measurement found in your Activities code sheet.
TYPE REPLACE
Activity Name Number Choose Choose Dimension I Dimension 2 Dimension 3 Dimension 4
One One
Pier 1 New Work® Replace 30 ft 5 ft
Maint❑ ® Y ❑N
Platform 1 New Work® Replace 32.5 ft 12 ft
Maint❑ ® Y ❑N
Platform 1 New Work® Replace 15 ft 5 ft
Maint❑ ❑ Y ®N
Pier 1 New Work® Replace 102 ft 6 ft
Maint❑ ® Y ❑N
Platform 1 New Work® Replace 90 ft 8 ft
Maint❑ ❑ Y ®N
Non-pier 1 New Work CO Replace 251 ft 5 ft
Maint❑ ❑ Y ®N
Excavation(up New Work® Replace 65 ft 40 ft 2,600 sqft
land)/grading Maint❑ ❑ Y ®N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N RECFIVED
New Work❑ Replace
Maint❑ ❑ Y ❑N
APR 12 2023
DCM-MHO 'rev sed Nov.2012
NC Division of Coastal Mgt, Application Computer Sheet, Page 3 of 3)
Applicant:Town of Murfreesboro
Date:4/3/23
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
TOTAL Sq.Ft. FINAL Sq.Ft. TOTAL Feet FINAL Feet
(Applied for. (Anticipated final (Applied for. (Anticipated final
DISTURB TYPE Disturbance total disturbance. Disturbance disturbance.
Habitat Name Choose One includes any Excludes any total includes Excludes any
anticipated restoration any anticipated restoration and/or
restoration or and/or temp restoration or temp impact
temp impacts) impact amount) temp impacts) amount)
Shallow Bottom Dredge❑ Fill El Both El Other EA1,947 sq ft 1,947 sq ft
High Ground Dredge® Fill❑ Both ID Other El2,600 sq ft 2,600 sq ft
High Ground Dredge El Fill❑ Both ❑ Other El1,255 sq ft 1,255 sq ft
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge 0 Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill 0 Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other 0
REEC IVED
APR 12 2023
DCM-MHL� :ATV
252-808-2808 :: 9.888 4ROAAST :; www,nccoastatmanagerent.net revised: Nov. 2012
- - --,••• - '' .,, ''''. r cf•,'''''•'.V.r -r:'.Ji•'•/',.:;p-, ,•
. , 1......,, ,(C..`t ip.4,..t,,:r4 1,A,,':1,,di_. •,.),,- il.,-V,4t..,V,..-ii•,.,f‘. i•.%/,,/,:'•••,;.•'••-•‘:' '1/.4,4‘7.4eff%:,4'1'.-.;CI' '1 r'-'''•--t•',-.--:•-r:,.....V ft,-,-N-',ipt`.51'4,3?;4:1.
• ,.t --,..ik_.' '-.s/-,'-'•.- •'.:• ' .k'''''...-..•-tI',$'!....-•. '',..,?:" V•1••••!,.'f, 4,1',._:/;`'l i. :,,,11"?.'•,(..i.3c..1"';,''rr•'`.:‘./,''','•,-.,,, .•-••-,•;.: 4,\'.0.•;•fetf“ .:'•:r.:,:.?•'..-'';''', .rtV;:fIn''.4"••••-•-"s•?..!..Z1-1,"• ?.,s1 .:,_-..,-;,4,,•-',,,:-..,',',..,./.,;„,1:5-:,:,0..f,.?.1...k,c,,,,V„
i."1-1 ..;-;`,.'• s'•'`,...,•1•• ••---• . -‘'/1,•:'-'i?r!.?/ , ,1.4•-•• '''hi.' ZIr`p,,.:..cii?:..!•'.''f•ei•-',.:`>•,,•;:'•••%V,'":'..PAI.k..'''14•,'''''-.d.r---!•%'1,•••,•-f•-•':'l';'•• 1-.•.-•Y---,st'L'i;: •:-.:,,:•••••%.:f.',.. 4\-, '4,,.,,..',.:•!.::•..:‘'):-.-..'..!'.:',.:',':-•_1-',p1,1::-;?
''',O•rs$,. .kik.-',s7- •• . - l'-',Y;',qr-:,-. 1-.i•• 7'. •,,erg*-.-r.,;'''1-•!:-s;••./";;:',-.----P.•:...Vid-2(6 .'‘•!•&•-r,i';7),.:•,,,;/..,(...:. r,;•EVA14.,/v'cf.:':'-,..i--.--.,....-'1:...:':•',:'-:..--;-eY',:.1.:-_=%-,6,6-,N'-:..;i.':•_,::.i:Vs,‹::--„,9'•N"..,5.‘„p';.k1,'.'.,‘l,1',0-.‘?,-4,'.N'.4-:.s'..,'',."0.,.z",.,4.'"!'.'..-,.)•;•,fe.k.i•-.4i,.--rl;1%,:f;`'„Y;fV..'-'-.:.:•.".-"P\.,.••'.".!.'.4,-..-,,1tI-..-.f.Fi,./.';•F.P'-''":,Z..'.::'..''•-.'‘.•'.'...:.:-:,,..t,•.,•`,u r-.k..--'-,2".!.--1-.:..:,•'..'.-:.,,:,!.i.'-),'.,f,'.-.i•,:.s..5?--1i7.24.,,.t.-.1;.f-,,*•'-,-'-,-'.,,.-r:.;e,l,,--''t.1,.',.',-•.`•y%',--'1!•-•;-.I-...41n,.a;t-?g l-y'i„'''••tA.r•".•,.'•.•.•.,•,.'t--'-.4..4':4 1-6',-7IiF•7 1.-I.,..1.f-1'-r .. '-••-'-:2,',;0.'--'-4.•';,>.t.,1-:4.i,`*g0*.;,;-,'.•,.i.s,-„e-.;7:,..".-,.%.:4;4_.':.'-?.,.-7f-..,z->;.0.r,.:".•-1't-41'5;.•t.:'';.1;.A,•%.'.,'!i2:.„g4.;.'.-,/---.,-t4',-':';i-.N.-4:p-.-,CjsA-•L.t:ti4,-.-.,-.2.'-,/Nt:-.V.:,1'•/.1..;''..Zj,Z„N:;2.t.c.i.•,:,•'frtr:•:,,i•.:••t"_t!*V.4;,.„?.:r:",:1•-t":;•f:•.-4'•:•:'•";;-.•.'-...•';'f'':;•••1.,-'.-••••'':-V'..':-:`'t',--'.'--,.''::':':-;'.:'','(.,,g'.-1.%;'',',,.•.'',,,':';',.'!t..•,;.--...i7..,..."r.,-'-;t4:;i.:1.•P2:?:•4••''•.'.*f•:'''‘7•'.-''''•,•.•.,1;.''--s:.If'',,;,k•-.',7=•;-'‘.,^';;3 r--'-....-1).?'•....:-,t.&1.;:!-..-:--;.::,,,41-•":,':7\.:;::--i•'#7e•?.',.;4'7':,f-'e,.•'-../','•''.V•.'.:7I';..',-'-,•„-4;:•.,,•.'-':'.-'-.:':.•'.• A'.if.'‘,:k'.t'"....4:-"e7'.t'e,.•:,,-.'-t1jr;.:-f-.;g:0,.-.-,.'q..•.s'.i;''",';•.;:-4-:.-i1i44..F.;'‘1,:..-,.T'-;?,...':.,t'j•1*i•.:iN.•.:7.•',i•:!-k5.41'.'...‘-.';'!_:.'.'.i,,-11k.F••1*•...•.,...5•.5•-44./ 11xt ' ! , ,itr 4 'V':...',.1...,.,`r:f-'•.7:'Z.:4 kt o".(‘,,Z',..:•i;.1.1.:„,'lf):.,l-•. '1[Icirt'..'8r4f4-„,viii:.'',f,-.t:tt.."'„.,';'..;%'•,';
4 a 1 1 "_it r . ',''.'-''''L-,..1.*-....y-'/-,:;3;.'1...-.',-.'':.•'.:!.i,`.-.-•-0,,•s''ei...
r *L1 5 1 . . - ' i
•; 4) f'' iiC ..'1.•,4..i.,3.';.-"-.-,'r•2?..•:1-7-,?-'y5e.,,‘;••,?1...„r::--,„..,V.i..7'.i'-.:'i',-'_,::.;--.'--'%.2--.'!,7'.",,)';;,.,'.....:;•:.,,:;•,:.I‹:'.:•:,,-%,--A,`-;,4,...--.('f17.,4'..'.--'..,!.L'.'.'t;-':7n---i,:-'7-z.t,1,r'-.''72.,l_.';...'.!'',.it.:._.,'..,-.i-:.'V';..;...-'.,..:."-„,.;,.,..-,-.,;_,-:,,i',.,:,:',ft..•,,Y•,.-t,.F4.VAc,:!-„::.,,,:i•,d;:.;:'7,,7:.'4,,,;rp-p:W'.I*•.V,1,r,..e,l4;.•-,.'.",",1',c
?"1,,•
' '1'' • '';1:-‘•''''''.:"'17. '•Yr'-.1-f.14.;4'
''''' .;4''! !:14,ir:i': '-V,,•21-•''1:;7,••••','.‘,,,..•';•',',.-:::, 'P''`'..', ,--.7] '''-",'4,4.. ..,,5-9":•,...44:%.;' :‘;,k • -•',..'1•. .,..'-' ...;:-.:lI,t.`.`.-i,.i3134iYil14,4l.i,'44`•:4-AA.i,ir,i,i-'l,0.::,4W.,i..?,'.,4"N..Vil,r,('c•.:;.1.,.k.4ee:..,;.'..•':.i,k.;'11'-,1,::.::'''."A,6.,:..4,i.Y.'•.':.k!/.%,.?$•i.-'i-.'_,:fex1-,,.ti-.,'';,::1'..•;,i.,.-•--:;':.--i!--.:.:b,--.-,.,.:,•,"..,':,'..•F.-'.:4...,'.".,.....,:,.:-'"••,.-'-'•''.-,!,-.,-,..,-..A,:---.•..".'...:.'•...;'.-‘.:,•..,.•-.-.-.';•...-'-="--.t.-•.-7.'-:"..:--=..,'.;-...-...''.1.%-•.'•..:.'--,'.-.,'".r..;...-;...'.'-:1;4`.7.''4:.-.!4;:.,:11.,.-0•....1 N,(r..''1:•'.,.;-0,.I,.,1..4110,.,,.s4't'r6-;.7,,,A,6 W_;0.`e-..,E,::,,:.1-..4.:..,,,`1•4•.,::,'. ?,.J:.,.-,-'•.:..„-•*,,„.!:-.P•,,:/t-!:.•-.,r.r:-;-.$..,,'..•...""",;.,4,,..,.,,'.'-..-.,..:."/F:.:.?.:,;-1c,,.l,.3k.''4.i...l.').,-c,',,,.1.:,1,.,."-'.?..."z-•.'.:,::...:-,z:,:.X.:,.j,.„-;,v-...f,,..,../-..A i.,K.,C.,,;•;.',l›.,,.,k1'',A,,f.f.,-::.I.':-...•;,!4;;i•,::4ir,.i,-0;1'•.'-•\!-i",!4;:,,4::::.,...,.•'-,-,-.74,•:....r-,...i!,."&'.p:-;"-l-f:,.-•,i,i.-..v1-!;_':-(.V•;'-*.';;",.-}.:-:'.-.,,.5-.-'..'.k:,<-..••'-'i'•i--•!,•.•.•..•....-••'..-,''4.'•;•.-..N%.-,.-,f.,i'•-,..l-;..-::..k(••l•-,=',1:•t,•...•;'•-:e•.,.i•'.;.','..;:..,•.,-,..Z:;..,:A.-:!4.*,.,•i.,.",:•..i".,-:.••:V.._•:,•Z;,,.i,N.4i‘L::g•s k..,..••. 'i.'!W.'.-••.,./:•.••1•-e;?i'f',...4,:-•;4 i..'.,..:.?.•.••'9:.':.-•f4...r:e,.i-•1V•.'.gt'-1;i'I.....:.T..A:I".A,.t1'f;-4r..,-.•?T•'I.'.?.'.•r's*:••k t•.-•-:.•.',•:.1-7"..8i,••4•''','"1 1,,tt.II.i:!II:'T i I'
,•!,•1
'•.;•••%;
' r 11 ,? t ;•,'''-:'-:.•-'--;'":'•:'.:."7•'!*.7...:.•.:.'..
,,3,....-,..-.-,/.-,.•..%-.._;..:
.‘.',.,
e•-_._\
•N :
' , 7
4 * ,4 t 4 i.7•'.k-
i.•:
-
..e.;,-..v,..,7,,,41.,...e.,..tsi -•:..... . . 0,.:
..1,AW*,7,,',...'3::..t.:;i,:•...r..--)' ',..,;. - .:-_'.0..ifpf- ,t ,:f,..,,:!..i•:,.:,..;...../wyili,,..i);.:71..,;:.-.,...,.elikt,c..0.1.:::,,,V47:.ip'-..‘,, k, '; i;:if.; • ;r!',::i .
:-#43.'g'.4 •: ,_:`:;..1 .`:L),--.t.--.,;',Y.........:. :, 0.: - '::IA • '- t?..::.1,..;:=?..,i-':"-_, :•..:7.*.--,-;;;;' ...s...::,''.--'.1..?.1.4f,t.W&t.,...-,0, „ ..t.,. • • ,.?-,;.. , . !i• ,*i . .
,t,...4i,•5 ik'At,;‘,.; "7••'''''•,`,..,--• , '
44\ -`. :...',..' -‘,-:.s..-7;.:..,..•.,4),..-L;.1.ir,e•.-z.-,,..-I.,,'•'1.4..t,--fx-N•70r.. .. 4,._f"., `1•.`t"••• ..,k .,'.,, •I r.• • ..„ ..
ktiQe,c1t.it Act.,41.;-;;•..;;Iipttt,,'.2,• . • .‘ 'R. - .,,.\, 4,i,c-t-4.,''..,•,..9,`,',044,, 1,,,V..-z",-•'..;,.,...'rtt.w.,..,:i.-fi.'S.-kgrot:'4'..P. %,..e.Ao-- •'.,, ; • tr'r li, : ::'-, t.
vz,f43,41: smtzfi';',,,-;-,...-04...,':-r.,.;,'•rl ;. ,', ' .‘ . 'r' ;;...1:. ...;-,,:i'',..;',.!•7-;..7,-...i-,.,-.-'...-r,,,t!..,..?..,i.,,....!..4elt,gi,,t, •r •,,-..•., 1, . •
1;44. :3-4,10^...iy,,,!A,1,k....?;::',.-.- ,. . 1-.., VW-i., -,.___`..v-..f.,_„Orf‘..:•;2:-.-'.;"...-:.2...-::•21.:-.--,!f:..,,,,,...ii..1.....;-::;;.......:i.,,-4:0;._,.. .'1 '_ -., ?:,-,.: • I iii,t,
,,Iii.ini4V.4 dkli;:--••••,al.::,..,.'...'*,, ,- -.-.. - .,-,ir %. 7,,47;i4r..;;..-.•.';.......t./.,•;•.i..irir.-1 ,-7-'‘.`-'''.`..* -.%i..3'
.•".t -' '' ' • 2'""y 'it'' - - ''-'-' -'•r•L , '‘'';.!•'-:'.'':..i,•.&., . N.- • ' • ;•-••;•!.'..?.',.• ' . ell'fl VI i' , •! t't ,
4101''''' i.i'.,,,,t:',•:'.4.4-ii""15,0......1. ,..:"‘",!.,,,-,,,„::', • . '::.'. ..'..0.1i. k •.. .. -"',-.'-'..-'. ',.•'''. ::•...A1::',......":4:-'•••'.4'"!..- '''''P•'''.&' '• ,..'' ''..,' '''• •' l'i 1, '.'
,. .
::/14.-4 :,:.)N1'...?ii,-4/•-'- '-'1:..,:.''!'''''.; -,.:r.'",-,,:l'',.:' ,kryi, : 43 :F,._. ri..(t.•yr,,.,,•.',I-17,. ...,,•-.. ,; ,i,.!,A.,4,....e, j, . .
A...,
•
...rt,• 1...,,-;,_I.•
..!;ti,...,:•.-t,,i,A.1,,..1.4.,::2,,,!i,..7'.. I ..,-,,e,j• ' ., ;:,
: ,•• .".-,,,,, W\ „ ••••• ..
• -'••-''illt,i •.1.
:11-';';,,',.:V.;''.''':.M.'-)%'''.C:AI- • ‘.:'''••' 1'4 • •?..c,4„,.1-;.'-';,;its 1\1.•% •' 1,;
_ .,.,,t!..;-.,-,•'
I,:f.&i...1 :4;"-,,-,:,:4.-1:-.'5.'.• :...i.), I. It, . •-,.,....;,.t.„!ti,,,,,, ‘ •,\.,.N, . .1.
....
I N.
r.31,-,-<;.'"r'::••i,•;-;'•':','Vr•i(r...:% •-,i'i ,,‘• ..----,.74,....i.,•-..!:-...' -;' A ...";-••'• •
4.'i...7.•0,-;,...'''..Ps,.'r,1 '-`.1.. :• .-".' I
4 . - ,....• ...... .
• . .. . - . ,
. ., • . • . .
. . , ... . - • • . I,
•t••
••••'::-....;•;-..!.,,i;,:-,.,•,,.•:.,•-...t.„....•,t ,...,--: ; i ..-.,•1--0.-• ' '• ,4 •It-1 i'.. ,
••••...i4•••"..!";%;,:".:-•;•1'.....k!,:: ,,,,,, ',,,,, t .'.:7--','''•••.;...ti ..,. '•,4 )1'k il,,,, - ..,c --. .. :
--7'..$,./•,:,'-'.;,..,-,;..Awi..t's ' it•!)... •.0.--7-.!:'1. g-t,0 •V I I .',• • ! - : k,... .• i _ . . _....._.,:..t ._. ,.
.•:4,../Z71•4,...:.•.:*''.'`,.-If:'..-..`4,:,V.- . ..,,,' ,
---,--r,V.Ar' '44'',''2.)1,' Pi.:,:-„. "r: '• -' .'f.'" -- - -1,.. :h,":,..."'; ' •• . •
%...i‘te,"',;A-`,',•••'4',4",''-•:.','::?:,,:' 'ef _ . ..
. _ .:-.'.., ----- . „ ...,-' : • •••.,!-,!y--
,....,;-\--,--,•••• .------•-• -..i.at-st .. -*- -',4F." '.; ,- . ,
......;. ?..1,1-'2.!..:-;',.f"--,-;,,,,V,1,1, -. '1%•••:---'''''. • ' A'• .4 kl!I C -J: •; • '.!''''.. .',• '• .,...'it.:*••,...- •-- .
4.,-,41,q.....‘,ti.,...,x'.,,....:-"1:•-.116,-.. : ,r ri V -,:V.W.'"4-,t 7 11-1 ,1•.%'..t.!'.'•.' . •••.••••'. ... .• ,, .,,..1:- „. ,';‘,41.::,--,- • -• • ;-•-,:..,:0`......:-.
tt..:.M tt---fri.• '.,
t _ t
:iittV!"'-'' ' ' 't'-,- f - ' . ;-..---,-• -,*•5 • . , ,...•-• ''` • 4,- -.•‘--.---'
0%,.•.. (f....-:',14.f:"1.-•----“4,& .-1\i ; rl .r.';'1'•I''C' 4 il ,'.,"•-• '''1.• • • . r..-'. .,, .-----Nf.7.---: s:._-- ••
4.ktit?..-=',';''.'::_;•....:.:-...,..4..?..4-.,f4r 1•-•••• . — ,11‘, ,f,- , ),,t „••• • •
.?,..,......-,-,-;;•-,J,..;:,..;?...-s.q.: -/- iAfif, ,-;14,.. •I ... ...1"Lif..1-.,.,,+.. 4,4.,, , .
.:`,..r '-
'41.. "•- - ' ''\'''--',:7•4*.•:''"
‘,.,!•:;1f..,'Z-,t4.4;:;•,.;.:: :ff.i".. ,,Y, ,H..,p.,..-.?i'...1.."'",,„ ;' :--1-`N:::*';'.' YA.k,.:, - ...-----
.,,, .-, ,. .i-2--,..;.:• •I4--4,-•-E.:-.,, -_-•. .
V,!•';‘,.•••t-,74.f,p4:::,..y ...4.1.g.4.-V•-':',• 4 .': :•. ' • . ti•-,' ' ':•• . ..,.. .
.
,. ,--4 p. i, '*:•1„:--,'. -',7'----.. :.',• ••••''.,-.!,'•-•:•-
1:P-1.? ":", --,int•ti-",:- ' -••••• ' ''.. .' 0'4{.X" ,'• At ,,.
01'41".•:.Y(..,•-0.-:•,\;6,.Vtv.- . ,,..- • -• ‘ :...i'41" ' ', Ir.,• 11;.'/".'• .'.
N'i,,, ,-.1--., -•• ' • .'.- ---t•"'.,..k". kl,tg(,,It it cp..i4,'.'
.- ,.t..t4',.,:-7' - - •'••.'.,-:- `-, ,
er,','..Z.,y441i,.,-14,'',. ./-;' "'.•: .,;".'!-•',./-NO I ) 0'ii 1.pi;hil 4'' • . ... - . .
4').;:1/4V:‘.'`,1/4,-V' ';''.'1.4`,..'".),•,),''1"...,'•••• , , .:'.... .; •-•,..;',.f.',...41,•!!!:-.', l' 1 ,,/;',i' ,$j I y.,','. -..,..
-..,R'4.4..14i4;'..p..'.-.•.,i;•W.:1.",,.c,,'.),:yC„..,--„,:.-.•.'c,-.s-,',-e*1.1.,,,.,i,.4•V)4...,.A,„.?.f....,,*:..‘„..£....,,34..;-14,,,:,E.4,4,4,.st',',.,,'...,.',„.,..'-.-:',,,;;.f,.:.,',k.‘1‘.,.'Y.,,7,•-„...'!-‘i.}.‘.-e:..'.,.,..,V.'.,,-i,,",.„.i•rt-.•!.„/,.,..•i,,.:,.-.,'1,;:,.,,.;,.,.•,..;.,,.''.,.'_-.-',:t'...'.'-'t';•,•,:,i,'.-,:,-„.•'1•r.,...,,..i....--.'.ir,.''..',,•..r-_'•.,../,,,:..,.,,/'.','''.,',.',.,',,.'.:,,..-;..,.N;-....;4.:,:,.,,--r,0:i4,:-e..f4wl.,,.e,‘o,...y.-,W,t,.;c'.o••:•i,-aA..,,'-.,--Arr,-,'
l
/
N?7;'. jm :9 i 1'49t,,tV,..'1
- ;'..'.?1 t',f".,-...--`.'.-•--"1-, ,'"%°--.1,,,Nk ,,,.',.!,....;..•'.,.''.•-.-.....,:..-;;.'.•
...ii,,......,.
.1.:...ik 1,.i.;•'.rz.-1•.,r,_i1,-,-,v,°.i.•4-.,•,..A0',A-?,,k',,.,,'.,.
•,.1 i 0.:-_i-,1,,1,-,.,,-.zv,.„:;,r'.r;
.1.t.,.,,1f‘'-;-1'.4-",4,:.-...,:,..'.:,1,WA.-V..:,-:„-,.1•....•4..'3..'..-.a.,-r',r..r):',...,-/; \
. - .1, , :'•...'.-,..1.:r.-"'=•\A-..'
...„'',. •-: ,.....
- .-.. • 14'.? = ...-'...• -T-t4k.'1
•?„•..k....4,,,,,4N7.64,:‘,..,:f.,',,,-,..*,:.. -....),•-•!:•-.--.•' ;At i' ''''-I,'. .....''' ...-"'- IIINA1, ' ';rf.-'4? r ",,. •A •-oz. •-0‘.., . - ,..,-.. -.. ,..
,f,‘,2:..1•,. .- , • •
- . , .v••,.. '-...e 0:
• rt ' •• ' ,- ...,-.4r...,:if'• ',1,- ,..9.f.e.'ri
• . jr/ , -4 ,'''''t f .
' • t
• :::.3 fq,4 4..„11,2- ; '.--`:--7 ,., ‘ " ;-';f„,:,';dr 4,
.'%,'•! ,i . ., .,-,. r. :.: r -`•.,,i' ..,!. ''f -
'-'.• ' ' 1-•;'.• ...„:- ..,....;, • -...-'114i,',...-'
.-.,....,10.-.: y„,..- • .,,,.--,-.;'::::If.,,,,,:• r ,,,,,,y../,.,... .,,,,12.:q.,..•-,',':•2.'.„ •.....l',;•;(,•'..,"•,.:-?Al...1;.!•ifrfir,,,i •
• . •,1 ,) . .... 4 . ; s• , t._1•.t ,,z!-,
•:?.j../\:'',V•ti.:::. t.''''''.`:7; ‘.. ...-': '11:1.1.-.:1, ',,fkTt.t.,Ite•e;,•' ... .
.1'.."::V.•; ,
.• ', ll ii'l'''ii;-',:ti' • • 1.,-.......,.,',.je%t ,,'.
••:,r/';'..;....`:',.,.'''`. -...'' i ,, Iff.f.'5.''''. . fi,/, ; . ..
. r
,)11 1.'','• -.
i4 1 F;t•r',-5.C$;.-4 ,. ..... ,..,.. .
. . .
'w;ii, •.;,!: .••:.;'(... •'.' .- ,,:.,1.0".
• • t-t • • ..,.t- . ;•, it.f..
41..i--1.,117 tit
, .
. . ,
. +-•,Y,4--• , -".. .,! . • i'-'4w.,/,/41.,eori, . , .1 ,
• - °.t,- i;'-.,' . !
. s.-: ''•A .'..-. - •• - .. ' '--
fkor .
. . „ .
i
I I.
, • , , . •-
,.. p-;,i, -.1A-f-!ff-r'' ,.,..:,:;:-.2,.t....':'"-•.- , .
- • , - '''.`?"-',-1-,-:---:•-41-1.",-'-f 4--- .;.;• ..•...,-
.....f*,7- a.ii. , il 7.
4i5 .-,v,,,. , ' ,, .
, 1 ,
,--, :.'i••,••itl v'....' '' 1 i?''....4 ..rtct-",,,;`, if 1 • ''-'''.•••-.4•?,1•...;--:;.r:';V:..'..:;;',;211-..r.',••247::`i:'::"--.',11:1le....:.<_:-14.:-.o..1 •„ .
, . . . -..-?:.:-.',,-,:;•.-..--•..-.7...• ' ...4P-.V..,-f.:,'t.ti,-,t-•,-,:r f$,rd,
'1...-!..: .-,2,---;)ir, '''..-.,'.1...,... . • ' ..,- I --/. (; • 1:i ttititi.4.-;i.:-.,.cc-...-4,2„,17,..:,..i.;.,.-.:!,:•••••::,,,,.-:.,:-.4-.::::.,-:•......-...;,,,,,,..•..:•:-.,
-)" :. r • • - "•••• r.kl'az.''i.-6'-,..•:-,,,-;,...,-. ,i......••....,...
4 1
s , i
Arir'• r 4' . .:', ' ' ' ., '
' - ' . '' '' -16-S•7''''-';"`T''-''.-‘-'"•
.-",'' ''t"r,`-3•,'„ • • -. . ' . ,
2''''2'.•'•-.i;.•"'J'•%•..•.•S••.'•*?..'..k,
I
-:.,, ,..........,,,,,....,•,..,-„,...),„0.."'.
'1:!. ..5',',.N.:-,,-, .,. .•..-'-'.' A...,*, / , -•,1' . ,''
gli..ICI••Tif,•".,7''''','•,''' ......i_r'''.-' .,r,t1,. , Vi ,:,..'..-1-
.
? -,:.,,,,,;',..s.,...:',. ...,.. 7..f.:, ..:3'..i,:„........../•3-',47•,-;,_ --v-
A.'••'..Y,:',:e..ii,'..-:!,•r-','''' =-•••••-;,S.. ,, ..,a,..,. ,I\ . • ,,, .4.,:....,
ds.,:-.,,,,.-...,;.,,.,,, ,-,,, ,,,,,,,i......,..,,,,•..,-„,...,v,,it.4,...',-,P,.•••..4,
?.,,2s--, .“d,...,,,,..;;. ,...,.., .-...,.,:?....:,!_.••,5•,..w.v'. .A .,.,':.,.i.;' ':.''.-.i....1.,-:,,5;,....:-...-!;.-,,i.N'•-,...i.-,fz.:...;.:::•-:'i'..'::••`-tif...--t;!..:;.:-1.:::;:1::'t
1.'-,..1`-'.0,7,-.4., ,.... '..:c‹.- ‘ -.- ... .„,..,.) :itt,-.,.., .,,-. • i •t.:1...-- ..-..e:•-p:-:.•,'"T.:::;-ii..,kkTik-,'-r.: --.7•-•'•••!.-7.1•.•.--zq••,:.....i.' -,•••
,
-, .•: ,.., ,: , •, •• • , • . , •
,•••, ,,-:,?:,..,-,....;, --,:- ,-..,•-.
1-. •.47-„, -.,,,?,-.:.,..,. •• •-g,,.: • •.:i..•:- .,..•'.,N :N.',. •„) • , .
.
•• • -, ...,..;:-.• ,-,--,,,,-7:,-,..„-..,..:.,\ .;: Jg.........-.• ,... ,, V. I
''' • ''''' 4/... ,.,VA. 7rS..c,1/4. s -WIN
OCM-MHD CHIN
..,'''..,.,•tv,e,••
' ,,,,, .--•-•`3.11 . 1 k J.••:, ;'..'•/,,,,, - . .i:-,•:,••.....•••,
\ . ')•V'k'44.,1'..1C F.- : • c' ','/Ilfr.•'•
•:.::•;1 ',*1-...'..is•‘.‘,-,1.•;•...:-: . -- ,, .,, •;•, .‘J3'4••1.."-•-'*- s ' ...1; N t tiit.
'
1 r.‘.'
- . ,,,i,•••,,,:',3, ' • .1!*4*-!1;;Ir t' . )' 1:1-it'3,C;i6F...:t.. '.'. • ,:•!!..:2 -.,,P.:!..,
.:•-••••.:‘,./.,....i:it,,,),' -,!;:,,, '• ' • • - ....-.-•.11:. •;.;'.:7;,::,..-;,.. .•:.: 144rip.
.'e48 -1`/- •
•••••1;!\•;,..,3-,1.,•.;:•,f•A,`‘;.•.•.' • • - , , ••.-•....,•••.7",..50.6."-?..: :.1., .''."." te-,-. ' '. kA*4•';'.1.;%--f- 1 ' ,•.. N s',;.;,'•;!"..c:',i4•c:, • 7.0-#4itik
-.,;•;••••‘:,'.2,1:%-fi'•'••••••••-•'•-•-' -:-*-., i - • '';'..,:..-;;;;;.•,. ..;•-•nrce .• .. ;. :, . .• ,,( • • •1•-••t• t -
....-- lit..1' , ' ' ‘''.vi`i).411•;''' 'i
i',.:./..-4-4e yt,•le.,-4111..s•r•'. — r ' - " ..,:‘,.,-, •-: i•--;.,-,!-••i-..••',S." -.
"•.,';',.::t:',.,•%,.0 4•4:.,..lie....•;•.-.. _. .•-. ,.,,...-,,..i,..f.,..,..,.,•., ,.,- ..,,.-,•,•,,.,_, , . . „- . .,,; ..,..i ,.,, i - ;.;••••''''''ir''
..4".2•L'i:.44.1.11.::.%1A.t.,•••• , '•:•.. , • '- ,• • -I..", .,,,.:-.:',1-'':N.:.! ••••t•e..,.1.„...,..,•„:•,..,. ,
k,• •4:`.k..,,L1:,./••,
.ik...:‘.0:•1/0-,••;.'10:•‘•'•ST:'••••-",; • " '• ;' 7Tt•..•.-...:_'.,-e.1`.•;`.#. .'t ".:-:,.e.ti"- -,,,'..r.;,• '. ! .•'..t.•..f:•,g-',"iiii),T..1 '•'
• '• ;II::...i",..)Nii: ,..:,.. .•:•;;;,'"
k-..‹,i.!"-ItAftt:4;;,V,....,- .. •...•-..... .,-.. -,- ,,,,,,,,;..,,. .r'•1•..1, V 4.r: ..-f•'
o '. . ; %--"•V•I'"'•0".1 • '' . • • •-
•••;y-.:::1;; •,, .14.,e .,,,.. • , ,•.-.,...7-_,., „... : .,,,,,-...._ I .,., . , .,!, .., ....0, , ,. ,,!....,.,.,.,:.-, ! , ,• \'• , i•NN,'.Y.:4:lc,' t . ;; -''''••;.
--•••••"•)4••.'4,,..:::-'.;•;•••`4,A,,"4••,,,, - : .. .;,,..:--:‘,1. :4-:•-.•.,.: -, i ..
' . .:' A, v.I , : ;.•. ,...it.
. I.,,. t!(/4-
"'i''k:. j ..
9-'.-7V1 ,,i7T.-A,l't ' '- . • ' -,.:-'-:'"'•-•..:'. :...
I...V:4;r .• ....• ...... .
'• '1"?i,J.T!;',‘,1,',,,i3:..•V. ',..,•- ',. •- ."•-.`•r.N.........,:,,.;!-Y• . .
. ,:‘ ' .3,V'.1:14:1 'C-j,i • ,...2: . ',,..t., tt
lilkif Atri4.4'.....itl..:. .,,-;_.',,,•:::,...i.:,:.::45t1/: ' .•
r ' 'k ;.:goiits-,,„4, •.,.. :. --...,,„...?,-...F.
.1-.--..,•lk.,.-40.7...,,te...... .,-,.;• -.t ...„.....„.?,-4,44‘• ,.... . • . .-.- —• •:,.,, ,....r•,.?••••,. ••• , 4• i•y:.7.-4',./., -1-7
k,,,mil.gitt•-q.,.,..•if,' '
4 - , :. - •.•4••.t., .-.1t. ' -• .-.414
'....,,W.g..,1C4.1..;;:. et, , - ..,--..:,,r.'•1,,,S•••t"•;'-.,.-,4:?..-,.....A.,.*% :'.;.1...'• :,,,1;,,),...'.,'i''';.41.34PJit''..'.1' •,..'-''i , '- -..-1,..'"ir i.'• • -- ' .1 It-.4- I,4" •:t', '• .....4.t
ile'24(11''''''''-CI':4-1''. • '.• . . •,• • k ,1 r: `;',24:.i„t•,Z•••.•.,,p ..1•,_ ,!. , ,. . .., .).,,,,., ., , ,,.,, .1,,,, , .
*7 ÷." ' ..";.1!• 1".... •-•-• - ,:--. : ••'4"-,-- •.it r,..:,,---...., ,,,.; ;'•;• -;'",•,.-. .,:. '., •c•• '. • :4
.0., , 4 i .,ftr.-/,,,.-; • . ,,,.:1,1•Az.-t-,••-•.•,,,v-• a', -1,1,,-...------:;,-..-4:!....:•-•';..11'4-.:• : . .•' : . .` .' ..-:.:- .• . ::;•t; - ;,o It ; .; -• _:,,,,;11,104;
'' -r '\'Foe;-.•'•e"-: -- -- .4 , ''',......•;•4,'•-t•ft,4:— , ',.'' . .'' : .' • ' :.. , • • • ' 'f''..-•.:i. . • :,'-.:,••,,.:t,' ..y,., . 7 , .•....:••7.?,.. ,
••' .'•,..'.4-, ',13r., -, 13•'-a''.•' ...."•-rViq .',:.'.1••'-a,i•lf.2:-- 1, : . ' ••-• • .• .;,,,',,...;•:..-•.: ..•_•,.. .S.,..- . '.'••••fp:-1,1,.. '.,, ,• --. --t'3.:1•4!,•
;.**1 f•,,...•4- ,lt' 4% it-,-;•',,. • .'•,`•-‘-'-2.,.--- . ' • •r?.•,;.'.', q.,:'. • ,. •• .,..-'•.!'.,;_„;-. . • •:._••:-•.... -,):::.f:t;li) .••• fi '-..
. ..,
,.-.• • .-.-. - . . .. ' ..--,. ., ,:. -,.... •: ,,7)....,;,,•,*1 ....,...•,k•Vif;.•ii.•.,•',•:.
1, 'A.,.& ./'-,.-041 sj f.'.• 1• .,-' ,.:7.•. ,T, .7,•,-,.,.,-,, ..,. • • :.......:: . •• ',,•A • .:::,...-Ytell'A. -P•
r••,=,•.!.X40 .L.Iii‘. ,'' • • -*• '
'''''':-.''i7Ai•,;':;31'.N .
-. ':IA .•' ;'1',5,•r1-••,-/:;4)•'-v;4 th%',,-Y• '-'-••' ••'• '• - •''• ''-"'• -":". .;,UP.itf3i4j.t'r,is-.,:,,.',,.,,..:'•,,--,1.-.,#.•••:..+i4.'4'.'',.-Vt i.1iy-o•'•4,A
4 i;-!4.;1 '••-N'"i.:c:.;..0.li'-T-dAi'ot-•,'t.,Ns-1,-,---',-.-''•-.,‘'7;:'j-..'-. •/
•,7.t!?A-,:r ,t-;,:, r, •i ...., . 1.14/..., .N... •
.!2.'4 '., ,f .. '-'i... l'I.T.$t.1'.. .14 ''. ie,•• , , Z-••-,;...i• )"...,..-;iii. •,'.;..,;.`.;,,.,.•,,:.:""." :......::....,'''s•': .. ,_ ,i: 74 F.,,X,•• Ali it',iii`II ...,!,' ',..?.,••• =-1-1-"-A ti
•! • •-•••,13•.• : ',?..i,,1,,,..-::!';5,•,,..;•!.'.:{%. '':"-:-•''',' '1.•', . • , , •,.•,, ,••• •-,..: ,r, . -7 ,, ,..- • , .. .„ , •
' '-''CSir ','-ist I 'I ''' -' f . •:- -,h
•• — • '.'.''',..•:,''• •;14':.-C.,..•__..--`- "'•
,Avilf.'?:..,1-'fi,t71 ,-',•'-• -
-t•hit6,-40;..ft,-.i: ,,..k'i - ' . ...!0:.si011,„-•4, :`,1 ,,,...' . . , . .,, .
, .
-11`. 111',...`1.f.9/1::,..„.- . ',.,'..:,,..1.).. . ' .1 ..'.: .,-,,';..,.'f.';'‘....•
AlitV, ,14P..--•"''',i 1.:'.ilf,k‘•1.:;.''1',.:,S,'. ',j1'..C1...',1,;,,,,,,e'llif' ;. Ill 1.'i, ,. ....
•",' 1091.14.e. ,':A i'll./;:".' ,, .''.:::.:1;(?;;::;';...Lb.ri
il 4.1ii.,017'ii• "•4,1'.., .' '. ' ••''...''‘'''4' ' ''. I ' ',.:'.:... ,. .Clin,;...,71. . :.i.'!'....,•-.;4i.1,••••• **.:•,,,1.1,''.•C0'47
kik,••l'k''F.t,•' ••, .I,. .-,,•• •,. . , •..• .1-4 ., .1• r. • , ,.t.,!%`: . Pi I ,..1',V11fr.. '-..' •••:...•'''47:...X.'';:l'?".`•:.•••,',..*,•'0:-'.4•40.-i4.4
- i 'rm'.7--,,' • ‘'4,' '..''0 .:'• "' '. 04VIV -•-,,. '11, ,,• r.,1.0.)
1.i • `utia ..e„-0.,,, 4....,,').........10.4p.z..:....,i.,Sw.i,,..!tr,el.,,1,,.....,
'':::4\, . ;,!-,t''er.i••S,‘........ :.„Ai.0. .,...,. .,
• ,4 ...*. ' •••• s**:3.•''.,Y• '.*_,•*,,i'...,7;;•':.I.:,•-•,,, ' i fl,•,, ..; g;tt.1 ''.'4 .... !IkV''..!;174.t.ilt.4.':',V1:01A4,,,I.'.18 ./'.1 ,:y.?:..
.; ,; . ...., „.2, ,.,.‘.,.., ... ....,.,,,.......). .- s .:•-•:„,„, ,,,-.0,, . . -.-..-_ _ . - .., :.... ., ., ... ,,,.._:I::,../.,,;..,....4:.,..,..,,,-...„4..:;,.-.4..ja.:1
4
4‘"'l'''':';;;I'.i'-'•'''..*:-1";4.•::.%,z•I.;c:,'?i.P-'.t''-‘:‘--.''','.''.:\‘'ili:;;;Of?-?4,
• - 7- i . i-' •:,1 -;:•-•,)-..• . . - i 1,1;•!,,,,,,q.• ... :00 '•,-',;.:'''',c,..;-.•••,-;',' 7.,•_'..,.!'i:. ,•,-'.. ":,'•,....,•,..•'....i‘?:"..Y'r.';4 ;'...,
• 1 0`...:.--•.--.-..1..,. ',I,K, ,,,r.... , . . i \/..4.1
;' .';' •!---t.-..i:-.:ci,-;'."- ''''/' '"-:,....i...:,..., ,..\'..,•' : •-•,,,.-4.._„.... ,.- - .•. ••,!.--• .. . i,..:,,,,,..', -•• '.• .-.N4. .',',,,...;- 1••
• -4.:...",,•*4;;"..- ‘ , , . , _ ,.If ..,. . .!.•_,...i'.....r.•••p•ur
0.'',;,`F: , .,, ...„„
•I.' -.-•••;^,•;. .-7-,,-s..,;;:•73. 1•'•-•.. • - - •:'-•,-.._Ii••i ..: 111;•.; • i ' :"i...C.,,,,,,..9' •.':.: ;.,...-,.-".-.J.S.-.•;,;,...• .--:.,,..k,-••..,,•-1,1,,,.. •s'..• , - • "k.1
.......:',..'1::'-- -, . ,,, ripleAlr,V,; '•• '• ,;,,',„•Tr'r-,N,,,:'• l''i: t-41i• .1 •• ...'•••'';?•.:!•:'•••:. 3,,,,„_..,_,,y,_...Z7+1•1••?..--. .....;:i.,,•••i-717,4.tt,71".1,4;,.4.4 .•• ' •'•,Vs
0,-:.,••••:-...•sz :., -"---",f,"-, •-..•••., ." :-• " ; ,' ."71‘a••., N •0'lek.•••''‘
, . -;.,..t,
4•••••t,' :'"' •::',..-;.- •.. "'":! .,;... ',•1 :• • . , - ..4.'-- 1, ' ' AA'. -. ' •:-•••":.:1•'.-•'
• •'‘•r • ',.4.•* • • ..1* ' ' .**' ' „I. 1‘,0,,,
r4F....g..„.„.:4.:.„.... .,.......4..„4,,,, , ...,, . , . 1, _.....,..„
,..c.i.4.,.._ ...., .1/4„..„0., • :_ . :.. , . ,,,...•/.. ,„, i7i,..,..,• . . .,:•.;;,.., . _ „...t .„;.6.1.c!.. s....?.. .1 ,.... ..,...,. .:„.•?.....0.
,..)..x. :.,.„.:.:.;:...t...„
?:,,._:!.„.....1_. : ,•,,w . i,..._,. •. .• ....,.„ t . ,...,1 ,? ...,:. . _
....f.....:__,.. ... •r-y1;',i/..II;.-<. • --''•,';',-•••.-..1!••••=::r•
"
`*'' „4...- ;. ..,., ••••••••• -••,./, •• ' ; : . .2•,;.• ..;•. I ,.. .;,: . . .'.. .•..--
---.• Itr-.......-:..tc • ,fituir•- ----. • ' ' ,...','-., 4.4! ,,• i.'41„k41..1... ;'•:...-;-::'.:.---.!., —
.s.--..v... -•::..:-.-.-z;.r--.7,-:-........-;-:-.••— • ' •' ; '1 : 0. ".••••-*''.6k,••,•••;,.,
5.,:•-' •- :•,-rri.:-.:' : ., ....:. -,, !,iriji•,1 ,,, , tAnt,, A.4,...i...,e,'4.,..,!,...m1.1_' ,— .. .-..1. -.' ••••,,I• ,-.. ..-!.•••=, • • ' ,.
'''47',.:r'ia•-t:'.?:'-,,,i.‘•j'':7 7.;'./ • '••' •.',..61 )1 i'l.,:-•,:•:;:f.-vi....I,...• . •f-.;7.,-......-;•;::•,,,,;•,-.,•••.--
•••,.. , . •-•$t il 1 . ,.;-? , 4,--A144,v) • ••.,-- i ' t 4...1•'.i):4-7,fp.,/.,.;:,•; . •.: .•. i,s,tc, 5 . :- '• ' de':i'- :";.ic 0, • . . ,- -' ' ,
k'.......- -..%.. ‘ iit., , '-t i . ..t C k..,: ' , E;71.74;;A:,-'•-• ''''' 1..,',•••?•-•-:•1....r.r;-,•--•.- •.
.1.-r• 1:,.'" --
• i`• ,/,-..,...i'•*,;'k. 1. * • • •
i -•
)•.„,_•-•.;11 • %.. 7. V -.7.?-7'-ii ..,- ..,,:<,•:,,,, • vd.,, ,'
,..... ,,,v-,,,,,e40.,,,.,,,:••• .
,-,7,-...- ', ---..4ii>1.;".,..,,,,. --. , ,...\-,. . ,,-.•,i,.,,,, '-. '
.. . . ,,.. ,. ,•::--'-':':••-,1•.''.1:1- 14.;...6,....e.:;tti:,"....itry...,:::;-...fs.„:1_::::. .-..,...::: ...........;.;? : . ',..'.„-'•.„,::,,,,,..,,,,-,..'12-..,.,
?',.47:• -'` •',‘,:c..,44;...;i:gl-''?•;••: • • ',• ''.•,--•- ,,f,lit li',11!•'••• •. ,.. C. ••••, "" --i..•
•'"i's - ,.t'l f ,'fr' . . . i• •' ./..“...‘".4411,t .
' '.1.;11- .'; ''.44'S'' -°if' ..'i. " .- '.{ '.' •-.;:..."s;.:••-:..1.'s:..‘1': V..,...4,..'‘.'.-.4d...,A...‘.t.g......'.- ':VQ.:,.',, '',1.k...,..,•,.. ,.--..'., . •':' til!.% k': . ,'• `c:,:."1., f•-r..*..'-'... .
-.' ei.,,' *•-•.,• 410 ,.../,'• .,•_, - ; -
:.'N • 3
-,.• ' fa-) •-4.:,,,;•.,..k' , . :. . :,• ' ..
'7--',. 1,&.-;.-..-.,74.0 i';.;,,,..,^.i ".:„.„...i A i......-...-• ...; I.. T .d,i;4 4.1,•i, .,••f.i',., '''':'.4 s• ;•''.• •-• - - •• • • '
1--1'-',,,,it:'.-/..; '.i•ir'..- .'....14Prii`s."' • •A *• /.I.f?..1 i "'I
. -, - , • „.1;. k•-•. ,,,,.. ,,, . ‘, •..., SN 1..,,',.:••"...V-.:F;;;•..14•i il• .' •,
.4,,'...i I:. • ••J'•••••••)• ;) ' l' '- • : ',••'; ';:A.4... .,;--. •; ''N'',-,.',' -''•.• -..i ,"•',...::*- --`.4.,YLI:Pr:i'l ,,'4.f-s'\1.;V`s4-,-;,''st"4;...,.1.-...?:,:".-''''-'1kH.,d.,..t;-.1 .:"..4-.. t'4.i./.ii.";*:',14;'''..;`:-.;1'i
,,.. ...., ,.';','.:-... . ., .1. •..‘,., - -.,,, . ,, . ,,,,,,,---, ii\,.., ..)„,,,,..,0. ,N'P. •••\.• ..,,...v — .•• •- -...--, — tt:514 4,k;.•-• ) - ..li.Ci•'•'••''.• •-.•'••.- ••••-• .•':).4:,••;•I' •-•‘..;••'•0'••:,'•' ' ,'.•;. f
, . • ,. . 'AV fi ,.;.'....:i.,.-.X,li,. '. ' . \ ..7 • % /
%.i.... .!ii'cr." .' '' ',..! . . N •• " ,.....'•': ' •;6;,.-'..--,:',.:•,"---; ',,•.,-•, ...,./A '1,4,....•. •',k,.... ..(,,,,,I...t 7•'•,..,et,••kt.:,,..•,,,,.•.-1',..•;:',- ,-., •" •/'•-•!-AL.... • .`!"`:41 •
0•''''Al.';','P'.-9' 'j•. 1,.,'..r : '.1 • ...qt-7 _7;.c..; - •- •.- • •• '• ,*1-Y ,„. ,1;!..t4t,i1.1, I 4 i,;'.-•'‘ '.;: !,• .N.;". -'. *-i/o'..•• •'..•.'.•11.;._k,,
'',,'''.,•4 -,,,. ,.
(.4.).-•-•;.,.....„....,,, .:4,..,., •-.., ,
. --
,,loiy--,, •- .1,-,.. I , ......
•••••••• -.. :.-i-.•_s. •-.., •.-• :-A-1.:-.. , ..i- _,_ _-*-. ./!• ,p-,,,,,..;!-,t4:,...-......, •••,..-•-4,-1,.., ,:.- .,i- •••.• ::-,,, . . I
.31‘,..,...t;.,.'.,-• `...:'',..v '. ; . .
;:t 1.-• ' - ::-'2...g. •r •-•.*'''•44%•'• •' - '''''''tie•';•'14-••:-;••••• . - •••.0'••- • '-' ' A.,
';:;..!..?1,-c-,:',/•,,,,:-i. ilk -:. , :,. - ••;* . • ',...,,i.-".".:7: .4,4v, ,....,.:A...t...,44 =1,1,,,.. .. ;, ::1-;?,?,:-.. ,...4. 1: ..?-....'...`,',-••
•:;•,•,,,,,.. ..:iz.;,•,..-.,/ ",-••:. 11
\
:::4•••....e i:,,,-;-•._,',- N •, .,• ,' ',..:-_-.••••,'.•. '.4.i.-,•--'<l'''-' , 1.N....5.W.I.. -...,''....,:t4it,.1%:,.. -•'.!!:'"
.-.-11-,r,...e.c--,... r „,„ -.._ , .. . ...„
..(1i,',...3k,..•'":::..i.',.. •1:' ci ' • ,.0.11:#0::7..
•.ik.r f-•', 1 I,: :4f1
---..•......,X5.'
,r.%,:,..,si.,...-..e.:,.;.- •t-,:, .
...-.,,.4:z•,.. /.•,,..,, ,, .-, PA.fle.J--- - , ,• 414 -,-% :-- • '
:.f,.::.,,.:•,;-.;;••••.:,c,':r..i. -',;;••• ' `.;„ '-.--' .:'IL- '-,-•/,-,-..,r. •--n • . .„."111.-.1.,i.,!,'t / L, -40,‘A..V..:.v 4, . ,..-• •'..% ••%R.‘. - ,......Ti...
'1;;;..,..1 :;ti...,,,e,•.:: ;:,1. ‘'. . 'ot . - '; .,,,,.-,:r.;:..,k-,• • ..: ,-,,•: ••• ,,?••:::.. . ••• 7).-3-!',•17 .:t.--. 'i-i• ,•••• '..,,P.Ki• .,-;,tei..-Z•1 t.:4
:ii';.:Ni,?1'i'::•-',','•,'-;1.ii: . '::.";,';I:; I',i i',:., I '.1;-,:-.4-1r.... ....•._;•....!?•; " ) •' --::<';`..-4sr••€ '>:•'-'-••••'••••• i.N. .4\1 ‘i,',....prfruff*rt,,,•,ii.4,./••••-.., ,,,,,0 hk.; ,.,‘',-•,.'...':',:,..,:',;.,1$ .; ....). v .......:. ....".„.,.-...4:1I....-.....5..t{zt
.;...:Vir..:!,;,;.:'iS,::-.,-,T•i,...';','.• .!, i • _..:...i,.s;!:1;-e, _ ,..;,. _.. .I::;',...,--,-t,.' ' ,1-..'..,. •.., -!....-ffil.R3.,,, ...:•:.„r•:,:•.••,:.;jn.,.,.•)_41.s ',,,f-).<,!;,,,O,..„, wi.,••e-A•,,,Pv
.,4•••.;.,•`%:•::';'.i. , _,,,.- S,', •I :-.i7.:'14,•i•••.1.i.i'
'...;!S '''.,i,li.lii;1•::•:..., ' .." 4" ••••, , i• .--•/-. .0.•-':'•-r 1,1,,,.•••••,.4.1.,. -: •'.\.•'-,:--''',• •%:- ,-4.,,,s....,..---i,tinth ..,- ...--i--.1 •4:•,....wrp
...,•:::, ,,-• ,:,... .,-.;-.,.,,,..4,,*.•,- V...." -\ f. . .i 1,1" ;:s.".,,::.',1-•-•:, . •••';'?:.`:1-- 1.-4-0,9r,, ,.' ct.4.7.:',',.----.,1"..-%',.'-'''-';..,:7...A''''`,''''..'1`k.'''il, ' '1,:',' • :--z:Ctiii>'1,-....k. 'i....4 7-"., .0....‘'-;‘,..i. . ,,',.. ./ 1.:fl.','t i'''' , .. .IA '''Av;e..-4011',..,• -•';',.,',V7'-ci.arg4":r ••'`"Mal-,; '•••••ki.t
i'Y''4,....%f:s.'i.'•::,:-!.!";...'.C.';;• -.A t.. '7"•!../41.!,..„:''' ";.'' .'.....{#'''''''''''t. '''%;';::......4. `..;•.''4,:.: . ."., .' -.::;.€ 1.:14.....1jf:;;,'''&.•.:;.'„.!‘.,t.;4,/,,,10.1'•..,11,,'''4Cfrl'0,,r,;;;.1,1
- ..'e.'1';';'fi'..::'.fl,'i'''.'N•;'-.°A ''.11
:-'4,4.''';.•'3' ').."•'-'1!,.'•:',-1' 4.(•;.::', %.' .".'''''''. ''' f';'../'`',C:-'.4'''V'''.;;"-.•',',..i.....'23'::''' fi; ,•1 '.,....,•:•-, ..,i. , .;•kj,,F, ,J,I*A-_,,,:•,:......,.,:_;....;„..,.,... .,.._.. ,. ._,,---04. ...‘=„1.:,...w..•.,ak.,):'!'-': !'L,...'-1-,1.--::',•*.i.,-'•;:' ''., 14;:::',#.1t-''''''‘'''". 4:•:,Lff.ea.:',.z.;i2 t.',,-',;,:-;,,,,';'.-;;;.:-..;-..:.*F'•,:-.-/' 'fi.,,,..". ...:...31.-'"..,..,.;;:-. 7;,TtIns"...rin:i.:-.',...i:4.--:::.,..Virt,•A.,-, , 4.0';',•:it-4:::
11';;Iffri.':',k:Ns4.',..5;4'''ir,t,t; '' , .7.:7-..,4:',v,-.- -.) 1P-:•:#-VV-i.'tt.A.Y4.1i'.sit 4...:;;ix...,;:-'''''''',:A•i:.# 'Vtif0:7,4till'S... ., ;, . _Mila,,tsZ•Ftil•_•1:,$
Itatsp,144,g•i,-,.1tri..44. 1 A -.;„:,:,-...,,-... .,,,.. , ,..„:orl,i,;,-.1,......f,-;',.,,flmo ...i.,....1-07,4-i,•-•.t.7, ./•..;•.-41.-k;--- -4,10.„‘74-tviks.-:.,,),-,.-..
b... t.,,,"...t.:,.,....,i1.,•,ii . . • - ---,i,
;11, ,.. , ; ..iA.;•..v.:!::---;:,-Y..-;‘,.,i.t. ,),A4...,.1 • 'Af.,:,' :;:'...','':6-,f-i.:1:;=...,tii P...1,1141";tr,-. -w- ? 7.4..„.-.&. ...i.4,: -.v :<.!,,s-t-2
..., .).::„ ,_:. .
,..04 .,,,.0: ._-.„,,...., t; .._.„...f,::;:_:,..•;.:::- ,,,, , .,5,.__7-,:',..;•..t:: :.,:,,,f.-.5-/;'.....royek. .'4--.:`...',.!...);',:i . '.4'47. ,S'..,., 4,1,k's_.,14..,..;,..).2:- ••":,.;•,/,")"...4.1,3,-;:4 $4, i'i,;.:,;,i,:'•,-.,,_
. ,--4,,,,P i•-,-;':4 !'• ••• .'37..* :.'ei•,•• ,'..). .ti..•--- . '-;A. '..4'•'7:4., •-,--;>!- !_.'"Ar.;,;'- ,,•-•4•:;-"Zfs.,.'1,1f,'s,../42. ,:4 -il... ,:ffg •- ' 'S';';'•'•••••‘?
..-NkttNf..:44svi&y,DA.,,,, 1,i ,, r.„::- . •••,•'...1!(...-• f,00,;:>:'4.-k.,9.1s,A.;*.:,-. ,' ,/,(.,k. '•".'S-,..÷: :,- -;‘-'4 f.-.4,,137..e.p-e -'44,47.•&,!•k-,:-•J',... k:,••:'
,f,-,fig:.:14.1)i.,NO•Wati.',--:A •'- -7.'-':•,..• •••.-.•''.. --,,41(--` :.-1.-•:-:*',.k..;• ..,a,'--. ':.tivt,-;,-..••-, .,-,‘'..'. .•1 -•-•1--r.',AV". . -•ze••-A-.-,-,ttc-K“,-f.',1 -.,-•„vot•
i.,7"t• : 1...y-.4-. --;•:•,.it'it:.,:lr.;, ;;',. ,'',',...•. ..a. ...,...4 "it:.... , 4,.,;•,/.%:,•,-*,../0•••... 117, )•,,I, , 0, ,.. „ •
RECEIVED
APR 3 2023
DCM-EC Project Narrative - King's Landing - Improvements
April 03, 2023
The Town of Murfreesboro is developing a site known as King's Landing,acquired in 2013 by the
Town, into a free public fishing access area. The proposed projects onsite involve the construction
of a fixed fishing pier and a floating kayak launch. The fixed pier will connect to an existing
concrete sidewalk that leads to the existing gravel parking area onsite. The kayak launch is a
prefabricated floating dock system connected to a proposed wooden board walk that connects to
the existing parking area onsite.
Fixed Pier(NCWRC Project)
The fixed pier portion of this project was originally approved and permitted by a CAMA major
permit on December 16, 2016 (Permit # 123-16). Due to permitting issues associated with the
floodplain permit,construction was never completed for the fishing pier portion of the project.
In regards to construction of the fishing pier, FEMA recently issued a CLOMR decision allowing
construction of the pier to proceed,NCWRC is requesting a CAMA Major Permit for construction
of the fishing pier originally permitted under permit # 123-16. The proposed design of the pier
remains unchanged from that originally submitted and approved under permit# 123-16.
The fishing pier will be an 8' X 90' wooden structure accessed by a 6' X 102' wooden walkway.
The pier and walkway will be pile supported and include a 42"railing system. To accommodate
users with disabilities the walkway includes a switchback to ensure an accessible walking surface
slope. Additionally, one-fourth of the fishing pier railing system will accommodate individuals
with disabilities.
In order to mitigate flood impacts upstream from the proposed pier as required by the issued
CLOMR,grading of the existing roadbed across the Meherrin River from the proposed pier location
will be required. This roadbed was the former location of US 258. Approximately 1.5' of material
is proposed to be graded(moved)from the southern half of the embankment to the northern half of
the embankment. No material is to be removed from the site,only regarded. No wetlands will be
filled due to the work, however approximate 800 sf of temporary impacts to wetlands will be
required to access the old embankment area. A contractor will use matting to cross this section of
wetlands and after work is complete the area will be restored to previous conditions. After grading,
the embankment will be reseeded and mulched. Please see attached CLOMR documents (FNI,
pages 1-8). Grading work is outside the 30' CAMA buffer.
The grading and excavating will be accomplished with typical construction equipment including
but not limited to: backhoe, excavator and potentially a bulldozer. The piles for the pier will be
installed from shore with a vibrator hammer installed on a long reach excavator or by vibratory
hammer installed on an excavator mounted on a barge.
Canoe/Kayak Launch
The proposed kayak launch is a prefabricated floating style launch that is 30' long and 5' wide.
The launch is attached to a prefabricated floating dock that is 32.5' long and 12' wide and a 15' by
5' wide kayak launch area. A prefabricated gangway will attach the floating dock to the proposed
wooden boardwalk which is 251' long and 5' wide. Per the Town's consultant(Davey Resource
RFCFIVED
- 1 - APR 122013
DCM-MHD CITY
Project Narrative
King's Landing - Renovation 4/2/23
Group, Inc.),upland development for the launch(grading,rip rap,and the gravel parking area)was
permitted under CAMA Minor Permit# 121322A.
The Project proponent hereby certifies that all information contained herein is true, accurate,and
complete to the best of my knowledge and belief.
The Project proponent herby requests that the certifying authority review and take action on this
CWA 401 certification request within the applicable reasonable period of time.
RECO L D
APR 3 2023
DCM...E C
RECEIVED
-2 APR 12 2023
DCM-MHD CITY
DCMMP-1 RECEIVED
APPLICATION for FEB 1 5 2023
Major Development Permit DCM-EC
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/Landowner Information
Business Name Project Name(if applicable)
Town Of Murfreesboro King's Landing-Improvements
Applicant 1: First Name MI Last Name
Carolyn Brown (Town Administrator)
Applicant 2: First Name MI Last Name
If additional applicants,please attach an additional page(s)with names listed.
Mailing Address PO Box City State
6 Murfreesboro NC
ZIP Country Phone No. FAX No.
27855 Hertford 252-398-5904 ext. -
Street Address(if different from above) City State ZIP
105 East Broad Street Murfreesboro NC 27855-
Email
cbrown@murfreesboronc.net
2. Agent/Contractor Information
Business Name
NC Wildlife Resources Commission(NCWRC)
Agent/Contractor 1: First Name MI Last Name
Michael W Leggett
Agent/Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
1718 HWY 56 West Creedmoor NC
ZIP Phone No. 1 Phone No. 2
27522 919-707-4050 ext. 919-632-0360 ext.
FAX No. Contractor#
2 NA
Street Address(if different from above) City State ZIP
SAB
Email
michael.leggett@ncwildlife.org
RECEIVED
<Form continues on back>
APR 1 2 2013
252-808-2808 .. 1-888-4RCOAST www.nccoastalmanagement.aq`+11wimp CITY
APPLICA
ON for
Form DCM MP-1 (Page 2 of 4) RECEIVED Major Development TI Permit
F E B t 5 2023
3. Project Location
County(can be multiple) Street Address DCM-EC State Rd.#
Hertford Termination of Hart Street Off of US 158B
Subdivision Name City State Zip
NA Murfreesboro NC 27855-
Phone No. Lot No.(s) (if many,attach additional page with list)
— ext. NA,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
Chowan Meherrin River
c. Is the water body identified in(b)above,natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural DManmade DUnknown Meherrin River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable,list the planning jurisdiction or city limit the proposed
®Yes ❑No work falls within.
Town of Murfreesboro
4. Site Description
a. Total length of shoreline on the tract(ft.) b. Size of entire tract(sq.ft.)
5277 LF(North Tract:4,975 LF/South Tract:302 LF) 4,393,026 sq.ft(100.85 acres)
c. Size of individual lot(s) d. Approximate elevation of tract above NHW(normal high water)or
2.41 Acres(S.Tract),98.44 acres(N.Tract), NWL(normal water level)
(If many lot sizes,please attach additional page with a list) 12.5 ❑NHW or®NWL
e. Vegetation on tract
Primarily scrub brush and grass; some trees along river and property perimeter to the south and east. Area required for
grading mitigation is wooded.
f. Man-made features and uses now on tract
Site was a commercial facility with associated concrete buildling pad,access road,small accessory concrete pads, and
retaining wall along a portion of the river and ditch on western side of the building pad. Site now has small gravel parking
area,concrete ADA parking spot,and concrete ADA sidewalk.
g. Identify and describe the existing land uses adjacent to the proposed project site.
East and South-Woodlands owned by the Town of Murfreesboro;West Hart Street(dead end road); North-Meherrin River
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
R-20(North Tract)/H-I (South Tract) (Attach zoning compliance certificate,if applicable)
®Yes ❑No DNA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? Dyes No
k. Has a professional archaeological assessment been done for the tract? If yes,attach a copy. Dyes ®No DNA
If yes,by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a DYes No DNA
National Register listed or eligible property?
<Form continues on next page> PFCEIVED
APR 1 2 /0?3
252-808-2808 .. 1-888-4RCOAST www.nccoastalmanagement.oq - HR CITY
Form DCM MP-1 (Page 3 of 4) APPLICATION for
RECEIVED Major Development Permit
m. (i) Are there wetlands on the site? FEB 1 5 2023
®Yes ❑No
(ii)Are there coastal wetlands on the site? DCM-EC DYes ®No
(iii)If yes to either(i)or(ii)above,has a delineation been conducted? DYes No
(Attach documentation,if available)
n. Describe existing wastewater treatment facilities.
None
o. Describe existing drinking water supply source.
Potable city water(meter removed)
p. Describe existing storm water management or treatment systems.
Existing culvert carries offsite storm water across site,currently storm water sheet flows across site to a ravine or river
5. Activities and Impacts
a. Will the project be for commercial,public,or private use? ❑Commercial ®Public/Government
OPrivate/Community
b. Give a brief description of purpose,use,and daily operations of the project when complete.
The proposed project will develop the site into a free public fishing access area to include a fixed wooden fishing pier and
floating kayak launch with gangway and wooden walkway. Construction for the fixed pier was delayed due to floodplain
permitting and the issued CAMA permit expired. Approximalty 500 CY of material will be regraded across the river to satisfy
the requirements of the issued CLOMR
c. Describe the proposed construction methodology,types of construction equipment to be used during construction,the number of each type
of equipment and where it is to be stored.
The piles for the wooden fixed pier will be installed with a vibratory hammer mounted on an excavator supported on land or
barge. Excavation for the CLOMAR will involve Equipment will be stored on site. The wooden walkway and kayak launch
will be installed via traditional conttruction methods.
d. List all development activities you propose.
Drive pilings for pier and walkway. Construct wooden fishing pier and walkway. Construction of wooden boardwalk and
installation of prefabricated kayak launch. Mulch an access path to the area required for grading(CLOMAR). Mulch area,
regrade area to satisy flood mitigation,and reseed. Approximalty 0.4 Acres of total land disturbance required. Area is
upland away from River and AEC.
e. Are the proposed activities maintenance of an existing project,new work,or both? New
f. What is the approximate total disturbed land area resulting from the proposed project? 0.5 DSq.Ft or®Acres
g. Will the proposed project encroach on any public easement,public accessway or other area DYes No DNA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
No new discharges to waters of the state.
i. Will wastewater or stormwater be discharged into a wetland? Dyes No DNA
If yes,will this discharged water be of the same salinity as the receiving water? Oyes ❑No DNA
j. Is there any mitigation proposed? Dyes ['No ®NA
If yes,attach a mitigation proposal.
<Form continues on back> tEC IVFD
APR 1 2 ' 0?3
252-808-2808 :: 1-888-4RCOAST www.nccoastalmanagement.net
.00:M- MHD CAT\
Form DCM MP-1 (Page 4 of 4) APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form,(MP-1)the following items below,if applicable,must be submitted in order for the application
package to be complete. Items(a)—(0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work,clearly indicate on maps,plats,drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed(with state application only)or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront(riparian)landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Murfreesboro Historical Association,INC Phone No.252 398-5922
Address PO Box 3,Murfreesboro,NC 27855
Name NCDOT,Division 1 /District Engineer Phone No.252 513-6030
Address 230 NC Highway 42 W,Ahoskie,NC 27910
Name Carol Lang Phone No.
Address 142 Old US 258,COMO,NC
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers,permittee,and issuing dates.
Major CAMA Permit 123-16(Issued 12/31/2016 Minor CAMA Permit#121322A(2022)
CLOMR/NC-21-745(Issued 05/06/2022)
h. Signed consultant or agent authorization form,if applicable.
i. Wetland delineation,if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner)
k. A statement of compliance with the N.C.Environmental Policy Act(N.C.G.S.113A 1-10),if necessary. If the project involves expenditure
of public funds or use of public lands,attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant,and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 2/$r1,,3 Print Name Oki G0\Stet 1, -f No"'QC
Signature Ih'Lr (.,.,"'I`' RECEIVED
Please indicate application attachments pertaining to your proposed project. FEB 1 5 2023
®DCM MP-2 Excavation and Fill Information EDCM MP-5 Bridges and Culverts
®DCM MP-3 Upland Development
®DCM MP-4 Structures Information
DC114ft-, ,,AFD
APR 1 2 ?0?3
252-808-2808 :: 1-888-4RCOAST www.nccoastalmanagemen*JMMHD cnT
RECEIVED
Form DCM MP-2
EXCAVATION and FILL FEB 1 5 1013
(Except for bridges and culverts) DCM-EC
Attach this form to Joint Application for CAMA Major Permit,Form DCM MP-1. Be sure to complete all other sectionsv of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL) stabilization)
Length
Width
Avg. Existing NA NA
Depth
Final Project NA NA
Depth
1. EXCAVATION This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i)Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards.
(CW),submerged aquatic vegetation(SAV),shell bottom(SB),
or other wetlands(WL)? If any boxes are checked,provide the
number of square feet affected.
❑CW DSAV ❑SB
OWL ❑None
(ii)Describe the purpose of the excavation in these areas:
2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
c. (i)Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
['Yes ❑No DNA ❑Yes ❑No DNA
(ii)If no,attach a letter granting permission from the owner. (ii)If yes,where?
e. (i)Does the disposal area include any coastal wetlands/marsh f. (i)Does the disposal include any area in the water?
(CIAO,submerged aquatic vegetation(SAV),shell bottom(SB), Oyes ❑No DNA
or other wetlands(WL)? If any boxes are checked,provide the
number of square feet affected. (ii)If yes,how much water area is affected?
❑CW ❑SAV ❑SB
OWL ❑None
(ii)Describe the purpose of disposal in these areas:
4FCFINFD
APR 2 ?0??
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net �'revised:[121 106
Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION This section not applicable
(If development is a wood groin, use MP-4—Structures)
a. Type of shoreline stabilization: b. Length:
❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width:
c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No DNA
(ii)If yes,state amount of erosion and source of erosion amount
information.
g. Number of square feet of fill to be placed below water level. h. Type of fill material.
Bulkhead backfill Riprap
Breakwater/Sill Other
i, Source of fill material.
4. OTHER FILL ACTIVITIES This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? DYes ❑No DNA b. (i)Will fill material be placed in coastal wetlands/marsh(CW),
If yes, submerged aquatic vegetation(SAV),shell bottom(SB),or
other wetlands(WL)? If any boxes are checked,provide the
(ii)Amount of material to be placed in the water number of square feet affected.
(iii)Dimensions of fill area ❑CW ❑SAV ❑SB
(iv)Purpose of fill OWL ❑None
(ii)Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used(e.g.,dragline,
controlled? backhoe,or hydraulic dredge)?
Silt Fence. Upland portion where grading activities will occur Excavator and Bulldozer
c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project
Oyes ❑No ®NA site? ®Yes ❑No DNA
(ii)If yes,explain what type and how they will be implemented. (ii)If yes,explain steps that will be taken to avoid or minimize
environmental impacts.
Steel bridge and wood mattin. Approximalty 800 SF with ACOE
concurence
02/07/2023 Town of Mufreesboro RECEIVED
Date Applicant Name 4ECFPVFL3
King;s Landing Improvements FEB 1 5 2023
Applicaht`Signature
Project Name DCM-E J a /U?3
OCM-MHD C r
252-808-2808 :: 1-888-4RCOAST::www.nccoastalmanagement.net revised:12/26/06
Form DCM MP-3
UPLAND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings,facilities,units or structures b. Number of lots or parcels.
proposed. N/A
Wooden walkway and wooden stairs down to proposed
kayak launch
c. Density(give the number of residential units and the units per d. Size of area to be graded,filled,or disturbed including roads,
acre). ditches,etc.
N/A 0.4 acres(Offsite Grading for Clomar)
e. If the proposed project will disturb more than one acre of land,the f. List the materials(such as marl,paver stone,asphalt,or concrete)
Division of Land Resources must receive an erosion and to be used for impervious surfaces.
sedimentation control plan at least 30 days before land-disturbing Concrete kayak launch abutment
activity begins.
(i) If applicable,has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
❑Yes ❑No ®NA
(ii)If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also
be covered by impervious and/or built-upon surfaces,such as require a Stormwater Certification.
pavement,building,rooftops,or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of
or parking. Water Quality for review?
15% Existing/22% Proposed ❑Yes ❑No ®NA
i. Give the percentage of the entire tract to be covered by impervious (ii)If yes,list the date submitted:
and/or built-upon surfaces,such as pavement,building,rooftops,
or to be used for vehicular driveways or parking.
19%
j. Describe proposed method of sewage disposal. k. Have the facilities described in Item(i)received state or local
N/A approval?
®Yes ❑No DNA
If yes,attach appropriate documentation.
I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater
state(e.g.,surface runoff,sanitary wastewater,industriaV design?
commercial effluent,°wash down"and residential discharges). ❑Yes ❑No ®NA
Surface Runoff/Sheet Flow. If yes,attach appropriate documentation. RECEIVED
DOM- Q%
vp 9 ire ise /26/
252.808-28082:: 1-888-4RCOAST:: ww.nccoastalmana ement,net
Form DCM MP-3 (Upland Development, Page 2 of 2)
m. Describe proposed drinking water supply source(e.g.,well, n. (i) Will water be impounded? Elves ❑No ®NA
community,public system,etc.)
N/A (ii)If yes,how many acres?
o. When was the lot(s)platted and recorded? p. If proposed development is a subdivision,will additional utilities be
N/A installed for this upland development?
Oyes ['No NA
02/08/2023
Date
Kings Landing-Improvements
Project Name
Town of Murfreesboro
Applicant Name
bilf
Applicant ignature
RECEIVED
FEB 1 5 2023
DCM-EC
4F(F VP:
APR ► z /n?
252-808-2808:: 1-888-4RCOAST::www.nccoastalmanagement.net revised: 12/26/06
ut,.F1r`'i•-•IIViP4!_ �,
REC F `�.
Form DCM MP-4
STRUCTURES APR 3 2023
(Construction within Public Trust Areas) `y rr`
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS ['This section not applicable
a. (i) Is the docking facility/marina: b. (i)Will the facility be open to the general public?
❑Commercial ®Public/Government ❑Private/Community ®Yes DNo
c. (i)Dock(s)and/or pler(s) d. (i)Are Finger Piers included? ❑Yes No
(ii)Number 1 (Dock), 1 Fixed Pier If yes: •
(iii)Length 30'Long, 102'Long (ii)Number
(iv)Width 5'Wide,6'Wide (iii)Length �{
(v)Floating ®Yes No (iv)Width
(v)Floating ❑Yes ❑No
e. (i) Are Platforms included? ®Yes ['No f. (i) Are Boatlifts included? Dyes No
If yes: If yes:
(ii)Number 1 (Dock), 1 Fixed Pier (ii)Number
(iii)Length 32.5'Lonq,90'Lonq, 15' Lonq (iii)Length
(iv)Width 12'Wide, 8'Wide,5'Wide (iv)Width
(v)Floating ®Yes No
Note: Roofed areas are calculated from dripline dimensions.
g. (i)Number of slips proposed h. Check all the types of services to be provided.
NA ❑Full service,including travel lift and/or rail, repair or
(ii)Number of slips existing maintenance service
NA ❑Dockage,fuel,and marine supplies
0 Dockage("wet slips')only,number of slips:
❑ Dry storage;number of boats:
0 Boat ramp(s); number of boat ramps:
®Other,please describe:
None of the above
i. Check the proposed type of siting: j. Describe the typical boats to be served(e.g., open runabout,
❑Land cut and access channel charter boats,sail boats,mixed types).
❑Open water;dredging for basin and/or channel Kayak
®Open water;no dredging required
❑Other;please describe:
k. Typical boat length: 10' I. (i)Will the facility be open to the general public?
®Yes ❑No
m. (i)Will the facility have tie pilings?
Dyes No
(ii)If yes number of tie pilings? RECEIVED
APR 1 2 2079
252-808-2808:: 1-888-4RCOAST ::www.nccoastalmanagement.net revised: 12/27/06
Form DCM MP-4 (Structures, Page 2 of 4)
12. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑Office Toilets
❑Toilets for patrons;Number: ; Location: (�
❑Showers RECEIVE
❑Boatholding tank pumpout;Give type and location:
APR 3 2023
b. Describe treatment type and disposal location for all sanitary wastewater.
DCM-FC
c. Describe the disposal of solid waste,fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i)Give the location and number of"No Sewage Discharge"signs proposed.
(ii)Give the location and number of"Pumpout Available"signs proposed.
f. Describe the special design,If applicable,for containing Industrial type pollutants,such as paint,sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and"No Wake"signs proposed.
I. Give the location of fuel-handling facilities,and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live-aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina,what types of services are currently provided?
�afer,)NFL1
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
APR 1 2 2023
OCM-MHD CITY
252-808-2808:: 1-888-4RCOAST::www.nccoastalmanagement.net
revised:12l27/06
Form DCM MP-4 (Structures, Page 3 of 4)
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
['Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh(CW),submerged aquatic vegetation(SAV),shell bottom
(SB),or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ['None , `E C E !I E D
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? Oyes ❑No APR 3 2023
If yes,give the name and address of the leaseholder(s),and give the proximity to the lease. DCM-EC
3. BOATHOUSE(including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial DPublic/Government ['Private/Community
(ii)Number
(iii)Length
(iv)Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN(e.g., wood, sheetpile, etc. If a rock groin, use MP-2,Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii)Length
(iii)Width
5. BREAKWATER(e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length b. Average distance from NHW,NWL,or wetlands
c. Maximum distance beyond NHW,NWL or wetlands
6. MOORING PILINGS and BUOYS This section not applicable
a. Is the structure(s): b. Number
['Commercial ❑Pubiic/Government ❑Private/Community
c. Distance to be placed beyond shoreline d. Description of buoy(color,inscription,size,anchor,etc.)
Note: This should be measured from marsh edge,if present.
e. Arc of the swing
7. GENERAL
RECEIVED
APR 12 ?023
OCM..MHD CITY
252-808.2808:: 1.888.4RCOAST::www.nccoastalmanagement.net revised:12/27/06
Form DCM MP-4 (Structures, Page 4 of 4)
a. Proximity of structure(s)to adjacent riparian property lines b. Proximity of structure(s)to adjacent docking facilities.
22'Toward Eastern&360' From Western(Fixed Pier) >0.5 miles
250'Toward Eastern&200'From Western (Floating Dock)
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body d. Water depth at waterward end of structure at NLW or NWL
135' 15'
e. (i) Will navigational aids be required as a result of the project?
❑Yes No DNA
(ii)If yes,explain what type and how they will be implemented.
8. OTHER El This section not applicable
a. Give complete description:
The structure will serve as a free public fishing pier.The platform will be accessed by a 6'wide by 102'long wooden walkway.
One switchback is required to meet ADA slope requirements. The wooden fishing platform will be 8'X 90'. Both the walkway
and platform will be supportted by driven pillings and include a railing system that is a minimum of 42"above the walking
surface. Also included is a prefabricated kayak/Canoe launch attached to a concrete abutment via a gangway.
04/03/2023
Date
King's Landing-Improvements
Project Name
Town of Murfreesboro Q a 5.J by,r)
Applicant Name
• APR 32123
Applic t 46re
DCM-
-FC F:IyFD
APR 1 2 1023
DDIIA�IUPHt)
252-808-2808 ::1-888-4RCOAST::www.nccoastalmanagement.net revised: 12/27/06
MAJOR PERMIT FEE MATRIX
A s 'licant: Tuw✓N cA M t tr- " rrt.1
Selection Development Type Fee DCM% DWQ %
(14300 1601 435100093 1625 6253) (24300 1602 435100095 2341)
I. Private, non-commercial
development that does not $250 100%($250) 0%($0)
involve the filling or
excavation of any wetlands
or open water areas:
II. Public or commercial
development that does not $400 100%($400) 0% ($0)
involve the filling or
excavation of any wetlands
or open water areas:
Major Modification to a $250 100%($250) 0% ($0)
CAMA Major permit
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B, C, or D below applies:
III(A). Private, non-
commercial development, if $250 100%($250) 0% ($0)
General Water Quality
Certification No. 4175 (See
attached)can be applied:
III(B). Public or commercial
development, if General $400 100%($400) 0% ($0)
Water Quality Certification
No. 4175 (See attached)
can be applied:
III(C). If General Water
Quality Certification No.4175 (see attached)could $400 60%($240) 40% ($160)
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life:
III(D). If General Water
Quality Certification No. $400 60%($240) 40% ($160)
4175 (see attached)cannot
be applied:
IV. For development that
involves the filling and/or $475 60%($285) 40% ($190)
excavation of more than ?FC,FJVFD
one acre of wetlands and/or
open water areas:
AI-1? .1 2 70/3
OCM-MID CITY'
Leggett, Michael W
From: Maldonado,Vanessa D
Sent Thursday, October 20, 2022 7:49 AM
To: Leggett, Michael W
Cc: Fears, Kimberly L
Subject Screen Shot of E-Payment - Major CAMA Permit- Kings Landing- Improvements Project- Murfreesboro - Hertford County
Good morning,
Here is the screen shot of e-payment confirmation.
FRCE1''V' D
FEB 1 5 2C23
DCM-EC
0
c n ;p
$ n
0 �. P11
00 m
OCP AP DOCUMENT PAYMENT GENERAL INFORMATION DPG
NEXT FUNCTION: ACTION: HISTORY: _ 10/20/2022 07: 4 r: 19
BROWSE:
PAY ENTITY : =TPT VEND/EMP NBR: So2 OE'272
VEND/EMP SHORT NAME: ..EC DOCUMENT NOR: �,=-1=.=_Rki . _..1522
DOCUMENT DATE : LC." 2::22 PAYMENT NOR: CCi PRTL PYMT NOR: 020
IND AMOUNT
SALES TAX/VAT • VAT INCLUSIVE : N
SALES TAX 2 EXPENSE Ih(D
SALES TAX 3 • GL EFFECTIVE DATE: 10/19/2022
FREIGHT • EXTRACT DATE
ADDITIONAL COST ACCRUAL CANC DATE:
GROSS INVOICE • 400. 00 CURRENCY CODE •
PAYMENT AMOUNT 400. 00 DISCOUNT TYPE : NOT TAKEN
AMOUNT PAID 400. 00 DISCOUNT TAKEN . 00
PAYMENT STATUS : PAID
PAYMENT TERMS : NET PAY IMMEDIATELY PAYMENT REF NOR : 0000149453
PAYMENT CATE : 10/19/2022 PAYMENT TYPE : ELECTRONIC
PAYMENT ROUTE CD : HANDLING CODE
FACTOR NUMBER ONE INVC PER PYMT: YES
REASC'' C77E:'0 BANK ACCT PYMT CD: IGO
y^°CIA
06/023
Vanessa Maldonado Jones
Controller's Office/Accounts Payable Manager
NC Wildlife Resources Commission Rr-.
•
102 MrService Center
Raleigh,1VC 27699-1702 FEE ; 5 2023
CI Fax:
( 9) 707-0090
Fax:(91 707-0094
7-7 ✓C —€ C
J
BOOK 759 PAGE 414 (3)
313670
kEc ... I . I/IIIIIIIIIIl/IIIlIllhI%
Filed:12/02/2013 04:38:59 PM
MELANIE H.STOREY,Register of Deeds
HERTFORD County,NC
LLJ�I�VJI*V1J1� raw+ MRrS
Excise Tax:550 00
GENERAL WARRANTY DEED
This certifies that there are no delinquent ad valorem real estate taxes, which the llerlford County Tax
Collector is charged with collecting, that are a lien on: Portion of PIN 594626-3671 Hertford County
Office of Land Records. This is not a certification that the P N R mate! ttre deed description.
1:212113 Tax Collector
Date Delinquent Tax Collector/Tax Clerk
Mail to Grantees after recorded
Excise Tax:$50.00 This Instrument Prepared By:
W. I tugh Jones,Jr.
Attorney at Law
1'.O.Box 986, Ahoskic,NC 27910
STATE OF NORTH CAROLINA
COUNTY OF HERTFORD
Tills DEED, made and entered in this Iq day of November, 2013, by and between and
MARVIN W. FIODGE, whose address is 401 Liberty Street, Winona, Minnesota 55987 and wife,
JENNIFER M. HODGE, whose address is 314 W. Main Street, Murfrccsboro, NC 27855, hereinafter
GRANTORS;and THE TOWN OF MURFREESBORO,a North Carolina Municipal Corporation, whose
address is Post Office Box 5,Murfreesboro,NC 27855, hereinafter GRANTEE;
WI NESSETI1:
That GRANTORS, for adequate valuable consideration, paid by GRANTEE, the receipt and
sufficiency of which is hereby acknowledged,have bargained and sold and by these presents do bargain.
sell,grant and convey unto GRANTEE and its successors and assigns,in fee simple,that certain tract or
parcel of land, located in the Town of Murfreesboro, Murfrccsboro Township, Hertford County, North
Carolina,described as follows:
That certain tract or parcel of land situate in the Town of Murfrccsboro. Hertford
County,North Carolina,and lying on the East side of Hart Street,containing 2.41 acres by
D.M.D.,according to plat of survey prepared by L.7'. Livcrmon,Jr.,R.L.S.,dated 2/19/86,
of record in Map Book 13,Page 64,and being more particularly described as follows:
BEGINNING at a concrete monument set in the eastern right of way line of Hart
Street, said monument being located South 79 degrees 30 minutes East 30.06 feet from a
point in the centerline of I-lart Street and said point being located in northeasterly direction
83 feet from the center of a culvert running under said road and said culver being located.3
miles North of East Main Street and running from said point of beginning and along the
eastern right of way line of Hart Street,North 12 degrees 57 minutes East 94.12 feet to a RFr,pIVFD
new iron pipe;thence running North 6 degrees 35 minutes East 235.89 feet to a point in the
edge of the Meherrin River; thence along the edge of said river, South 86 degrees 46
minutes East 281.47 feet to a concrete monument, this being a meandering line along the APR J 2 /O2
• A •
BK 759 PG 415 DOC#313670
Meherrin River,the North boundary of the property conveyed being the high water mark of
the Meherrin River; thence on a common line with the lands of the Town of Murfreesboro,
South 1 degree 10 minutes East 340.72 feet to a concrete monument;thence along another
line for the lands of the Town of Murfreesboro,South 88 degrees 50 minutes West 155 feet
to a concrete monument and North 79 degrees 30 minutes West 184.22 feet to the point
and place of beginning.
Grantors and Grantee were not occupying the property as their primary residence.
To the extent the fair market value of the property exceeds the sales price the
Grantors make a gift of the same to The'Town of Murfreesboro.
TO HAVE AND TO HOLD the aforesaid tract or parcel of land,together with all privileges and
appurtenances thereunto belonging,to GRANTEE and its successors and assigns,in fee simple.
And GRANTORS covenant with GRANTEE,that GRANTORS are seized of the premises in fee
simple,have the right to convey the same in fee simple,that title to said property is free and clear of all
liens and encumbrances,and that GRANTORS will warrant and defend the title against the lawful claims
of all persons whomsoever, except for the exceptions and restrictions hereinafter stated. Title to the
property hereinabove described is subject to the following exceptions and restrictions:
1. Ad valorem taxes and assessments,if any,for the current year.
2. Legally enforceable restrictions, easements, rights of way and conditions of record or
apparent on-site.
3. Restrictive Covenants in deed recorded'in Book 642, Page 719,Ilertlbrd County Register
of Deeds Office.
IN WITNESS WHEREOF, GRANTORS have caused this deed to be executed the day and year
first above written.
Marvin W.Hodge
STATE OF MINNESOTA
CITY/COUNTY OF (,);'/ICAC\
, a Notary Public of the City/County and State of Minnesota,
do hereby certify that MARVIN W. 1-LODGE personally appeared before me this day and acknowledged
the due execution of the foregoing Deed.
Witness my hand and official seal or stamp,this Z r 14" day of November,2013.
Notar Public
My Commission Expires: I .;t i y
(NOTARY SEAL/STAMP)
.� RE .EJVED
:•. ANDREWJOHNSCHMIOTKNECHT
`• f NOTARY PUBUC-MINNESOTA o�
,` MYCOMMISSiON WIRES 01/31118 AP' 1 2 ?P73
OCNM HD CITY
mow
• • BK 759 PG 416 DOC#313670
•
nnifer M Hodge
STATE OF NORTH CAROLINA
COUNTY OF ,41z l
I, Atha)" J. Fr,.4iealL _,a Notary Public of the County and State of North Carolina,do
hereby certify that JENNIFER M.HODGE personally appeared before me this day and acknowledged the
due execution of the foregoing Deed.
Witness my hand and official seal or stamp,this iQ _day of November,2013.
�1 No ary Public
My Commission Expires: A/tc.3t-2r a.011
(NOTARY SEAL/STAMP)
0,00 I S'FG/0
F%
1,0TARr �=
PUBL►C .
its
'/i/0RO CO '
>.t
W111/dcedc/h dge.murfrecshoro.deed.1 115 I3.jhp
R
FEB 1 5 2023RFCE-1uFF)
[CM—EtR 1 2 l(l??
CCM-•MHD .;SIT s
. !
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Town of Murfressboro
Name of Property Owner Requesting Permit:
Mailing Address: Po Box 6
Murfreesboro, NC 27855
252-398-5904
Phone Number:
Email Address: cbrown@murfreesboronc.net
I certify that I have authorized Michael Leggett- PE I NCWRC
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
King's Landing Improvements-Town of Murfreesboro
at my property located at Hart Street, Murfreesboro, NC 27855
f
in Hertford County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
C
Signature
(Gtrolv,n 'rvinly\
Pr!ntbr Type Name
Title
1 ls / a.032
Date
RECEIVED
This certification is valid through I I
FEB 1 5 2023 RECEIVED
DCM-ECAPR 12 2023
. IDCM..MHD CITY
Leggett, Michael W
From: Scarbraugh,Anthony D CIV USARMY CESAW(USA)
<Anthony.D.Scarbraugh@usace.army.mil>
Sent: Wednesday, November 16,2022 1:29 PM
To: cbrown@murfreesboronc.ne
Cc: Leggett, Michael W
Subject: [External] Delineation Concurrence for Old US Hwy 258/Como NC/Hertford County
(SAW-2022-01502)
Attachments: PJD Figure(Kings Landing).pdf
CAUTION:External email.Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Good Afternoon,
On July 6,2022,we received information from NC Wildlife Resources Commission of behalf of the Town of
Murfreesboro requesting the Wilmington District, Regulatory Division to review and concur with the boundaries of an
aquatic resource delineation.
We have reviewed the information provided by you concerning the aquatic resources,and by copy of this e-mail, are
confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and
reliable representation of the location and extent of aquatic resources within the identified review area.The location
and extent of these aquatic resources are shown on the delineation figure, labeled Kings Landing Improvements PJD
Figure and dated August 29, 2022.
Regulatory Guidance Letter(RGL) 16-01 https://usace.contentdm.ocic.org/utils/getfile/collection/p16021co119/id/1256
provides guidance for Jurisdictional Determinations(JD)and states"The Corps generally does not issue a JD of any type
where no JD has been requested". At this time,we are only verifying the delineation. This delineation may be relied
upon for use in the permit evaluation process,including determining compensatory mitigation. "This verification does
not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted
as such.This delineation verification is not an Approved Jurisdictional Determination(AID)and is not an appealable
action under the Regulatory Program Administrative Appeal Process(33 CFR Part 331). However,you may request an
AJD, which is an appealable action.
If you wish to receive a Preliminary Jurisdictional Determination(PJD),or an Approved Jurisdictional Determination(AJD)
please respond accordingly,otherwise nothing further is required and we will not provide any additional
documentation.
The delineation included herein has been conducted to identify the location and extent of the aquatic resource
boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular
site identified in this request.This delineation may not be valid for the Wetland Conservation Provisions of the Food
Security Act of 1985,as amended. If you or your tenant are USDA program participants,or anticipate participation in
USDA programs,you should discuss the applicability of a certified wetland determination with the local USDA service
center,prior to starting work.
V/r
Anthony Scarbraugh r� J.,
VCEIUED
FEB 1 5 2023 APR 2 IQ??
i
DCM-E0CM-mHD CITY
Anthony Scarbraugh
Regulatory Specialist
US Army Corps of Engineers
Washington Regulatory Field Office
2407 W. 5th Street
Washington, NC 27889
Phone:(910)251-4619
Email: anthony.d.scarbraugh@usace.army.mil
We at the U.S.Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We
would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatorv.ops.usace.armv.mil/customer-service-survev/
Thank you for taking the time to visit this site and complete the survey.
RECEIVED
2 APR 12 202?
DCM-MHD CITE;
1
I—ADJANCENT PROPOERTY OWNER NOTIFICATIONS—Green Card Receipts
Mufreesboro Historical Association
NCDOT—District Office
Carol Lang—142 Old US Hwy 258(Physical Address)
Carol Lang—539 Benthall Bridge Road(Mailing Address)
•
RECEIVED
FEB 1 5 2023
RFCEWED
DCM-EC
APR 12 2023
OCM-MHD CITE'
.
ENDER: COMPLETE THIS SECTION
COMPLETE THIS SECTION ON DELIVERY
A. Signature
• Complete Items 1,2,and 3. ❑Agent
• Print your name and address on the reverse X 0 Addressee
so that we can return the card to you. B. Received by(Printed Name) 1C. Date of Delivery
• Attach this card to the back of the mailpiece,
or on the front if space permits. -
1. Article Addressed to D. Is delivery address different from item 1? 0 Yes
If YES,enter delivery address below: 0 No
Carol Lang R E C E '""D
142 Old US Hwy 258
1 Como, NC 27818 FEB 1 5 2C23
3. Service Type -ci Priority Mall Express®
RReg:
eerred
III'IIII IIII(IIII II 11111111111111111111111 0 Adult MCCertitled Mall � ilve .-,,.( ❑Deliiveryed MahRestricled
❑Certified Mail Restricted Delivery[ 0 Signature Confirmation'.
9590 9402 6909 1104 4750 86 ❑Collect on Delivery El Signature Confirmation
O Collect on Delivery Restricted Delivery Restricted Delivery
9 Article Number(Transfer from service label) - ued Mail
7021 0950 0000 8032 9679 rr ."r Restricted Delivery
Domestic Return Receipt i
PS Form 3811,July 2020 PSN 7530-02-000-9053
ENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY
• Complete items 1,2,and 3. A. Signature
• Print your name and address on the reverse X 0 Agent
so that we can return the card to you. 0 Addressee
• Attach this card to the back of the mailpiece, B. Received by(Printed Name) C. Date of Delivery
or on the front if space permits.
1. Article Addressed to: G D. Is delivery address different from item 1? ❑Yes h"" .i , i ' r
(/�,,,, 11 �n�V If YES,enter delivery address below: ❑ Np ti L..,l:9 f,.-.. i ,� d, s'
--tr0\ I- 3 01 ,
';3`i ‘ . FEB6d3e , 1 5 2023
� i4 L.; ` Q L 27855
P V
DC - F 3. Service Type c
Priority Express®
IIIIIIIII ^ IIIIIIIIIIIIIIIII IIII 0 Adult d Mail®u Restricted Delivery Registered Mall Restricted
61rertifie
9590 9402 7056 1225 2618 45 O Certified Mail Restricted Delivery D Signature ConfirmationfM
O Collect on Delivery ❑Signature Confirmation
2 Article Number(Transfer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery
lured Mail
7021 0950 0000 8035 3391 lured Mail Restricted Delivery
r.-;er$500)
PS Form 3811,July 2020 PSN 7530-02-000-9063 Domestic Return Receipt
ENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY
• Complete Items 1,2,and 3.
• Print your name and address on the reverse � �l Agent
so that we can return the card to you. '''/l� 0 Addressee
• Attach this card to the back of the mailpiece, :• "-'-sued by(-tinted Name) C. D.tteo 1of Delivery
or on the front if space permits. ��IA / ' ` 2 ��
1. Article Addressed to: D. Is delivery address different from item 1? 0 Yes
If YES,enter delivery address below: 0 No
Debbie Hill - President 1!'
Murfreesboro Historical Association
PO Box 3
Murfreesboro, NC 27855
11I
3. Service Type O Priority Mail Express®
RFCEIVED
I II IIII III I I I I I I I I I I I IIIII III II III O Adult Signature 0 Registered Mail
O Adult Signature Restricted Delivery 0 Registered MailrRestricted
I ji(Certifled Mail® Delivery
9590 9402 6909 1104 4751 30 O Certified Mail Restricted Delivery 0 Signature Confirmation,. APR 12 2023
O Collect on Delivery E Signature Confirmation
2. Article Number(Transfer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery
nsured Mail
7021 0950 0 0 0 0 8 0 3 5 3384 nsured Mail Restricted Delivery DCM-IVIHD CITY
__ -- - — -T ,over$500)
PS Form 3811,July 2020 PSN 7530-02-000-9053 Domestic Return Receipt ;
':i1,'V.
—
NORTH CAROLINA WILDLIFE RESOURCES COMMISSION 01
Cameron Ingram, Executive Director
CERTIFIED RETURN
RECEIPT REQUESTED
August 19,2022
Carol Lang
142 Old US 2587
Como,NC 27818
RE: King's Landing Improvements—Fishing Pier
Permit 123-16—Major Permit Renewal
To Whom it May Concern:
The North Carolina Wildlife Resources Commission(NCWRC) is submitting plans and applications for review for a CAMA Major
Permit for construction of a fishing pier at the site known as Kings Landing(Murfreesboro,Herford County). The construction project
is a joint effort between the Town of Murfreesboro and NCWRC to provide free public access to the Meherrin River.
As the adjacent riparian property owner to the aforementioned project,NCWRC is required to notify you of the development in order
to give you the opportunity to comment on the project. Please review the attached permit application and drawings.
Should you have any objections to this proposal, please sent your written comments to the Ronald Renaldi (District Manager),
Northeastern District Office,401 S. Griffin Street,Suite 300,Elizabeth City,NC 27909 within 30 days of your receipt of this notice.
Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of
your receipt of this notice will be considered as no objection. Please let me know if you have any questions related to this project. I
can be reached at(919)707-0083 or via email at michael.leggett@ncwildlife.org.
Sincerely,
1(010
Michael Leggett, PE r.,EIVED
Engineer
SEP302022
enclosures
DCM-EC
.4F(EIVED
Mailing Address:N.C. Wildlife Resources Commission • 1701 Mail Service Center• Raleigh,North Carolina 27699-1701 APR 1 2 20?q
Telephone:919-707-0010 • ncwildlife.org
OCM-MHD ;ITV
i
F
•
NORTH CAROLINA WILDLIFE RESOURCES COMMISSION 0
Cameron Ingram,Executive Director
CERTIFIED RETURN
RECEIPT REQUESTED
August 19,2022
Debbie Hill, President
Murfreesboro Historical Association
PO Box 3
Murfeesboro,NC 27855
RE: King's Landing Improvements—Fishing Pier
Permit 123-16—Major Permit Renewal
To Whom it May Concern:
The North Carolina Wildlife Resources Commission (NCWRC) is submitting plans and applications for review for a CAMA Major
Permit for construction of a fishing pier at the site known as Kings Landing(Murfreesboro,Herford County). The construction project
is a joint effort between the Town of Murfreesboro and NCWRC to provide free public access to the Meherrin River.
As the adjacent riparian property owner to the aforementioned project,NCWRC is required to notify you of the development in order
to give you the opportunity to comment on the project. Please review the attached permit application and drawings.
Should you have any objections to this proposal, please sent your written comments to the Ronald Renaldi (District Manager),
Northeastern District Office,401 S.Griffin Street,Suite 300,Elizabeth City,NC 27909 within 30 days of your receipt of this notice.
Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of
your receipt of this notice will be considered as no objection. Please let me know if you have any questions related to this project. I
can be reached at(919)707-0083 or via email at michael.leggettQncwildlife.org.
Sincerely,
416A
Michael Leggett,PE RE r'E I V E D
Engineer
SEP302022
enclosures
DCM—EC RECEIVED
APR j 2 20?3
DCM-MHD CITY
Mailing Address:N.C.Wildlife Resources Commission • 1701 Mail Service Center• Raleigh,North Carolina 27699-1701
Telephone:919-707-0010 • ncwildlife.org
•
{dam NORTH CAROLINA WILDLIFE RESOURCES COMMISSION 0
Cameron Ingram, Executive Director
CERTIFIED RETURN
RECEIPT REQUESTED
August 19,2022
Michael Hill,PE—District Engineer
NCDOT—Field Office
230 NC Highway 42 W
Ahoskie,NC 27910
RE: King's Landing Improvements—Fishing Pier
Permit 123-16—Major Permit Renewal
To Whom it May Concern:
The North Carolina Wildlife Resources Commission(NCWRC) is submitting plans and applications for review for a CAMA Major
Permit for construction of a fishing pier at the site known as Kings Landing(Murfreesboro,Herford County). The construction project
is a joint effort between the Town of Murfreesboro and NCWRC to provide free public access to the Meherrin River.
As the adjacent riparian property owner to the aforementioned project,NCWRC is required to notify you of the development in order
to give you the opportunity to comment on the project. Please review the attached permit application and drawings.
Should you have any objections to this proposal, please sent your written comments to the Ronald Renaldi (District Manager),
Northeastern District Office,401 S.Griffin Street,Suite 300,Elizabeth City,NC 27909 within 30 days of your receipt of this notice.
Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of
your receipt of this notice will be considered as no objection. Please let me know if you have any questions related to this project. I
can be reached at(919)707-0083 or via email at michael.leggett a,ncwildlife.org.
Sincerely,
At,16,4
Michael Leggett, PE RECEIVED
Engineer
SEP 3 0 2022 RFC:FR/Pp
enclosures
DCM-EC APR ► 2 ?0?3
DCM-MHD CITY
Mailing Address:N.C.Wildlife Resources Commission • 1701 Mail Service Center• Raleigh,North Carolina 27699-1701
Telephone:919-707-0010• ncwildlife.org
Leggett, Michael W
From: Hill, Michael R
Sent: Wednesday, September 7,2022 10:54 AM
To: Leggett, Michael W
Subject: RE: Kings Landing - Improvements(CAMA Notification)
Good Morning Mr. Leggett,
I have no objections to your project. I have previously filled out a hard copy expressing no objection. If you have not
already received this document by mail, hopefully it will be arriving soon.
Thanks,
Michael R. Hill, PE
District Engineer
North Carolina Department of Transportation
252 513 6030 office
mrhill2ancdot.gov
230 NC 42 West
Ahoskie, NC 27910 F`E C! 3 i1:D
>' f ; FEB 1 5 2023
z
DCM-EC
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Leggett, Michael W<michael.leggett@ncwildlife.org>
Sent:Wednesday,September 7,2022 9:48 AM
To: Hill, Michael R<mrhill2@ncdot.gov>
Subject: Kings Landing-Improvements(CAMA Notification)
Mr. Hill,
The North Carolina Wildlife Resources Commission (NCWRC) is submitting plans and applications for review for a CAMA
Major Permit for construction of a fishing pier at the site known as Kings Landing (Murfreesboro, Herford County). The
construction project is a joint effort between the Town of Murfreesboro and NCWRC to provide free public access to the
Meherrin River.
As the adjacent riparian property owner to the aforementioned project, NCWRC is required to notify you of the
development in order to give you the opportunity to comment on the project. Please review the attached permit
application and drawings.
Should you have any objections to this proposal,please send your written comments to the Ronald Renaldi (Dist n iVit=j
Manager), Northeastern District Office,401 S.Griffin Street,Suite 300, Elizabeth City, NC 27909 within 30 days of your
APR 12 Z02
CCitot— AHQ Cir=,
receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the
application.
If NCDOT has no objections could you please complete and submit back to me the"Adjacent Riparian Landowners
Statement"form completed indicating that NCDOT has no objections.
Please let me know if you have any questions.
Michael Leggett, PE
Facility Construction Engineer
NC Wildlife Resources Commission
Mailing Address: 1718 NC 56
Creedmoor, NC 27522
office: 919-707-4050//cell: 919-632-0360
ncwildlife.orq
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
FRFCEIVFD
APR 12 ?0?3
2
CCM~MHD
Leggett, Michael W REC DV .;D
From: 401PreFile FEB 1 5 2023
Sent: Tuesday, May 24, 2022 12:24 PM
To: Leggett, Michael W
Subject: Automatic reply:401 Pre-filing Meeting Request DCM-EC
This email confirms receipt of your pre-filing meeting request. Please retain this email for your records and
submit this documentation as part of your 401 application (PCN Application)as required by federal law. DWR
will not be able to accept your application without this federally required documentation.401 applications
received without documentation that a pre-filing meeting request was submitted at least 30 days prior will be
returned as incomplete.
Responses to this email are not monitored.
Background
On April 6, 2022, the United States Supreme Court issued an order staying a lower court's vacatur of the
Trump Administration's 2020 "Clean Water Act Section 401 Certification Rule" ("Federal Rule"). As a result of
the United States Supreme Court order,the Trump Administration's Federal Rule has sprung back into effect.
The Trump Administration's Federal Rule imposes additional procedural requirements on applicants for 401
Certifications and on DWR's processing of those applications. One requirement is that 401 applicants must
request a pre-filing meeting request at least 30 days prior to submitting their 401 application. [40 C.F.R.
§121.4] In turn,the Federal Rule requires that applicants include documentation of their pre-filing meeting
request in their 401 Certification application. [40 C.F.R §121.1; 40 C.F.R. §121.5]. Please refer to the Federal
Rule for more information.
Per 40 CFR§121 and §121.5, a 401 Certification application that does not include the required pre-filing
meeting request documentation does not constitute a "certification request." As a result of the reinstatement
of the Trump Administration's Federal Rule, all 401 applications received after April 6, 2022 that do not have
documentation that a pre-filing meeting request was submitted at least 30 days prior to submittal of a 401
Certification application will be returned as incomplete.
If you need to contact 401/Buffer Permitting Staff, please use the following link(s)to access of staff contact
list(s).
For Non-Transportation Central Staff:
https://deq.nc.Rov/about/divisions/water-resources/water-quality-permitting/401-buffer-permitting/401-
buffer-permitting-contacts
For Non-Transportation Regional Staff:
https://edocs.deu.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2162034&cr=1
For all Transportation Projects Including NCDOT Projects: 4F(;EI!!ED
https://deq.nc.gov/a bout/divisions/water-resources/water-resources-permits/transportation-
permitting/staff-contacts
4PR 12 2023
1 OCA4.. IHD CITY
1
K-ADDITIONAL INFORMATION
CLOMR APPROVAL-05/06/2022
CLOMR NARRATIVE
PREVIOUS CAMA MAJOR PERMIT-NCWRC PIER
RECEIVED
in. D
FEB 1 5 2023
DCM-EC
RFCFIUF D
APR 12 2023
OCM•.MHD CITY
�..
R wig ,, .)
��,QAIr
Federal Emergency Management Agency
y o Washington, DC 20472
a F
� � North Carolina Floodplain Mapping Program
�, Y /
s.
Cooperating Technical State
May 06,2022
CERTIFIED MAIL
RETURN RECEIPT REQUESTED IN REPLY REFER TO:
The Honorable Ronald J. Gatling Case No.: 21-04-4056R
Community Name: Hertford County,NC
Chairman,Hertford County Board of
Commissioners Community No.: 370130
115 Justice Drive, Suite I
Winton,NC 27986
Dear Mr. Gatling:
We are providing our comments with this enclosed Conditional Letter of Map Revision(CLOMR)on a
proposed project within your community that, if constructed as proposed,could revise the effective Flood
Insurance Study report and Flood Insurance Rate Map for your community.
If you have any questions regarding floodplain management regulations for your community or the National
Flood Insurance Program(NFIP)in general,please contact the Floodplain Administrator for your community.
If you have any technical questions regarding this CLOMR,please contact the North Carolina Floodplain
Mapping Program(NCFMP)at(919)825-2318,or the Federal Emergency Management Agency(FEMA)Map
Information eXchange(FMIX)toll free at 1-877-336-2627(1-877-FEMA MAP). Additional information about
the NFIP is available on FEMA's website at https://www.fema.gov/flood-insurance,and additional information
about the NCFMP is available at http://tlood.nc.gov/ncflood.
Sincerely,
74:A/: F E B 1 5 2023
Patrick"Rick"F. Sacbibit,P.E.,Branch Chief Chris Koltyk, Assistant Director !al'IVI EC
Engineering Services Branch Risk Management Chief
Federal Insurance and Mitigation Administration Nqrth Carolina Emergency Management
Enclosure:
Conditional Letter of Map Revision Comment Document
cc: Mr. David Cotton,County Manager, Hertford County
Mr.Robert Mizelle; Floodplain Administrator&Chief Code Building Inspector,Hertford County
Ms.Carolyn Brown,Town Administrator/Floodplain Administrator,Town of Murfreesboro
Mr.Brian Dick; PhD,P.E.,Freese and Nichols, Inc. C Mr. Scott Gentry,P.E.,CFM,North Carolina Floodplain Mapping Program
F,C; Iy�D
Mr.Steve Garrett,CFM,NFIP Coordinator,North Carolina Emergency Management
APR 12 2023
DCM••MHD CITY
Page 1 of 6 ifssue Date:May 06,2022 (Case No.: 21-04-4066R I CLOMR-APP
� sQART,yF
,„
Federal Emergency Management Agency
U
Washington, D.C. 20472
ND Sf.,v
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT
COMMUNITY INFORMATION PROPOSED PROJECT DESCRIPTION BASIS OF CONDITIONAL REQUEST
CHANNELIZATION ID HYDRAULIC ANALYSIS
Hertford County UPDATED TOPOGRAPHIC DATA
North Carolina
COMMUNITY (Unincorporated Areas)
COMMUNITY NO.:370130
NO.21-745-Kings LandingFishingPier APPROXIMATE LATITUDE&LONGITUDE: 36.446,-77.068
IDENTIFIER g SOURCE: Other DATUM: NAD 83
AFFECTED MAP PANELS
TYPE: FIRM' NO.: 3710596800J DATE:August 03,2009
•FIRM-Flood Insurance Rate Map
TYPE: FIRM' NO.: 3720596900K DATE:August 03,2009
FLOODING SOURCE AND REACH DESCRIPTION
Meherdn River-From approximately 0.7 miles downstream of the crossing at Virginia Boulevard(US 258)to approximately 1.0 mite upstream of the crossing at Virginia
Boulevard(US 258)along Meherrin River.
PROPOSED PROJECT DESCRIPTION
Flooding Source Proposed Project Location of Proposed Project
Meherrin River Channelization
Approximately 800 feet upstream of crossing at Virginia Boulevard(US
258)along Meherrin River
SUMMARY OF IMPACTS TO FLOOD HAZARD DATA
Flooding Source Effective Flooding Proposed Flooding Increases Decreases
Meherrin River BFEs' BFEs' Yes
Yes
Zone AE Zone AE Yes None
Floodway Floodway Yes Yes
•BFEs-Base(1-percent•annual-chance)Flood Elevations
COMMENT
This document provides the Federal Emergency Management Agency's(FEMA's)comment regarding a request for a CLOMR for the project described above.
This document Is not a final determination;it only provides our comment on the proposed project in relation to the flood hazard information shown on the effective
National Flood Insurance Program(NFIP)map. We reviewed the submitted data and the data used to prepare the effective flood hazard information for your
community and determined that the proposed project meets the minimum floodpiain management criteria of the NFIP. Your community is responsible for
approving all tloodplein development end for ensuring that all permits required by Federal Or State/Commonwealth law have been received.
State/Commonwealth,county,and community officials,based on their knowledge of local conditions and in the Interest of safety,may set higher standards for
construction In the Special Flood Hazard Area(SFHA),the area subject to inundation by the base flood). If the State/Commonwealth.county,or community has
adopted more restrictive or comprehensive floodplain management criteria,these criteria take precedence over the minimum NFIP criteria.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)
toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304 6426.
Additional Information about the NFIP Is available on the FEMA website at httpiAvww.fema.goWnational-flood-insurance-program.
i LCt.:�IVLD
Patrick*Rick*F.Sacbibit,P.E.,Branch Chief FEB4Hrei•Engineering Services Branch IbC�D
Federal Insurance and Mitigation Administration
21-04-4056RLIC Mig. c/0 2 3
• DCM"MHO CITY
Page 2 of 6 [Issue Date:May 06,2022 (Case No.: 21-04-4056R I CLOMR-APP
? *10li
O64A��E,j
Federal Emergency Management Agency
oCz Washington,D.C. 20472
,4ND SE�
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
OTHER COMMUNITIES AFFECTED BY THIS CONDITIONAL REQUEST
CID Number: 370419 Name: Town of Murfreesboro, North Carolina
AFFECTED MAP PANELS
TYPE: FIRM NO.: 3710596800J DATE; August 3,2009
TYPE: FIRM NO.: 3720596900K DATE: August 3,2009
F E B 1 5 2023
this comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Mapping end Insurance eXchange
(FMIX)toll free at 1-877-336.2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304.
Additional Information about the NFIP is available on the FEMA website at https/Avww.fema.gov/flood-Insurance.
C /It^/4/1
Patrick'Rick'F.Sacb1b11,RE.,Branch Met ['C VFQ
Engineering Services Branch L+
Federal Insurance and Mitigation Administration
21.04-4056R A PR
�C�•rviHa ;lT
Page 3 of 6 Issue Date:May 06,2022 Case No.: 21-04-4056R CLOMR-APP
:QSPART,yF-
.)
ix Federal Emergency Management Agency
,� r�'' V
\�� J4r Washington, D.C. 20472
`tgND SEG:"
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION
To determine the changes in flood hazards that will be caused by the proposed project,we compared the hydraulic modeling reflecting the proposed
project(referred to as the proposed conditions model)to the hydraulic modeling used to prepare the Flood Insurance Study(FIS)(referred to as the
effective model). If the effective model does not provide enough detail to evaluate the effects of the proposed project,an existing conditions model must
be developed to provide this detail. This existing conditions model is then compared to the effective model and the proposed conditions model to
differentiate the increases or decreases in flood hazards caused by more detailed modeling from the increases or decreases in flood hazards that will be
caused by the proposed project.
The table below shows the changes in the DFEs:
BFE Comparison Table
Flooding Source: Mcherrin River BFE Change(feet) Location of maximum change
Existing vs. Maximum increase 0,3 Approxlmatey 1.0 miles upstream of the crossing at Virginia Boulevard(US 258)
Effective Maximum decrease None Not applicable
Proposed vs. Maximum increase 0.1 Approximately 1,100 feet upstream of the crossing et Virginia Boulevard(US 258)
Existing Maximum decrease 0.1 Approximately 0.8 miles upstream of the crossing at Virginia Boulevard(US 258)
Proposed vs. Maximum increase 0.2 Approximatey 1.4 miles upstream of the crossing at Virginia Boulevard(US 258)
Effective Maximum decrease None Not applicable
Increases due to the proposed project that exceed those permitted under Paragraphs(c)(10)or(d)(3)of Section 60.3 of the NFIP regulations must adhere
to Section 65.12 of the NFIP regulations.With this request,your community has complied with all requirements of Paragraph 65.12(a)of the NFIP
regulations.Compliance with Paragraph 65.12(b)also is necessary before FEMA can issue a Letter of Map Revision when a community proposes to
permit encroachments into the effective floodplain/regulatory floodway that will cause BFE increases in excess of those permitted under Paragraph
60.3(d)(3)/60.3(c)(10).
NFIP regulations Subparagraph 60.3(b)(7)requires communities to ensure that the flood-carrying capacity within the altered or relocated portion of any
watercourse is maintained. This provision is incorporated into your community's existing floodplain management ordinances;therefore,responsibility
for maintenance of the altered or relocated watercourse,including any related appurtenances such as bridges,culverts,and other drainage structures,rests
with your community. We may request that your community submit a description and schedule of maintenance activities negesrlary to pnsure thin s requirement. PP _ s
FEB 1 5 2C23
-
\4 DC1EC
,� a f. ...
This comment is based on the flood data presently available, If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)
toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304 6426.
Additional Information about the NFIP Is available on the FEMA website at http:/Avww.fema.gov/nat''onal-food-Insurance-program.
41—" P"41 RECF IV
Patrick'Rick'F.Sacbibtt,P.E.,Branch Chief
Engineering Services Branch 1 2 117-Federal Insurance and Mitigation Administration r,PR
11
21-04.4356R Hf R 1, '
'•-',Vi.,aitrit 4.;11'
Page 4 of 6 Issue Date:May 06,2022 ICase No.: 21-04 4066R I CLOMR-APP
Qti.Ar\F
is• �f ot:
. 1 Federal Emergency Management Agency
•o3�l9VD s�GJ� , Washington, D.C. 20472
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
DATA REQUIRED FOR FOLLOW-UP LOMR
Upon completion of the project,your community must submit the data listed below and request that we make a final determination on
revising the effective FIRM and FIS report. If the project is built as proposed and the data below are received,a revision to the FIRM
and FIS report would be warranted.
•Detailed application and certification forms must be used for requesting final revisions to the maps. Therefore,when the map revision
request for the area covered by this letter is submitted,Form 1,entitled"Overview and Concurrence Form,"must be included. A copy of
this form may be accessed at http://www.fema.gov/plan/prevent/flim/dl_mt-2.shttn.
•The detailed application and certification forms listed below may be required if as-built conditions differ from the proposed plans. If
required,please submit new forms,which may be accessed at http://www.fema.gov/planiprevent/fhm/dl_mt-2.shtm,or annotated copies
of the previously submitted forms showing the revised information.
Form 2,entitled"Riverine Hydrology and Hydraulics Form." Hydraulic analyses for as-built conditions of the base flood,the 10-
percent,2-percent,and 0.2 percent annual chance floods,and the regulatory floodway,must be submitted with Form 2.
Form 3,entitled"Riverine Structures Form."
•A certified topographic work map showing the revised and effective base and 0.2 percent annual chance floodplain and floodway
boundaries.Please ensure that the revised information ties in with the current effective information at the downstream and upstream ends
of the revised reach.
•An annotated copy of the FIRM,at the scale of the effective FIRM,that shows the revised base and 0.2 percent annual chance
floodplain and floodway boundary delineations shown on the submitted work map and how they tie into the base and 0.2 percent annual
chance floodplain and floodway boundary delineations shown on the current effective FIRM at the downstream and upstream ends of the
revised reach.
•As-built plans,certified by a registered Professional Engineer,of all proposed project elements.
•A copy of the public notice distributed by your community stating its intent to revise the regulatory floodway,or a signed statement by
your community that it has notified all affected property owners and affected adjacent jurisdictions.
•Documentation of the individual legal notices sent to property owners who will be affected by any widening or shifting of the base
floodplain and/or any BFE increases along Meherrin River.
This Comment Is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map information eXchange(FMDQ
loll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304 6426.
Additional Information about the NFIP is available on the FEMA website at httpl/Awnv.ferna.pov/national-flood-Insurance-program.
R LC VE::j ----'J..�%�
Patrick'Rick'F.Sacbibll,P.E.,Branch Chief Pi
2 lQ?�
FEB 1 5 2023 Engineering Services Branch
Federal Insurance end Mitigation Administration Orft,, r%
21-04-4056R �•r 104 '/L) �1'I 1"\!
D C M-.`..a C F
•
Page 5 of 6 ,Issue Date:May 06,2022 Case No.: 21-04-4056R CLOMR-APP
40107
Federal Emergency Management Agency
A41 S�GJa Washington, D.C.20472
1vDCONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
DATA REQUIRED FOR FOLLOW-UP LOMR(continued)
•FEMA's fee schedule for reviewing and processing requests for conditional and final modifications to published flood information and
maps may be accessed at hops://www.fema.gov/forms-documents-and-software/flood-map-related-fees. The fee at the time of the map
revision submittal must be received before we can begin processing the request. Payment of this fee can be made through a check or
money order,made payable in U.S.funds to the National Flood Insurance Program,or by credit card(Visa or MasterCard only). Please
either forward the payment,along with the revision application,to the following address:
North Carolina Emergency Management,Risk Management
Attention: Scott Gentry
4218 Mail Service Center
Raleigh,NC 27699-4218
or submit the LOMR using the Online LOMC portal at: https://hazards.fema.gov/femaportal/onlinelomc/signin
After receiving appropriate documentation to show that the project has been completed,FEMA will initiate a revision to the FIRM and
FIS report. Because the flood hazard information(i.e.,base flood elevations,base flood depths,SF1-lAs,zone designations,and/or
regulatory floodways)will change as a result of the project,a 90-day appeal period will be initiated for the revision,during which
community officials and interested persons may appeal the revised flood hazard information based on scientific or technical data.
i`; Li L.. V L.
F E B 1 5 2023
DCM-'LC
The comment is based on the flood data presently available. If you have any questions about this document please contact the FEMA Map Information eXchange(FMIX)
toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304 6428.
Additional Information about the NFIP Is available on the FEMA website at httplivnew.fema.gov/national-flood-Insurance-program.
Patrick'Rick'F.Sacbibit,P.E.,Branch Chief
Engineering Services Branch
Federal Insurance and Mitigation Administration APR 1 0 20?3
21-04-4058R 1
OCM..MHD CITY
Page 6 of 6 Issue Date:May 06,2022
Case No.: 21-044056R CLOMR-APP
' Federal Emergency Management
g ent Agency
o�tRNll SECJ1. 4 Washington, D.C. 20472
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
COMMUNITY REMINDERS
We have designated a Consultation Coordination Officer(CCO)to assist your community. The CCO will be the primary liaison between
your community and FEMA. For information regarding your CCO,please contact:
Ms.Jacky Bell
Director,Mitigation Division
Federal Emergency Management Agency,Region IV
Rhodes Building,3005 Chamblee Tucker Road
Atlanta,GA 30341
(770)220-5406
r.+ 1. yrw.. 1 V....
FEB 1 5 2023
DCM—E C
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)
oil free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304 6426.
Additional Information about the NFIP is available on the FEMA website at http://www.fema.gov/national-ticod-Insurance-program.
4 -- -,-,/4/ i
Patrick'Rick"F.Sacbibit,P.E.,Branch Chief
Engineering Services Branch
Federal Insurance and Mitigation Administration 4 PR 21-04-4056R 40
IUCM..M I i-
r1FR E E S E Innovative approaches
°NICHOLS Practical results
i Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
NC MT-2 LOMC Depot- North Carolina Floodplain Mapping Program
4218 Mail Service Center REC i\ �6' .i )
Raleigh, NC 27699-4218 i W �t•�f-J
FEB 1 5 2023
Kings Landing Improvements Project Narrative
Conditional Letter of Map Revision(CLOMR) DCM-EC
January 2020
The North Carolina Wildlife Resources Commission (NCWRC)is proposing improvements to Kings Landing
that include a fishing pier to provide public fishing access along the Meherrin River in the Town of
Murfreesboro, North Carolina.The purpose of this letter is to describe the hydraulic modeling conducted
to assess the impacts that the proposed improvements cause on the 1%Annual Chance Event(also called
the Base Flood) water surface elevations in the vicinity. This effort was undertaken in support of an
application package for a Conditional Letter of Map Revision (CLOMR) for the Federal Emergency
Management Authority(FEMA). In North Carolina,the review duties and responsibilities are delegated to
North Carolina Flood Mapping Program,which is a FEMA Cooperating Technical Partner(CTP)for projects
that are proposed in the state's mapped floodplains and non-encroachment areas.
Project Background and Location
This project involves the construction of a fishing pier which will provide public fishing access to the
Meherrin River via Hart Street.The pier includes two switchback ramps and is 90-feet long by 8-feet wide
at its longest run,as shown on the attached plans(Exhibit5).The project also involves some tree removal
and the construction of a concrete walkway.
The project location is shown on FEMA FIRM panel 37205968001, effective August 3rd, 2009.This area is
mapped as Zone AE, which designates areas in the 1% annual chance event special flood hazard area
studied using detailed methodology.There is a regulatory mapped floodway, which depicts the channel
of a stream, plus any adjacent floodplain areas,that must be reserved so that the 1%annual chance flood
can be conveyed without increasing in flood elevations more than a designated amount.The prop se lug)/
improvements are located approximately 800 feet upstream of the US-258 bridge.
APR 1 .'4
•
0CM..V1►is;
Page I 1
t
� SFREESE Innovative approaches
practical results
i�NICHOL
a Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
The existing surface data used were from LiDAR downloaded through the North Carolina One Map
webpage combined with field survey in the vicinity of the proposed pier.All elevations reference the North
American Vertical Datum of 1988 (NAVD88)and maps are shown in North American Datum (NAD) 1983
State Plane North Carolina (US Feet).
Hydrology
The flood insurance study (FIS) for Hertford County indicates that the hydrologic analyses, except for
gaged flooding sources, were performed using the urban or rural regression equations developed by
United States Geological Survey(USGS). No revisions were made to the FEMA effective hydrology.
Methodology
FNI obtained the effective model,copied it onto its computers and ran the model which is referred to as
the duplicate effective model. Water surface elevations from the duplicate effective model were then
compared to published effective base flood elevations (BFE), the 100-year return interval flood. Water
surface elevations were the same at comparative locations. FNI then reviewed the model for any errors
or discrepancies in geometry and configuration based on review of LiDAR topography and inspection of
the project site. During this review, it became apparent that a significant topographic feature was not
fully included in the duplicate effective model. This feature is the relict roadway embankment/fill of the
former US Highway 258,which once crossed the Meherrin River upstream of the current US 258 bridge.
Although the bridge was removed, the roadway fill embankments were not removed and remain as a
significant encroachment/blockage to flood flows(see Figure 1). To represent this feature,cross-sections
were added on the upstream,downstream and top of the feature and extended across the full extent of
the floodplain. Ineffective flow areas were added to the model at these cross-sections and also at
upstream and downstream cross-sections in order to model the effects of the relict roadway embankment
on BFEs. Expansion and contraction coefficients were also changed to 0.3 and 0.5,respectively,at sections
upstream and downstream of the former roadway embankment.
In order to compare the effects of the proposed fishing pier on BFE's with pre-project conditions, five
cross sections were added in the corrected effective model where the proposed work is to be completed
(RS 65468,65451, 65421, 65363, 65343). Relative roughness values were similar to roughness values in
proximal cross sections and ineffective flow areas were included in the added cross sections. A total of
,4FCFIVFD
PAR' I. 2 ZO??
DCM-•iMHD CITY
f�FREESEInnovative approaches
�NICHOLS Practical results
a Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
eight cross sections were added between cross sections 65895 and 64688. This model was referred to as
the"Corrected Effective" model and run.
FL .�� .. 'V :.3
C ` FEB 1 52023
68093 ... (�''+np/q� rr
LFormer US 258 Roadway ' �✓I V C
mbankment
LEGEND •
tive Cross-
ons y Le *AWNSf"J
F I
F,p
Proposed
Pier Locat •n
.11111.
Figure 1. Digital Elevation Map(DEM)of project area and effective cross-sections. Cross-sections were added to the duplicate
effective model to capture the effects of the former roadway embankment on base flood elevations,and the model was renamed
as"Corrected Effective".
An encroachment analysis was completed for the Corrected Effective conditions models using the
duplicate encroachment stations as a guide. The target water surface change (referred to as surcharge)
was initially set at 1.00 feet and the encroachment stations were adjusted until all surcharge elevations
were 1.01 feet or less.
The Corrected Effective model was copied and changes were made to the model geometry where the
proposed work is to be completed. This model scenario was referred to as the Proposed Conditions
model. Modifications to reflect the proposed project were made to the cross sections between and
FCFIVFD
AngE1 1`81.O?3
OCM-MHD CITY
•
fiFREESEInnovative approaches
ZS Practical results
NICHOL
a Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
including 65895 and 65363. Changes included adding blocked obstructions(to model the proposed pier),
ineffective flow areas and cross-sectional topography. The geometry of the proposed fishing pier was
taken from the design drawings and modeled as a blocked obstruction, including the railings, piers and
other features of the pier, in order to fully assess the impact of the proposed fishing pier on BFEs.
In order to mitigate flood impacts upstream from the proposed fishing pier, a modification of the former
roadway embankment is proposed that involves removing a portion of the roadway embankment fill in
order to expand flood conveyance area. Approximately 1.5'depth of material is proposed to be removed
from the southern half of the former roadway embankment, lowering the top of roadway embankment
and placing the material on the northern half of the roadway embankment by a depth of approximately
1.5'. This would lower the elevation of the southern half of the embankment to approximately 15' MSL
and raise the northern half of the embankment to approximately 18' MSL. The total quantity of fill to be
moved would be approximately 1500 CY (see Figure 2). This was modeled by adjusting the cross-section
geometry at Station 65681 to reflect the lowering of one side of the embankment and the raising of the
other side, which opens up conveyance area and mitigates impacts of the proposed fishing pier on
upstream BFE's. Ineffective flow areas were adjusted accordingly to reflect the lowering of the
embankment. As a result of the change, the Proposed model shows a lowering of BFEs compared with
Corrected Effective conditions except in the immediate vicinity of the proposed fishing pier, where a
maximum rise of 0.07' is shown at Station 65721. This work is proposed to be completed at the time of
construction of the fishing pier and will be accomplished with grading equipment and appropriate
sediment and erosion control measures.
RFC FINED
APR 12 .023
Page 14
cry
_____......„,
fe°F R EH EO SL ES Innovative approaches aches
Practical resultsaNIC Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
.. r
. r
1 s • . \,
;.;. Proposed Fishing
/ Pier
.% /
0
loi
\ - vi \rt {' \ - r ',,
Figure 2. Aerial view showing area of proposed modification of former roadway embankment berm to increase flood conveyance.
The area highlighted red will be modified through cut and fill to open up conveyance area around the proposed fishing pier.
The proposed conditions model was run and the BFEs between corrected effective and proposed
conditions were compared. An encroachment analysis was then run to determine the encroachment
stationing under proposed conditions (Proposed Floodway). The target water surface change (referred
to as surcharge)was initially set at 1.0 feet and the encroachment stations were iteratively adjusted until
RF
all surcharge elevations were 1.01 feet or less. C-.EI4/E
D
A i..- 'f.- , ,. .
FEB t 5 2023 APR 12 ?fl 1
DCM-EC Page J 5
-- I
fFREESE Innovative approaches
Practical results
Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
Findings
The largest increase in Base Flood Elevations between the Corrected Effective model and Proposed
Conditions was 0.07' which occurs at cross section 65721. Cross section 65721 is located approximately
60 feet upstream of the upstream extent of the proposed work area. This increase diminishes by the next
upstream cross section upstream (65895) which is located 186 feet upstream of cross section 65721. At
cross section 65895 the Proposed Conditions BFE was 0.07 feet lower than Existing Conditions. This
suggests the increase in the BFE goes to zero much closer to the proposed work area and is somewhere
between 58 feet and 185 feet upstream of the proposed work area. All the proposed conditions BFEs
were equal or lower than the Corrected Effective BFEs upstream of cross section 65895.
The encroachment stationing changed from existing conditions to proposed conditions. The stationing
change varied between 7.8 feet landward to 100.1 feet riverward.The maximum change riverward(100.1)
occurred at cross section 65895 and at the next cross section located upstream, cross section 69093
(located 3,198 feet upstream)this change reduced to 5.8 feet riverward. The change went to 0.0 feet by
the next cross section upstream (cross section 71751) which was located 2,658 feet upstream of cross
section 69093. The largest landward encroachment station change (7.8 feet)was located at cross section
65343. There was no change (0.0 feet)at the next cross section downstream.
Regulatory Requirements of 44 CFR§65.12
Because this project will have construction within the floodway,which cause the BFEs to increase (more
than 0.00 feet),then the conditions in NFIP Regulation 44 CFR Ch. 1,Section 65.12 must be met:
• An evaluation of alternatives, which would not result in a BFE increase above that permitted
demonstrating why these alternatives are not feasible: Over 20 feasibility alternatives were
attempted to eliminate the rises associated with the project. Due to the nature of the project
(providing fishing access), it is not feasible to locate the project outside of the regulatory floodway.
• Sample documentation of individual legal notice to all affected property owners within and outside
of the community, explaining the impact of the proposed action on their property is provided in
Exhibit 6 and will be delivered to property owners after initial review of this study by NC+MP.
• Concurrence of the Chief Executive Officer(CEO)and any other communities affected by the
RECEIVED
proposed actions is provided in Exhibit 1 (Form 1).
APR 1 2
F R E E S E Innovative approaches
vim
Practical results
°NICHOLS Outstanding service
1 Main Campus Dr,Suite 1200 • Raleigh,North Carolina 27606 • 919-582-5859 • fax 919-582-5851 www.freese.com
• Certification that no structures are located in areas that would be impacted by the increased base
flood elevation is provided in the following section.
Conclusion
The proposed improvements at Kings Landing cause a maximum rise in water surface elevations of the
1%annual chance event,which occurs at cross section 65721.The floodway model was run to adjust the
encroachment stations such that reasonable surcharge values were obtained.The maximum change in
encroachment stationing was approximately 100 feet,which is a relatively small percentage of the
overall floodplain width in this watershed.
The results of this modeling effort demonstrate that the construction of the proposed fishing pier would
cause a maximum rise in BFE at cross section 65721 and an average decrease of 0.1 feet for the
remaining upstream reach. No structures are located in areas that would be impacted by the increased
base flood elevation. The preceding narrative description of the modeling efforts undertaken is
provided in support of a CLOMR application for your consideration. If you have any questions about the
process used to develop the modeling results or any other comments,please to not hesitate to contact
me at 864-506-1465 or brvan.dick@freese.com.
Sincerely, ��� . p--t.� p•�-•I--,•
f>E �N� ► V ED
F E B 1 5 2023
Bryan Dick PhD, PE, PH Associate DC M-EC
cc: Daniel Cabe(NCWRC)
Ian Jewell (FNI)
Attachments ,w
Exhibit 1—MT-2 Checklist and Application Forms(Forms 1—3) RF(`FINED
Exhibit 2—Hydraulic Analyses Documentation
• 2.1—HEC-RAS Results Tables and Comparison
APR 12 20?3
9 -'MHD CITY
.• .. ... ... .. . --0'iVM4hX-094-, c+,4 0.112,0 .40 i1}00943-,0+040 WO'44,0 a} `4J94J T4Y.b44F'h'JhYJMy'of""s
Permit Class Permit Number
NEW 123-16
STATE OF NORTH CAROLINA
Department of Environmental Quality
1 ,/ and
4 �'`"" `'°'r "" i t"` Coastal Resources Commission
A 1
FEB 1 5 2023 ' I, Litt
,��++ for
• '
CK/ - �.s X Major Development in an Area of Environmental Concern
•
pursuant to NCGS 113A-118
•
X Excavation and/or filling pursuant to NCGS 113-229
•
•
Issued to Town of Murfreesboro, PO Box 6, Murfreesboro,NC 27855 •
•
•
Authorizing development in Hertford County at adjacent to the Meherrin River, in Murfreesboro, •
•
, as requested in the permittee's application dated 9/20/16(MP-1, MP-3),8/8/16(MP- •
• 2),and 8/12/16(MP-4)including attached workplan drawings(4),sheets 4&7 of7 dated 7/21/16,FP-2.1 and FP-8.0 dated 8/16.
This permit, issued on December 16,2016 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Fishing Pier Facility
1) This permit authorizes only the pier and other structures and uses located in or over the water that are
expressly and specifically set forth in the permit application. No other structure, whether floating or
stationary, shall become a permanent part of this fishing pier facility without permit modification. No c
non-water dependent uses of structures shall be conducted on, in or over Public Trust waters without
f permit modification.
2) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the
U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum,
permanent reflectors shall be attached to the structure in order to make it more visible during hours of
darkness or inclement weather.
4 4
(See attached sheets for Additional Conditions)
• This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the
qualified persons within twenty(20)days of the issuing date. Chairman of the Coastal Resources Commission.
•
• This permit must he accessible on-site to Department •
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered G
hereunder requires further Division approval. Br x on C. Davis, Director
Division of Coastal Management
All work must cease when the permit expires on
This permit and its conditions are hereby accepted-.4
ccepted���(� 4
December 3l,2019
In issuing this permit,the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal cie •
•
Management Program.
. APR G 7�
•
Signature of-P,orpiittee .
JJ000440?O+V.{000000 0001030 Jrt-0-0441.14-3.00.*O- >00)0.0000006V,W-0-0+rYArh'k iM00•440040YJi0Sb+/JXJrC90 004Wi40M}90rJ
.-C.WhIO•NMM ! h'A4:4 e. ,ye 0,2 00.YlNi 41.4-0 Ad60f'.0
Town of Murfreesboro Permit No. 123-16
Page 2 of 3
• ADDITIONAL CONDITIONS •
3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable •
waters at or adjacent to the authorized work.
•
4) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
• interest.
•
Shoreline Stabilization
•
5) In order to reduce the potential for negative effects on the spawning migration of anadromous fish,no
excavation or filling shall be permitted between February 15 and June 30 of any year without the prior
approval of the Division of Coastal Management, in consultation with appropriate resource agencies.
6) The alignment of the permitted rip rap shall be verified by a representative of the Division of Coastal
Management within a maximum of 30 days prior to the start of construction.
7) The rip rap material shall consist of clean rock or masonry materials such as, but not limited to, granite, •
marl, or broken concrete. It shall be of a size sufficient to prevent its movement from the site by wave or
• current action.
•
Upland Development
•
• 8) Unless specifically altered herein,this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the access road, parking
area, concrete sidewalk, and other associated infrastructure, all as expressly and specifically set forth in
the attached permit application and workplan drawings. •
Sedimentation and Erosion Control
•
9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
• ensure that eroded materials do not enter adjacent wetlands, watercourses and property.
•
10) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
11) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
• grading on cut or filled slopes.
•
General •
12) The temporary placement or double handling of excavated or fill materials within waters or vegetated
wetlands is not authorized.
•
PRFCElV )
13) No excavation or filling of any vegetated wetlands is authorized by this permit.
APR 12 201
.aa000cv .c0-w1-r044.44,e7 aw.ar drow}0.0.- r»v ono- mrr:e 0 0 e>0:»o-rr t vt0., -. - .... ....
X-0Y,,,..,,,,MMY6.... .., .... VMA ¢04K�./+6P}00./.9�Y1.?W4Y'YX.{+:00,,t+00M+1h'JY+b64hv.}P4.iG4 ,..060'
i..
'
Town of Murfreesboro Permit No. 123-16
Page 3 of 3
ADDITIONAL CONDITIONS
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written consent of the Division of Coastal Management.
15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
• NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
• approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Programmatic
General Permit 198000291 and assigned the project Action ID No. SAW-2016-02201. •
NOTE: The N.C. Division of Water Resources authorized the project by way of General Water Quality •
Certification 3900 and assigned the DWR Project No. 2016-1052.
' NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946-6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: An application processing fee of$400 was received by DCM for this project.
•
•
E i: . .�'t ki i .... •
•
F E B 1 5 2023
DCM- EC
•
i.
i .
•
APR 12 2023
•.d W.t4-03..0-044 444. OtrY+0+hP40WOVriO4L^ANA
} f/'DS.O644.40-0 44.4.-00 Y..h61'AVHJJ 0 S 0)):Nh...�r.G470S-YIJ. /l..N! . ,. -D 6 1, �. .�