HomeMy WebLinkAboutEX 17-95 Byrd, Tyler DECEMBER 11, 2017 Exemption Number—17-95
111----.11."11.111111111
'" TYLER BYRD
EMERALD ISLE 10532 COAST GUARD RD
NORTH CAROL NA EMERALD ISLE NC 28594 /
Nice Matters!
RE: EXEMPTED PROJECT-SINGLE FAMILY RESIDENCES WITHIN THE ORW
ESTAURINE SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC) 15A NCAC
Emerald Isle 07K.0208
Planning and Inspections `
7500 Emerald Drive PROJECT LOCATION/ADDRESS— 10532 COAST GUARD RD
Emerald Isle, NC 28594
Dear MR BYRD:
252-354-8548 voice
252-354-5068 fax I have reviewed the information submitted to this office in your inquiry concerning the necessary
filing of an application for a CAMA Minor Development Permit under the Coastal Area Management
www.emeraldisle-nc.org Act. After making a site inspection on DECEMBER 11, 2017, I have determined that the activity
you propose is exempt from needing a CAMA Minor Development Permit, as long as it remains
consistent with your project drawing, submitted on DECEMBER 7, 2017, and it also meets the
Town Planner conditions specified below. If you plans should change and your project will no longer meet these
conditions, please contact me before proceeding.
Josh Edmondson
jedmondson@emeraldisle-nc.org SINGLE FAMILY RESIDENCES WITHIN THE ORW ESTAURINE SHORELINE AEC EXEMPTED
1. All development shall be constructed more than 40 feet landward of the normal high
water or normal water level from waters classified as ORW.
2. No ground disturbance or land disturbing activity shall occur within 40 feet of the
normal high water or normal water level.
3. The development may not exceed a 25% built-upon area within 575 feet of the
normal high water or normal water level from waters classified as ORW, and shall
not include any stormwater collection system.
'T•,,. , 4. The development shall be consistent with all other applicable CAMA permit
standards, North Carolina Building Code standards, local ordinances and local land
use plans in effect at the time the exemption is granted.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining
any other State, Federal or Local authorization. Construction of the structure authorized by this
exemption shall be completed by December 31 of the third year of the issuance date of this
exemption.
Sincerely,
JOSH EDMONDSON, LPO
EMERALD ISLE
7500 EMERALD DR
EMERALD ISLE, NC 28594