HomeMy WebLinkAboutNCDOT 78-22 Minor Mod NC 24 White Oak River Permit Class Permit Number MODIFICATION/MINOR 78-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ' i ermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N.C. Department of Transportation, 1598 Mail Service Center,Raleigh,NC 27699-1598 Authorizing development in Onslow County at White Oak River.NC 24 causeway between Swansboro and Cedar Point , as requested in the permittee's application dated 10/12/22, including the attached workplan drawings(7)all dated as received 10/26/22. This permit, issued on November 7,2022 , is subject to compliance with the application(where consistent with the permit), all applicable regulations,special conditions and notes set forth below.Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) Unless specifically altered herein,this Minor Modification authorizes the following: (a)an alternate temporary construction trestle design using stacked 4' x 20' logging mats as the supporting trestle bents that are spaced at approximately 25-foot intervals within the same footprint as the previously approved temporary construction trestle design; (b)the elimination of approximately 70 steel piles at the bent locations required for construction of the previously approved temporary construction trestle design; and(c)phasing plan for construction of the_sills_and placement of marine sand-fill,all as- depicted on the attached workplan drawings and as described in the permit modification request. 2) The activities authorized by this Minor Modification shall not result in any new temporary or permanent impacts to wetlands or waters of the State, including submerged aquatic vegetation(SAVs), without prior approval from DCM. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the Chair other qualified persons within twenty (20)days of the issuing of the Coastal Reso s Commission. date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered Braxton C. Davis, Director hereunder requires further Division approval. Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. No expiration date, pursuant to GS 136-44.7B In issuing this permit, the State of North Carolina agrees 5' a.11/ P--aAA4gle that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee N.C. Department of Transportation Permit#78-22 Page 2 of 3 ADDITIONAL CONDITIONS NOTE: The permittee shall limit in-water work between February 1 to June 30 of any year to the maximum extent practicable to protect juvenile fishes that may be in the vicinity and shall also limit in-water work to the maximum extent practicable from April 1 through October 31 to avoid additional impacts to submerged aquatic vegetation(SAV). 3) The authorized temporary construction trestle shall be elevated a minimum of 2 feet above the normal high water level of the White Oak River as measured from the low chord of the structure. 4) In accordance with commitments made by the permittee, all of the sills shall be constructed in their entirety prior to the placement of the authorized marine sand backfill landward of the sills. 5) The permittee shall remove the temporary construction trestle, including logging mats, and the temporary access ramps, in their entirety within 90 days after they are no longer needed. • Sedimentation and Erosion Control 6) Turbidity curtains shall be used where practicable to isolate all in-water work areas from the adjacent waters of the White Oak River, including but not limited to installation and removal of the temporary construction trestle and temporary access ramps, and placement of fill material within or adjacent to wetlands or waters of the State. The turbidity curtains shall be of sufficient length and effectiveness to prevent a visible increase in the amount of suspended sediments in adjacent waters. The turbidity curtains shall be properly maintained and retained in the water until construction is complete. The turbidity curtains shall be removed when turbidity within the curtains reaches ambient levels. 7) This project shall conform to all requirements of the N.C. Sedimentation Pollution Control Act and the N.C. Department of Transportation's (NCDOT's) Memorandum of Agreement with the N.C. Division of Energy,Mineral and Land Resources. General 8) The permittee shall develop a demobilization/evacuation plan for the authorized construction trestle and any equipment on the project site that is subject to potential flooding during storm events, such that it may be removed out of the potential flood hazard area within 24 hours of receiving a weather forecast that suggests the project site may become inundated with water. 9) If it is determined that additional permanent and/or temporary impacts are necessary that are not shown on the attached workplan drawings or described in the authorized permit application, a permit modification and/or additional authorization from DCM and/or USACE shall be required. In addition, any changes in the approved plan may also require a permit modification and/or additional authorization from DCM and/or USACE. The permittee shall contact representatives of DCM and USACE prior to commencement of any such activity for this determination and any permit modification. 10) This Minor Modification does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. N.C. Department of Transportation Permit#78-22 Page 3 of 3 ADDITIONAL CONDITIONS 11) This Minor Modification shall be attached to the original of Permit No. 78-22, which was issued on • 7/22/22, and copies of both documents shall be readily available on site when a Division representative inspects the project for compliance. 12) All conditions and stipulations of the active permit remain in force under this Minor Modification unless • altered herein. NOTE: A minor modification application processing fee of$100 was received by DCM for this project. • i 2,6 64 06 41614 6ad ,t , 4 STA7[y LI STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE . GOVERNOR SECRETARY October 12, 2022 Mr. Stephen Lane Coastal Management Representative, Transportation Projects Division of Coastal Management 400 Commerce Ave. Morehead City,NC 28557 Subject: Minor Modification Request for Alternate Work Trestle Design CAMA Major Permit No. 78-22,TIP No. M-0540A NC 24 Resiliency and Living Shoreline Project WBS No. 49083.3.1 Dear Mr. Lane, The N.C. Department of Transportation, Division 3 Highway Unit is requesting a minor modification for an alternate temporary work trestle design as proposed by the contractor in the enclosed submittal for the construction of the M-0540A NC 24 Living Shoreline.The proposed alternate trestle design would be constructed within the same footprint as the existing approved trestle and would not exceed the currently authorized permanent impact area. The alternate trestle design would eliminate the use of piles at the trestle bents and instead proposes the use of 4' x 20' logging mats to be stacked as the supporting trestle bents to maintain the minimum low chord 2' above normal high water. Eliminating the use of pipe piles from the from the trestle design eliminates the approx.1 cu. yd. of substrate per pile that is typically displaced during pile extraction. Approximately 70 piles would be required for the construction of the trestle as currently authorized. The proposed alternate design would prevent the need to fill in voids in the substrate typically left by pipe piles. The elimination of the piles also eliminates the vibration associated with pile driving and reduces the heavy equipment required for construction by eliminating the need for a crane and vibratory hammer. An additional benefit of the proposed alternate trestle design is that it would reduce the overall in-water work construction timeline from approx. 18 weeks with a pile drive trestle Mailing Address: Telephone:910-341-2000 Location: NC DEPARTMENT OF TRANSPORTATION Fax:910-675-0143 5501 BARBADOS BOULEVARD DIVISION OF HIGHWAYS Customer Service: 1-877-368-4968 CASTLE HAYNE,NC 28429-5647 5501 BARBADOS BOULEVARD CASTLE HAYNE,NC 28429-5647 Website:ncdot.gov 1 to approx. 12 weeks. The quicker construction and increased mobility of the proposed system would allow for faster deconstruction in the event of severe weather forecasts. Using the logging mats as trestle bents would not significantly increase the weight per square foot that is currently proposed by the authorized marine sand backfill.As noted on the enclosed work trestle plan submitted by the contractor,the sills will be constructed in their entirety prior to placing any of the proposed backfill in an effort to minimize losses of material. Included in this submittal is information and photos provided by the project contractor, T.A. Loving Co.,on their previous used of a logging mat system in constructing the Living Shoreline for Carteret Community College(CCC)in Morehead City,N.C.. The system was utilized from October 2021 to May 2021 and did not suffer any failures due to tides or weather and resulted in no observable impacts to the environment. The N.C. Coastal Federation has also acknowledged the success of this system in constructing the CCC project and has vocalized their support for the proposed alternate trestle design. The Division understands that a minor modification processing fee of$100.00 will be applied the subject WBS. Please let me know if I can provide any additional information. Sincerely, Sean Farrell NCDOT Division 3 Environmental Officer (910)341-2033 scfarrell@ncdot.gov ec: Tom Steffens,USACE Hannah Sprinkle,NCDWR Mailing Address: Telephone:910-341-2000 Location: NC DEPARTMENT OF TRANSPORTATION Fax:910-675-0143 5501 BARBADOS BOULEVARD DIVISION OF HIGHWAYS Customer Service: 1-877-368-4968 CASTLE HAYNE,NC 28429-5647 5501 BARBADOS BOULEVARD CASTLE HAYNE,NC 28429-5647 Website:ncdot.gov • • Example Photos Provided by T.A. Loving Co. of CCC Project Utilizing Temporary Logging Mats for Construction __ I WI; *iiiirrl M rirr71111 nal EMI Mil .16 '_"". .S_,-.,41 -:-. 1111111 MI l!TI .ci�'.�Y"`� rx�e�. C a ""'!.:. T . ,., r r I I l 41P". ••-. ...„ . -'"--- --,..- 4 * MR.., . • , • le..9-9.9 .4 ' ''i''' -: ' - ' t . . .. • • I -,-- . •, . .. . 4:71iiiiiirolor- . , , , ., •;.!d• -• " ' 8 r I 4 I noir.'!IL 4 • 1't :'''- - *tiP-.'11 1'1• ‘-'114.,- .. , . .-..,.P. MN 0 ..-- 1.1.* -• . ...' .. id 11111111Mil min.. . :2.9.9 4.4.9 ek. 71. • • ' 4t ''. '; lib' +. At 4 - , • NMI „Are .: . , •-1,---, - ..'';SI ' -4 Po/ ‘..`... '".... 4 41** ................ .., , . , -.... • '..s-.."6"Nir. ' ,' '-,.-",- 7,,'- - , ''''''' ''' : ".5,i- ::., --... . .-•Ck; - --. ''''' . •,. • ° % •„*.,,,"` •• - ,....... :--- ._-..- _TT-- ,--- 111111111111111A- .._ , . . ..., . • . • ....v. • • 43,,,. . " - .... .• .,. issik„:„,._:-........... iz,, . ;-.•._-., ... —4.-.;-"zo-- --e-er'- ..,..-- __ - ---••••0" -- .. ...._ ..-- ___...- :.•----- -....,_ --- - - ....Jr--.....,,e• ,:•,_. .. sir' -., , v 04: __ z ° 1 I .+-fit` r r •t,fi_ sa _ _ _ _ .f.-,y • _. s .r rA'ra Ivy . 'tip. ,-a„i.. IM.• - -. ' ' • r inrerfia ma,illumine. is/ . ' 1' . y • 1. '*'._r , t '. 110140 ....yea_�_. .. ..._. LI lifiiii ti • ,( 11 I sitiiiielgOvel ......41.4msoniewirommiummaiii' .•�� ....._: ...- ,• 111 ,...---*V;-_----•.0.1011Plit—...,.:, _ ,.,, ,_ . ......_ , ___,, _ 0/4/pzirro.:474 04: ..^...,.111.11......,,. ,ter,. T ... . *. - - .±4 1° .-I--; .I •.' .. , .....47‘i.-t:iFili.434tippi., . . V a • - - i• r s 'li 44. •sar r • a. ti' e... 7 f. f • ... 4111114( • J: �► - ..r DURING AFTER t *!T ' Iti. d rr:: - -. ___- •+- S s+ !uy `_ at Vy rt•y\� �'. i — �f-.. * - FV� Y .'.4 d' , , : lc . • <• 'E [BEFORE] 1 r14-1 "dal H m^"" "" `'T" CCC Living Shore line-1250 LF Living Shoreline consisting of granite sill `41W.' , sections in water and articulated concrete block plated shoreline. ,',, y:,:,- , - Contras ted to TA Loving and constructed from October 2021 to May 2021 - '�-. utilizing the same trestle system being proposed for the NCDOT Living Shore = ' line project.The attached pictures show before,during and after construction. Major Difference,this project deleted the sand fill material between the ,i,,, - stabilized shoreline and rock sills. - �� n Current conditions at CCC Living Shoreline(above). lik ° - . ..j.`7,.. ,4: --'1,,,C`'!,_-_ A _t e- •ys fa �' ;'t ,, • (' ,, y, �w ' `\ p: • •;.. Yi` AFTER-PRIOR TO AFTER-PRIOR TO PLANTINGS PLANTINGS ' i.• sa• ' .._��. .: ._— nH mac_. '1: .. _. r.�; II ,. _ 4 I aillmmaiii' _ 16 ,. - ,� T " 4:761,4Prnr,O,', ‘:<44. itc 44,41,TWAK4 4 . 4 Th:UgLSQ2 ) v3ct/k,i24(\ Nc_Dr)j- q 0-CL.6.7 • vs- a • Praqi e_ S'et; (0 .1=7231- ‘ 4 _c/karipir, Aevor qi?"/95 - /34 ato - b'fA ,51k USACC-In)11•61 5 to-251-416 t/ -i sTZ_I-4:1-Z4-1-6- (421e, 9,)7)-2.61- 46 15- _ ??a 9 1/41.uks . S4FfftLL I IJCUT ()CI> 010134( NcAoT (110) 3'11 - COW • A Yliel ct I.• -5 1-tal l'OcDOT Ow 3 to 34 L_-_2-037 JeNcks.c.n aC DOT cn.,3 - 5 3 OCY4 Oita_ F5\PCIt ((tc-E' LA. 35ca C.Lctatc44:Te cia-G._t_tit, (Ala'2.41nt moyscvin gmetel N. Shoycli LA,e5 So • 38 5• LAwint.L, rglo - • 111615 S4ix/IX4/31r1 06- 75 2 /‘ jtAs 44, Wi • t A__Lvvin5_Co. 9141-12Z-434a NcRoi (-1-5 ) 515% s-los. _ _ .fr_,;S 5'.a TATEa ROY COOPER Governor �6 ELIZABETH S.BISER �'�„ ,,,n,,,,,. �-� Secretary pv '',� BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality November 7,2022 N.C.Department of Transportation 1598 Mail Service Center Raleigh,NC 27699-1598 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,the State Dredge and Fill Law, for you to proceed with your project proposal. The original(buff-colored form) is retained by you and it must be available on site when the project is inspected for compliance.Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714, (919) 733-2698 within twenty(20)days of this decision on your permit.You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty(20)days. The project plan is subject to those conditions appearing on the permit form. Otherwise,all work must be carried out in accordance with your application. Modifications,time extensions,and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans,as approved.If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site. To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However, if questions arise concerning permit conditions, environmental safeguards, or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Since , Jonathan Howell Major Permits Manager N.C. Division of Coastal Management Enclosure North Carolina Department of Environmental Quality I Division of,Coastal Management ,-4, NORTH CAROLINA Q Morehead City Office I400 Commerce Avenue I Moorehead City North Carolina 28557 M°`b otegberhYImWI°Y°b�� 252.808.2808 Brittingham, Cathy From: Brittingham, Cathy Sent: Monday, November 7, 2022 6:02 PM To: SVC_DEQ.DCM_Accounting Cc: Lane, Stephen Subject: DOT debit memo permit fee, Minor Modification, 78-22, Onslow County Attachments: DOT PERMIT FEE BILLING REQUEST.doc Hello, Please see attached. Please let me or Stephen Lane know if you have any questions or concerns. Sincerely, Cathy Cathy Brittingham Transportation Project Coordinator, Division of Coastal Management North Carolina Department of Environmental Quality Office: (919) 707-9149 Cathy.brittingham@ncdenr.gov Mailing Address: c/o DWR Transportation Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building, 12th Floor, Room 1204C Raleigh, NC 27604 NORTH CAROLINA _n Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. i ■ DOT PERMIT FEE BILLING REQUEST Date: 11/7/22 To: Jessica Gibson and Ellie Davis, SVC_DEQ.DCM_Accounting <DCM Accounting@ncdenr.gov> CC: Stephen Lane From: Cathy Brittingham Transfer Amount: $100.00 Project Description: An alternate temporary construction trestle design using stacked 4' x 20' logging mats as the supporting trestle bents that are spaced at approximately 25- foot intervals within the same footprint as the previously approved temporary construction trestle design; (b)the elimination of approximately 70 steel piles at the bent locations required for construction of the previously approved temporary construction trestle design; and(c)phasing plan for construction of the sills and placement of marine sand fill, Project Location: NC 24 Resiliency and Living Shoreline Project, Onslow County DCM Permit Type,Number and Issue Date: Minor Modification 78-22, issued 11/7/22 Fee Division if Applicable: (record amounts to be split with DWR, if applicable) DCM: 100% DWR: 0% WBS Element Number: 49083.3.1 -1- -' ' 7r A•s''. ROY COOPER 5 )� -- I,a, Governor O O ELIZABETH S. BISER ?` .� �/ Secretary `$�aw,v--- - BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality MEMORANDUM TO: Jonathan Howell FROM: Stephen Lane SUBJECT: Comments& Recommendations—Minor Mod. for CAMA Permit No. 78-22 NCDOT NC 24 Living Shoreline Project, (TIP No. M-0540A) Onslow County DATE: November 4,2022 The following are my comments and recommendations regarding the permit modification request referenced herein. The request is for authorization to modify the design of the currently authorized construction trestle. The currently authorized trestle was designed to utilize steel piles at the bent locations to support the trestle above the White Oak River. The revised design as proposed by the modification request would substitute stacked 4' x 20' wooden logging mats to support the construction trestle instead of steel piles. Based upon my review I have no objection to the issuance of this permit modification but offer the following conditions: Unless specifically altered herein, this Minor Modification authorizes the following: modification of the authorized construction trestle design to eliminate the use of steel piles at the bent locations and instead utilize stacked 4' x 20' wooden logging mats to support the trestle, all as depicted on the attached workplan drawings or described in the permit modification request. 2 he authorized temporary construction trestle shall be elevated a minimum of 2 feet above the normal high water level of the White Oak River as measured from the low chord of the structure. 3 n accordance with commitments made by the permittee, the sills shall be constructed in their entirety prior to the placement of the authorized marine sand backfill landward of the sills. 4 T e permittee shall remove the temporary construction trestle, including logging mats, d the temporary access ramps, in their entirety within 90 days after they are no longer • needed. ODE North Carolina Department of Environmental Quality I Division of Coastal Management -) Morehead City Office 1400 Commerce Avenue I Moorehead City,North Carolina 28557 NORTH CARCLINA 0.0.1rela Effirkarratsia+N /� 252.808.2808 lTepermittee shall develop a demobilization/evacuation plan for the authorized nstruction trestle and any equipment on the project site that is subject to potential oding during storm events, such that it may be removed out of the potential flood hazard area within 24 hours of receiving a weather forecast that suggests the project site may become inundated with water. 6 o additional temporary and/or permanent impacts to wetlands or waters of the State are irized by this permit modification without prior approval from DCM. onditions and stipulations of the active permit remain in force under this minor fication unless specifically altered herein.I8 's Minor Modification shall be attached to the original of Permit No. 78-22, which was issued on July 22, 2022 as well as all subsequent modifications and/or refinements, and copies of all documents must be readily available on site when a Division representative inspects the project for compliance.yhor ermit does not eliminate the need to obtain any additional permits, approvals or zations that may be required. DEQom,_ North Carolina Department of Environmental Quality I Division of Coastal Management `�//y� Morehead City Office 1400 Commerce Avenue 1 Moorehead City,North Carolina 28557 "+-—;ILto—...n\ 252.808.2808 Brittingham, Cathy From: Brittingham, Cathy Sent: Wednesday, October 26, 2022 2:45 PM To: Tom Steffens; Sprinkle, Hannah H; Wilson, Travis W.; Harrison, James A Cc: Lane, Stephen Subject: M-0540A NC 24 Living Shoreline, CAMA Permit 78-22 - Minor Modification Request Attachments: M-0540A_MinorModRequest_TrestlePlans.pdf; M-0540A OnsitePreCon_signlnSheet.20221006.pdf; M-0540A_MinorModRequest_20221011.pdf; Request for permit comments 2022.docx Hello, Attached for your review please find three pdf files that constitute a request from NCDOT for a modification of existing CAMA Major Permit 78-22 which was issued on July 22, 2022 for TIP M-0540A, Repair the NC 24 roadway embankment/causeway and adjacent sidewalk, and stabilize the adjacent shoreline by installing a Living Shoreline composed of Coastal Wetland planting areas, rock sills, and oyster structures. The current modification request is for an alternate trestle design as discussed at the October 6th onsite pre-con for M- 0540A. The following is additional information received from NCDOT in an e-mail dated 10/25/22: The Rock Sill installation will be completed in 3 phases working WEST to EAST and the marine sand fill will be placed by placing the trestle back into phase 2 and then phase 1. Once the Rock sills are completed,the trestle will be removed from Phase 3, and placed back into the phase 2 location. As the trestle in phase 3 is being removed and repositioned at Phase 2,marine sand fill will be placed behind the rock sills in phase 3 placing sand from EAST to WEST. When the marine sand fill reaches phase 2, the trestle will begin being repositioned into phase 1. Sand fill will be placed from EAST to WEST behind the rock sills in the phase 2 area. At that time, the access at 22+50 will be removed. When the marine sand fill reaches phase 1,the marine sand fill operation will then begin at the WEST end of phase 1 in order to maintain access at 19+75. The phase 1 trestle will then be removed from WEST to EAST and demobilized from the site. As phase 1 trestle is being removed sand fill will be placed in its place from WEST to EAST. The marine sand fill operation will be a continuous operation until complete. Also attached please find a form in WORD for you to indicate your agency's position or viewpoint on the proposed project. Please respond by e-mail and/or return this form as soon as possible to Cathy Brittingham at cathy.brittingham(a,ncdenr.gov. When appropriate, in-depth comments with supporting data are requested. If you have any questions about the proposed project,please contact Cathy Brittingham at cathy.brittingham@ncdenr.gov or Stephen Lane at stephen.lane@ncdenr.gov. i Sincerely, Cathy Brittingham Cathy Brittingham Transportation Project Coordinator, Division of Coastal Management North Carolina Department of Environmental Quality Office: (919)707-9149 Cathy.brittingham@ncdenr.gov Mailing Address: c/o DWR Transportation Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building, 12th Floor, Room 1204C Raleigh, NC 27604 NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 vc,..c ST o ATE ROY COOPERS" Governor d 4'v ELIZABETH S.BISER ,;,,,,,, ,I , Secretary °x Q,,,,,,,,,,''°'. BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality MEMORANDUM DATE: October 26,2022 FROM: Cathy Brittingham, DCM Transportation Project Coordinator SUBJECT: CAMA Permit 78-22 Applicant: N.C. Department of Transportation Project Location: NC 24 Resiliency and Living Shoreline Project in Onslow County. Proposed Project: Alternate trestle design. Please respond by e-mail and/or return this form to Cathy Brittingham by e-mail at cathy.brittingham@ncdenr.gov as soon as possible due to the NCDOT project schedule. If you have any questions regarding the proposed project,please contact Cathy Brittingham at cathy.brittingham@ncdenr.gov or Greg Daisey at Greg.daisey@ncdenr.gov. When appropriate, in-depth comments with supporting data are requested. REPLY X This agency has no objection to the project as proposed. _This agency has no comment on the proposed project. This agency approves of the project,only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached memo. PRINT NAME Hannah Sprinkle AGENCY Division of Water Resources DoeuSigned by: SIGNATURE [al JA4 S.pvitatt, 58C5B8F268B1409_. DATE 10/28/2022 Qom,V NorthDWRW Carolinaetlands Unit Depar1 512 tmentNorth of EnvironmentalSalisburyStreet Quality11617 Mail I Division ofService CoastalCenter MI anagementRal//g eigh,North Carolina 27699-1617 NORTH C OI I, E ow..mfldrmmenblm"''\ /" 919.707.9149 4 ROYGover COOPER 'll5 `^r - �'M or ELIZABETH S.BISER %, ,;n,,,. „ Secretary `+*E rdv° BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality MEMORANDUM DATE: October 26,2022 FROM: Cathy Brittingham, DCM Transportation Project Coordinator SUBJECT: CAMA Permit 78-22 Applicant: N.C. Department of Transportation Project Location: NC 24 Resiliency and Living Shoreline Project in Onslow County. Proposed Project: Alternate trestle design. Please respond by e-mail and/or return this form to Cathy Brittingham by e-mail at cathy.brittingham@ncdenr.gov as soon as possible due to the NCDOT project schedule. If you have any questions regarding the proposed project,please contact Cathy Brittingham at cathy.brittingham@ncdenr.gov or Greg Daisey at Greg.daisey@ncdenr.gov. When appropriate, in-depth comments with supporting data are requested. REPLY _X_This agency has no objection to the project as proposed. USACE will provide in-field approval via separate email and cc DCM This agency has no comment on the proposed project. This agency approves of the project,only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached memo. PRINT NAME Thomas Steffens/USACE AGENCY USACE SIGNATURE DATE ?), 10 Oct 2022 f D_E Q North DWRW Carolinaetlands Unit Depart1512 mentNorth of EnvironmentalSalisburyStreet Quality1617 Mail I Division ofService CoastalCenter IManagementRaleigh,North Carolina 27699-1617 ^r° """"d °"'"°n"'a."\ �� 919.707.9149 , Brittingham, Cathy From: Wilson, Travis W. Sent: Tuesday, November 1, 2022 2:28 PM To: Brittingham, Cathy Cc: Dunn, Maria T. Subject: RE: M-0540A NC 24 Living Shoreline, CAMA Permit 78-22 - Minor Modification Request Attachments: CAMA Permit 78-22 Trestle.pdf Cathy since this area is sand bottom and not marsh or SAV WRC does not object,see attachment. Travis From: Brittingham, Cathy<cathy.brittingham@ncdenr.gov> Sent: Wednesday, October 26, 2022 2:45 PM To:Tom Steffens<thomas.a.steffens@usace.army.mil>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Harrison,James A<James.Harrison@ncdenr.gov> Cc: Lane, Stephen<stephen.lane@ncdenr.gov> Subject: M-0540A NC 24 Living Shoreline, CAMA Permit 78-22 - Minor Modification Request Hello, Attached for your review please find three pdf files that constitute a request from NCDOT for a modification of existing CAMA Major Permit 78-22 which was issued on July 22, 2022 for TIP M-0540A, Repair the NC 24 roadway embankment/causeway and adjacent sidewalk, and stabilize the adjacent shoreline by installing a Living Shoreline composed of Coastal Wetland planting areas, rock sills, and oyster structures. The current modification request is for an alternate trestle design as discussed at the October 6th onsite pre-con for M- 0540A. The following is additional information received from NCDOT in an e-mail dated 10/25/22: The Rock Sill installation will be completed in 3 phases working WEST to EAST and the marine sand fill will be placed by placing the trestle back into phase 2 and then phase 1. Once the Rock sills are completed, the trestle will be removed from Phase 3, and placed back into the phase 2 location. As the trestle in phase 3 is being removed and repositioned at Phase 2, marine sand fill will be placed behind the rock sills in phase 3 placing sand from EAST to WEST. When the marine sand fill reaches phase 2, the trestle will begin being repositioned into phase 1. Sand fill will be placed from EAST to WEST behind the rock sills in the phase 2 area. At that time, the access at 22+50 will be removed. When the marine sand fill reaches phase 1, the marine sand fill operation will then begin at the WEST end of phase 1 in order to maintain access at 19+75. The phase 1 trestle will then be removed from WEST to EAST and demobilized from the site. As phase 1 trestle is being removed sand fill will be placed in its place from WEST to EAST. The marine sand fill operation will be a continuous operation until complete. i Also attached please find a form in WORD for you to indicate your agency's position or viewpoint on the proposed project. Please respond by e-mail and/or return this form as soon as possible to Cathy Brittingham at cathy.brittingham@ncdenr.gov. When appropriate, in-depth comments with supporting data are requested. If you have any questions about the proposed project,please contact Cathy Brittingham at cathy.brittingham@ncdenr.gov or Stephen Lane at stephen.lane@ncdenr.gov. Sincerely, Cathy Brittingham Cathy Brittingham Transportation Project Coordinator, Division of Coastal Management North Carolina Department of Environmental Quality Office: (919)707-9149 Cathv.brittingham(c@ncdenr.gov Mailing Address: c/o DWR Transportation Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building, 12th Floor, Room 1204C Raleigh, NC 27604 TDTE Q NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 2 • • 7:417' ,. ROB'COOPER b. ^ . l't.ti: ,rGovernor � r�:; 1ELIZABETH S.BISER Sccrrtary ` ,,,a,. ,�`°_+ 2 BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality MEMORANDUM DATE: October 26, 2022 FROM: Cathy Brittingham, DCM Transportation Project Coordinator SUBJECT: CAMA Permit 78-22 Applicant: N.C. Department of Transportation Project Location: NC 24 Resiliency and Living Shoreline Project in Onslow County. Proposed Project: Alternate trestle design. Please respond by e-mail and/or return this form to Cathy Brittingham by e-mail at cathy.brittingham@.ncdenr.gov as soon as possible due to the NCDOT project schedule. If you have any questions regarding the proposed project, please contact Cathy Brittingham at cathy.brittingham@ncdenr.gov or Greg Daisey at Greg.daisey@ncdem•.gov. When appropriate, in-depth comments with supporting data are requested. REPLY X This agency has no objection to the project as proposed. This agency has no comment on the proposed project. —This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached memo. PRINT NAME \ t,\.,;:,,,,,, \\NR;\,, AGENCY C C— -, 7,/ /i 77.„‘„_____ SIGNATURE Fv DATE / (i7AC.)�")., L-.." E l V North Carolina Department of Environmental Quality I Division of Coastal Management ��!$ DWR Wetlands Unit Sl2 North Salisbury Street 1617 Mali Service Center Raleigh hlorth Carolina 27699 Ib17 NOW ,LA N. b°t..NIE°'"""'mm"'b\ /^ 90.707.9149 Brittingham, Cathy From: Harrison,James A Sent: Friday, November 4, 2022 10:34 AM To: Brittingham, Cathy Cc: Lane, Stephen Subject: Re: M-0540A NC 24 Living Shoreline, CAMA Permit 78-22 - Minor Modification Request Morning Cathy, Comment sheet is attached. No objection from DMF as well. Thanks Cathy, and have a great weekend! Jimmy Jimmy Harrison Habitat and Enhancement Section NC Division of Marine risheries james.harrison@ncdenr.gov 252-9+8-5855 (office) 757-272-5250 (Mobile) k ca,F L���� i • • '�F I sN "Ever pizza can be a personal pizza if you try hard enough and believe in yourself" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brittingham, Cathy<cathy.brittingham@ncdenr.gov> Sent: Friday, November 4, 2022 10:22 To: Harrison,James A<James.Harrison@ncdenr.gov> Cc: Lane,Stephen <stephen.lane@ncdenr.gov> Subject: FW: M-0540A NC 24 Living Shoreline, CAMA Permit 78-22- Minor Modification Request Hi Jimmy, Happy Friday! I am checking in to see if DMF has comments on this permit modification request? We received the attached no objection from WRC "since this area is sand bottom and not marsh or SAV", and we received a no objection from USACE and DWR. Please let me or Stephen Lane know if you have any questions or concerns. Thank you. Sincerely, 1 p 1 ���� ' PROJECT REFERENCE NO. SHEET NO. 7 'I' LEGEND r'+,'=,,.mau'•m•,rtuuc PROJECT ENGINEER .- MCA Emeonmental Consuttanune E.Enguteeong Inc I PROPOSED SILL „ n TEMPORARY 93+g RCDen O s ger Re Stale 436 „\p Ca.... l ACCESS RAMP TEMPORARY PROPOSED OYSTER STRUCTURE IDI gt' 2 ?QQp{LSS10 !4 , APPROVED CONSTRUCTIONvivow TRESTLE �•'•'•''' ACCESS CORRIDED CONSTRUCTION _ 0ia76t EXISTING MARSH wCa CDT CONSTRUCTION `•. r F �1A Nc'I+tt / ACCESS PLAN --,0,4 .......pN)5; DATE EX. --_.______ GRADE I I Trestle Plan Drawing 1 of 7 DOCUMENT NOT CONSIDERED FINAL {TYP) 20 PHASING PLAN 10/12/2022 UNLESS ALL SIGNATURES COMPLETED PR.GRADE(TYP.) PR.ROCK SILL TYPICAL CONSTRUCTION ACCESS CROSS SECTION DC00339 Onslow Co. Living Shoreline RECEIVED OCT 2 6 2022 DCM-RALEIGH N ACCESS RAMPS TO TRESTLE SHALL BE CONFIGURED TO MINIMIZE EMBANKMENT EXCAVATION.ADDITIONAL ACCESS POINTS `�_" MAY BE CONSIDERED WITH ENGINEER'S Stine 1-,40 APPROVAL COMPACTED AREAS WITHIN THE PR.MARSH TO BE SCARIFIED PRIOR TO PLACEMENT OF SAND MATERIAL ***Rock sills to be constructed from start of job (17+00) to end of job (26+00), West To East, in their entirety prior to placing TEMPORARY TREE marine sand fill PROTECTION FENCE(TYP.) STAGING/STOCKPILING SHALL OCCUR ONLY UPLAND OF FENCING. TEMPORARY CONSTRUCTION Phase 2 ACCESS CORRIDOR/TRESTLE Phase 1 �� I Phase 3 . I �m ""mimm,A. ,rm.rlm w...r■ iirl .s..mi..r..... =Mr 1== OHIO',.. f.K•iy:•a1 ••�:•i.� .A�.�•.•.1 •• . •� i�•^���+�..•f e:.ii i:�r:iff:• •f.•.1 A.f�••.•A.•r •r+'.'lc•�fr•1•f �••��i i���f1 �+�•:.:••�..�.�•e-ice�"'.�.� iY�..�.•+.r�•�_f�.'•ff._•f..+:••��i•.1�••�_..Y.f.f..lf.•-..• .1A ':•�.A�I�A. t • �ff%i�. .tiff♦ ♦ _�f•.. ..�1••.i•f•�•1.•f1•..•�Cf� -:.�fiC.f ff••.f••f- - /� f_ f•_ .-:t••A�•:ff •v�+..f�f•.f f...i.�zf•! ._•.._.++.,..+.o_.. fA f:6R:•:::f ti:i'1. ...�.�. •A�._ :It'I o_ff e0::1Os'f4.c+ff f..f.:!'fDif• 3•r..1..•w.. ,.r.c` � - ••�i" •e.�•-`=sf.❖:v...-.-w....v 1i�_�..��:•s�::J.+...°.•i�:=- -_ ow•. .o•f.:_.o .:.J.•e�^! .tt....���.0�...a_4.w.�...,rs.•.+-�.�.�Mc -..� n's;�,�f.�� - •�Sh.v .f.f.•..,_.r--__...•_..._..:.__... _ :_ .>+��...-,.:+.. _ -:'♦'.�.•f yPPf poif yiCf 0•p.•,'1•• O f.i..'+••i e. °'W.a..vi c, �I - '� �•- ._�.... :: •.•:w•.•:.•..-.. .�.�.;f_%:.•:!Ac•.�:3....i•.A f..•Vie..•A...fA.!•_.•.<:.•O.•.'i f fa..1.p • s / f��— � 'w'�z�i�.�•p•a.- .—. .... „ .f f f f• .A.f•J+O ay�••ia+��'.%�•�r.'Q•a�..•�: 1 m. ZES15' a/.SMGT I --'� _� .t. -- Z - ci t I i a. `' 50' '3 m 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 1 26+00 n a c v cE r----r--r--.--r--+— II— IL o i I Exi51aG AM .� EnS IDtq a:. '• u MATERIAL STAGING/ z STOCKPILING AREA ea (TYP.) ea V N rs.G. Oj• m0 CI W, cc W 'I Tr PROJECT REFERENCE NO. SHEET NO. • SWCA M-054OA 7 in LEGEND n.mc,•.uau a T.;aanmo PROJECT ENGINEER SWCA Emmmmanul Conauln,ronq a Enpnaaang Inc I PROPOSED SILL \RCA ., C TEMPORARY CCS nEW NIC&waaTRd 5ure]E sra..NCA•...14�, ACCESS RAMP TEMPORARY 'n'i1 i:i'igi: PROPOSED OYSTER STRUCTURE 1P19192922208021J S 4of3S03i0 1y1%, — EDPrt5 1D www awn can :t% '' , c CONSTRUCTION .... PROPOSED CONSTRUCTION TRESTLE `•.•'•'•'' ACCESS CORRIDORt oEI ,`- �1 [ [ EXISTING MARSH CONSTRUCTION r rMn«..a„y.r«.wv ACCESS PLAN 4 �?!c,Il ` DATE J , A C.•.+anmm�n` GRADE I I Trestle Plan Drawing 2 of 7 DOCUMIENTNOT CONSIDERED FINAL (TYP) zo 10/12/2022 UNLESS ALL SIGNATURES COMPLETED PR.GRADE(TYP.) PR.ROCK SILL TYPICAL CONSTRUCTION ACCESS CROSS SECTION RECEIVED OCT 2 6 2022 DCM—RALEIGH \\IN, ACCESS RAMPS TO TRESTLE SHALL BE CONFIGURED TO MINIMIZE EMBANKMENT EXCAVATION.ADDITIONAL ACCESS POINTS a iv .cr MAY BE CONSIDERED WITH ENGINEER'S srwa r.ev APPROVAL COMPACTED AREAS WITHIN THE PR.MARSH TO BE SCARIFIED PRIOR TO PLACEMENT OF SAND MATERIAL ***Rock sills to be constructed from start of job (17+00) to end TEMPORARY TREE of job (26+00), West To East, in their entirety prior to placing PROTECTION FENCE(TYP.) marine sand fill STAGING/STOCKPILING SHALL OCCUR ONLY Phase 1 UPLAND OF FENCING. Turbidity TEMPORARY CONSTRUCTION ACCESS CORRIDOR/TRESTLE Curtain y '—• ••• sar Ds9>•■'a.� •w.•w: •v.a. ••.:w.•Kti.:••-r V...., w:.':g*: iP.. '.tf ft:i.••4:i :�.:•Qi ••, •':••:.'°• .:•:.;•.-:..::.•••s..::::•'.O•.•..•.•::.!••._._ew•_ •&::• e� /�w''w 7.:.i.._.___•. ..M:.7=.•.`.:.a.-.:•:...L tx4 y-...w•w• !CFd •:•�i.•�:.4A•..►e•wr•x.-:. ..rs... 4�x�•::h•.�z.•i x-•J. - vr.:����i= i'i y"•e::...._..• _ _ / 1;,:w.-,--.-�.— .a _ .wso..-.+v.6 l!{QL.0 t O •_r-_ __ .Tr_=•Js .'•. ♦.t.,..:...__. _ =i+[i�:. •.•... , ....'��!.t •�'.S- .ti-w - ..•.r.!iylv�. ;....•c..r.•':5:�•.�i°w.=:=.•a x.-�� �'a'r_ _..v» rr .ae:: a...� ._�...�.+"�:.:�:::`�.' - ._��J. .1:1:fwi:°'''� � . 0`t:ei:=F.:_ `�—t �$1:4•, • I ...... e!.`.•w•...�..._.•.•J:) Ca_3 •a..:w�.•...•d.•:�• :1•%:::'::�•�%'�• ''.:%•�•:•�:ye•��i i.•�•• t,::::.. �I ` +.•_ 1 ��t�.3_wiyM: ��.� � �r•i•.•,g J.•.�� '�d:•:ii•::i•' wL..—.•'••• i`^+ :��c i a — -41 _�_7_ Y—�T..d-L _ �`�> �:.f I_-___ _ -_ _ :- :�'•-wiO l���i -�.. -.__ _ 1T_. Mkirikikew x 270'-8 41 �50' —I A m 17+00 18.00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 28+00 — in 2: Er o I EXITneG Rif , MATERIAL STAGING/ STOCKPILING AREA m (TYP.) NG NO• Oj. N .D. • 0 W. a W A cr REFERENCE NO Ft ���� PROJECT NO. SHE 7 .- U7 LEGEND NNNMru w.,&.45.1.1„,0 PROJECT ENGINEER SWCA ENweanmentei CenaWtamAg&Engneanng Inc I I PROPOSED SILL 4(:,,,„..r..dn.,, TEMPORARY a3Ng aoeax o Ra ""6 +a N tAR.". C I I ACCESS RAMP TEMPORARY . ;.I_•;; ; Cnanon2 222 ++o�.. by+4 _ N tl �; PROPOSED OYSTER STRUCTURE 1px„M we*cm :,i1ssi:t;;t APPR VED CONSTRUCTION TRESTLE ;•,❖,•„ PROPOSED CONSTRUCTION ( sEx;)A CCESSCORRIDORaa7s =' IMhwn.IR,.y�r,rJ.,,44.`n�EXISTING MARSH CONSTRUCTION tarACCESS PLAN 7 F DATE EX. —�, _ Anmemu GRADE I I Trestle Plan Drawing 3 of 7 DOCUMENT NOT CONSIDERED FINAL (TYP) zO UNLESS ALL SIGNATURES COMPLETED 10/12/2022 PR.GRADE(TYP.) PR.ROCK SILL TYPICAL CONSTRUCTION ACCESS CROSS SECTION RECEIVED OCT 2 6 2022 DCM-RALEIGH NN1N4. ACCESS RAMPS TO TRESTLE SHALL BE CONFIGURED TO MINIMIZE EMBANKMENT EXCAVATION.ADDITIONAL ACCESS POINTS ao MAY BE CONSIDERED WITH ENGINEER'S Sale I•.av APPROVAL COMPACTED AREAS WITHIN THE PR.MARSH TO BE SCARIFIED PRIOR TO PLACEMENT OF SAND MATERIAL ***Rock sills to be constructed from start of job (17+00) to end TEMPORARY TREE of job (26+00), West To East, in their entirety prior to placing PROTECTION FENCE(TYP.) marine sand fill STAGING/STOCKPILING SHALL OCCUR ONLY Turbidity UPLAND OF FENCING. Curtain Phase 2 TEMPORARY CONSTRUCTION A ACCESS CORRIDOR/TRESTLE I� ,==„,::, . „........._____,____ ........................ .. . • ,.......,..„...........„:„..,..„:„.„,...7.......„:„...........„...„.„....„..,,.....„:„...„..„„....„.,...,,,.....„..............„.....„,,,...,............,..................................••...................,......• ...___ , . int t • __ ,..I� _ — �. -sue:„:„...,,..,,..„:„....„:„„:„.„....„,„:„.„...,.....„.„..„,,,_..„...„.._,„.„..„,„........„,.._...„,,,,...„.„,„:„....„,...:::„:::•„:;:„:...:,..,.e.tv„„:„,„„:„,,:,.....„:„...:,„:„..._„„,„.......,..,......„....„.„..„.„..„..._,....„.,, - I ,.....,..,.„.„..„:,_ .___ 1 . 306'-4" 50' mr 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 RI c v 1. c o l M [ ��— �_ �' Fst5Tn6 R.e —^ ExKiwG Rlx v CI MATERIAL STAGING/ z. STOCKPILING AREA m (TYP.) Li z «-. 0E N 'D, • 0 n tmt C� W Q PROJECT REFERENCE NO. SHEET NOcr SWCAm M—O540A 7 LEGEND ' "runutn+:aaar NO PROJECT ENGINEER I PROPOSED SILL SWCA Ernranmemal Coneunan g&Eninneenng Inc mNN=,=, TEMPORARY 21 ROEeRO Ra'"3 0., NCAR("// ACCESS RAMP TEMPORARY .K;I_ =;=;:, of 9192 NC 2 �•... lid ni =.I J,.e d PROPOSED OYSTER STRUCTURE IPI g'g CCM .,.AtIk•1LS 0'++"s Agra vED CONSTRUCTION ""w sMc,tom _ ;a� PROPOSED CONSTRUCTION TRESTLE �•-•'•�•'' ACCESS CORRIDOR = .. o+osa i J/�1 ""�I I EXISTING MARSH CONSTRUCTION % \ ` ^ °a" ~'� ..= EX. ACCESS PLAN "y4z jJiGnia v�eyg DATE GRADE ! I Trestle Plan Drawing 4 of 7 DOCUMENT NOT CONSIDERED FINAL (TYP.) 20 10/12/2022 UNLESS ALL SIGNATURES COMPLETED PR.GRADE(TYP.) PR.ROCK SILL TYPICAL CONSTRUCTION ACCESS CROSS SECTION RECEIVED OCT 2 6 2022 �p \NliN ACCESS RAMPS TO TRESTLE SHALL BE DC IV1-RALEIGI CONFIGURED TO MINIMIZE EMBANKMENT EXCAVATION.ADDITIONAL ACCESS POINTS ______� MAY BE CONSIDERED WITH ENGINEER'S setae V.ea APPROVAL COMPACTED AREAS WITHIN THE PR.MARSH TO BE SCARIFIED PRIOR TO PLACEMENT OF SAND MATERIAL ***Rock sills to be constructed from start of job (17+00) to end TEMPORARY TREE of job (26+00), West To East, in their entirety prior to placing PROTECTION FENCE(TYP.) marine sand fill STAGING/STOCKPILING SHALL OCCUR ONLY UPLAND OF FENCING. Turbidity TEMPORARY CONSTRUCTION Curtain ' Phase 3 ACCESS CORRIDOR/TRESTLE III .a..arr�• AMIE IIMIMIIIIIIMI /1.11 • rrA. . . • ���•�•:•.•:•a'i-:•�❖�•:Jam:i:•:••S%' .i.L•..•.b•. d::�...•:'i i:.•.�i❖-•..:•��•. T+ ♦ -vT•`�'c•...•.v.-:•••- •p 1ST�•...� •_•�•:•.:Q•::�_g.•i••l. '+•.J:�i P e J.•�p••�•�:•••'•• _ _ +.+ • •�•.•T••T.:•:+�•��Ys.:•T.� �•...•i�L..�++• • •.A..•�•.1.���•��.:�� •••'.'..••Y i•1��i�i��� _ _/... _.T �w i5�i •A. •�•.•Y..y - ♦.•_.�1 ii.� i.�o a!:.til�iw T•et f�.�T.- la _ = —' - L—_-- Z CAWING R/M SW /( =-1 a..r _ - __ _; _ Ul CI m 17+00 E 18.00 19.00 20+00 21+00 22*00 23+00 3231- 4+00 25+00 26+00 E i C U , cr C C - r � l ` III■— o i i 4 EYISTNIG N/M ExSTMrG Rift 3 u , `, MATERIAL STAGING/ VSTOCKPILING AREA ca (TYP.) DEu N \IY PL]v_ ta. pa CC WJ Q PROMO uwr+u NC • LEGEND S I Y C A M—D5rADA TEMPORARY (--- PROPOSED SILL Irk SAGA Senn' "Ozeutreng 6 E `�`g~` as,v Roberto Rotar4ne ACCESS RAMF CONSTRUCTION PROPOSED OYSTER STRUCTURE �,, VMS OW it '\ _ TRESTLE PROPOSED CONSTRUCTION sEn _ ACCESS CORRIDOR 1i. 0401e+� � 1I _ l'_'_' EXISTING MARSH All- GRADE I. I Trestle Plan Drawing 5 of 7 eoculrun NOT c UMW IGNIX ( ) PR.GRADE MP.) PR ROCK SILL10/12/2022 A`" RECEIVED TYPICAL CONSTRUCTION ACCESS CROSS SECTION. OCT 262022 CCMV1-RALEIG1-1 \\INACCESS RAMPS TO TRESTLE SHALL BE CONFIGURED TO MINMAIZE EMBANKMENT EXCAVATION-ADDITIONAL ACCESS POINTS C® MAY BE CONSIDERED WITH ENGINEER'S Sore re ea APPROVAL COMPA(.I tU AREAS WITHIN THE PR,MARSH TO SE SCARIFIED ---\ PRIOR TO PLACEMENT OFSAND NOTE : Mat bent Locations are shown to MATERIAL reference potential layout only. Actual locations TEMPORARY TREE PROTECTION FENCE(TYP.) may vary slightly. STAGING/STOCKPIUNG SHALL OCCUR ONLY UPLAND OF FENCING. TEMPORARY CONSTRUCTION 4'_0" n �_On ACCESS CORRIDOR!TRESTLE G " s.' L'FWLtC: 1, "¢. - " �� ,}'v iYS.:_:.e..w...S'�..NSSS. Pt.µ+: yl -- 4 • - _ _ •may _ _ • _ i )_i } :r`: • - - _ a / _. iWit:s4a,irC'^b'n 'ai`�.s'_ S '^°y"0Y^[+ .'. a ... Les.. .. _ yy.___ ''4. . -..__ • • •4. O I •I . scr Q 17+00 18+(10 19+00 20.00 21+00 22+00 23+00 24+00 25.OD 2BW0 Ii U — C o CaSTwi RillEVStM6 WI U f $ t v MATERIAL STAGING/ M-0540A Trestle Plan Drawing 6 of 7 10/12/2022 Logging Mat Bents 4' x 20' F 4'—> - - _L, _ -_ _ _ _ - 1 7- -I - _i- — -, 2o'I 1 1 1 1 -_ -_ -- - = - I = = _ C - =I = = I- - I I VI 7 _1 _ T - r RECEIVED OCT 2 6 2022 PLAN VIEW DCM-RALEIGH L J L J J `J L J L J 1----1r'---. -1 c--I I- 1 I-1 _______ Low Cord to be a minimum of 2 feet above normal high water SECTION VIEW ^ . M-0540A Trestle Plan Drawing 7of710/12/2022 ' RECEIVED _~ OCT � � 9027 "�` -_ x� x - - Mat hpOt� 0� ��'���[l hn�n[� 8Uh�tr�t2 PROFILE \/|��J �� -- ---- ---- / /�u/ /�� VIEW -- -- -- -- _ _- -- -- _- _- _� �- -7 �- -- -- -- �� -- -T T- -� -�� T- -� N- �_ . _ _ � _ -� _ _ _ � _ _ _ _ � _ _ _ _ _ �� � �- -� � �- -� -- -- -- -- -- -- -- | | | | | | | | | | | | | | | | | | | | | | K� � - - - 0- - - - - 7 - - - T - - - - 7 - T -1 � | v� � _ _ _ � _ _ _ _ -� _ _ _ �- _ _ _ _ � - � _� � -� � - - ' - - - - - - - - - - - -� � } [}| � \ V|��� / �r� � VIEW vv