Loading...
HomeMy WebLinkAboutNCDOT 46-00 Bridge #29 Scranton Creekr' Permit Class Permit Number NEW STATE OF NORTH CAROLINA 46-00 Department of Environment and Natural Resources , and Coastal Resources Commission ltinit , for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N.C. Department of Transportation,P.O.Box 850,Edenton,NC 27932 ' authorizing development in Hyde County at Scranton Creek, Bridge No. 29 on US 264-NC 45 near Scranton,NC as requested in the permittee's application dated 12/23/99(Form DCM-MP-5, 1/3/00), , including attached workplan drawings: 1,2 , 6, 7& 8 of 10 dated 7/19/99; 3,4& 5 of 10 dated 11/2/99. / / , This permit, issued on (:)3 //7/CEO ,is subject to compliance with the application (where consistent with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. , Bridge Construction 1) The relocation of any utility lines will require additional authorization, either by way of a r ' modification of this permit or by the utility company obtaining separate authorization. , 2) In accordance with the permittee's application letter dated 7/19/99, grubbing activities shall be , , prohibited within the detour alignment. , 3) All excavated materials and debris associated with the removal of the existing bridge will be ' disposed of on an approved high ground site. ' , , , (See attached sheets for Additional Conditions) , , / • This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the ' ' other qualified persons within twenty (20) days of the Chairman of the Coastal Resources Commission. ' ' issuing date. An appeal requires resolution prior to work / ' initiation or continuance,as the case may be. , • This permit must be accessible on-site to Department / ' personnel when the project is inspected for compliance. ' / L .Moffitt,Director , Any maintenance work or project modification not � 'ision of Coastal Management / , covered hereunder requires further Departmental approval. ' All work must cease when the permit expires on This permit and its conditions are hereby accepted. ' December 31. 2003 , In issuing this permit,the State of North Carolina agrees , , that your project is consistent with the North Carolina , Coastal Management Program. Signature of Pennittee ' ` oNo,o,,a, c • N.C. Dept. of Transportation Permit#46-00 Page 2 of 4 ADDITIONAL CONDITIONS ' • 4) Placement of rip rap shall be limited to the slopes underneath the proposed bridge, as depicted on the attached workplan drawings. The riprap material must be free from loose dirt or any pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current ' action. The riprap material must consist of clean rock or masonry materials such as but not limited to granite or broken concrete. 5) The fill material will be clean and free of any pollutants except in trace quantities. 6) No excavated or fill material will be placed at any time in any vegetated wetlands or surrounding waters outside of the alignment of the fill area as indicated on the workplan drawing(s). , 7) All fill material will be obtained from an upland source. 8) The temporary placement or double handling of any excavated or fill material within waters or vegetated wetlands is not authorized, with the exception of that fill necessary for the construction of the temporary detour bridge/causeway. This condition also applies to the removal of the • existing bridge structure. • 9) All temporary fill must be placed on geo-textile fabric to facilitate the total removal upon the completion of the project. • 10) All temporary fill material must be removed in its entirety immediately following project completion and placed in an approved high ground disposal area. Sedimentation and Erosion Control • 11) A ground cover sufficient to restrain erosion must be provided within the shorter of 15 working or 30 calendar days of completion of any phase of grading on cut or filled slopes. , 12) Erosion control structures must be installed on the out board edge of both the temporary and permanent fill in or adjacent to wetlands, between the area to be filled and the existing creek to , prevent sediment from entering the adjacent wetlands/watercourses/property. , ' 13) In order to protect water quality, runoff from construction must not visibly increase the amount ' of suspended sediments in adjacent waters. • 14) The cut or filled slopes shall be at an angle which can be retained by vegetative or other appropriate cover. oNoxo�o■c, N.C. Dept. of Transportation Permit#46-00 Page 3 of 4 , Mitigation , 15) Temporary fill areas are to be returned to pre-project contours and elevations. These areas will be undercut below the adjacent marsh elevation(minimum 1') and refilled to adjacent wetland elevation with suitable wetland or organic substrate to ensure revegetation of the impacted areas. ' 16) Due to the possibility that compaction and/or other site alterations might prevent the temporary wetland impact area from re-attaining wetland jurisdictional status,the permittee shall provide an . annual update on the wetland areas temporarily impacted by this project. This annual update will • ' consist of photographs provided during the agency monitoring report meeting and a brief report on the progress of these temporarily impacted areas in re-attaining wetland jurisdictional status. Three years after project completion,the permittee shall schedule an agency field meeting with , DCM,the NC Division of Water Quality and the NC Wildlife Resources Commission to determine if the wetland areas temporarily impacted by this project have re-attained jurisdictional ' wetland status. If at the end of 3 years the wetland areas temporarily impacted by this project have not re-attained jurisdictional wetland status,NC DOT and the above listed agencies shall determine whether a compensatory wetland mitigation plan will be required. • 17) In order to properly gauge the effect of construction on existing SAV habitat, and in accordance ' with the permittee's application letter dated 7/19/99,the permittee shall conduct an underwater survey to establish spatial distribution of SAV, species composition and population densities. This pre-construction survey will serve as the base line for comparing a later post-construction survey. In order to determine the effects of factors unrelated to construction activities, the permittee shall also conduct similar surveys in a nearby "control" site. Results of the pre- construction survey will be forwarded to DCM and the U.S. Army Corps of Engineers when the report is published. NOTE: In accordance with the 401 Water Quality Certification(DWQ Project No. 000040) issued 3/9/00, if total wetland fills for this project(now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). ' General • 18) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or ' work or injury which may be caused from existing or future operations undertaken by the United States in the public interest. , , NOTE: The U.S. Army Corps of Engineers authorized the proposed project under Nationwide ' Permit Number 23 (Action ID No. 199810334) which was issued on 11/17/97. tafo%o.toxoy „c • N.C. Dept. of Transportation P P Permit#46-00 Page 4 of 4 NOTE: The N.C. Division of Water Quality (DWQ) has authorized the proposed project under General Water Quality Certification No. 3112 (DWQ Project No. 000040), which was issued on 3/9/00. NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. NOTE: The permittee is encouraged to contact the Public Health Pest Management Section at • (919) 733-6407 to discuss mosquito control measures. • / , , , , , 01/07i2000 14:20 DIVISION 1 EDENTON 4 17009480478 NO.583 I702 • � �� ws to STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B.HUNT JR. DAVID McCOY GOVERNOR SECRETARY July 19, 1999 N. C.Department of Environment and Natural Resources Division of Coastal Management 943 Washington Square Mall Washington,North Carolina 27889 ATTENTION;Mr. Terry E. Moore,District Manager SUBJECT:Application for CAMA Major Development Permit for the Proposed Replacement of Bridge No.29 over Scranton Creek on US 264 NC 45 in Hyde County; TIP No. B- 3193; State Project No. 8.1080501; Federal Aid Project No. BRSTP-264(6) The Department of Transportation is planning on replacing the bridge over Scranton Creek on US 264 in Hyde County. The aging bridge is becoming structurally deficient and should be replaced in the near future. The proposed design will result in the construction of a.new bridge at the same location;however, it will be necessary to construct a temporary detour immediately east of the existing bridge alignment to accommodate traffic during the construction interval. An off- site detour utilizing existing secondary roads is not feasible. Project construction will result in the Ioss of 0.15 acre of Section 404 wetlands due to the permanent discharge of fill and 0.10 acre from excavation (relocation of ditch) for a total of 0.25 acre (0.247 acre). As part of the construction of the temporary detour, 0.34 acre of Section 404 wetland (including up to 0.1 acre of coastal wetland) will receive temporary fills. The Department agrees to prohibit grubbing activities within the detour alignment and require the placement of a geotechnical fabric under all fills that will be placed to accommodate the detour. At the conclusion of construction, all temporary fills and fabric will be removed. Upon inspection with staff from the DCM and the USACE, if substantial changes have occurred to the underlying wetlands, the Department agrees to undertake compensatory mitigation for losses agreed to during the post-project, interagency review. Attempts to minimize impacts to adjacent wetlands from temporary construction were carefully examined. For example, the use of sheet piling to eliminate impacts from temporary fill slopes along the east side of the temporary fills could potentially reduce wetland impacts only up to 0.1 acre at an estimated cost of S100,000-200,000. The Department feels that such costs substantially outweigh the benefits that would be derived. P.Q. Box 850, Edenton, NC 27932 l252) 482-7977 Fax: (252)482-3826 01/07/2000 14:20 DIVISION 1 EDENTON 4 17009480478 NO.583 903 Page 2 July19, 1999 Terry Moore One further resource issue which must be explored because of its importance to aquatic and estuarine ecosystems is submerged aquatic vegetation. There are stands of SAV in the shallows of the creek, particularly along the north shore. Since the proposed bridge is to be built on the same alignment as the existing bridge, and since the proposed structure will have 5 less structural bents in the water than the existing structure, it is reasonable to conclude that less SAV habitat will be affected by the proposal. The temporary bridge may result in temporary impacts to SAV, but it is also reasonable to anticipate that the population will adjust when the temporary pilings and the bridge deck have been removed. In order to properly gauge the effect of construction on existing SAV populations, the Department will conduct an underwater survey to establish spatial distribution of SAV, species composition and population densities. This pre-construction survey will serve as the base line for comparing a later post-construction survey. In order to determine the effects of factors unrelated to construction activities, similar surveys will be conducted in a nearby"control" site, Results of the pre-construction survey will be forwarded to the DCM (and USACE)when the report is published. Since the proposal will result in development activities in Areas of Environmental Concern, CAMA application forms MP-1 and MP-5, as well as site drawings, letters and forms to adjacent riparian landowners and a check for $250.00 are enclosed for your review and consideration. Also enclosed is a copy of the Categorical Exclusion document and a tear sheet from the U.S. Army Corps of Engineers, authorizing the proposal under NWP-23. Please call me if you have questions or require additional information. Thanks for your time and cooperation. M. Randall Turner, Senior Environmental Officer Project Development&Environmental Analysis Branch Enclosures Cc: T.Lindsey Riddick,Division Environmental Officer,NCDOT Michael F. Bell, Project Manager, USACE _ . • Form DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT Scranton Community c. Street address or secondary road number a. Landowner: US 64-264-NC 45 Name N. C. Department of Transportation d. Is proposed work within city limits or planning jurisdiction? Yes X No Address P.O. Box 850 e. Name of body of water nearest project (e.g. river, City Edenton State N.C. creek, sound, bay) Scranton Creek Zip 27932 Day Phone (252) 482-7977 Fax (252) 482-8722 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT b. Authorized Agent: Name D. R. Conner. PE. Division Engineer a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Address P.O. Box 850 Replacement of existing bridge,, requiring construction of a temporary on-site detour. City Edenton State N.C. demolition and removal of old bridge and construction of new bridge Zip 27932 Day Phone (919) 482-7977 b. Is the proposed activity maintenance of an existing project, new work, or both? Both Fax (919) 482-8722 c. Will the project be for public, private or commercial use? Public Transportation c. Project name (if any) B-3193 d. Give a brief description of purpose, use, methods of construction and daily operations of proposed NOTE: Permit will be issued in name of landowner(s), and/or project. If more space is needed, please attach project name. additional pages. Purpose: To replace a deficient bridge on a primary transportation route: USE: Public Transportation: Methods of Construction: standard roadway and bridge construction 2. LOCATION OF PROPOSED methods: Daily Operations: conveyance of traffic PROJECT a. County Hyde Revised 03/95 • Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash a. Size of entire tract N/A down" and residential discharges.) surface runoff b. Size of individual lot(s) N/A o. Describe existing drinking water supply source. c. Approximate elevation of tract above MHW or NWL +/-5 feet N/A d. Soil type(s) and texture(s) of tract: Capers-Newhan complex: sands to clays 5, ADDITIONAL INFORMATION e. Vegetation on tract: mixed herbaceous. scrub shrub and emergent marsh In addition to the completed application form, the f. Man-made features now on tract: bridge. highway following items must be submitted: power lines and ditch • A copy of the deed (with state application only) or g. What is the CAMA Land Use Plan land other instrument under which the applicant claims title classification of the site? (Consult the local land use plan.) to the affected properties. If the applicant is not claiming to be the owner of said property, then x Conservation Transitional forward a copy of the deed or other instrument under Developed x Community which the owner claims title, plus written permission Rural Other from the owner to carry out the project. h. How is the tract zoned by local government? • An accurate, dated work plat (including plan view N/A and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to i. Is the proposed project consistent with the applicable Coastal Resources Commission Rule 7J.0203 for a zoning? Yes No N/A detailed description.) (Attach zoning compliance certificate, if applicable) Please note that original drawings are preferred and j. Has a professional archaeological assessment been only high quality copies will be accepted. Blue-line done for the tract? X Yes No prints or other larger plats are acceptable only if an If yes, by whom? NCDOT Archeologists adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of k. Is the project located in a National Registered Engineers regarding that agency's use of larger Historic District or does it involve a National drawings.) A site or location map is a part of plat Register listed or eligible property? requirements and it must be sufficiently detailed to Yes X No guide agency personnel unfamiliar with the area to the site. Include highway or secondary road (SR) 1. Are there wetlands on the site? X Yes No numbers, landmarks, and the like. Coastal (marsh) X Other X If yes, has a delineation been conducted? Yes (Attach doczune,uation, if available) •A Stormwater Certification, if one is necessary. •A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and m. Describe existing wastewater treatment facilities. signed return receipts as proof that such owners N/A have received a copy of the application and plats by certified mail. Such landowners must be advised Form DCM-MP-1 on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. I understand that any permit issued in response to this application will allow only the development described in Name Bruce Cameron the application. The project will be subject to conditions Address Box 3649 and restrictions contained in the permit. Wilmington, NC 28406 I certify that to the best of my knowledge, the proposed Name Troy L. Mayo activity complies with the State of North Carolina's Address Route 1, Box 220 Scranton, NC 27875 approved Coastal Management Program and will be conducted in a manner consistent with such program. Name Roy E. & Nancy H. Cotton Address US Hwy 264 I certify that I am authorized to grant, and do in fact, Scranton, NC 27875 grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in Name William A. Griffin connection with evaluating information related to this Address 715 First St. permit application and follow-up monitoring of the Elizabeth City, NC 27909 project. • A list of previous state or federal permits issued for I further certify that the information provided in this work on the project tract. Include permit numbers, application is truthful to the best of my knowledge. permirtee, and issuing dates. N/A This is the 23 day of /7eGe..., , 19 99 . • A check for $250 made payable to the Department of Print Name D. R. Conner. PE Environment, Health, and Natural Resources R. (rt.e) Signature (DEHNR) to cover the costs of processing the Landowner or Authorized gear application. • A signed AEC hazard notice for projects in Please indicate attachments pertaining to your proposed oceanfront and inlet areas. project. • statement of compliance with the N.C. DCM MP-2 Excavation and Fill Information Environmental Policy Act (N.C.G.S. 113A - 1 to DCM MP-3 Upland Development 10) If the project involves the expenditure of public DCM MP Structures Information funds or use of public lands, attach a statement X DCM MP-5 Bridges and Culverts documenting compliance with the North Carolina DCM MP-6 Marina Development Environmental Policy Act. See Categorical Exclusion Document (Enclosed) NOTE: Pease sign and date each attachment in the space provided at the bottom of each form. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. • Form DCM-MP-5 _ BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major i. Height of proposed bridge above wetlands Permit, Form DCM-MP-1. Be sure to complete all +/-4-5 feet other sections of the Joint Application that relate to this proposed project. j. Will the proposed bridge affect existing water flow? X Yes No 1. BRIDGES If yes, explain Subtle improvements in water flows will result from less structural supports in water a. Public X Private k. Navigation clearance underneath proposed bridge b. Type of bridge (construction material) +/-3.5 feet (vertical) steel-reinforced concrete 1. Will the proposed bridge affect navigation by c. Water body to be crossed by bridge reducing or increasing the existing navigable Scranton Creek opening? X Yes No If yes, explain Horizontal navigational clearances d. Water depth at the proposed crossing at MLW or Will double from 25' to 50'; vertical clearance NWL +/- 6.5 feet will not change e. Will proposed bridge replace an existing bridge? X Yes No m. Will the proposed bridge cross wetlands containing If yes, no navigable waters? X Yes No (1) Length of existing bridge 300 feet If yes, explain proposed temporary bridge will (2) Width of existing bridge 26 feet Cross wetlands (see drawings) (3) Navigation clearance underneath existing bridge +/-3.5 feet (vertical) n. Have you contacted the U.S. Coast Guard (4) Will all, or a part of, the existing bridge be concerning their approval? removed? (Explain) entire bridge to be Yes X No removed If yes, please provide record of their action. • f. Will proposed bridge replace an existing culvert(s)? 2. CULVERTS Yes X No N/A If yes, (1) Length of existing culvert a. Water body in which culvert is to be placed (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL b. Number of culverts proposed (4) Will all, or a part of, the existing culvert be removed? (Explain) c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? g. Length of proposed bridge 322 feet Yes No If yes, h. Width of proposed bridge 36 feet (1) Length of existing bridge Revised 03/95 Form DCM-MP-5 (2) Width of existing bridge (3) Navigation clearance underneath existing If yes, bridge (4) Will all, or a part of, the existing bridge be (1) Length of area to be excavated 295 feet removed? (Explain) (2) Width of area to be excavated 17 feet (3) Amount of material to be excavated in cubic e. Will proposed culvert replace an existing culvert? yards +/355 cubic yards Yes No If yes, c. Will the placement of the proposed bridge or culvert (1) Length of existing culvert require any highground excavation? (2) Width of existing culvert Yes X No (3) Height of the top of the existing culvert above If yes, the MHW or NWL (1) Length of area to be excavated (4) Will all, or a part of, the existing culvert be (2) Width of area to be excavated removed? (Explain) (3) Amount of material to be excavated in cubic yards d. If the placement of the bridge or culvert involves f. Length of proposed culvert any excavation, please complete the following: (1) Location of the spoil disposal area g. Width of proposed culvert used as temp. on site detour fill. If excay. material is not suitable, fill material will be h. Height of the top of the proposed culvert above the trucked to the site. All temp. fill will be MHW or NWL removed after construction and disposed of in an upland disposal site. See plats for temp. i. Will the proposed culvert affect existing water flow? fill location. Yes No (2) Dimensions of spoil disposal area If yes, explain (3) Do you claim title to the disposal area? Yes No j. Will the proposed culvert affect existing navigation If no, attach a letter granting permission from potential? Yes No the owner. If yes, explain (4) Will the disposal area be available for future maintenance? X Yes No (5) Does the disposal area include any coastal 3. EXCAVATION AND FILL wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from(2) a. Will the placement of the proposed bridge or culvert above. require any excavation below the MHW or NWL? (6) Does the disposal area include any area below Yes X No the MHW or NWL? Yes X No If yes, If yes, give dimension if different from No. 2 (1) Length of area to be excavated above. (2) Width of area to be excavated (3) Depth of area to be excavated e. Will the placement of the proposed bridge or culvert (4) Amount of material to be excavated in cubic result in any fill (other than excavated material yards described in Item d. above) to be placed below MHW or NWL? X Yes No b. Will the placement of the proposed bridge or culvert If yes, require any excavation within: (1) Length of area to be filled SEE BELOW Coastal Wetlands SAVs X Other (2) Width of area to be filled SEE BELOW Wetlands (3) Purpose of fill placement of 6 bents with 7 piles per bent. A total of 2.7 sq. feet per Revised 03/95 Form DCM-MP-5 pile for a maximum of 116 sq feet for the new bridge and 270' x 10' (2.700 sq ft) of fill to If yes, explain in detail temp. on-site detour will be fill an existing drainage ditch. total of 0,065 required (see drawings) acres d. Will the proposed project require any work f. Will the placement of the proposed bridge or culvert channels? Yes X No result in any fill (other than excavated material If yes, complete Form DCM-MP-2 described in Item d. above) to be placed within: X Coastal Wetlands SAVs X Other e. How will excavated or fill material be kept on site Wetlands If yes, and erosion controlled? Strict adherence to best management practices (1) Length of area to be filled See below (2) Width of area to be filled See below f. What type of construction equipment will be used (3) Purpose of fill permanent and temporary fills (for example, dragline, backhoe or hydraulic needed to improve fill slope and construct temp. dredge)? Cranes, barge. backhoe. dump trucks detour. Site 1= 60'x 1.5' perm. Site 2= 285'x 4.5'perm. And 276'x 27.3' temp. Site3= 455'x 9.5' perm. Site 4=190'x 3.2' perm. And 300'x g. Will wetlands be crossed in transporting equipment 24.8' temp. to project site? X Yes No If yes, explain steps that will be taken to lessen g. Will the placement of the proposed bridge or culvert environmental impacts. Wetlands crossed are within result in any fill (other than excavated material temparary and permanent impacts zones as shown described in Item d. above) to be placed on on drawings highground? X Yes No If yes, (1) Length of area to be filled see plats h. Will the placement of the proposed bridge or culvert (2) Width of area to be filled see plats require any shoreline stabilization? (3) Purpose of fill temporary detour and X Yes No permanent fill slope construction will result If yes, explain in detail rip rap placed along bridge in 70.000 sq. ft (1.6 ac) temp. and 40.700 sq. abutments. see plats for location ft. (.93 ac) permanent fill on highground 4. GENERAL D. R. Conner. PE. Division Engineer. NCDOT Division One a. Will the proposed project involve any mitigation? Applicant or Project Name Yes X No _D, � �` ��z �. If yes, explain in detail ' ( �! Signature 1231oo b. Will the proposed project require the relocation of Date any existing utility lines? X Yes No If yes, explain in detail over head poles and lines will have to be relocated. Tideland EMC and Sprint Telephone have already applied for and received permits from the NCDCM to relocate the utility lines. c. Will the proposed project require the construction of any temporary detour structures? X Yes No Revised 03/95 VICINITY MAP . __ .. ..A,„ 74 ., /�,� ;-57 \• _f. / L. �� .� eke,. \A /�1/f .. [YkY / ���/// V/ Alof • oleo /,, -\>40 I, , ,� Yfnde.r ;/ R // ' i i 5 3 6 — 1 Poir, ,'S . 0. CnIumbl. lowi .w I NW ll.v,. \):;' / \ y.l_ ik (� i b4,j o ivy �� ra Rv..lrl�. rope =-,-,,..2 ,,,_,N,, t cranton� �' 1 A �'i i,• )/ . � � w,.nlnaso *` a loeasol.f ti, 4 �1 R I7\!..11.14.4ii:J f'.^ • t\, n lit ttd .vY..ro U Fti ^) rents \ \ wan Quart\Er ;�.."r. ��' ;�• 9� 7 J \ APPROXIMATE SCALE 1" = 30 MI II II 41y ....,.....„2„k. ��) -/1� �` -` lm �� q..cam.. ISLAND \ CJ * �J` N. C. DEPT.OF TRANSPORTATION VICINITY MAP SHOWING LOCATION DIVISION OF HIGHWAYS HYDE COUNTY OF STATE PROJECT NO. 8.1080501 PROJECT:8.1080501 (B-3193) BRIDGE NO.029 OVER SCRANTON CREEK • APPROXIMATE SCALE 1" = 2.5 MI SHEET 1 OF 10 7//1/94 /►VRT SITE MAP STA.14+09.16 -L- BEGIN STATE PROJECT 8.1080501 STA.14+09.16 -L- BEGIN F.A.PROJECT BRSTP-264(6) ' Y • • U — vim • • — — ---- Ifa )• TO SWAN QUARTER Tj US--264 - NC 45 * Wle •• TO eEL11AVEN I 1 II * Pa i ,a ' •II STA.25+ 74.70 -L- END STATE PROJECT 8.1080501 II • STA.25+74.70 -L- END F.A.PROJECT BRSTP-264(6) 0 0 N. C. DEPT.OF TRANSPORTATION DIVISION OF HIGHWAYS HYDE COUNTY Denotes Property Owner (See Sheet 9 of 10) - •PROJECT: 8.1080501 (B 3193) BRIDGE NO.29 OVER SCALE 1" = 200' • • ' • • SCRANTON CREEK _ • a DENOTES WETLANDS �_®_IL®ccoi 1.1✓ SHEET 2 OF _10 7//4/9`1 mRT' BEGIN DETOUR PLAN VIEW -L- POTSto. 14+09.16 = _ • . -DET- PC.Sto. 10+OOAO ' - _w�E O 4 I 1-0 —'I r 0 1-1i-0-14 ll 1-14-`tl'1ta`l! •I"tlr'11- 1 14-0-1�r04 I"-`ip•-'I 4- 4I'z34-114 0 ill g I[1-(1'.'tl .'• `V'•1.`t! .I.'tl .l i Fl h ii'A J -------------WEB --- WLB•--- --W{B - j ii,f2 Nt• �'---, Q j 'Is I-' \ F I I - _.a17 te► ••• _ - (� erf'4 ir-ZZA r 42"A I Ir-4 • 1riB1.i alt i _I ' r=r��:_lrrilrrr!�rrr.� II -fL, .•::,:: ■ r *��■ �1■r�r���r��r�■ ■�C ��r��i�t�rr��. 1 I _^' 1I 1 1 II 1 C I I ci 1 1 .�. ,.1..�Y 1';',*:.( ' .'........ .. '. .... 1.7:.gr?ri .lef �r.r ogiTNN I ` I \ { = P D E. -� --_, I 0 = 1 ••••j2•2•2•2•2•I••••: DENOTES PERMANENT FILL svwxyxvivw -DET- PCSto. 12+9/.17 N. C. DEPT.OF TRANSPORTATION �.000❖.o❖.❖.•.oa IN WETLANDS DIVISION OF HIGHWAYS ..J........... �/ �/ DENOTES TEMPORARY FILL HYDE COUNTY f IN WETLANDS -DET- PTSto. 11+,31.51 PROJECT:8.1080501 (B-3193) p�p�i� � �i DENOTES EXCAVATION BRIDGE NO.029 OVER 1 111 _ ■ IN WETLANDS SCRANTON CREEK DENOTES MECHANIZED SCALE 1" EQUALS 50' • .. CLEARING IN WETLANDS tmoivicutio —.. _. __ SHEET 3 OIL lU /1 fq 9 T[�c 40 . 8 PLAN VIEW O L,(11-z kh1 BRIDGE IDENTIFICATION STATION N \! ;a 1 0.•- P.O.T.STA.I9+73.000 ! B A i ifi. I - _ CLASS II RIP-RAP i 14 • EXISTING ! '.' I I .r i. TWO LANE HIGHWAY BRIDGE " 29 1 !J __— - J IVA 1 'a L �' 1 ` - i F D.I.W///"DRAINS :.� %'fir II AI y :.; : `. 4' w/ CLASS 'B'RIPRAP ---� ni p, ... ... Syr ,; ;, I � � ,� N } 2' I40137 �:W II k I- I 4 II 1 I � � rnN JIC ', ILLu I ► 1 I I I I I I I , 1 cn _ I 7� I I v �I -I << -- v iu I � /t �.::: I 1 4, ..� _�►:- u, - ter ' I '� I N 2• l�' 37.2" W_ 1 1 •/►� �,/ 1 01-.....;'.:' • el r CLASS II RIP-R �i 1 -DET- PTSto. 14+22.68 : _ . - ! d.77...= i S END DETOUR BRIDGE I ti W STA. /7 4-40.00 -DET- -DET- PCSto. 17+46 -� BEGIN DETOUR BRIDGE �MLn 1 pn�1 STA. I4--08.00 -DET- N. C. DEPT.OF TRANSPORTATION %�%�%%1O%%%%i DENOTES PERMANENT FILL '..................•'' IN WETLANDS DIVISION OF HIGHWAYS HYDE COUNTY VDENOTES TEMPORARY FILL IN WETLANDS PROJECT:8.1080501 (B-3193) ili= 1 i- �e0 1 DENOTES EXCAVATION BRIDGE NO.029 OVER 165 - 1 IN WETLANDS SCRANTON CREEK • . . . DENOTES MECHANIZED I �_�SC�SCALE 1" EQUALS 50' ��/z/9 1 T�/� CLEARING IN WETLANDS / SHEET 4 OF 10 . . I PLAN VIEW c3 8 . ,, (,1)_z 7-.... _ 1/ , / 0 . • „ 4 l 1) "0 oikra ///?f5t9 ..,,, ± ± N C3///, //, I 0 ,, 'brn /ON END DETOUR °'I'• / ., I //, ± e/// L%--',/, e, -L- -• to. + ,/, • • 1 e 0 u-w, -.. -DET- PTSto. 21+7021 Ozz_o_. s... • —47/ . ——-1-14 0 77;,„ `65-fti- ( )ril) n-- !--I-•------=% / a/ / 11 D 4%"E.2.W . _ ___ _y_i0 .;.,.'. ..:.:.;,w:' ..;.;:..!;.l:;•a'.:r::::•-x•'.:y5:.iy'-':::::•:-:• .•fYV rT Y'.-':.:":::7:;:k::.!'::::•‘,::,•::;:i: . ( . . . ------- ----- -IMPIMIF J) I F ' -I ---• 1 - F rri ty.... L. ________- - • liwpwww...----__-- F 4. (.31 "-- -; Aariv 4.4811 -iiir • , ......,; :.:!.:...:-......14. 7:17.n.?:: :.-,.. .:?;::;:;:.;,:::::;,',.?.::,:- 1 fr ref ...#4.- .1""viv -,-,--,,,-.r--.4---,4--,•• ' .' 1 ± 1 ,,, . . . •4 • 1. . .-, .••• 7 lir 4/.. Ai .,.:,...:„,:.: :;.:- :,., ."..•.:' '''''• -- f 126E-t4-14. .: :;;. .;:.:.: ...:.-:.:-..:•,:-..,:-:,':......::. .•-.• • * ott0000g i # ± ± ± ± 0 -DET- PTSto. 18+76.62 c\1 7DET- PCSto. 20+.39.79 scvmvAvmv N. C. DEPT.OF TRANSPORTATION amove.Voi DENOTES PERMANENT FILL ..00000.+444444 x.x.x.:440:44 IN WETLANDS DIVISION OF HIGHWAYS 1 DENOTES TEMPORARY FILL , ± HYDE COUNTY v IN WETLANDS PROJECT:8.1080501 (B-3193) 1111111111111 DINENWOTE,ErSLAENXDCSAVATIO N 1 BRIDGE NO.029 OVER 1 SCRANTON CREEK DENOTES MECHANIZED SCALE 1" EQUALS 50' ';',.:-",..:-•:•:-',..:-•:.:-';.:-',..• CLEARING IN WETLANDS LiDINEW_ICINEMMIL___MINIM. /// */q SHEET 5 OF 10 QIL- PROFILE rn rTi 18.00I 8*00 I rri 19.00 20.00 21.00 2 P1 =17.50.00 rn I j 0 I I I I I I o f E1 = 6.48' jr-i I 10 VC 40.00 I- q K = 260 to i, (-)0.0737/. : I ij'ti NWL0T' V / 4 , \ __/'_ 0 . 0 p • \ Al j \ I j -5 NO IMPACTS ANTICIPATED BY N. C. DEPT.OF TRANSPORTATION PROPOSED BRIDGE ABUTMENTS, DIVISION OF HIGHWAYS SKETCH FOR INFORMATIONAL PURPOSES HYDE COUNTY PROJECT:8.1080501 (B-3193) HORZINTAL SCALE 1" = 50' BRIDGE NO.029 OVER LT■--0 SCRANTON CREEK VERTICAL SCALE 1" = 5' LIODIE_LZ71 SHEET 6 OF 10 `7//9/99 47/E DETOUR O PROFILE 12 I00 I 13.00 00 I 14.00 I 1500 I 00 16.00 I 0 17.00 /8.00 /9.00 20.00 I I I I I I I BaT•S A 11.45.78 EL 5.95' V) o •LSET•s rA 20424.31 J I IO EL 4J3' I- it EL i3• k, I ! o /0 W 8I I LU . I � L r-X0727 i W --..___._________ 74 Nw�0.7 2 L / zzitzzi____--- - I V i • 0 \ ____.y- I I I -l0 N. C. DEPT.OF TRANSPORTATION DIVISION OF HIGHWAYS HYDE COUNTY PROJECT:8.1080501 (B-3193) VERTICAL SCALE 1" = 10' BRIDGE NO.029 OVER XSCRANTON CREEK �/ DENOTES FILL IN WETLANDS HORIZONTAL SCALE 1" = 100' -r>,r7rr>.I SHEET 7 OF 10 7/i94,9 //mi. CROSS-SECTIONS 40 0 30 20 10 0 10 20 30 a 40 50 60 70 80 90 31 I I I I I I I e I I I I I I of 39.54'RT .0 -DET- STA 13+93.18 " • -10- I I .1 i \ / —5- / .y ) —0- I I -0.J5 -L-/8.00.00 SECTION A-A SOUTH SIDE OF SCRANTON CREEK 40 30 20 10 0 10 20 30 40 50 60 70 I 141. I I I I I I I I I I I ,3■ 40.00'RT 13 -DET- STA 17+43.18 -10- tj IYZ os —5 ' I —0- -L-2I 50.00 I SECTION B-B NORTH SIDE OF SCRANTON CREEK N. C. DEPT.Or TRANSPORTATION DIVISION OF HIGHWAYS HYDE COUNTY HORIZONTAL SCALE 1" = 20' PROJECT: 8.1080501 (R-3193) ■ ■ ■ ■ IN j /� DENOTES FILL IN WETLANDS BRIDGC NO.29 OVER SCRANTON CREEK VERTICAL SCALE 1" = 10' } DENOTES EXCAVATION . +` _ 1-rlrl< + -- IN WETLANDS SHEET P OF 10 T//9/99 /11k41- PROPERTY OWNERS 1. BRUCE CAMERON Box 3649 Wilmington, NC 28406 2. TROY L. MAYO Rt. l Box 220 Scranton, NC 27875 3. ROY E. & NANCY H. COTTON US HWY 264 Scranton, NC 27875 4. WILLIAM A. GRIFFIN 715 First St. Elizabeth City, NC 27909 N. C. DEPT.OF TRANSPORTATION DIVISION OF HIGHWAYS HYDE COUNTY PROJECT:8.1080501 (B-5195) BRIDGE NO.029 OVER SCRANTON CREEK SHEET 9 OF 10 7/i9/99 ilheT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Interchange Mechanized Existing Site Station Structure Fill In Temp.Fill Excavation Isolated Clearing Fill In SW Fill In SW Channel Relocated Enclosed No. Size Wetlands In Wetlands In Wetlands Wetland (Method III) (Natural) (Pond) Filled Channel Channel (From/To) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 17+00/18+29 0.002 0.025 2 14+26/18+37 0.03 0.173 0.115 0.109 3 23+84/25+75 0.099 0.039 4 �21+20/25+75 0.014 0.171 0.121 TOTALS: 1 0.145 0.344 0.294 0 • N.C. DEI, T. OF TRANSPORTATION DIVISION OF HIGHWAYS HYDE COUNTY - PROJECT 8.1080501 (B-3193) BRIDGE NO. 29 OVER //03 o v SCRANTON CREEK .rLA SHEET 10 OF 10 Supplement to IVIP-5,3.d. WASTE/BORROW SITE DECLARATION For the record, the Department of Transportation requires its contractors to provide proof that his plans to utilize a candidate waste/borrow area will not result in impacts to wetlands (Coastal or Section 404) or waters. If the site is an agricultural field, we require the contractor to provide copies of forms and aerial photo confirming the field's status as either prior converted (PC) or nonwetland. These forms are obtainable from the Farm Service Agency offices and/or the NRCS offices. If the site is in natural vegetation we require the contractor to engage the services of an environmental consultant for the purposes of performing on-site environmental evaluations. The environmental report from the consultant is reviewed by the Division Environmental Officer to determine its accuracy. Since no contractor has been assigned to this project, it is not practical to identify a suitable waste site at this time. In order to allay any concerns the Division of Coastal Management has concerning the future selection and approval of a waste/borrow site, the Department hereby declares that sites chosen for waste and/or borrow activities will not result in secondary impacts to wetlands, waters or AECs. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT NCDENR March 22 2000 JAM Es B. HUNT JR. NC Dept.of Transportation GOVERNOR P. O.Box 850 Edenton,NC 27932 Dear Sir: WAYNE MCDEVITT SECRETARY The enclosed permit constitutes authorization underthe Coastal Area Management Act,and where applicable, the State Dredge and Fill Law,for you to proceed with your project proposal.The original(buff-colored form)is retained by you and it must be available on site when the project is inspected for compliance.Please sign both the original and the copy and return the copy to this office in the enclosed envelope.Signing the permit and proceeding DONNA D. MOFFITT means you have waived your right of appeal described below. DIRECTOR If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings,P.O.Drawer 11666,Raleigh,NC 27611,(919)733-2698 within twenty(20)days of this decision on your permit.You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days,the matter must be resolved prior to work initiation.The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form.Otherwise,all work must be carried out in accordance with your application.Modifications,time extensions,and future maintenance require additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved.If you are having the work done by a contractor,it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Very sincerely, • 01,:aueed10. V 4 Douglas Huggett Major Permits/Consistency Manager DH/amw Enclosure 1638 MAIL SERVICE CENTER, RALEIGH, NC 27699-1638 2728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE 919-733-2293 FAX 919-733-1495 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10io POST-CONSUMER PAPER w DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: N.C. Department of Transportation SC ►'1+0 2. LOCATION OF PROJECT SITE: Photo Index - 1995:118-1276 K16 1989:91-16 K-L13 State Plane Coordinates - X:2,760,000 Y:646,350 Scranton Quadrangle Upper Left 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 8 November 1999 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 4 January 2000 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification From LUP - Conservation (Water & Wetlands) Rural with Services (Land) (B) AEC(s) Involved: PTA,CW (C) Water Dependent:YES (D) Intended Use: Public (E) Wastewater Treatment: Existing - N/A Planned - N/A (F) Type of Structures: Existing -Bridge, utility lines, Planned -Bridge, temporary detour bridge, utility lines (G) Estimated Annual Rate of Erosion: N/A Source - Applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands 5,015 ft2 6,303 ft2 (perm) 14,975 ft2 (temp) (B) Non-Vegetated Wetlands 2,700 ft2 (ditch) 4,152 ft' Creek Bottom 116 ft2 shaded by bridge (C) Other 40,700 ft2 (perm) Uplands 70,000 ft2 (temp) (D) Total Area Disturbed: 143,961ft2 3.3 ac. (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: No 8. PROJECT SUMMARY:The applicant proposes to replace a ±300' long by ±26' wide bridge with a ±322' long by ±36 ft wide bridge and construct a temporary detour bridge. • E' , 1 NCDOT Bridge #29 Hyde County Project Setting The North Carolina Department of Transportation(NCDOT)proposes to replace Bridge#29 located on US 264 and NC 45 over Scranton Creek between Belhaven and Swan Quarter in Hyde County,North Carolina. The bridge is oriented north-south,and the proposed construction will take place on the upstream(east)side of the bridge.The wetlands in the project area have been delineated as 404 wetlands by NCDOT but the delineation has not been approved by the US Army Corps of Engineers. The bridge is located in an undeveloped area with abundant wetlands, dominated by black needle rush(Juncus roemerianus).The existing right of way contains vegetated uplands with various grass species, and drainage ditches containing a mix of Coastal Wetlands and other 404 wetland species. The dominant species in the ditches include wax myrtle, Iva frutescens, Carex sp., other wetland species. A small area of Coastal Wetlands, dominated by Juncus roemerianus with Typha spp. borders the creek, and extends approximately 20 ft. landward on the North side of the bridge. Also on the North side of the project area, there is a narrow strip of wooded uplands between the existing ditch and the adjacent Juncus roemerianus marsh. These uplands appear to be growing on an old spoil berm. On the South side of the project area,there is a±150'wide area of mixed wetland between the existing road shoulder and the Juncus roemerianus marsh. The dominant species in this area include wax myrtle, Iva frutescens, and Carex sp.. The navigable water depth at the existing bridge is±5'. Scranton Creek is±300' wide at the existing bridge crossing. All of the existing bridge bents are in the creek proper. Navigation is limited by the bent configuration of the existing bridge,and the temporary structure will not further impede navigation. The proposed bridge will increase navigability upstream because there will be fewer bents in the creek. Scranton Creek is classified as SC-NSW by the Environmental Management Commission and is not open to shell fishing at this location. Project Description The NCDOT proposes to replace an existing±26' wide by±300' long two lane bridge over Scranton Creek with a±36'wide by±322'long two lane bridge and to construct a±24'wide by±289' long temporary detour bridge. The existing bridge has twelve bents in Scranton Creek evenly spaced across the creek. The creek is±300'wide at the crossing. The proposed bridge will have six bents in the creek with the center bent approximately in the center of the creek. The existing bridge has a navigation clearance of±3.5'and the proposed bridge will have a navigational clearance of±3.5'. A temporary detour bridge will be constructed on the upstream side of the existing bridge . NCDOT proposes to temporarily fill ±14,975 ft2 of noncoastal 404 wetlands to construct the temporary detour structure and its associated approaches. These temporary impacts will be returned to preproject contours and elevations upon completion of the permanent bridge. Construction of the replacement bridge will result in the permanent filling of±400 ft2 of Coastal Wetlands and±5,903 ft2 NCDOT Bridge #29 Hyde County Page 2 of noncoastal 404 wetlands immediately adjacent to the existing structure. Construction of permanent drainage ditches will result in excavation of±5,015 ft2 of noncoastal 404 wetlands. Approximately 70,000 ft2 of highground will be temporarily filled during construction of the detour structure, and ±40,700 ft2 of highground will be permanently filled during construction of the replacement bridge. Anticipated Impacts Construction of the detour structure will result in temporary impacts that will be restored upon completion of the replacement bridge. Approximately ±14,975 ft2 of noncoastal 404 wetlands will be filled to construct the temporary detour structure. Approximately 70,000 ft2 of highground will be filled during construction of the detour structure. These impacts will be temporary, and the effected areas will be returned to preproject contours and elevations upon completion of the permanent replacement bridge. Construction of the replacement bridge and widened approaches will result in the permanent filling of±400 ft2 of Coastal Wetlands, predominantly vegetated with Juncus roemerianus, and ±5,903 ft2 of other 404 wetlands adjacent to the existing structure. This area already impacted by existing road fill and an existing unassociated fill area±20' to the east. Permanent drainage ditches will be constructed in the area that will be impacted by the temporary detour structure, and will result in the excavation of±5,015 ft2 of other 404 wetlands. Approximately 40,700 ft? of highground will be filled during construction of the replacement bridge. Construction of the new bridge will result in the shading of 4,152 ft2 of creek bottom. Turbidity from construction activities will vary with construction technique, water depth and substrate type, and will temporary. The net impact of the proposed bridge replacement is the permanent loss of±400 ft2 of Coastal Wetlands and +29,109 ft2 of other 404 wetlands that will be filled or excavated. Approximately 4,152 ft2 of creek bottom will be shaded by the replacement bridge. Tracey L. Wheeler- 7 January 2000 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: N.C. Department of Transportation County: Hyde County LOCATION OF PROJECT: US 264 and NC 45 near Scranton, NC 6 319 3 DATE APPLICATION RECEIVED COMPLETE BY FIELD: 4 January 2000 %t_ CO FIELD RECOMMENDATION: Attached CONSISTENCY DETERMINATION: To be forwarded ` FIELD REPRESENTATIVE: Tracey Wheeler DISTRICT OFFICE: Washington ��,.� ' DISTRICT MANAGER REVIEW: 7M�,. DEiVED ° �,� �°;��"\q`� P` s B) DATE APPLICATION RECEIVED IN RALEIGH: JAN 1 1 2000 FEE REC'D:$ v�5v_ OO PUBLIC NOTICE REC'D: l� COASTAL M iO E ( OTICE DATE: a/)3/OO ADJ. RIP. PROP NOTICES REC'D: i7 DEED REC'D: /l/1A APPLICATION ASSIGNED TO: -RAjt4^ D ON: r/i/,% O C) 75 DAY DEADLINE: 3)19)OD 0 150 DAY DEADLINE: MAIL OUT DATE: r— J, — 0 0 STATE DUE DATE: 2 - - e 0 FEDERAL DUE DATE: NI Alt FED COMMENTS REC'D: /0„) Pt ,+ce>,,,,-..„ l PERMIT FINAL ACTION: ISSUE 3\\,\CD DENY DRAFT ON 3115/pp / AGENCY DATE COMMENTS OBJECTIONS: NOTES RETURNED YES NO Coastal Management - Regional Representative I t ( — 0 6 V Coastal Management - LUP Consistency / — /` —0"0 V Division of Community Assistance Land Quality Section I-ad-OCR ✓ w c044\\-Ion s Division of Water Quality k� 1— j—C, llKtv . j Storm Water Management (DWQ) 3,aD,‘o,Co: I aI-00 5'4DCVvoa4l-r�Cml-v u)� reAState Property Office �--n 0 %/ Division of Archives & History • ._ 7` Q 0 ✓� Division of Environmental Health -14--0 t V Division of Highways \—3\—a 'Wildlife Resources Commission a'15—C10 Division. of Water Resources 3-1 C-00 Division of Marine Fisheries Submerged Lands (DMF) ,. MEMORANDUM TO: Doug Huggett FROM: Tracey Wheelea`at.) THROUGH: Terry Moore DATE: 7 January 2000 SUBJECT: Application for CAMA Major Permit NC Department of Transportation Bridge#29 Replacement Hyde County,North Carolina I have reviewed the application for a CAMA Major Permit submitted to this office on behalf of NC Department of Transportation in regards to the rules and regulations adopted by the CRC, specifically NCAC 7H.0205, 0207, and 0208. My review indicates that the proposal appears to be consistent with these regulations. If the permit is issued, I recommend the following conditions be included: Conditions: 1) debris associated with the removal of the existing bridge will be disposed on an approved highground site unless otherwise permitted by this Division. 2)Tempo 1 areas are to be returned to preproject contours and elevations. These as will be undercut below the adjacent marsh elevation(minimum 1') refilled to adjacent wetland elevation with suitable wetland or organic substrate to ensure revegetation of the impacted areas. en.o 'c'i 3)P ' r to construction of the proposed bridge and detour structure,permits for e relocation of existing utility lines must be obtained from the Division of Coastal Management. 4)A ropriate erosion and sedimentation control devices,measures,or structures all be used to prevent sedimentation from entering adjacent wetlands/fr 4 v eSI en'?" 7 5) No e avated or fill material will be placed at any time in any vegetated wetl s or surrounding waters outside of the alignment of the fill areas indicated the work plats. 6 e fill material will be clean and free of any pollutants except in trace Memorandum NC Department of Transportation 29 October 1999 Page Two quantities.Metal products,organic materials,or unsightly debris will not be used. 7 1 backfill material will be obtained from and upland source. 8) order to protect water quality, runoff from the construction area must not isibly increase the amount of suspended sediments in the adjacent water. 9)This permit oes not authorize the interference with any existing or proposed Federal ect, and the permittee will not be entitled to compensation for dam to the authorized structure or work or injury which may be caused from sting or future operations undertaken by the United States in the public interest. The peittee will maintain the authorized work in good condition and in co ance with the terms and conditions of this permit. The permittee is not ieved of this requirement if he abandons the project without having the permit transferred to a third party. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor MAR 13 NCDENR Bill Holman, Secretary COASTAL CAROLINA DEPARTMENT OF COASTAL MA�R� ENVI ONMENT AND NATURAL RESOURCES Kerr T. Stevens, Director March 9,2000 Hude County Mr.D.R.Conner DWQ Project#:000040 APPROVAL OF 401 Quality Certification Tar-Pamlico River Division Engineer NCDOT PO Box 850 Edenton,NC 27932 Dear Conner: You have our approval,in accordance with the attached conditions and those listed below,to dredge 0.12 acres of wetlands,permanently fill 0.34 acres of wetlands,and 0.09 acres of creek bottom for the purpose of replacing a bridge#29 over Scranton Creek Rd.US 264/NC 45, as you described in your application dated January 12,2000. After reviewing your application,we have decided that this fill is covered by General Water Quality Certification Number 3112.This approval is also valid for the Tar-Pamlico River buffer rules(15A NCAC 2B.0259). In addition,you should get any other federal,state or local permits before you go ahead with your project including(but not limited to) Sediment and Erosion Control,Coastal Stormwater,Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project,you must notify us and you may be required to send us a new application. If the property is sold,the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project(now or in the future)exceed one acre,compensatory mitigation may be required as described in 15A NCAC 2H.0506(h)(6)and(7).This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification.For this approval to be valid,you must follow the conditions listed in the attached certification and any additional conditions listed below. If you do not accept any of the conditions of this certification,you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,send a written petition,which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings,P.O.Box 27447,Raleigh,N.C.276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-9646. Si erely, rr T. tevens Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DWQ Regional Office File Copy Central Files Doug Huggett;DCM Wetlands/401 Unit4401 Reedy Creek Road Raleigh,North Carolina 27607 Telephone 919-733-1786 FAX#733-9959 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post consumer paper State of North Carolina Department of Environment A19111ilirli and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor I1CDEI'1R Bill Holman, Secretary NORTH CAROLINA DEPARTMENT OF /, ENVIRONMENT AND NATURAL RESOURCES Kerr Stevens, Director IVISION OF WATER QUALITY � 1�/�� March 3, 2000 �/ MAR 10 2000 COASTAL MANAGE LENT NC Department of Transportation Attn: Mr. D.R. Conner P.O. Box 850 Edenton, NC 27932 Subject: Stormwater Project SW7000102 CAMA Application for Bridge No. 29 Beaufort County Dear Mr. Conner: This office received a copy of your CAMA application on January 11, 2000. At our request, Mr. T. Lindsey Riddick, Jr. provided additional supporting information on February 24, 2000. Staff review of the plans and specifications has determined that the project, as proposed, consists of activities that will not pose surface water quality threats from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. For this reason, we are informing you by way of this letter that your project will not require a stormwater management permit. Please keep in mind that this determination does not affect your legal requirements to obtain other permits which may be required by the Division of Water Quality, the Division of Land Resources, Coastal Area Management Act or any other Federal, State or Local Government. In addition, any future modifications to the project will require additional review from this office to assure that stormwater impacts are not an issue. If you have any questions or need additional information concerning this matter, please contact Mr. Bill Moore at (252) 946-6481, extension 264. Sincerely, A-Jim Mulligan Water Quality Regional Supervisor Washington Regional Office cc: oug Huggett, DCM - Raleigh, NC Washington Regional Office Central Files 943 Washington Square Mall,Washington, North Carolina 27889 Telephone 252-946-6481 FAX 252-946-9215 An Equal Opportunity Affirmative Action Employer . State of North Carolina •w Department of Environment • and Natural Resources p Division of Water Quality James B. Hunt, Jr., Governor t"lCDEt"IR Bill Holman, Secretary NORTH CAROLINA DEPARTMENT OF Kerr T. Stevens, Director ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY RECEIVED January 14, 2000 JAN 21 2000 NC Department of Transportation COASTAL MANAGEMENT Attn: Mr. D.R. Conner P.O. Box 850 Edenton, NC 27932 Subject: Stormwater Permit SW7000102 Replacement of Bridge 29 Scranton Creek Hyde County Dear Mr. Conner: This office received a copy of your CAMA application on January 11, 2000. This application has been assigned the number listed above. A preliminary review of your project has been completed. The following additional information is needed before a permit can be issued: - stormwater application & appropriate fee - site plan showing details & stormwater control measures The above information must be submitted within 30 days, or your application will be returned as incomplete. If you have questions, please feel free to contact me at (252) 946-6481, extension 264 . Sincerely, • William J. oore Environmental Engineer Washington Regional Office cc: Doug Huggett, DCM - Raleigh✓ Hyde County Inspections Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 Telephone 252-946-6481 FAX 252-946-9215 An Equal Opportunity Affirmative Action Employer NORTH CAROLINA DEPARTMENT OF r,'. -- - ���� ENVIRONMENT AND NATURAL RESOURCES �= JAN 2 1 2000 DIVISION OF COASTAL MANAGEMENT A•4; . IIMIN t •. L MANAGEMENT 10 January 2000 NCDENR RIT2M111 u MEMORANDUMY7 - - • J ,JAMES B.HUNT JR. AN zDC3C) OVERNOR TO: Mr. Charles Gardner, Director Division of Land Resources LAND QUALITY SECTION 1� '; 4. '• WASHINGTON REGIONAL OFFICE . FROM: Doug Huggett °E - Major Permits Processing Coordinator '� , 7 -rye,• 4,1� SUBJECT: LAMA/Dredge and Fill Permit Application Review Applicant: North Carolina Department of Transportation 4.411‘,A4t,:.11'I'4 14,,*:t+ . 'f:. Project Location: Bridge No. 29 over Scranton Creek on US 264 and NC 45 �;i between Belhaven and Swan Quarter in Hyde County, North 4ti3"4.. II, Carolina ,, iiti _. • Proposed Project: To replace an existing bridge and construct a detour bridge. IPlease indicate below your position or viewpoint on the proposed project and return - 4. '' . this form by 31 January 2000. If you have any questions regarding the proposed 110, project, please contact Tracey Wheeler at 252-946-6481. When appropriate, in-depth comments with supporting data is requested. I REPLY This office has no objection to the project as proposed. • -_ <.. This office has no comment on the proposed project. - -. ,. :,.mot-- This office approves of the proposed project only if the ..* recommended changes are incorporated. See attached. — ,,,,. •, This office objects to the proposed project for reasons """- , .:- described i t ched comments. -.;- -'.I"'.,�,",,, „- N. Signed / '�L Date / /. MY ,, WASHINGTON REGIONAL OFFICE 943 WASHINGTON SQUARE MALL,WASHINGTON, NC 27889 i "'7j7 PHONE 252-946-6481 FAX 252-975-3716 t�` '" -... AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/10% POST-CONSUMER PAPER ( . DIVISION OF LAND RESOURCES LAND QUALITY SECTION January 18 , 2000 MEMORANDUM TO: Doug Huggett/ Major Permits Processing Section Division of Coastal Management FROM: Pat McClain 7 Assistant Regional Engineer Washington Regional Office RE: Applicant: NCDOT Location: Bridge 29, US 264 & NC 45 County: Hyde This office will require: 1 . The area be properly graded 2 . A permanent ground cover sufficient to restrain erosion be provided on all exposed areas within the shorter of 30/15 working or 120/60 calendar days after project completion. XXXX 3 . T cut or filled slopes be at an angle which can be etained by vegetative or other appropriate cover. XXXX 4 . App riate erosion and sedimentation control devises, m sures or structures be used to prevent sediment from ' ntering the adjacent wetlands/watercourses/property. XXXX 5. A gro d cover sufficient to restrain erosion be provided wit n the shorter of 15 working or 30 calendar days of c pletion of any phase of grading on cut or filled lopes 6 . An erosion and sedimentation control plan must be submitted at least 30 days prior to beginning this or any associated land disturbing activity. 7. Additional information concerning the area(s) of the land disturbance be submitted to determine if an erosion control plan is required. XXXX 8. Ot er: This project may be impacted by the Tar-Pamlico ver Basin Buffer Rule (15A NCAC 2B.0259) . Appropriate umentation from the Division of Water Quality prior this project. �d� q I BPS wc -�q rYl K.t, NtPI; Sc' ?1\0(rsick Q� - le is ca,t A164\ ate- NORTH CAROLINA DEPARTMENT OF , �'F• ENVIRONMENT AND NATURAL RESOURCES � y"• DIVISION OF COASTAL MANAGEMENT r • • sh ...... RECEIVED January 12,2000 `IT .:` R * M R 0 tat . � 7 2000 4 F. COASTAL MANAGEMENT - JAN 14 2GG`1 c:JAMES B.HUNT.JR e GOVERNOR . ,ERvAii,..„.„. ,�.. � HlBT(3F� ' MEMORANDUM - (`'�' I-V26 .WAYNE MCDE I% lit 0 SECRETARY ,�` � �// �� z* ,yR *! 08 J,r? TO: Ms. Renee Gledhill-Early f Cco — { G��J - � •a 'r v Environmental Review Coordinator Q-5 Division of Archives and History YZC< ••NNA D MOFFITT DIRECTOR - v., ' = FROM: Doug Huggett 'ji" Major Permits Processing Coordinator t-. -, l SUBJECT: CAMA/DREDGE & FILL Permit Application Review v. ^ ; R 1i' (lik APPLICANT: NC DOT --Bridge#29 , i it . "� PROJECT LOCATION: On US264 and NC45 over Scranton Creek, in Hyde Co. PROPOSED PROJECT: To replace bridge and construct a temporary detour bridge. Please indicate below your agency's position or viewpoint on the proposed project and return this A form by February 2,2000. If you have any questions regarding the proposed project, please ' contact Doug Huggett at 733-2293 when appropriate, in-depth comments with supporting data 4 . are requested. _ --= .— REPLY This agency has no ob'ection to the project as pr-, .osed. This agency has no comment on the proposed .roject. This agency approves of the project, only if the recommended changes are incorporated. See attached. "it;; '"' .;.,;,,: This agency objects to the project for reasons described in the attached "`- .�. '- comments. • Signed ` 'I ( Date41102) Q 4 _ - FEB• " 2000 P.O.BOX 27687, RALEIGH, NC 27611-7687/2728 CAPITAL BLVD.,RALEIGH, NC 27604 PHONE 91 9-733-2293 FAX 91 9-733-1495 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/10%POST-CONSUMER PAPER JAN 1 9 2C00 STATE • North Carolina Department of Cultural Resources State Historic Preservation Office David L.S. Brook,Administrator James B.Hunt Jr.,Governor Division of Archives and History Betty Ray McCain, Secretary Jeffrey J.Crow, Director February 24, 2000 MEMORANDUM r0: William D. Gilmore, P.E., Manager 's`) • It4- Project Development and Environmental Analysis Branch Division of Highways Department of Transportation FROM: David,Brook F_ `LZ 1j.�:'C.�z Deputy State Historic Preservation Officer SUBJECT: Replace Bridge #29 over Scranton Creek, TIP No. B-3193. Hyde County. ER 00-8607 We have reviewed the permit application for the above project. We have conducted a search of our maps and files and have located the following structures of historical or architectural importance within the general area of the project: (Former) Scranton Post Office (HY 175). located on the west side of SR 1154, 0.1 mile south of its junction with SR 1155. Thomas Calvin Bishop House (HY 176). located on the south corner of SR 1154 and SR 1155. Scranton Christian Church (HY 177). located on the west side of SR 1154. 0.5 mile south of its junction with SR 1155. Supervisor's House (HY 178). located on the west side of SR 1154. 0.1 mile north of its junction with SR 1143. Jim Clark House (HY 179). located on the north corner of the junction of SR 1 143 and SR 1154. Location Adtlress 1'cicphunc`Frs ADMINISTRATION Win' N Rhutnt St.. Raki_h \(' 1,,1- Mail Scr‘ico ('enter. Rakish \( t0)0_10, ' 1,)1 )t 74'61 • ;_Nf,; ARCHAEOLOGY 121 \ Ii"" Si- Ralc,_h Ni' .tn'o Mau S r icy ('corer. Raici_h \t' (v,)-1r,l,t ,vlo( - 1-7312 • -I5-2071 RESTOR DTIO' Si . R.tl.:!_h \t 1,11 \I:ul `crt ice ( enter. It.tici_h N( 2-,0o0-1t,i ; ,ol')t ;-();1' • -1:-1.:111 SL'R%F.1 \ PLANNING \ It1,u:u �i I(.tlr•_h \r i,,:. \I:ni �en:.c (enter. R.tlei¢It \l :"t.•+o-1t,ls ('tloi :-h;1; • _1•;DI • • pa, e2 There are no known archaeological sites within the proposed project area. Based on our present knowledge of the area. it is unlikely that any archaeological resources which may be eligible for inclusion in the National Register of Historic Places will be affected by the project construction. We. therefore. recommend that no archaeological investigation be conducted in connection with this project. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 co:itied at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning. the above comment. please contact Renee Gledhill-Earley. environmental review coordinator, at 919/733- 4763. cc: B. Church . Bc: Brown,/Alperin County RF ,' q • ., NI( y& NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT 4.7A__�__f 10 January 2000 NCDENR RE.CE,IVED MEMORANDUMY jAN 14 2.000 JAMES B.HUNT JR. .GOVERNOR TO: Ms. Jane Daughtridge, District Planner NAGEME s' COASSAL MA N 'I., .`�':° Division of Coastal Management 1 � -re . FROM: Doug Huggett . D6 '1.F�}' � Major Permits Processing Coordinator ' ,' SUBJECT: CAMA/Dredge and Fill Permit Application Review ,, , ``4' I "• Applicant: North Carolina Department of Transportation �t 7 At r Project Location: Bridge No. 29 over Scranton Creek on US 264 and NC 45 ., -, between Belhaven and Swan Quarter in Hyde County, North ' s ar, •-' Carolina A +r. .. Proposed Project: To replace an existing bridge and construct a detour bridge. Please indicate below your position or viewpoint on the proposed project and return 4 this form by 31 January 2000. If you have any questions regarding the proposed project, please contact Tracey Wheeler at 252-946-6481. When appropriate, in-depth i ; comments with supporting data is requested. 4 ¢ 7 REPLY I/ This office has no objection to the project as proposed. _ This office has no comment on the proposed project. — :..�:.a..== .. . - This office approves of the proposed project only if the recommended changes are incorporated. See attached. _ - This office objects to the proposed project for reasons '' '"' .44.:• described in the attached comments. 4ir,..'-...`00%. ..,. ' -1, Signed Date // v v l • WASHINGTON REGIONAL OFFICE 943 WASH INGTON SQUARE MALL,WASH INGTON, NC 27889 { `v - PHONE 252-946-6481 FAX 252-975-3716 1. 1�` `" .y AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST-CONSUMER PAPER 1 1 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT • • 4• C. �1 JAMES B.HUNT JR MEMORANDUM OYERNOR . . V 44 ', TO: Doug Huggett, Major Permits Processing Coordinator ' " THROUGH: Terry Moore, District Managi1W\ r "` FROM: Jane Daughtridge, District Planner .:,, . �f./ DATE: January 13, 2000 4. J. 'Si: . �'Sli fin, 1 r- RE: CAMA/Dredge & Fill Permit Application Y' 4 • �. yr ,• Bridge No. 29 over Scranton Creek on US 264 " ' _ Between Belhaven and Swan Quarter in Hyde County,NC ,A 1.� =,' Thank you for the opportunity to comment on this proposal. The project is subject to ' the 1997 Hyde County Land Use Plan. The Land Use Plan policies relating to transportation do not specifically lig NO P414' p .art address individual DOT projects in this plan. Water uses, wetlands, and other fragile jareas are anticipated to be protected through enforcement of state and federal regulations as described in policies on pages IV-7 through IV-9. Policies relating to local commitment to State and Federal programs on page IV-37 states that the countyin generally receptive to such programs, particularly those which provide improvements to the county. NCDOT is noted as one of the programs included in this policy. Land classification will not pose consistency problems. Also, to the extent that the project is expected to improve navigation at this location, the plan would appear It 1 to support such action, as general concerns for navigation are expressed in the plan. 0 s - It is my opinion that this project is consistent with the local Land Use Plan, - provided it conforms to all other state and federal standards. —.:�.:;r,.P- - t .....--- =— « . «. Cc: Tracey Wheeler Awe....�'..r"• rip- • ``►' WASHINGTON REGIONAL OFFICE 943 WASHINGTON SQUARE MALL,WASHINGTON,NC 27889 A -no - PHONE 252-946-6481 FAX 252-975-3716 le '++. • • AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1O% POST-CONSUMER PAPER NORTH CAROLINA DEPARTMENT OF - ENVIRONMENT AND NATURAL RESOURCES �. t%g5 DIVISION OF COASTAL MANAGEMENT '>. Ne Imo• o r N . D % Y, , ,. c. 2/45 -e_vti tic--Tt.y S ,'` '� �r January12 2000 111'=JAMES B.H UNT JR • „Go T A�'V 4 ELT• ,GOVERNOR . _ . , :`=• =.t MEMORANDUM i+ ,r, ,' DE I ik- 1y.1 TO: Mr. L. A. Sanderson, P.E. 4`" ' =, Highway Administrator RECEIVED $/�' Division of Highways JAN 31 2000 DONNA , -r o> ,3 FROM: Doug Huggett COASTAL MANAGEMENT{DIRECTOR +� �*= Major Permits Processing Coordinator -- -- `: SUBJECT: CAMA/DREDGE & FILL Permit Application Review h •�' '`-- ° = w AJC OAPs- Of TALA0-'Spoa'T -r1vI'd en "tea` APPLICANT:• ' va �I i Ito SG R!k v-r o Pi C it Q e_< , ,ea_,v G_ 140 j.1 , N y4 e_ cd. �:-� ;/ _t' ' PROJECT LOCATIO . , o. lilt PROPOSED PROJECT: ' ' G " f {` . > Please indicate below your agency's position or viewpoint on the proposed project and return st :I._ `` this form by February 2, 2000. If you have any questions regarding the proposed project, `' � please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with ,�` -� supporting data are requested. tom .4 A,,. ,. ; ,., _,___• REPLY V This agency has no objection to the project as proposed. �... - — This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes ZA = are incorporated. See attached. --�= "` This agency objects to the project for reasons described in the attached 1'. .4,16 comments. ?- 3= _ Signed Date j d-d 4 -.: tteCA�',f } P.O.BOX 27687,RALEIGH, NC 276 1 1-7687/2728 CAPITAL BLVD., RALEIGH, NC 27604 sas a°' 4' PHONE 919-733-2293 FAX 919-733-1495 r •"+3'� "`.2 --., 4 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1 O90 POST-CONSUMER PAPER ea-�s:5671' - M . NORTH CAROLINA DEPARTMENT OF y-•- s t.` ENVIRONMENT AND NATURAL. RESOURCES =:,e . --,r DIVISION OF COASTAL MANAGEMENT Ar"WA ME R ' January 12, 2000 .2:J :, RECEIVED °?:DAMES B.HUNT JR.: GOVERNOR -.--, • ''-`� _, MEMORANDUM FEB 0 4 2000 y? 544;.1 COASTAL MANAGEMENT =fat -< AYNEaNGDEVir[ u TO: Ms. Linda Sewall, Director SECRETARY 1 Division of Environmental Health k-%.,,.,, 7 z FROM: Doug Huggett Major Permits Processing Coordinator DO N ii N7►D-7/IOF;ITT i DIRECTOR �-' 4' SUBJECT: CAMAIDREDGE & FILL Permit Application Review 74 !_t APPLICANT: NC DOT--Bridge #29 � .�� - 1 PROJECT LOCATION: On US264 and NC45 over Scranton Creek, in Hyde Co. t- F PROPOSED PROJECT: To replace bridge and consruct a temporary detour bridge. _ Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 2, 2000. If you have any questions regarding the proposed project, please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with :i f supporting data are requested. 0 P ;-"i 4•r--- 1 t t I REPLY This agency has no objection to the project as proposed. — °` This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. -= ,, =_4_---, - , This agency objects to the project for reasons described in the attached comments. 5� Signed do 5--iGUcd-�/ Date i� 2 740 g- }1.i •L M rEs .yam. ar- .q P.O. BOX 27687, RALEIGH, NC 2761 1-7687/2728 CAPITAL BLVD., RALEIGH, NC 27604 '--.• y-k�^y'\ - .a PHONE 919-733-2293 FAX 919-733-1495 ___�- .<. �-1,:.a-ar:ffisf AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/I 0% POST-CONSUMER PAPER `'0'. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 1. ,,$;� sZ'' DIVISION OF COASTAL MANAGEMENT ®� f ___ "1 QN.R January 12, 2000 D �1 '� ', JAMES B.HUNTJR ______2-, pi I , I 1 ;>•,SGOVERNOR 1 l `MEMORANDUM SHELLFISH SANITATION TO: Ms. Linda Sewall, Director . •,- �,yp ;; f, Division of Environmental Health 4 *, I t.' FROM: Doug Huggett;.:;�..�, { 5 Major Permits Processing Coordinator f - r rt SUBJECT: CAMA/DREDGE & FILL Permit Application Review .3'44, ' :, APPLICANT: NC DOT--Bridge #29 p. ,. , a;, , PROJECT LOCATION: On US264 and NC45 over Scranton Creek, in Hyde Co. am t. - tom. PROPOSED PROJECT: To replace bridge and consruct a temporary detour bridge. t Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 2, 2000. If you have any questions regarding the proposed project, b please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with ^ ' '` supporting data are requested. 4 thastai-31;i--4--'..-. .--;,.ox REPLY This agency has no objection to the project as proposed. � _-. _. _� _ — ency has comment oripe proposed project. ""r=' —"— / This agency approves of the project, only if the recommend chan es are incorporated. See attached. — iii-e)k,4. • - This agency objects to the oject for reasons de ribed in the attached comments. aee(freC.Q :-- Signed ��% Date P.O. BOX 27687, RALEIGH, NC 2761 1-7687/2728 CAPITAL BLVD., RALEIGH, NC 27604 - �- PHONE 91 9-733-2293 FAX 91 9-733-1495 y.... ,.- ,..�s, . _ ._.. ^�►' ,� AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1 O% POST-CONSUMER PAPER NORTH CAROLINA DEPARTMENT OF ,I; ENVIRONMENT AND NATURAL RESOURCES � DIVISION OF COASTAL MANAGEMENT _ C L N • • • RECEIVEL 4 January 12, 2000 JAN 1 4 2000 '�; State Property Off ; JAMES B.HUNT-lit MEMORANDUM .GOVERNOR TO: Mr. Joseph H. Henderson, Director 4.. ,..1 '. it State Property Office .1 '...it DE I..'I iy _ ,i'i�, Department of Administration, h •, . '..4% 4' 'r `, FROM: Doug Huggett I �2 Major Permits Processing Coordinator .:5 ` it f.k '`}o SUBJECT: CAMA/DREDGE & FILL Permit Application Review .. ; ,.'s APPLICANT: NC DOT -- Bridge #29 *, s -Alkham,.., `' 1?;k. PROJECT LOCATION: On US264 and NC45 over Scranton Creek, in Hyde Co. ii .:_. t i , a_... PROPOSED PROJECT: To replace bridge and construct a temporary detour bridge. Please indicate below your agency's position or viewpoint on the proposed project and return "�' this form by February 2, 2000. If you have any questions regarding the proposed project, please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with t supporting data are requested. >Y ■ REPLY This agency has no objection to the project as proposed. :;; .. �'. This agency has no comment on the proposed project. -� r `� = r M This agency approves of the project, only if the recommended changes --==.:,- _ . are incorporated. See attached. This agency objects to the project for reasons described in the attached zi _ "--- ,�� comme '_ soc.,,'" Signed -L Date aZ c •....o•,, P.O.BOX 27687, RALEIGH, NC 2761 1-7687/2728 CAPITAL BLVD., RALEIGH, NC 27604 A- • - PHONE 919-733-2293 FAX 919-733-1495 7m , 1,1 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10% POST-CONSUMER PAPER NORTH CAROLINA DEPARTMENT OF ,, ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT �FA71# DENR Y January 12, 2000 r PFCEIVED .JAMES B.HUNTJR °• MEMORANDUM FEB 15 2000 .;,GOVERNOR . . COASTAL MANAGEMENT .,A, ' g TO: Mr. Charles R. Fullwood, Jr., Director . +t: ".,,,*cDE ,;". Wildlife Resources Commission SECR A Y Attn: Habitat Conservation Program " FROM: Doug Huggett ; �.� . .. Major Permits Processing Coordinator DONNA D. OF- : �YIREGTOR� .r.=`- RECTO: . .- SUBJECT: CAMA/DREDGE & FILL Permit Application Review s. APPLICANT: NC DOT--Bridge#29 - , �." a PROJECT LOCATION: On US264 and NC45 over Scranton Creek, in Hyde Co. 1 "` ' ' PROPOSED PROJECT: To replace bridge and construct a temporary detour bridge. . .l- i ; a Please indicate below your agency's position or viewpoint on the proposed and return this form t t, 1 . 4 by February 2,2000. If you have any questions regarding the proposed project,please contact '. : , « DougHuggett at 733-2293. When appropriate, in-de th comments with supporting data are : t --...: ggp Pp g I :1 _ requested. 1 4 .. `� -, F `:- REPLY This agency has no objection to the project as proposed. = — _— X This agency has no comment on the proposed project. "' "= This agency approves of the project, only if the recommended changes .. are incorporated. See attached. This agency objects to the project for reasons described in the attached _ ,:.--.,° memo. � ., Coasl Signed (oorL- Date 01.-I1 -02000 i ..rainy= �.� -„t taw" ;4.. ; 'r I ,. -, ,, . -';� , P.O.BOX 27687, RALEIGH, NC 2761 1-7687/2728 CAPITAL BLVD., RALEIGH, NC 27604 4 °^ ,-�;� PHONE 91 9-733-2293 FAX 91 9-733-1495 * —�,..sa' �y4+ry AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-5O% RECYCLED/1 0% POST-CONSUMER PAPER State of North Carolina AST*. • Department of Environment and Natural Resources Division of Marine Fisheries NCDENR James B. Hunt, Jr., Governor NORTH CAROLINA DEPARTMENT OF Bill Holman, Secretary ENVIRONMENT AND NATURAL RESOURCES Preston P. Pate, Jr., Director February" 2000 MEMORANDUM TO: Doug Huggett Major Permits Processing C rdinator FROM: Michael . e SUBJECT: CAMA/DREDGE AND FILL PERMIT NC DOT—Bridge No.29 over Scranton Creek on US 264 and NC 45—HYDE COUNTY Attached is the Division's reply for the above referenced project. If you have any questions, please don't hesitate to contact me. PAW/bc permits\adm i n\j pcover.I tr RECEIVED FEB 2 5 2000 COASTAL MANAGEMENT P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper Ne 0 yI NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 4 DIVISION OF COASTAL MANAGEMENT • ` 1 • _ 10 January 2000 r .:„. 4 E'er MEMORANDUM .. JAMES B.HUNT JR. XERNOR TO: Mr. Preston P. Pate, Jr., Director L^ Division of Marine Fisheries t .1 FROM: Doug Huggett DE ` 01,, ., Major Permits Processing Coordinator 11. "' j f SUBJECT: CAMA/Dredge and Fill Permit Application Review :r �A I ; • p Applicant: North Carolina Department of Transportation Project Location: Bridge No. 29 over Scranton Creek on US 264 and NC 45 �y+ #�' between Belhaven and Swan Quarter in Hyde County, North ,- $ . Carolina bri r, /� ii Proposed Project: To replace an existing bridge and construct a detour bridge. :./ ti, Please indicate below your position or viewpoint on the proposed project and return this form by 31 January 2000. If you have any questions regarding the proposed project, please contact Tracey Wheeler at 252-946-6481. When appropriate, in-depth comments with supporting data is requested. i 0 ri .44S. ii REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. ,-- = This office approves of the proposed project onlyif the �,. _ , - PP P P P j . ; recommended changes are incorporated. See attached. x ^� I.. .wr• „w This office objects to the proposed project for reasons '" " • ::..op►. e:-, described in the attached comments. ~ . • -lb Signed e� Ot Date 4/.esse-) 11 • WASHINGTON REGIONAL OFFICE 943 WASHINGTON SQUARE MALL,WASHINGTON, NC 27889 { `"1,P r.. " . .. PHONE 252-946-6481 FAX 252-975-3716 •+.. '" _„~ AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1 0q POST-CONSUMER PAPER ig -,. „,, '' `"}} NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT ATICIA : NCDENR January 12, 2000 • L PP/41 0 JAMES B.HUNTJR 1.'GOVERNOR MEMORANDUM pr i-,(,b, ,, , ` TO: Mr. John Sutherland, Chief -1 "` Water Planning Section A'.WAYNE MCDE I q .� + Division of Water Resources SECRETARY D - , A� ' .? Y-, ', ;, .y]t' FROM: Doug Huggett //s / , Major Permits Processing Coordinator ` DONNA D.MOFFITT ' DIRECTOR SUBJECT: CAMAIDREDGE & FILL Permit Application Review .7 APPLICANT: NC DOT--Bridge#29 i�*l. 3 Y, "`I fin:. y1 -, PROJECT LOCATION: On US264 and NC45 over Scranton Creek, in Hyde Co. 10,1 , `ilk"4iiiii `z: PROPOSED PROJECT: To replace bridge and construct a temporary detour bridge. !may ii; Please indicate below your agency's position or viewpoint on the proposed project and return `-. this form by February 2,2000. If you have any questions regarding the proposed project, 1 ` please contact Doug Huggett at 733-2293. When appropriate, in-depth comments wdth supporting data are requested. ' --/ t' REPLY This agency has no objection to the project as proposed. Y. K This agency has no comment on the proposed project. '� 1 This agency approves of the project,only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached --=.. — --r comments. Signed —- Date i i.�f d' tit i .r .,fir.• '. P.O. BOX 27687, RALEIGH, NC 2761 1-7687/2728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE 919-733-2293 FAX 919-733-1495 *-3 `' r AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1 0% POST-CONSUMER PAPER U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. / * i County GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property owner 4✓/ I\ l/ ,/ {t 7'c�i i o /c a ri ; o 1 T z(i i Address ffi7�� . �1N�� 1,, 1 1 !t�'':I�t� 1/ 11i �^J'-'�^� (�'.'1v� : .a,r lU� P (%� ��> t 5-0 Telephone No. K 1'1- `t q Z- 7 Size and Location of project (water body,road name/number, town,etc.) O fo, A)v z G( 1,15 , c",`i- tile j cveY 5� �,j //�� :tip SJ /� � 1_ � N �, v � f ;'a 4 7 v✓i � ��y�t�a Lid 4) n Description of Activity 11 -(7/,; Y 7 C4 /3 r l 1 k 5 4-1 7 --i i i ) Applicable Law: 'Section 404 (Clean Water Act, 33 U.S.C. 1344). (check all that apply) /Section 10(River and Harbor Act of 1899). Authorization: Regional General Permit Number. 2 3 Nationwide Permit Number. Your work is authorized by this Rcgiona Nationwide Permit(NWP)provided it is accomplished in strict accordance with the attached conditions and your submitted plans. If your activity is subject to Section 404 (if Section 404 block above is checked), before beginning work you must also receive a Section 401 water quality certification from the N.C. Division of Environmental Management, telephone (919) 733-1786. For any activity within the twenty coastal counties, before beginning work you must contact the N.C. Division of Coastal Management, telephone (919) 733-2293. Please read and carefully comply with the attached conditions of the arNWP. Any violation of the conditions of the RGP or the NWP referenced above may subject the permittee to a stop work order,a restoration order,and/or appropriate legal action. This Department of the Army RGP-or NWP verification does not relieve the permittee of the responsibility to obtain any other required Federal, State,or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. If there are any questions regarding this authorization or any of the conditions of the General Permit or Nationwide Permit please contact the Corps Regulatory Official specified below. w/ 0t l.0al �C� ✓ Date i f // 7 / ?- Corps — Re Regulatory Official / G'�' h �( 7 - � T g ry f elephone No. `1 � � lC/ Expiration Date of Verification I i // } l `y SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE YELLOW(FILE) COPY OF THIS FORM,IF REQUIRED OR AVAILABLE. CESAW Form 591 Revised July 1995 �Y" NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT "`NCDENR 10 January 2000 Mr. D. R. Conner, PE JAMES B.HUNT JR. North Carolina Department of Transportation GOVERNOR Post Office Box 850 •tfs ' ' Edenton, North Carolina 27932 • �- Dear Mr. Conner: - WAYNE MCDEVITT lr. SECRETARY ' '-,7 � The Division of Coastal Management hereby acknowledges receipt of an application �- ,;- for State approval for development of property located at Bridge No- 29 over Scranton Creek `°� ,,, ' �-�� on US 264 and NC 45 between Belhaven and Swan Quarter in Hyde County, North Carolina. '`--` , 'w 4 d = .. It was received on 4 January 2000 and appears to be adequate for processing at this time. The DONNAD MoFFrTT projected deadline for making a decision is 19 March 2000. An additional 75-day review DIRECTOR s.•,' period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the > ,,, �,. 4• . N review period extended. Under those circumstances, this letter will also serve as your notice wj of an extended review. However, an additional letter will be provided on or about the 75th day. Should there be any questions on this procedural change, do not hesitate to contact me. • N.C.G.S. 113A-119(b) requires that notice of an application be posted at the location vh: of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard Ywhich must be posted at the property of your proposed development. You should post this z notice at a conspicuous point along your property where it can be observed from a public i, road. Some examples would be: nailing the notice card to a telephone pole or tree along the 4.- - i f T, road right-of-way fronting your property, or at a point along the road right-of-way where a i. '-1: private road would lead one into your property. ,Failure to post this notice could result in an , r _ "� incomplete application. :: • ,. -J •• An onsite inspection will be made and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any w� :, " - questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. . Sincerely, ;.„. 4-0--.-4:',4:44,4:,a --,-t Tracey L. Wheeler * - Coastal Management Representative V �", 1 44"4i3 Division of Coastal Management ent s �� . te» Washington Regional Office ;r7- ENCLOSURE r t;;, . .: TLW: d ' P P n , x 4: j WASHINGTON REGIONAL OFFICE i �,� 943 WASHINGTON SQUARE MALL,WASHINGTON,NC 27889 ry .a I Y«slCl PHONE 252-946-6481 FAX 252-975-3716 Gi..>!•7._ .- AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1 0%POST-CONSUMER PAPER NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES c. ~ DIVISION OF COASTAL MANAGEMENT rit x it WA kx NCDENR w<4 " JAMES B.HUNT JR.''..,...:,,- T MEMORANDUM tw,„ � CDEVJr # :. _ '� `' ` TO: Jim Mulligan v.. Deborah Sawyer i .,�., { FROM: Tracey Wheeler° DATE: 10 January 2000 :. , s ,,, , SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit °". ' North Carolina Department of Transportation •,; fi Bridge No. 29 over Scranton Creek on US 264 and NC 45 between Belhaven and Swan Quarter in Hyde County, North Carolina t +.. Zt Y:Vie' Attached is an application for a CAMA Major and/or a Dredge & Fill permit which It was received by me on 7 January 2000. I am considering this application complete, ` `` have acknowledged receipt, and begun processing. ..�, If you have any questions do not hesitate to contact me. �t . G.. .....r..-1F. i �. ANIL TOZION=Ager.6 .: ''. WASHINGTON REGIONAL OFFICE '�-' 943 WASHINGTON SQUARE MALL,WASHINGTON,NC 27889 PHONE 252-946-6481 FAX 252-975-3716 ,.., AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/1 0q POST-CONSUMER PAPER -.off RAt99 A L 1\1 a��d �e6 A�2000 �4'4 _pt LPN GM° CAN STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B.HUNT JR. DAVID McCOY GOVENOR SECRETARY January 3, 2000 Cii,7 North Carolina Division of Coastal Management F y ' Washington Regional Office 943 Washington Square Mall Washington,NC 27889 ATTENTION:Ms. Tracey Wheeler, Field Representative SUBJECT: Proposed Replacement of Bridge No. 29 over Scranton Creek on US 264- NC 45 in Hyde County; TIP No. B-3193; State Project No. 8.1080501; Federal Aid Project No. BRSTP-264(6) Please reference your letter of November 16, 1999 regarding the North Carolina Department of Transportation's request for a CAMA Major Development Permit to replace bridge No. 29 over Scranton Creek in Hyde County. Your letter requested several items of additional information. The following is a list of corrections per your request. e Form DCM-MP-5 has been amended per page 2 of your letter • Form DCM-MP-1 has also been amended per page 2 of your letter • Summary total sheet has been revised per our phone conversation of January 3, 2000 Additionally, please note that DCM-MP-5, 3.d. is further discussed in a supplement to DCM-MP-5. I have included the following items with this package. 1. revised forms DCM-MP-1 and DCM-MP-5 2. revised summary total sheet (sheet 10 of 10) n Ms. Tracey Wheeler November 3, 1999 Page Two 3. copies of adjacent riparian landowner notification letters 4. supplement to DCM-MP-5, 3.d. 5. check in the amount of$250.00 to cover the application fee 6. copy of the USACE Department of the Army Nationwide Permit 23, issued 11/17/97 The project description has not changed since the original application package was submitted. Therefore, the NCDOT requests that the application now be accepted as complete and that processing begin as soon as possible. If you have any questions or would like additional information, please don't hesitate to call. Thank you for all of your help with this important matter. Sincerely, D. R. Conner, PE Division E n r t. Lindse dick, Jr. Division Environmental Officer CC: R. E. Capehart, PE Terry Moore Doug Huggett 1..'�" NORTH CAROLINA DEPARTMENT OF ' ; ENVIRONMENT AND NATURAL RESOURCES :' r .%: DIVISION OF COASTAL MANAGEMENT r''�• ` ,. ' 16 November 1999 ;4 k. RECEIVED , �`' .... Riddick, Jr.".;.. Mr. T. Lindsey NOV 18 1999 ;;'� Division Environmental Officer • .JAMES H.HUNT 1R:;, i' GOVBRNQR • �.;.l Project Development and Environmental Analysis Branch COASTAL MANAGEMENT z,-,;•- . "4•'` • . c North Carolina Department of Transportation r "y'�' Post Office Box 850 ,.''w;`s+, .44 .r• Edenton, North Carolina 27932 ":::.k, 'gMFMICDEv TT.' .,, r tom►+.,.. A r•.;, nR Yf ' : ?' Dear Mr. Riddick: j(, �}};;',�� �'�`;:� :xis. ; •'•' ' . • -= This letter is in reference to your resubmitted application for a CAMA Major `-)>i''�'' :Z;: �'`•�''�'• r" ' Bridge No. 29 on US 264- r .�=`{�•- �;;,,�_":.;��,� Permit received by this office on 8 November 1999 to replace • ;T;`' :' •�o1f NC 45 over Scranton Creek near Scranton in Hyde County, North Carolina. This letter J r° -st. '-•°•: .,{1� .�a4.;:� also references our 12 November 1999 telephone conversation. As we discussed, I have �_�,�t�Y:�3;�1;_t •�` ,`;;3,•� reviewed the application for completeness and have found that several of the items ,.-•..fi—.X.:,:- -��••• mentioned in my 10 August 1999 letter to Mr. Randy Turner still need to be addressed _; rt .- r� •, , 1 prior to accepting the application as complete. The application submitted on 8 i•' '= Y' 'F . • • November 1999 is not the corrected form of the application I commented on in my 10 t' `k 0' r:, August 1999 letter. There are errors on the most recent application that were not present �• ..�! ;'` , ,-:` in the original version. These errors also need to be corrected before the application can s:' : .. f'• be accepted as complete. x 1,, ". 1` -. In the application, the spoil material excavated from the existing drainage ditch t 1.-:'(f,- 4if .„-:;::=' is proposed for use in temporary fill areas. As I stated earlier, the dimensions of the area +° ':::,=° s s to be filled must be included in the application. There is no distinction in the application it.,,:�' I . � cr between temporary and permanent fill areas; however, sheet 10 of 10 divides the impacts ---,,:r and provides total areas for each. This distinction needs to be included on the application r,.: • :•'::'-"; form. All of the material placed in the temporary fill areas will be removed tot e �'.. _`` ':-3 'tr 1 satisfaction of DCM and disposed of in an approved upland disposal site upon 5; ` ' ''- ..,ti;, •': completion of the project. :_;' •, . Excavation and fill areas described in the application are not the same as the ., ' ' values shown on Sheet 10 of 10. These numbers need to be consistent. There was no ii .� .. discrepancy when the application was originally submitted. Although you have r'•` : ". •' '•' `,,i repeatedly addressed the question of spoil disposal in letters to me, this information must t:�I"a;;^;' .r ',,!..;•-,- '.-,�� be included in the application form to be reviewed by other agencies. -1: { •;'.x •'•I,•;:'; -.;" F On the plats, it appears that rock riprap will be added to the bridge abutments. r�' ,,.>'•;::r `:_' This constitutes shoreline stabilization, and needs to be included in the application. •• f �:' +� ,'?'•y+{i'�•,s'{'; WASHINGTON REGIONAL OFFICE ;.FA •.«,( }/I;J?A Ste,`!h•:: 1^,' :+"`, �••-�• �": � '''* ' 943 WASHINGTON SQUARE MALL,WASHINGTON,NC 27669 PHONE 252-946.6481 FAX 232-975-3716 ;;,7 p$.141;:i3y;,.y,; ,r.,;Z•k, ;:.j AN EQUAL OPPORTUNITY/AFFIRMATIY£ACTION EMPLOYER•5096 RECYCLED/10%POST-CONSUMER PAPER Mr. T. Lindsey Riddick, Jr. 16 November 1999 Page Two Items DCM-MP-1 3.b. should say "both" 4.f. add utility lines 4.h. is applicable, even if the answer is None 4.n. Surface runoff 4.0. N/A 5. On plats 3-5 of 10, the utility lines are not shown. DCM MP-5 3.d(1) What if material is not suitable for the proposed purpose? How will material be handled when it is removed from the temporary fill areas? 3.d. Questions 4-6 need to be answered for the temporary fill areas, and for spoil disposal area to be used when temporary structures are removed. 3.e. There is no distinction between Temporary and Permanent fill below NWL. What area will be filled by the bridge bents? Is any of this fill associated with the temporary structure? Is it all associated with the permanent bridge? 3.f. There is no distinction between Temporary and Permanent Wetland Impacts. Is sufficient material going to be excavated to provide all of the fill required for the detour structure? If not, the additional area to be filled must be described here. 3.g. Must provide square foot values or dimensions for temporary and permanent fills. 4.b. Existing lines and proposed relocations need to be shown on the plats and described here. If relocation will involve activity in an AEC, information concerning the relocation needs to be included in this application, even if the utility companies are obtaining their own permits. • Mr. T. Lindsey Riddick, Jr. 16 November 1999 Page Three Plats) Overall The plat(s) do not identify the proposed high ground to be filled on either side of the river. Existing lines and proposed relocation alignments should be shown on the plats. Plat 3 of 10 Existing lines and proposed relocation alignments should be shown on the plats. Plat 4 of 10 If riprap material is being added to high ground, the square footage needs to be noted on MP-5 3. g. Sheet 5 of 10 Existing lines and proposed relocation alignments should be shown on the plats. Sheet 7 of 10 Plat clearly shows area of highground to be filled adjacent to the fill in wetlands. Fill material placed on high ground during construction of the detour structure should be documented on the application. Section MP-5 3. g. Sheet 8 of 10 Plat clearly shows area of highground to be filled adjacent to the fill in wetlands. Fill material placed on high ground during construction of the detour structure should be documented on the application. Section MP-5 3. g. Plat shows that the new road is higher than the current elevation. If wider shoulder is required, the associated high ground fill needs to be documented in the application. Mr. T. Lindsey Riddick, Jr. 16 November 1999 Page Four I am returning the entire application package to you so that these items can be addressed and check No. 5299 in the amount of$250.00. As soon as you can provide all of this information to me and I can accept the application as complete, the 75 day processing time can begin. If I can provide you with any assistance, please call me at (252) 946-6481. Sincerely, cf2AtTracey L. eeler Coastal Management Representative cc: Terry Moore - District Manager, Washington Regional Office, DCM _Doug Huggett - Major Permits Chief, DCM Raleigh Bland - US Army Corps of Engineers Mike Bell - US Army Corps of Engineers D.R. Conner - NCDOT R.E. Capehart, P.E. - NCDOT -1-tugg C gf,y, F�ECEIVED Fyn ? Nov o91999 614 ,w srn�a tr % re, STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVENOR SECRETARY November 5, 1999 North Carolina Division of Coastal Management Washington Regional Office 943 Washington Square Mall Washington,NC 27889 ATTENTION:Ms. Tracey Wheeler, Field Representative SUBJECT: Proposed Replacement of Bridge No. 29 over Scranton Creek on US 264- NC 45 in Hyde County; TIP No. B-3193; State Project No. 8.1080501; Federal Aid Project No. BRSTP-264(6) This letter serves to address concerns expressed during our phone conversation earlier today. During our conversation we discussed the issue of excavated material being used as temporary fill material for the proposed temporary on-site detour. Your main concern is whether or not the NCDOT is certain that the material is suitable for use as temporary fill; and if it is not suitable, what will be done with the material. Additionally, you would like a more concise description of the removal and disposal of temporary fill material. As we discussed, all excavated material will be used as temporary fill for the on-site detour. If the excavated material is found to be unsuitable for use as temporary fill, it will be disposed of at an upland disposal site. The disposal site is the responsibility of the contractor who constructs the project. Any contractor awarded a construction project that involves waste or borrow is required to provide proof that his plans to utilize a candidate waste/borrow area will not result in impacts to jurisdictional areas. If the site is an agricultural field, the contractor is required to provide copies of forms and aerial photos confirming the field's status as either prior converted (PC) or non-wetland. These forms are available from the USDA Farm Service Agency and/or the NRCS. If the site is in natural vegetation, the contractor is required to engage the services of an environmental consultant for the purpose of performing on-site environmental evaluations. The environmental report is reviewed by the Division Environmental Officer to determine its accuracy. JI All waste or borrow associated with this project, including removal of the temporary detour,will be subject to the above mentioned process. All waste will be disposed of in an upland disposal area approved by the NCDOT. I hope this information is helpful in completing your review. If you have any questions or would like additional information, please don't hesitate to call. Thank you for all of your help with this important matter. Sincerely, T. Li Riddick, Jr. Division Environmental Officer CC: D. R. Conner. R. E. Capehart, PE Terry Moore Doug Huggett A REC EIVED NOV 0 4 1999 d. .,.. COASTAL MANAGEMENT 4r, , _ft • .tea,,.,.®' Cci 7/ F ' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B.HUNT JR GOVENOR DAVID McCOY SECRETARY November 3, 1999 North Carolina Division of Coastal Management Washington Regional Office 943 Washington Square Mall Washington, NC 27889 ATTENTION:Ms. Tracey Wheeler, Field Representative SUBJECT: Proposed Replacement of Bridge No. 29 over Scranton Creek on US 264- NC 45 in Hyde County; TIP No. B-3193; State Project No. 8.1080501; Federal Aid Project No. BRSTP-264(6) Please reference your letter of August 10, 1999 regarding the North Carolina Department of Transportation's request for a CAMA Major Development Permit to replace bridge No. 29 over Scranton Creek in Hyde County. Your letter requested several items of additional information. The following is a list of corrections per your request. • Green cards are attached. Additionally, copies of letterc ma;leA fr trip „i;• ,.o..+ property owners are included for reference • ROW easement for the temporary construction detour is no"�' shown,on the construction drawings r our letter • Form DCM-MP-5 has been amended asper pages 1-4 of y p g es 1-2 of your letter • Form DCM-MP-1 has also been amended as per pag ours ter Construction drawings have been revised as per pages 1'4 �f y et • discussed in a supplement to Additionally,please note that DCM-MP-5, 3.d is further DCM-MP-5. I have included the following items with this package. 1. revised forms DCM-MP-1 and DCM-I\1P-5 2. revised construction drawings Ms. Tracey Wheeler November 3, 1999 Page Two 3. original application cover letter from M. Randall Turner, Senior Environmental Officer, NCDOT 4. copies of adjacent riparian landowner notification letters 5. supplement to DCM-MP-5, 3.d. 6. check in the amount of$250.00 to cover the application fee 7. copy of the USACE Department of the Army Nationwide Permit 23, issued 11/17/97 8. copy of the approved Categorical Exclusion The project description has not changed since the original application package was submitted. Therefore, the NCDOT requests that the application now be accepted as complete and that processing begin as soon as possible. If you have any questions or would like additional information, please don't hesitate to call. Thank you for all of your help with this important matter. Sincerely, D. R. Conner, PE Division Engineer Lin Ridd1 i! y k, 7( Division Environmental Officer CC: R. E. Capehart, PE Terry Moore Doug Huggett NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 4 rT` DIVISION OF COASTAL MANAGEMENT AW if NCDENR 10 August 1999 RECEIVED ` AUG 1 6 1999 JAMES B.HUNT JR. Mr. M. Randall Turner GOVERNOR Senior Environmental Officer COASTAL.MANAGEMENT Project Development and Environmental Analysis Branch North Carolina Department of Transportation Post Office Box 850 WAYNE M`DEVITT Edenton, North Carolina 27932 SECRETARY Dear Mr. Turner: DONNA D.MOFFITT This letter is in reference to your application for a CAMA Major Permit DIRECTOR - - received by this office on 26 July 1999 to replace Bridge No. 29 on US 264-NC 45 over Scranton Creek near Scranton in Hyde County, North Carolina. I have reviewed the application for completeness and have found that several items need to be addressed prior to accepting the application as complete. Overall No green cards or receipts or copies of either are attached to show notification of the adjacent riparian property owners. The project as proposed appears to involve work outside the established DOT R/W for the placement of the detour structure. If NCDOT intends on using the condemnation process to obtain the necessary R/W, then you need to explain this in your cover letter and include the appropriate Y documentation. If the project will take place on property other than that owned by the r,,,;, ' F .. NCDOT then the application should be changed to reflect that and copies of the '7" 11 appropriate deeds and letters of consent must be attached. In the application, the spoil material excavated from the existing drainage ditch ,, is proposed for use in temporary fill areas. Is this material suitable for the proposed ' s=:..;,,‘— use? How will the material be contained? Are silt fences adequate to prevent —PNAVX*----z. - potentially wet material from encroaching further in wetland areas? How will this ,� material be disposed of when the temporary fill is removed? If it determined that the --� `""',"' `. excavated material is not suitable for the proposed use, how will it be handled? Is the existing marsh substrate of a suitable consistency to support the temporary road fill? q "'`'`"' There is no distinction in the application or on the plats between temporary and . - permanent fill areas; however, an existing drainage ditch is proposed to be filled, and .., permanent fills are described to improve fill slopes. Temporary fill areas include the g temporary detour structure, and all of this material will be removed to the satisfaction ;_ •• of DCM upon completion of the project. WASHINGTON REGIONAL OFFICE 'h' 943 WASHINGTON SQUARE MALL,WASHINGTON,NC 27889 `" �� ��.y �. PHONE 252-946-6481 FAX 252-975-371 6 ; .;x7+e"h{. ., ,,,,g` }j AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/10% POST-CONSUMER PAPER Mr. M. Randall Turner 10 August 1999 Page Two Items DCM-MP-1 4.j. Remove underline and bold text on NO. 5. On plats 3-5 of 10, the temporary detour structure appears to be outside of the NCDOT Right of Way, and there is no written permission from the property owners to carry out the project. There are no green cards to prove that adjacent property owners have received a copy of the application and plats. DCM-MP-5 3.d(1) What if material is not suitable for the proposed purpose? How will material be handled when it is removed from the temporary fill areas? 3.d. Questions 4-6 need to be answered for the temporary fill areas, and for spoil disposal area to be used when temporary structures are removed. 3.e. There is no distinction between Temporary and Permanent Wetland Impact on the plats. 3.f. There is no distinction between Temporary and Permanent Wetland Impact on the plats. 3.g. This should be yes, according to plats. There appears to be fill material for the proposed detour structure, in the existing right of way, immediately adjacent to the existing bridge. 4.b. Existing lines and proposed relocations need to be shown on the plats. If relocation will involve activity in an AEC, information concerning the relocation needs to be included in this application. Plat(s) Overall The plat(s) do not identify the proposed high ground to be filled on either side of the river. There is no distinction between temporary and permanent fill areas. • Mr. M. Randall Turner 10 August 1999 Page Four Fill material placed on high ground during construction of the detour structure should be documented on the application. Section MP-5 3. g. The existing as well as the proposed structure should be shown on this plat. Sheet 8 of 10 Plat clearly shows area of highground to be filled adjacent to the fill in wetlands. Fill material placed on high ground during construction of the detour structure should be documented on the application. Section MP-5 3. g. Plat shows that the new road is higher than the current elevation. If wider shoulder is required, the associated high ground fill needs to be documented in the application. The existing as well as the proposed structure and bents should be shown on this plat. I am returning the entire application package to you so that these items can be addressed I am also returning your $250.00 check No. 5299. As soon as you can provide this information to me and I can accept the application as complete, the 75 day processing time can begin. If I can provide you with any assistance, please call me at (919) 946-6481. Sincerely, Tracey L. Wheeler Field Representative cc: Terry Moore - District Manager, Washington Regional Office, DCM .ug Huggett - Major Permits Chief, DCM Raleigh Bland - US Army Corps of Engineers Mike Bell - US Army Corps of Engineers �°I L F First-Class Mail UNITED STATES POSTAL SERVICE P M Postage&Fees Paid } USPS 2 Permit No.G-10 i • Print your n iatddtras, and ZIP Gede in this-box • 'Ve ,O �sr` Fsso �nfr��ur��r�rru��rrr�r���ru�n�u�r�r��urr�r�r�irn�r�n� c'• SENDER: 'o •Complete items 1 and/or 2 for additional services. I also wish to receive the N ■Complete items 3,4a,and 4b. following services(for an 0 •■Print your name and address on the reverse of this form so that we can return this extra fee): card to you. c6 > ■Attach this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address .5 permit. iv ■Write'Return Receipt Requested'on the mailpiece below the article number. 2. Cl Restricted Delivery to .t. •The Return Receipt will show to whom the article was delivered and the date c delivered. Consult postmaster for fee. a o m -0 3.Article Addressed to: 4a.Article Number m P. 0 7, S6 1 C�d c1 13 cc E (� 'CAt C 4b.Service Type u (��� 34y ` ❑ Registered 1C-ia h�,� p Certified cc J M C 0 Express Mail ,,. C \ 0 Insured E N ¢ W l c 0 Return Receipt for Merchandise 0 COD ' in ��t 7. Date of Delivery a z i, m , . cei d By: ( lipt Name) Addressee's Address(Only if requested t / /� t�, � �, and fee is paid) t I— g 6. i na r . ddr e or g ) o y • t- PS 3811, cember 1994 Domestic Return Receipt r- . • �Tydd yn SLVF' N e-;,;) %III STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVERNOR SECRETARY July 19, 1999 Bruce Cameron Box 3649 Wilmington, NC 28406 Dear Landowner: The North Carolina Department of Transportation is planning to replace the bridge over Scranton Creek on US 264-NC 45 in Hyde County. A temporary, on-site detour will be constructed immediately east of the existing bridge while the old bridge is removed and a new structure built at this location. This action requires the approval of the Division of Coastal Management (DCM) under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The attached form is submitted to insure that you, one of four adjacent riparian landowners, have an opportunity to comment on the proposal. The work planned is depicted in the attached drawings. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Terry E. Moore,District Manager Division of Coastal Management 943 Washington Square Mall Washington,North Carolina 27889 Thank you for your cooperation. Sincerely, iC d/n /i� '//%' M. Randall Turner, Senior Environmental Officer Project Development& Environmental Analysis Branch Enclosures cc: T. Lindsey Riddick, Division Environmental Officer P.O. Box 850, Edenton, NC 27932 (252) 482-7977 Fax: (252) 482-3826 First-Class Mail UNITED STATES POSTAL SERVICE Postage&Fees Paid LISPS Permit No.G-10 • Print your name, address, and ZIP Code in this box • c. dux �50 d SENDER: .D ■Complete items 1 and/or 2 for additional services. I also wish to receive the rn •Complete items 3,4a,and 4b. following services(for an a)) ■Print your name and address on the reverse of this form so that we can return this • card to you. extra fee): ti iii •Attach this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address •` permit. w ■Write'Retum Receipt Requested'on the mailpiece below the article number. 2. ❑ Restricted Delivery to •The Return Receipt will show to whom the article was delivered and the date ., o• delivered. Consult postmaster for fee. .° o 3.Article Addressed to: 4a.Article Number a° rib\ �� y Ce �. _ E 4b.Service Type 0 a 0 Registered ® Certified ¢ to a)w \\C V�S 0 Express Mail 0 Insured m W ❑ Return Receipt for Merchandise ❑ COD o 0 7. Date of Delivery •xt0 5. Received By: (Print Name) 8.Addressee's Address(Only if requested t t L-Mil£ i ,t a- Q and fee is paid) pa /,�o X , -C 6.Signatiire: (Addressee�rrAgent, PS Form 381 , December 1994 7 Domestic Return Receipt r-moo air 4' el STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVERNOR SECRETARY July 19, 1999 Troy L. Mayo Route 1, Box 220 Scranton,N.C. 27875 Dear Landowner: The North Carolina Department of Transportation is planning to replace the bridge over Scranton Creek on US 264-NC 45 in Hyde County. A temporary, on-site detour will be constructed immediately east of the existing bridge while the old bridge is removed and a new structure built at this location. This action requires the approval of the Division of Coastal Management (DCM) under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The attached form is submitted to insure that you, one of four adjacent riparian landowners, have an opportunity to comment on the proposal. The work planned is depicted in the attached drawings. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Terry E. Moore, District Manager Division of Coastal Management 943 Washington Square Mall Washington,North Carolina 27889 Thank you for your cooperation. Sincerely, • M. Randall Turner, Senior Environmental Officer Project Development& Environmental Analysis Branch Enclosures cc: T. Lindsey Riddick, Division Environmental Officer P.O. Box 850, Edenton, NC 27932 (252) 482-7977 Fax: (252) 482-3826 UNITED STATES POSTAL SERVICE111111 First-Class MailPostage&Fees Paid LISPS Permit No.G-10 • Print your name, address, and ZIP Code in this box • Ncflo�` sc\ N C- III)III ilf �II{„lIlIII�{�I�((����I�(�II> cs SENDER: 61 v ■Complete items 1 and/or 2 for additional services. I also wish to receive the w •Complete items 3,4a,and 4b. following services(for an H •Print your name and address on the reverse of this form so that we can return this extra fee): card to you. y j •Attach this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address d permit. at ■Write'Return Receipt Requested'on the mailpiece below the article number. 2. ❑ Restricted Delivery in •The Return Receipt will show to whom the article was delivered and the date c delivered. Consult postmaster for fee. t o c 3.Article Addressed to: 4a.Article Number cc a m � z y 3 s\i c 4b.Service Type 'alto C 0 Registered i�Certified rn ci)w a� a �� El Express Mail ❑ Insured E y cc 0 Return Receipt for Merchandise ❑ COD o _^1 (iVJ 1/4+ L cc., d f 96`) 7. Date of Delivery I i Dates 0 z c cc 5. Received By: (Print Name) 8.Addressee's Address(Only if requested c co w and fee is paid) t r 6.Sigha Addressr t� (I) PS Form , ember 1994 Domestic Return Receipt d g. STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVERNOR SECRETARY July 19, 1999 Roy E. &Nancy H. Cotton US Hwy 264 Scranton,N.C. 27875 Dear Landowner: The North Carolina Department of Transportation is planning to replace the bridge over Scranton Creek on US 264-NC 45 in Hyde County. A temporary, on-site detour will be constructed immediately east of the existing bridge while the old bridge is removed and a new structure built at this location. This action requires the approval of the Division of Coastal Management (DCM) under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The attached form is submitted to insure that you, one of four adjacent riparian landowners, have an opportunity to comment on the proposal. The work planned is depicted in the attached drawings. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Terry E. Moore, District Manager Division of Coastal Management 943 Washington Square Mall Washington,North Carolina 27889 Thank you for your cooperation. Sincerelyad4/147- ' M. Randall Turner, Senior Environmental Officer Project Development& Environmental Analysis Branch Enclosures cc: T. Lindsey Riddick, Division Environmental Officer P.O. Box 850, Edenton, NC 27932 (252) 482-7977 Fax: (252) 482-3826 cs' SENDER: 0 •Complete items 1 and/or 2 for additional services. I also wish to receive the rn •Complete items 3,4a,and 4b. following services(for an N •Print your name and address on the reverse of this form so that we can return this extra fee): card to you. N > ■Attach this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address •5 d permit. , ■Write'Return Receipt Requested'on the mailpiece below the article number. 2. 0 Restricted Delivery Cl) « •The Return Receipt will show to whom the article was delivered and the date c delivered. Consult postmaster for fee. ° ° m -03.Article Addressed to: 4a.Article Number cc.), _ \ cJ a � �ur� G E 4b.Service Type m 8 \S \-- _c ❑ Registered Certified cc rn cn _ ` �\ C 0 Express Mail 0 Insured C irr V 0 Return Receipt for Merchandise 0 COD a CSd� 7. Date of Delivery Q Q ° z I ! T • 0 rs 5. Received By: (Print Name) 8.Addressee's Address(Only if requested w and fee is paid) t is I-- 6.SX rg�o % �iL dres or A t) en �/ PS Form 3811, December 1994 L r Domestic Return Receipt UNITED STATES POSTAL SERVICE Po Post-Class Mail stage&Fees Paid LISPS Permit No.G-10 • Print your name, address, and ZIP Code ih t ''s box• !) S3a • 1„1,11„I11I1Ilf,lli"1,111:, h,II,, ,l,ll,I„l,i,ill„i,l,jl •yyyye„a SU7Fo Z %di re)/ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVERNOR SECRETARY July 19, 1999 William A. Griffin 715 First Street Elizabeth City,N.C. 27909 Dear Landowner: The North Carolina Department of Transportation is planning to replace the bridge over Scranton Creek on US 264-NC 45 in Hyde County. A temporary, on-site detour will be constructed immediately east of the existing bridge while the old bridge is removed and a new structure built at this location. This action requires the approval of the Division of Coastal Management (DCM) under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The attached form is submitted to insure that you, one of four adjacent riparian landowners, have an opportunity to comment on the proposal. The work planned is depicted in the attached drawings. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project,please forward your comments to: Mr. Terry E. Moore,District Manager Division of Coastal Management 943 Washington Square Mall Washington,North Carolina 27889 Thank you for your cooperation. Sincerely, 8. tatA/ l M. Randall Turner, Senior Environmental Officer Project Development& Environmental Analysis Branch Enclosures cc: T. Lindsey Riddick, Division Environmental Officer P.O. Box 850, Edenton, NC 27932 (252) 482-7977 Fax: (252) 482-3826