HomeMy WebLinkAboutNCDOT 18-01 Amended 2001 Swan Quarter Bay Ferry Terminal .pp,p,gtitiyq,p..ylpq.pMy \\/0;0 C::i'a\}. \++h C C S'O G:0 0 0 C C:C
Permit Class Permit Number •
AMENDED 18-01
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
RAF(. Coastal Resources and
Commission
MAY 07 2001 tl, trmtt
COASTAL MANAGEMENT for
X Major Development in an Area of Environmental Concern
pursuant to N S 113A-118
Exc a " n d/or filling pursuant to NCGS 113-229
Issued to N.C. Department of Transporta on 4-14M iI Service Center, Raleigh,NC 27699-1548
� r
Authorizing development in Hyde / nt; Adjacent to Swan Quarter Bay, off NC 45 on
a manmade canal. Swan Quarter , as requested in t eimittpe's application dated 10/26/00. including
attached workplan drawings (14), dated July 2000
This permit, issued on `fAl WO I , is subj; t . fiance with the application (where consistent
with the permit),all applicable regulations, special conditions and 'o es .et forth below. Any violation of these terms may
be subject to fines,imprisonment or civil action; or may cause the permit to be null and void.
Swan Quarter Ferry Terminal Improvements
1) The boardwalks, loading ramps, and associated structures shall be elevated a minimum of 36" above any
coastal wetland substrate as measured from the bottom of the decking.
2) NC DOT's Design Standards for Sensitive Watersheds will be implemented.
3) This permit authorizes only the boardwalks, loading ramps, mooring pilings and other structures and
uses located in or over the water that are expressly and specifically set forth in the permit application.
No other structure, whether floating or stationary, may become a permanent part of this ferry terminal
without permit modification. No non-water dependent uses of structures may be conducted on, in or
over public trust waters without permit modification.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department /�
personnel when the project is inspected for compliance. � v (///iGy, 7
Doz�DJ
D. Moffitt,Director
Any maintenance work or project modification not covered
hereunder requires further Division approval. Division of Coastal Management
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
December 31, 2004
In issuing this permit, the State of North Carolina agrees ��+s�+��e11(L-
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
000.10"000000000000000000000000000.00.00.•t0o0c..y.•00C0.0.0 .t0"00:00.0.000000200.M O'•o-OCC 00000000000sh`0
N.C. Department of Transportation Permit#18-01
Page 2 of 3
ADDITIONAL CONDITIONS
4) All debris associated with the removal of the existing dolphins, ramps and related structures will be
disposed of on an approved high ground site outside of the project area.
•
5) No vegetated wetlands will be excavated or filed. `
6) No wet concrete may come into . ith.any open water area.
7) The temporary placement or doub h. : o materials within waters or vegetated wetlands is not
authorized.
Stormwater Mafia ment
8) The N.C. Division of Water Quality appro •s pr.• rider stormwater management rules of the
Environmental Management Commission under St.rm, . ' rmit No. SW7000814 on 9/27/00. Any
violation of the permit approved by the DWQ wil •- c: ,-red a violation of this CAMA permit.
Sedimentation and Erosion Control
9) A permanent ground cover sufficient to restrain erosion be provided on all exposed areas within the
shorter of 15 working or 60 calendar days after project completion.
10) Appropriate erosion and sedimentation control devises, measures or structures be used to prevent
sediment from entering the adjacent wetlands, watercourses or properties.
NOTE: The NC Division of Land Resources requires the use of a design standard of 25 year, type II
storm. The sediment control measures or devices are to remove 70% of the +40 micron sized
particles generated in a 2 year peak storm event.
11) A ground cover sufficient to restrain erosion shall be provided within the shorter of 15 working or 30
calendar days of completion of any phase of grading on cut or filled slopes.
12) This project must conform to all requirements of the NC Sedimentation Pollution Control Act and NC
DOT's Memorandum of Agreement with the Division of Land Resources.
General
13) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work. The authorized structure and associated activity must not
cause an unacceptable interference with navigation.
14) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee will not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
•4A
N.C.Department of Transportation Permit#18-01
Page 3 of 3
ADDITIONAL CONDITIONS
15) The permittee understands and agrees that, if future operations by the United States require the removal,
relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the
Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable
obstruction to the free navigation of the navigable waters, the permittee will be required, upon due
notice from the Corps of Engineers, to remove, o ate, or alter the structural work or obstructions
caused thereby, without expense to the U ' t s. No claim shall be made against the United States
on account of any such removal or alteratio
16) The permittee must install and maintain at his e ppnr thy_8gnal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, n`�fhh(uthorized facilities. At a minimum, permanent
reflectors should be attached to the structure in o er to ice ' lore visible during hours of darkness or
inclement weather.
17) The permittee will maintain the authorized work in g cons io . d in conformance with the terms
and conditions of this permit. The permittee is not rel. •-d o h' requirement if he abandons the
project without having the permit transferred to a third p. .
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action ID. No.
200110188.
NOTE: Due to the potential of creosote treated lumber to leach toxic chemicals into the water, the NC
Division of Marine Fisheries has requested that the permittee explore alternatives to the use of
creosote treated timber dolphins, such as concrete or salt treated lumber.
North Carolina
Department of Environment and Natural Resources AlpDivision of Coastal Management
Michael F. Easley,Governor NCDENR
William G.Ross Jr.,Secretary
Donna D.Moffitt,Director
April 18, 2001
NC DEPT OF TRANSPORTATION
1548 MAIL SERVICE CENTER
RALEIGH, NC 27699-1548
Dear Sir:
The enclosed permit constitutes authorization under the Coastal Area Management Act,and where applicable,
the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff-colored form) is
retained by you and it must be available on site when the project is inspected for compliance. Please sign both the
original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding
means you have waived your right of appeal described below.
If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1
or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, P.O. Drawer 11666, Raleigh,NC 27611, (919) 733-2698 within twenty(20)days of this
decision on your permit. You should also be aware that if another qualified party submits a valid objection to the
issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal
Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved.If
you are having the work done by a contractor,it would be to your benefit to be sure that he fully understands all permit
requirements.
From time to timer Department personnel will visit the project site.To facilitate this review,we request that you
complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit
conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for
assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal
resources.
Very sincerely,
AI stlet-'
•
Douglas V.Huggett
Major Permits/Consistency Manager
DH/amw
Enclosure
1638 Mail Service Center,Raleigh,North Carolina 27699-1638
Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us
AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER