No preview available
HomeMy WebLinkAboutNCDOT 101-01 SR 1704 Great Neck Creek �rmiti Class Permit Number NEW 101-01 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission RECEIV ' it trmit AUG 3 0 2001 for COASTAL MANAGEM - Major Development in an Area of Environmental Concern - pursuant to NCGS 113A-118 X E ation and/or filling pursuant to NCGS 113-229 - Issued to N.C.Department sportatioP.O.Box 1587, Greenville,NC 27835 Authorizing development in Craven / County at Great Neck Creek, tributary to the Neuse River, • SR 1704 (Becton Road). in Bachelor. as r uested in the;pe ittee's application dated 3/3/01. including attached workplan drawings (3): 1 dated 7/9/01; 1 data 5/2/0k,an ted 4/3/01 issued on Rl24/O1 �' , 's sub�"ct o compliance with the application (where consistent This permit, ,�. with the permit), all applicable regulations, special cond.f ioIlsjati otes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may u e e permit to be null and void. • Widening, paving and culvert replacement 1) In order to protect anadromous fish within Great Neck Creek, no in-water work will be permitted' . between February 15th to June 15th of any year without the prior approval of the Division of Coastal Management, in consultation with the Wildlife Resources Commission. • 2) No excavated or fill material will be placed at any time in any wetlands or surrounding waters outside of the alignment of the fill area as indicated on the workplan drawing(s). 3) No excavation will occur within waters or wetlands of the United States, except for that associated with • the authorized culvert replacement at Great Neck Creek. 4) The roadway fill material will be clean and free of any pollutants, except in trace quantities. (See attached sheets for Additional Conditions) This permit action may be appealed bythe permittee or Signed by the authority of the Secretary of DENR and the pp other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department J, personnel when the project is inspected for compliance. 1� {/ onna D. Moffitt,Director Any maintenance work or project modification not coveredj I) Division of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2004 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Signature of Permittee Management Program.�am. - •-•-•-ooa•-o--•aa-000aooa--•-��" o:ooaaeeaoaooaa:a000aoaaoaaoeoaaa ti.54.8.e.ib°. • 4900000E N.C. Department of Transportation Permit#101-01 Page 2 of 3 ADDITIONAL CONDITIONS 5) The temporary placement or double handling of excavated or fill materials within waters or vegetated • wetlands is not authorized. 6) Placement of riprap shall be limited to the areas as depicted on the attached workplan drawings. The riprap material must consist of-clean rock and be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its .1-ment from the site by wave or current action. • • 7) The culvert inverts mus •- a ed at least one foot below normal streambed elevation to allow for • passage of water and aqua i 'e. • • 8) Live concrete shall not be allowe ti ontact e ter in or entering into the stream. 9) If the permittee determines that additi pe ane and/or tem or impacts access roads, detours, or matting to tran o`rtt,equip ross wet ands)will occur that lare no as tlshown on the attached permit drawings, additions aut .za . rom DCM will be required. Depending upon the magnitude of the impacts and the habitat t a e impacted, additional DCM authorization may .• be in the form of a refinement of this permit or .t modification. Sedimentation and Erosion Control 10) The permittee will install turbidity curtains in the water area immediately adjacent to the replacement culverts at Great Neck Creek. The turbidity curtains shall be removed when turbidity within the curtains reaches ambient levels. 11) Any work conducted within the portion of this project that is in a High Quality Water Zone (575 feet on either side of Great Neck Creek) must comply with the Design Standards in Sensitive Watersheds, 15A NCAC 4B .0124. • 12) The permittee shall follow Best Management Practices for the Protection of Surface Waters and sedimentation and erosion control measures sufficient to protect aquatic resources. 13) In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. 14) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). 15) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within 15 working days or 60 calendar days of project completion. General NOTE: The permittee and/or his contractor is strongly encouraged to contact a representative of DCM's Morehead City Office at (252) 808-2808 to request a preconstruction conference prior to project initiation. N.C. Department of Transportation Permit#101-01 Page 3 of 3 ADDITIONAL CONDITIONS 16) The permittee understands and agrees that, if future operations by the United States require the removal, • relocation, or other alteration, o. ,e structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his . it►.rized representative, said structure or work shall cause unreasonable obstruction to the free n. .:.t.•n of the Avigable waters, the permittee will be required, upon due notice from the Corps •' ' Q neer o e ove, relocate, or alter the structural work or obstructions caused thereby, without exp- •se t tt�he�.U4rted. a . No claim shall be made against the United States on account of any such removal o a1 ration , . 2 NOTE: This permit does not eliminate th n d tb ob'�,' additional state, federal or local permits, approvals or authorizations that may�be�req ' ed. NOTE: The N.C. Division of Water Quality authori e proposed project on 6/22/01 (DWQ Project No. 01-0929) under General Water Quality Certification No. 3274. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under Nationwide Permit Number 18 (COE Action ID. No. 200110782), which was issued on 7/16/01. • • • • • • 60C64CC6CC C44CC664b4-0-0+*.6{+,}OC6664 O-0660CC66C4C 604090 C-04-9 .w SU7E u� STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS Lindo Tippett GOVERNOR SECRETARY May 2, 2001 a -1 Mr. Brad Shaver --� MAY 0 4 2001 Coastal Management Field Representative Division of Coastal Management North Carolina Department of Environment and Natural Resources COASTAL EHEADMENT 151 —B Highway 24 Hestron Plaza Morehead City, North Carolina 28557 Dear Mr. Shaver, NCDOT is making application for a CAMA Major Permit to widen and pave SR 1704(Becton Road) from SR 1700 to the end. Please find enclosed revisions to the drawings and application from your March 5, 2001 letter. Avoidance and minimization was initiated so that a maximum of 1,597 Sq. Ft. of coastal wetlands will be filled, 1,451 Sq. Ft. of 404 wetlands and 240 Sq. Ft of open water will be impacted by the widening of SR 1704. New upland side ditches are designed to enter settling basins and filter through vegetated uplands prior to entering the wetlands or the stream buffers eliminating water being discharged directly into the stream. Please let me know if there is additional information required. Sincerely, ay , son Division 2 Environmental Officer CC: Mr.Neil Lassiter, Jr., P.E. Division Engineer NCDOT Div 2 Mr. Dwayne Alligood, P.E. Maintenance Engineer NCDOT Div.2 Mr. Thom Edgerton, Bridge Superintendent NCDOT Div.2 Mr. Aaron Everett, District 2 Engineer NCDOT Div. 2 Division Two•P.O.Box 1587•Greenville,N.C. 27835 Form DCM-MP-1 APPLICATION• (To be completed by all applicants) IAAY CUtt COASTAL M AG. MINT b. City, town, community or . I OREMEAp Bachelor 1. APPLICANT c. Street address or secondary road number SR 1704 a. Landowner: d. Is proposed work within city limits or planning Name N. C. Department of Transportation jurisdiction? Yes X No Address P.O. Box 1587 e. Name of body of water nearest project (e.g. river, creek, sound, bay) Great Neck Creek Tributary City Greenville, State N.C. to the Neuse River Zip 27835 Day Phone (252) 830-3490 3. DESCRIPTION AND PLANNED USE Fax (252) 830-3352 OF PROPOSED PROJECT b. Authorized Agent: a. List all development activities you propose (e g. Name. Jay Johnson, -NCDOT Div. 2 building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace culverts on SR 1704 Address P.O. Box 1587 Widen and Pave SR 1704 from 1700 to end. City Greenville, State N.C. b. Is the proposed activity maintenance of an existing Zip 27835 Day Phone (252) 830-3490 project, new work, or both? Both Fax (252) 830-3352 c. Will the project be for public, private or commercial use? Public Transportation c. Project name (if any) SR 1704 Craven d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach NOTE: Permit will be issued in name of landowner(s), additional pages. Purpose: To upgrade existing and/or project name. gravel secondary road to a 2 lane paved road to improve safety of traffic movement and to comply with State Highway standards for secondary roads. 2. LOCATION OF PROPOSED METHODS OF CONSTRUCTION: Standard roadway PROJECT and culvert construction methods; DAILY OPERATIONS: Conveyance of vehicular traffic a. County Craven Revised 03/95 Form DCM-MP-1 ~1 - J 4. LAND AND WATER CHARACTERISTICS n. Describe 1 atiaAar j*A Ilarges to waters of the state. or examp e, sur ace runoff, sanitary a. Size of entire tract N/A wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface Runoff b. Size of individual lot(s) N/A o. Describe existing drinking water supply source. c. Approximate elevation of tract above MHW or N/A NWL 1' d. Soil type(s) and texture(s) of tract 5. ADDITIONAL INFORMATION Arapahoe fine sandy loam, Augusta fine sandy loam In addition to the completed application form, the e. Vegetation on tract Juncus Roemeranus, Baccaris following items must be submitted: Hamilifolia, Tyhpa Spp. Cladium jamaicense • A copy of the deed (with state application only) or f. Man-made features now on tract Existing gravel other instrument under which the applicant claims road and steel culverts. title to the affected properties. If the applicant is not claiming to be the owner of said property, then g. What is the CAMA Land Use Plan land forward a copy of the deed or other instrument under which the owner claims title, plus written permission classification of the site? (Consult the local land use plan.) from the owner to carry out the project. Conservation Transitional Developed Community • An accurate, dated work plat (including plan view Rural X Other Residential/Forested and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to h. How is the tract zoned by local government? Coastal Resources Commission Rule 7J.0203 for a N/A detailed description.) i. Is the proposed project consistent with the Please note that original drawings are preferred and applicable zoning? Yes No N/A only high quality copies will be accepted. Blue-line (Attach zoning compliance certificate, if applicable) prints or other larger plats are acceptable only if an adequate number of quality copies are provided by j. Has a professional archaeological assessment been applicant. (Contact the U.S. Army Corps of done for the tract? Yes X No Engineers regarding that agency's use of larger If yes, by whom? drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to k. Is the project located in a National Registered guide agency personnel unfamiliar with the area to Historic District or does it involve a National Register listed or eligible property? Yes X No the site. Include highway or secondary road (SR) 1. Are there wetlands on the site? X Yes numbers, landmarks, and the like. No Coastal (marsh) X Other X •A Stormwater Certification, if one is necessary. If yes, has a delineation been conducted? Yes (Attach documentation, if available) •A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners m. Describe existing wastewater treatment facilities. have received a copy of the application and plats N/A by certified mail. Such landowners must be advised Form DCM-MP-1 MAY 0 4 2001 that they have 30 days in which to submit comments the application. h project will be subj ct o conditions on the proposed project to the Division of Coastal and restrictions n • • Management. Upon signing this form, the applicant MOREHEAD further certifies that such notice has been provided. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's Name Earl B Harris approved Coastal Management Program and will be Address 3560 Adams Creek Rd. conducted in a manner consistent with such program. Havelock, N.C. 28532 I certify that I am authorized to grant, and do in fact, Name William K Bradley, Jr. grant permission to representatives of state and federal Address 351 Becton Rd review agencies to enter on the aforementioned lands in Havelock, N.C. 28532 connection with evaluating information related to this permit application and follow-up monitoring of the project. Name Geneva Tyndall Moore Address 2260 Wilmar I further certify that the information provided in this Vanceboro, N.C. 28586 application is truthful to the best of my knowledge. Name Weyhauser Co. Address P.O. Box 1391 This is the 3rd day of March , 2001 . New Bern, N.C. 28563 Print Name Jay Johnson • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, Signature (3. permittee, and issuing dates. Landow r of uthorized A t N/A (� Please indicate attachments pertaining to your proposed project. • A check for $400 made payable to the Department of Environment, Health, and Natural Resources X DCM MP-2 Excavation and Fill Information (DEHNR) to cover the costs of processing the X DCM MP-3 Upland Development application. DCM MP-4 Structures Information X DCM MP-5 Bridges and Culverts • A signed AEC hazard notice for projects in DCM MP-6 Marina Development oceanfront and inlet areas. NOTE: Please sign and date each attachment in the • A statement of compliance with the N.C. space provided at the bottom of each form. Environmental Policy Act (N.C.G.S. 113A - 1 to • 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in Revised 03/95 Form DCM-MP-2 EXCAVATION o MAY p4 2 AGENIENT AND FILL GOAS MOREHEAD (Except bridges and culverts) Attach this form to Joint Application for CAMA Major 1. EXCAVATION Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this a. Amount of material to be excavated from below proposed project. MHW or NWL in cubic yards N/A Describe below the purpose of proposed excavation or b. Type of material to be excavated N/A fill activities. All values to be given in feet. Average Final c. Does the area to be excavated include coastal Existing Project wetlands (marsh), submerged aquatic vegetation Length Width Depth Depth (SAVs) or other wetlands? Yes No Access N/A channel (MLW)or(NWL) d. High ground excavation in cubic yards N/A 2. DISPOSAL OF EXCAVATED Canal MATERIAL a. Location of disposal area N/A Boat basin b. Dimensions of disposal area N/A Boat ramp c. Do you claim title to disposal area? Yes No N/A Rock If no, attach a letter granting permission from the groin owner. d. Will a disposal area be available for future Rock maintenance? _ Yes No N/A breakwater If yes, where? Other Road N/A N/A (Excluding 60' shoreline 6864' stabilization) Revised 03/95 lot Form DCM-MP-2 L MAY O 4 2001 e. Does the disposal area include any coastal wetlands (1) Amount of a •rial to be placed n he (marsh), SAVs or other wetlands? water N/A ^S,aSTAL MANAGEMENT Yes No N/A (2) Dimensions ofFill. f. Does the disposal include any area in the water? (3) Purpose of fill N/A Yes No N/A 3. SHORELINE STABILIZATION N/A b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? a. Type of shoreline stabilization X Yes No 404 Wetlands Bulkhead -Riprap If yes, (1) Dimensions of fill area 5' Avg. x 660' b. Length Total combined from each side of the road c. Average distance waterward of MHW or NWL (2) Purpose of fill To widen and Pave SR 1704 d. Maximum distance waterward of MHW or NWL e. Shoreline erosion during preceding 12 months 5. GENERAL (Source of information) a. How will excavated or fill material be kept on site f. Type of bulkhead or riprap material and erosion controlled? Silt Fence g. Amount of fill in cubic yards to be placed below water level (1) Riprap b. What type of construction equipment will be used (2) Bulkhead backfill (for example, dragline, backhoe, or hydraulic dredge)? h. Type of fill material Standard road and culvert construction equipment i. Source of fill material c. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen 4. OTHER FILL ACTIVITIES environmental impacts. (Excluding Shoreline Stabilization) a. Will fill material be brought to site? X Yes No NCDOT SR 1704 Craven /J Applicant or P • t Name Signature //3/c,1 Date If yes, Revised 03/95 Form DCM-MP-3 UPLANDr":0 MAY 0 4 200 i DEVELOPMENTMOREHEAp MENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Division of Environmental Management for review? Permit, Form DCM-MP-1. Be sure to complete all Yes X No other sections of the Joint Application that relate to this If yes, date submitted proposed project. i. Describe proposed method of sewage disposal. a. Type and number of buildings, facilities, units or N/A structures proposed Widen SR 1704 and pave from SR 1700 to end j. Have the facilities described in Item i. above received state or local approval? N/A b. Number of lots or parcels N/A (Attach appropriate documentation) c. Density (give the number of residential units and the k. Describe location and type of proposed discharges to units per acre) N/A waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, d. Size of area to be graded, filled or disturbed "wash down" and residential discharges). including roads, ditches, etc. approx. 60' wide on Surface runoff from roadway; stormwater SR1704 from 1700 to end except 42' at Great capture and retention from upland ditches , Neck Creek crossing. diffuse flow into wetlands e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must 1. Describe proposed drinking water supply source receive an erosion and sedimentation control plan at (e.g. well, community, public system, etc.) least 30 days before land disturbing activity begins. N/A If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land m. Will water be impounded? Yes X No Resources? Yes X No If yes, how many acres? If yes, date submitted n. If the project is a oceanfront development, when f. List the materials (such as marl, paver stone, was the lot(s) platted and recorded? N/A asphalt, or concrete) to be used for paved surfaces. NCDOT SR 1704 Craven Asphalt and concrete Applicant or 'ect Name g. Give the percentage of the tract within 75 feet of Signature MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by /�/� impervious and/or built-upon surfaces, such as Date pavement, buildings, rooftops, or to be used for vehicular driveways or parking. N/A h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Revised 03/95 Form DCM-MP-S BRIDGES AND Y 04 COgSTMAALMANAGEMENT2001 MOREHEAp CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all j. Will the proposed bridge affect existing water flow? other sections of the Joint Application that relate to this Yes No N/A proposed project. If yes, explain 1. BRIDGES k. Navigation clearance underneath proposed bridge N/A a. Public Private N/A 1. Will the proposed bridge affect navigation by b. Type of bridge (construction material) reducing or increasing the existing navigable N/A opening? Yes No N/A If yes, explain c. Water body to be crossed by bridge N/A d. Water depth at the proposed crossing at MLW or m. Will the proposed bridge cross wetlands containing NWL N/A' no navigable waters? Yes X No If yes, explain e. Will proposed bridge replace an existing bridge? Yes No N/A If yes, n. Have you contacted the U.S. Coast Guard (1) Length of existing bridge concerning their approval? (2) Width of existing bridge Yes X No (3) Navigation clearance underneath existing If yes, please provide record of their action. bridge (4) Will all, or a part of, the existing bridge be 2. CULVERTS removed? (Explain) a. Water body in which culvert is to be placed f. Will proposed bridge replace an existing culvert(s)? Great Neck Creek Yes No N/A If yes, b. Number of culverts proposed 4 (1) Length of existing culvert (2) Width of existing culvert c. Type of culvert (construction material, style) (3) Height of the top of the existing culvert above Corrugated Aluminum pipe the MHW or NWL d. Will proposed culvert replace an existing bridge? (4) Will all, or a part of, the existing culvert be Yes X No removed? (Explain) If yes, (1) Length of existing bridge (2) Width of existing bridge g. Length of proposed bridge N/A (3) Navigation clearance underneath existing bridge h. Width of proposed bridge N/A (4) Will all, or a part of, the existing bridge be i. Height of proposed bridge above wetlands removed? (Explain) N/A Revised 03/95 Form DCM-MP-5 e. Will proposed culvert replace an existing culvert? c. Will the placement of the prop se IN eC1.14cua }} X Yes No require any highground excav If yes, X Yes No COASTAL MANAGEMENT (1) Length of existing culvert 3 xf* ' If yes, MOREHEAD (2) Width of existing culvert 3 x 30" (1) Length of area to be excavated 36' (3) Height of the top of the existing culvert above (2) Width of area to be excavated 22' the MHW or NWL 2' (3) Amount of material to be excavated in cubic (4) Will all, or a part of, the existing culvert be yards 103 cu. Yds. removed? (Explain) Yes, each existing culvert will be removed & replaced with a d. If the placement of the bridge or culvert involves larger diameter and length pipe (see map) any excavation, please complete the following: (1) Location of the spoil disposal area Temporary spoil area is existing road bed beside the pipes. f. Length of proposed culvert 4 x 60' (2) Dimensions of spoil disposal area 20' x 20' g. Width of proposed culvert 4 x 36" (3) Do you claim title to the disposal area? X Yes No h. Height of the top of the proposed culvert above the If no, attach a letter granting permission from MHW or NWL N/A the owner. (4) Will the disposal area be available for future i. Will the proposed culvert affect existing water flow? maintenance? X Yes No Yes X No (5) Does the disposal area include any coastal If yes, explain wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) j. Will the proposed culvert affect existing navigation above. potential? Yes X No (6) Does the disposal area include any area below If yes, explain the MHW or NWL? X Yes No If yes, give dimension if different from No. 2 above. 3. EXCAVATION AND FILL e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material a. Will the placement of the proposed bridge or culvert described in Item d. above) to be placed below require any excavation below the MHW or NWL? MHW or NWL? Yes X No X Yes No If yes, If yes, (1) Length of area to be filled (1) Length of area to be excavated 22' (2) Width of area to be filled (2) Width of area to be excavated 61' (3) Purpose of fill (3) Depth of area to be excavated 3' (4) Amount of material to be excavated in cubic yards 103 cu. Yds. f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material b. Will the placement of the proposed bridge or culvert described in Item d. above) to be placed within: No require any excavation within: X Coastal Coastal Wetlands_ SAVs _Other Wetlands Wetlands SAVs X Other Wetlands Open If yes, Water (1) Length of area to be filled (2) Width of area to be filled If yes, (1) Length of area to be excavated 31' (3) Purpose of fill (2) Width of area to be excavated 22' (3) Amount of material to be excavated in cubic g. Will the placement of the proposed bridge or culvert yards 76 cu.yds. result in any fill (other than excavated material Revised 03/95 Form DCM-MP-5 described in Item d. above) to be placed on highground? Yes X No If yes, NCDOT-SR 1704 Craven (1) Length of area to be filled Applicant or Project Name (2) Width of area to be filled (3) Purpose of fill Signature 93-7 �./3fo Date 4. GENERAL f- a. Will the proposed project involve any mitigation? VI MAY 0 4 Z001 Yes No Unknown If yes, explain in detail ANAQ'EMENT OOASSMORE14 eAD b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Road construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? X Yes No If yes, explain in detail To protect culvert structure at shoreline. RipRap will be place around culvert to prevent scour. Revised 03/95 VICINITCY MAP*:' T I < >`c_> c v. (, \,,` ` NOT TO SCALE �. q/3 0 , I •I • ;\ ' 1 -7—--(7) 1. o 4W ; � - N Q 11} Ileis II Lam} U ' W1 = ` 17(_) / / � i 7(-'4 -- PROJECT '\/ . , /c . , 6\c4</ 7 .7 ,..7 ( ) ( -- 1 <->:3(_) 1a) - - 7(_)(_) \ • ')\ ` _ _ _ V111116,. 0,,p : • \ i ',,,,, ai ;_-_,___I i ve- \ \\ 70r, , --- \ ,....-- \\\\\, *,- /„ PROJECT NUMBER: 6.172360 DATE: MAY 2, 2001 ROAD: SR 1704 CROSS SECTION OF ROAD NAME: BECTON ROAD COUNTY: CRAVEN CULVERT CROSSING ROUND CULVERT EXISTING PIPE 3 @ 3011 x 48" �RROAD \7 1704 22' 7/ AREA TO BE EXCAVATED 103 CUBIC YARDS �.5' GREAT NECK CREEK NwL AND BACKFILLED r H \ EXISTING 3 0 30'x 48'CMP 1.0' 2' EXISTING PIPES 1 AREA TO BE EXCAVATED 2' AND BACKFILLED 150 CUBIC YARDS I II 1—I II-L I I I�IIII — yl,�I II=IIIW UNDERCUT & 'MINIMUM BEDDING BACKFILL NOT TO SCALE PROPOSED 4 @ 36" x 60' PIPES 22 ROAD SR 1704 — AREA TO BE EXCAVATED— 103 CUBIC YARDS A1.5' GREAT NECK CREEK 4 0 36'x 60' AND BACKFILLED r _ — _ _ fl 2' 11H N 2' , E , r- \ 12, 4200,-ICI--'li FIT— °1-Ttu1 COASTAL MANAGEMENT UNDERCUT & / 12` MINIMUM BEDDING w MOREHEAD BACKFILL o TOP VIEW L, o ._ � o n AREA TO BE EXCAVATED— 150 CUBIC YARDS i t i AND BACKFILLED10 i 17, `,24 NOT TO SCALE PROPOSED RIP RAP 0 END 11 PAW''''''PE ,Inr. PROPOSED RIP RAP 0 END Of PIPE r',� ®nir.I OF PIPE ■ PROPOSED PIPE M//: CREEK :raMMIMINIMIIIM92 CREEK ',■ PROPOSED PIPE ■%; ISO SQUARE FEET OF NEW FILL �_ M,=� 11110' :% PROPOSED PIPE ■` ISO SQUARE FEET OF NEW FILL TOTAL SQUARE FEET IO' OF NEW FILL .360 SQUARE FEET j L'?, EXCAVATION ABOVE NWL: a FINISHED EARTH SLOPE AS REQUIRED n 36'L x 22'W x 3.5'D = 103 CUBIC YARDS `O EXCAVATION BELOW NWL: W ' PROPOSED RIP RAP a END ir� OF PIPE ] /4j[ ,, $ ,•,_ JfII21 3 61'L x 22'W x 3'0 = 150 CUBIC YARDS s P DETAIL MAP y/ /0 1 cL ,, DIFFUSE FLOW THROUGH VEGETATED UPLANDS -, " ± BEFORE ENTERING WETLANDS WETLANDS TEMPORARY ROCK SILT UPLANDS CHECK TYPE "A" i W `:� a � W UU W /J SILT BASIN TYPE "B" .`;, Z s a W O j x Ilit C —- I s �J MA U 4 ►001 COASTAL MAN'GEME T MOREHEAD DIFFUSE FLOW DETAIL NTS (jo NOS SILT/�gA N TYPE-B `, �` �' / GA ` ^ //18'RCP` // :•M04) TEMP.ROCK SILT CHECK TYPE-/A/. v / DIFFUSE FLOW THROUGH / ':7� ,,,, cow VEGETATED UPLANDS BEFORE ENTERING WETLANDS / . ''' 11, SILT BASIN TYPE-B PROPOSED SLT FENCE 4„4,• ••• . .•EXISTING FtL ••♦��♦0.. / iI���.•'.,'.•:. �..A..�j'4*.. PROPOSED SILT FENCE \ �_ / i' I, O� . l:■ETL.NO Ir N P.O'-6' HAR.O'-6' ■ETuro - Nip ��i 0r,3 TEMP.ROCK SILT CHECK TYPE-A EDGE OF EXIST.PONOI EDGE OF EAST.ROAD I 'S / �4� .!' i , TEMP.ROCK SILT CHECK TYPE-A UTILITIES LEGEND, SOIL EROSION CONTROL LEGEND, °• — I S SILT BASIN TYRE-B TYPICAL EACH SHEET TYPICAL EACH SHEET -_, AI,, `cia*Ni iro / * , b. / SILT BASIN TYPE B WILLIAM K BRADLEY, JR. SILT FENCE — ,' ;' Z yPOWER POLE TEMPORARY ROCK SILT CHECK TYPE-A ELIZABETH BRADLEY DETAIL Ilk 7/0 TEMPORARY POCK SILT CHECK TYPE-8 r i /' • AG -.--•--r— TEMPORARY SILT FENCE - I 35 I BECTON RD �� / // - HAVELOCK NC 28532 < I >- GRADE BREAK , /i kI TD TELEPHONE PEDESTAL DEED BK 1472, Pg 865 - -.- DIRECTION OF FLOW / / 0 PROJ.REFERENCE NO. SHEET NO. TOTAL SHEETS © CABLE TV PEDESTAL ,' �, 6J72360 I l Q+ SEWER CLEAN OUT LU — ' %Qc' " STATE PROJECT NO. DESCRIPTION ® WATER VALVE o — ; O CAMA MAJOR SR 1704 �6 'h cL PERMIT BECTON ROAD r.. _ / APPLICATION TOWNSHIP NO.5 FIRE HYDRANT , U ,' A.. s CRAVEN COUNTY Q WATER METER Lv — ; ' ,' / ski a/ SCALE:I"-50 EARL B HARRIS Z �\ ;' s23 TRH MAY 2,2001 REVISED EIP O EXISTING IRON PIPE \ BARBARA J HARRIS / PERMIT PLAN DATE:NOVEMBER 20,2000 z 3560 ADAMS CREEK RD Q —El/ ;. PREPARED BY:N.C.D.O.T. -}- PROPERTY CORNER HAVELOCK NC 28532 /a / �� DISTRICT ENGINEER'S OFFICE 404 WETLANDS \ DEED BK 1499, Pg 240 ; EXISTING 3© 48'x 3O CMP ;'�� ;/ ."' 209 S.GLENBURNIE ROAD AEC AREA OF ENVIRONMENTAL �I1 PROPOSED 4@ 60' X 361I CMP }-c,: ;/' 6 NEW BERN.NC 28560 CONCERN I' ' , 404 WETLANDS ,%.` REVISED: JULY 9, 2001 ---COASTAL WETLANDS \ = y XXX 404 WETLANDS FILL AREA /^ — — Q `v I / // C�fEi TING ONLY: ZONE 2 ZONE ___ NEUSE RIVER —SILT FENCE =�,q '�'oQ 2' . ?LT1/O200'ONSTRUCTION Z - RIPARIAN BUFFER \ — * �, ' kZI U ',/ WEYERHAEUSER COMPANY -0II�I1III Q— WOODSUNE ; PoCA611k MANAGEMENT .ram DIFFUSE FLOW NEW BERN, NC 28563 DIFFUSE FLOW THROUGH \,,,,,,,,, — * / COvJ / < ti y VEGETATED UPLANDS BEFORE ENTERING WETLANDS — — — — .// / o DEED BK 364, Pg 539 O ii */*/, 3 TEMP.ROCK SILT CHECK TYPE-A — — WOODS — ;' GRADE BREAK SILT BASIN BASIN+�TYPE-8 UPLANDS \404 WETLANDS REA I — 404 WETLANDS — �� i' iI iI III III `tI •III 0•III 0.II Q.III 1l _ — BUFF R p• — „ / % {�i I 0 IIIEC) PROP SED R/W l — ZONE 2 BUFF AREA 2 /I ; s 6 CAMA WETLANDS ER 0 20' lik II 7� ? ZONE I BUFFER — SILT BASIN TYPE B !1l1L i� _ — BUFFER �/ 1ilk``` ;:§:i:i SILT F CA —�OOSED DITCH ._... EN e,A CA 4LIINE AN UNE ' S CgMA LINE /! ZONE I ZONE 2 — lr I�// // 'p0 D EP ------ EXIST.EDGE OF ROAD 404 — — �e�;. / TEMP.ROCK SILT CHECK TYPE-A __ L/N: 1 PR ��C. II'1*/ SILT — �� ' ilt AREA OF OPEN WATER TO BE FILLED:80 SQUARE FEET NORTH SIDE Ai.`:►ll� Eis'C �`t' --------- EXIST Or , III lii��lek2P F 4- �r,•♦ AP. A F P PI WAT I E � E 0 0 E ER TO BE FILLED:160 SQUARE FEET SOUTH SIDE iPOSEO ,c _ _* C.,`1 � �}E _ l 1, -_ � �14 AREA OF OPEN WATER TO BE FILLED BY PIPES:86 SQUARE FEET LT. -L- PPL DITCH T `�.At 'It a. pi z, 06 SQUARE FEET RT. L � pP. POSE ��'#�� � 1 DIFFUSE FLOW THROUGH P/W SILT BASIN TYPE-B .�'���� -._� __ VEGETATED UPLANDS BEFORE ENTERING WETLANDS PROPOSEDTEMP.POCK SILT CHECK TYPE-A 9 — 9 T--•A.. ��044 -_-- NOTE:OPEN WATER, EXCAVATION WILL BE EIS SQUARE FEET DIFFUSE FLOW THROUGH tA�.�C►_'=.--_�-.-. * CAMA WETLAND AREA TO BE FILLED 404 WETLAND AREA TO BE FILLED VEGETATED UPLANDS BEFORE ENTERING WETLANDS ^) F? "2 .3 - "����%� e0q �%' _ — v - LINE —SILT FENCE- c _ \ . �.-. ' UPL.AND_ AREA 1- 0.0 SQUARE FEET _ _ AREA I 138 SQUARE FEET UPLANDS a. — CAMA WETLZNOS 404 WETLANDS I �D?DS-' 4iW- — 4 AREA 2 0.0 SQUARE FEET AREA 2 1168 SQUARE FEET 20 — / �o AREA 3 298 SQUARE FEET AREA 3 697 SQUARE FEET GENEVA TYNDALL MOORE — Q F WOODS AREA 4 �� l_ E�Y�; ZONE 2 BUFFER BUFFFER BLFFER — 404 WETLANDS _ \\ AREA a - � SQUARE FEET AREA 4 �g SQUARE FEETj"z� 2260 WILMAR ROAD Q "iiiJll G ' VANCEBORO, NC 28586 ZONE 1 ZONE 1 ZQ;IE 2 — TOTAL 4FEA k�fE-_iuA E FEEY TOTAL AREA SQUARE FEET_ D.BK. 1049, PG. 38 — — — — _ — a — — --- -- -- - ` E A 0 @�AC X�07 rFE� FES North Carolina Department of Environment and Natural Resources , • A Division of Coastal Management Michael F.Easley,Governor NCDENR William G.Ross Jr.,Secretary Donna D.Moffitt.Director August 27, 2001 NC Department of Transportation P.O.Box 1587 Greenville,NC 27835 Dear Sir: • The enclosed permit constitutes authorization under the Coastal Area Management Act,and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff-colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh,NC 27611, (919)733-2698 within twenty(20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the • issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved.If • you are having the work done by a contractor,it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you r complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, j"Chgre64.- V k Douglas V.Huggett Major Permits/Consistency Manager DH/amw Enclosure } 1638 Mail Service Center,Raleigh,North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER I DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: North Carolina Department of Transportation - attn: Jay Johnson 2. LOCATION OF PROJECT SITE: Widen and pave State Road 1704 and replace culverts at Great Neck Creek (tributary to the Neuse River), in Bachelor, Craven County, from State road 1700 to the end. Photo Index -1995: 731 V, W-7 2000: 764 V, W-17 State Plane Coordinates x: 2683850 y: 435400 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 3/19/2001 Was Applicant Present - Yes (Jay Johnson, DEO) 5. PROCESSING PROCEDURE: Application Received - 5/4/2001 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Craven County Land Classification From LUP - LIMITED TRANSITION and CONSERVATION (B) AEC(s) Involved: PT, CW, EW and CS (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - Roadway, Culverts Planned - Replacement of same (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] Excavated Filled Other ele (A) Coastal Wetlands 1$ sf tre� FfV� �t-i('fcAS 10� (B) Shallow Bottom 240 sf (C) Other Wetlands - -Sf s re e .p t 1 High Ground excavation at culverts 1056 sf ?-ec‘ (y„, 7I`1 High Ground disturbance (in road R/W) 6864 linear feet x 60 feet (R/W) 7. (Continued) d;s (o (D) Total CAMA AEC Disturbed: 0N42 acres C���\ �'� (E) Total area disturbed by project 9.55 acres (includes existing roadbed and high ground disturbance) (F) Primary Nursery Area: No (G) Water Classification: SA-NSW Open: Yes FIELD INVESTIGATION REPORT NC DOT - SR 1704 May23, 2001 PAGE 2 8. PROJECT SUMMARY: The applicant is the N.C. Department of Transportation. The proposal is to upgrade the existing gravel secondary road to a 2 lane paved road that complies with State Highway standards for secondary roads. 9. PROJECT DESCRIPTION: The site of this proposal is State Road 1704(Becton Road) in the community of Bachelor, NC. The road is approximately 2 - 10' above msl. The culverted crossing at Great Neck Creek is flanked with wooded Cypress/Gum swamp wetlands and coastal wetlands on either side. This area is primarily residential, and undeveloped wooded swamp and forest. The site consists of a 15' wide creek body at the existing culvert crossing with the remainder of state road 1704 on high ground. The coastal wetland consists of Juncus roemerianus, Typha spp. and Cladium jamaicense. The adjacent uplands are forested, and are vegetated primarily with various pines, Tulip Poplar, and Oak. Soils in the area are loams and sandy loams. Great Neck Creek is coastal waters at the project site, and is classified SA-NSW by the Division of Water Quality and subject to the Neuse River Buffer Rules. The area is open to shellfishing, and is not designated as primary nursery area by the North Carolina Division of Marine Fisheries. The project begins at State road 1700 (Adams Creek Road) and terminates at the existing road end(6864 feet). The Craven County Land Use Plan designates the project area as Limited Transition, with all areas lying within CAMA Areas of Environmental Concern, designated as Conservation. The proposal is to replace the 3 existing 30-inch diameter by 48 feet long culverts with 4 new 36- inch diameter by 60 feet long culverts on the existing alignment, to allow for State Highway standards. The ends of the culverts will be stabilized with riprap. The roadway, shoulders and slopes will extend for a width of 43 feet or less (12 feet wider than existing) at the culverted crossing, to minimize impacts to coastal and 404 type wetlands. The approaching roadway will be widened to 20' and paved. The road shoulders will be widened from 6' to 8'. The pavement, shoulders and ditches of the high ground portion of State Road 1704 will encompass the entire 60- foot right of way. Silt fences, silt basins and temporary rock silt check damns will be used to minimize erosion and sedimentation. Roadside ditches will terminate in high ground and the flow will be dispersed through vegetated uplands before entering wetlands. FIELD INVESTIGATION REPORT NC DOT - SR 1704 May 23, 2001 PAGE 3 10. ANTICIPATED IMPACTS: ta,°6 ov As proposed, this culvert re lacement, road widening and paving will result in the following impacts: Approx' te,�ly J.1 square feet of coastal wetlands will be filled by road shoulder and culvert, 14411e¶et of 404 type wetlands will be filled by road shoulder and culvert, and 240 square feet of shallow bottom will be filled by culvert and riprap. Approximately 9.45 acres of high ground will be graded, filled or excavated for the roadway and paving. There is a high probability of turbidity to be expected during the replacement of the culverts. Stringent sedimentation/erosion control measures can minimize this. Storm water concerns have been addressed by terminating ditches with diffuse flow over vegetated high ground. Principally local residents use state Road 1704. The widening and paving of the roadway and replacement of the deteriorated culverts should enhance the safety of motorists using SR 1704. Public trust waters end at the existing culverts and will not be affected. The collective disturbance area for the project is 9.55 acres. Bill Arrington May 22, 2001 Morehead City DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: NC DOT attn: Jay Johnson County: Craven I b ( -6 I LOCATION OF PROJECT: State Road 1704 and replace culverts at Great Neck Creek (tributary to the Neuse River), in Bachelor, Craven County, from SR 1700 to the end. DATE APPLICATION RECEIVED COMPLETE BY FIELD: May 4, 2001 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No JUN 04 2Q , CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES COASTAL MANAGE ,?: FIELD REPRESENTATIVE: Bill Arrington DISTRICT OFFICE: Morehead\ DISTRICT MANAGER REVIEW: B) DATE APPLICATION RECEIVED IN RALEIGH: FEE REC'D:$ q00.00 PUBLIC NOTICE REC'D: END OF NOTICE DATE: b 570 / ADJ. RIP. PROP NOTICES REC'D: V DEED REC'D: N\A APPLICATION ASSIGNED TO: R� ON: 6', y- c"( C) 75 DAY DEADLINE: 7- (7- 0 I 150 DAY DEADLINE: 9 — o) 9 — O MAIL OUT DATE: 7)— I Q — 0 / STATE DUE DATE: ? 9 - O 1 FEDERAL DUE DATE: N Ind \D 1 g 15SSu'2-e1 FED COMMENTS REC'D: 7-i6 - 0 / -s�\y 1 , PERMIT FINAL ACTION: ISSUE IC glliC\ DENY DRAFT ON AGENCY DATE COMMENTS OBJECTIONS: NOTES RETURNED YES NO I � Coastal Management-Regional Representative f Z1 f C 1 1`. d � '4i o A S Coastal Management-LUP Consistency !'7P-�'J 1° ( t,/ Division of Community Assistance q IA Quality Section `O 0 1 ✓ (/� C.0 1 i ol\S.Division of Water Quality CQ a,5 J" ( t / °�<<.x k 1551,,,ei o'^_�p 1aa'aco l / too. o\— 29 Storm Water Management(DWQ) 0\ I v Ili �p- g 5 P noV Navi State Property Office U—\—b ' V Division of Archives&History Division of Environmental Health ' -D'C)\ ✓ Ul c b.( 1A\w 1.5 Division of Highways I Wildlife Resources Commission S- p�O`b \ k7 A GOAe 1 T 1 Dn S Division. of Water Resources S ` 0 I / Division of Marine Fisheries 1 (-\$-O \ ✓ Submerged Lands (DMF) North Carolina ._ Department of Environment and Natural Resources AlpDivision of Coastal Management Michael F. Easley,Governor NCDENR William G. Ross Jr.,Secretary Donna D. Moffitt,Director July 18, 2001 r'c_ 6VED MEMORANDUM AUG z 1 Z001 Mr. Charles R.Fullwood,Jr., Director COASTAL MANAGEMENT Wildlife Resources Commission . ATTN: Habitat Conservation Program FROM: Doug Huggett ' Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL PERMIT APPLICATION REVIEW APPLICANT: NC DOT—JAY JOHNSON PROJECT LOCATION: Widen and pave SR1704 and replace culverts at Great Neck Creek,in Bachelor, Craven Co. PROPOSED PROJECT: To upgrade the existing secondary road to a 2 lane, paved road, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 9,20001. If you have any questions regarding the proposed project,please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data are requested. • REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. / This agency objects to"the project for reasons described in the attached comments. SIGNED ( II)C1L )(/4"tt" C DATE g/I77O1 1638 Mail Service Center,Raleigh,North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER • > North Carolina Wildlife Resources Commission Charles R.Fullwood,Executive Director MEMORANDUM TO: Doug Huggett Major Permits Processing Coordinator Division of Coastal Management FROM: David Cox, Highway Project C *nator Habitat Conservation Program DATE: August 17, 2001 SUBJECT: NCDOT request for a CAMA/Dredge and Fill permit to widen and pave SR 1704 and replace culverts at Great Neck Creek in Bachelor, Craven County,North Carolina. We have reviewed the information included in the package received from the Division of Coastal Management. Our comments are provided in accordance with provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et. seq.) and the Coastal Area Management Act(G.S. 113A-100 through 113A-128). We do not object to the issuance of the permit for this project provided that the following conditions are include in the CAMA Permit: 1. All riprap placed in-water should be free of pollutants and soil. 2. Culvert inverts should be buried 1 foot below normal streambed elevation. 3. Live concrete should not be allowed to contact the water in or entering into the stream. 4. There is the potential for anadromous fish to occur in Great Neck Creek, therefore,we request that no in-water work occur from February 15 to June 15. NCDOT is expected use Best Management Practices for the protection of Surface Waters and sedimentation and erosion control measures sufficient to protect aquatic resources. Thank you for the opportunity to comment on this permit application. If you have any concerns about our comments,please contact me at(919) 528-9886. cc: John Hennessy, DWQ,Raleigh Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center• Raleigh,NC 27699-1721 Telephone: (919) 733-3633 ext. 281 • Fax: (919) 715-7643 North Carolina Department of Environment and Natural ResourcesA . A Division of Coastal Management Michael F.Easley,Governor NCDENR William G.Ross Jr-,Secretary Donna D.Moffitt,Director RECEIVED AUG 0 8 2001 July 18, 2001 I T r p ----`' COASTAL MANAGEMENT -1 , MEMORANDUM L+ JUL 2 6 !I Linda Sewall, Director SHELLFISH SANITATION Division of Environmental Health . FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL PERMIT APPLICATION REVIEW APPLICANT: NC DOT—JAY JOHNSON PROJECT LOCATION: Widen and pave SR1704 and replace culverts at Great Neck Cree. in Bachelor, Craven Co. PROPOSED PROJECT: To upgrade the existing secondary road to a 2 lane, paved road, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 9,2001. If you have any questions regarding the proposed project. please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project. only if the recommended changes are incorporated. Thi agency objects to the project for reasons described in the attached comments. ? (Ettir SIGNE DATE /' • C Gt.,c,L.a_¢._ d ° G � �a u• a 4 ' !$� 1 rvlce enter, Raleia , . o •olina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Inte et: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/I0%POST CONSUMER PAPER GENERAL COMMENTS Applicant: IV(1, IOOT The applicant should be advised that plans and specifications for all water system improvements must be approved by the Division of Environmental Health prior to the award of a contract or the initiation of construction (as required by 15A NCAC 18C 0.0300 et. seq.). For information, contact the Public Water Supply Section, (919)733- 2460. This project will be classified as a non-community public water supply and must comply with state and federal drinking water monitoring requirements. For more information, the applicant should contact the Public Water Supply Section, (919)733-2321. If this project is constructed as proposed, we will recommend closure of adjacent waters to the harvest of shellfish. For information regarding the shellfish sanitation program, the applicant should contact the Shellfish Sanitation Section, (252)726-6827. Cumulative impacts from this type of project could cause deterioration in water quality. The proposed project would increase impervious surfaces and alter natural drainage patterns. There would be a loss of natural vegetation causing an increase in stormwater runoff which could jeopardize the open status of adjacent waters. For more information, the applicant should contact the Shellfish Sanitation Section at (252)726-6827. The subject project is located in an area open to shellfish harvesting. The 10-slip dock, as proposed, would nor cause closure in accordance with 15A NCAC 18A MARINAS: DOCKING FACILITIES: OTHER MOORING AREAS. however, dockage at the facility could exceed 10 boats. If this was to occur, closure would be recommendea in accordance with DEH rules. For information regarding shellfish sanitation, the applicant should contact the Shellfish Sanitation Section at (252)726-6827. Proliferation of these type facilities coula cause deterioration in water quality and consequently additional closures of shellfishing waters. For more information, the applicant should contact the Shellfish Sanitation Section cT (252)726-6827. The spoil disposal area(s) proposed for this project may produce c mosquito breeding problem. For inter,-':agan concerning appropriate mosquito breezing measure, tr;e coo!icant should contact the Public Hecit Fest Management Section at (252)726-8970. Tne eeclicent sncu!o also contact with Mc_au. c Control in County at / This is a mosquito breecina area. Ccn tuc`icn pions oho ccerctions srcuic inc:uce owcrenes: C - - i G. c hea:tr. Pest en V 252 2-'97n c c;r- c _ applicant should correct the ..cii,. Mancc... �,t ��,.�.; , � far ,. � n..� -r .rtcrr----- -- --c prevent Inc cr- ,on Cr more scone n.CCIT�. -P/j2J C2� mc� vzv �'Cv b� �� l ,o 7. T °colic- i sncuid ntcct ,vrr MCS T TC Cclt.ci . Ccunr✓Cr The applicant should be advise-a Tot-r.,.. area :s C m,csoc.:rtc ;rtester norIto-. loscuitc ccnrci '.vl ce C _ ::_ e The applicant should be advise: that of cr tc the rer`1cvc: cr Cemcirtion of ailapiCC&C sl Cures. Cr. ,<te-'.:::e. rodent control program may be neces,:.cr✓ in order to prevent the m;Crciicn of rodents to cdicce'nt or-c: -: information concerning rodent contra:. cortcor the loco: ne:'ith deportment Cr the Public Heart, F=" N.Mcn.CC_e'----=': Section, (919)733-640 i. The applicant should be advised to contact c:e local necrit-, ceocrrr-;exit rercrcinc their recu,re'":ent: : :: %.-.7,K rrs ciic ens las recuirec uhce` 7 �,- . :CSC I C? .7 'CC et.,��... For intcrr ,=cr ccrcerr,rrc :eotc -7.-, a _ cr Ter cn-site waste cis:osci methcc . __ act ,he sir.-.,.te Wc:rewc-F--r Sevier ^7 f C 7 C T re applicant snculc cc CCVisea to re Kcal necrrn Ceca a rent re-crc;nc the :miter- t...c:ii'ec -=-_:r=a -:. 71S arc e-c:. - .. The cppiic:ni snculc WCnK with the loco: rtecIT. ceccrr m:eni to assure that GC"S for the ore cccrrov prior tc ccnstrucrcn. d:/-C4e:aReviewer: / Date: 7l3//Q i North Carolina . Department of Environment and Natural Resources _ _ 1 • ' Division of Coastal Management Michael F. Easley, GovernorC D EN R William G. Ross Jr. Secretary ` . : t"l Donna D. Moffitt, Director _. 5 2001 May 30, 2001 'oS croup W��pEITY SECTION MEMORANDUM: TO: Mr. John R. Dorney • Environmental Biological Supervisor Division of Water Quality FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC DOT/ attn: Jay Johnson Project Location: Craven County, SR 1704 and Great Neck Creek (tributary to the Neuse River), in Bachelor from SR 1700 to the end. Proposed Project: Proposes to widen and pave SR 1704 and replace culverts at Great Neck Creek (tributary to the Neuse River), in Bachelor from SR 1700 to the end. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 20, 2001. If you have any questions regarding the proposed project, please contact Bill Arrington at(252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE (p Jjo I ead City istnct 151-B Hwy. 24, Hes ronaza II More ad City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER OF,WATFR Michael F. Easley 0- C. Governor f!j William G.Ross,Jr.,Secretary j - Department of Environment and Natural Resources O -C Kerr T.Stevens Division of Water Quality June 22, 2001 DWQ# 01-0929 Craven County Jay Johnson North Carolina Department of Transportation P.O. Box 1587 Greenville, NC, 27835 APPROVAL of 401 Water Quality Certification Dear Mr. Johnson: You have our approval, in accordance with the attached conditions, to place fill in 0.075 acre of wetlands and shallow bottom in order to upgrade SR 1704 in Craven County, as described in your application received by the Division of Water Quality on June 5, 2001. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3274 which can be downloaded from our web site at http://h2o.enr.state.nc.us/ncwetlands . This Certification allows you to use your CAMA Permit when it is issued by the NC Division of Coastal Management. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Con#rol, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owne,Lmust be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. irtotal wetland fills for this project(now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506(h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150E of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611- 7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Tom Steffens in DWQ's Washington Regional Office at 252-946-6481 or Cyndi Karoly in Raleigh at 919-733-9646. Sincerely, r Stevens Attachment cc: Corps of Engineers Washington Field Office • Washington DWQ Regional Office Central Files File Copy Doug Huggett 010929 North Carolina Division of Water Quality,401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh,NC 27699-1650(Mailing Address) 2321 Crabtree Blvd.,Raleigh,NC 27604-2260(Location) 919-733-1786(phone),919-733-6893(fax),http://h2o.enr.state.nc.us/ncwetlands/ MEMORANDUM: TO: DOUG HUGGETT FROM: Bill Arrington SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT— State Road 1704, Craven County DATE: May 23, 2001 The following are my comments and recommendations regarding the above mentioned proposal. The project consists of replacing existing culverts and paving an existing roadway. The roadway will be widened just enough to allow compliance with Federal Highway Standards. Relatively small areas of coastal wetlands, 404 wetlands, and shallow bottom will be filled at the Great Neck Creek crossing. Roadside ditches, required by Federal Highway Standards, will terminate on high ground and sheet flow over upland vegetation before reaching wetlands. I would recommend the project be approved contingent upon the following conditions: 1) The temporary dlacement or double handling of excavated or fill materials within waters or \/'vegetated wetlands is not authorized. 2) No excavated or fill material will be placed at any time, in any marsh or surrounding waters, outside of the alignment of the fill area indicated on the work plats. 3) All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. 4) The riprap material must consist of clean rock and be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. __6)-'The roadway fill material will be clean and free of any pollutants, except in trace quantities. 6) In,order to protect water quality, runoff from the construction must not visibly increase the i. gmount of suspended sediments in adjacent waters. Cc: Ted Tyndall, DCM Charles Jones, DCM OF W A7- 0:1 Michael F.Easley,Governor RECEIVED William G. Ross,Jr. Secretary Kerr T.Stevens,Director JUN282001 COASTAL.MANAGEMENT June 26, 2001 Mr. Jay Johnson N. C. DOT Post Office Box 1587 Greenville,North Carolina 27835 Subject: Stormwater SW7010601 Great Neck Road Crossing Craven County Dear Mr. Johnson: This office received a copy of your CAMA Permit application and supporting information on June 4, 2001. Staff review of the plans and specifications has determined that the project, as proposed, consists of activities that will not add any additional impervious surface to the project site. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. For this reason, we are informing you by way of this letter that your project will not require a stormwater management permit. Please keep in mind that this determination does not affect your legal requirements to obtain other permits which may be required by the Division of Water Quality, the Division of Land Resources, Coastal Area Management Act or any other Federal, State or Local Government. Any future modifications to the project may require an additional review from this office to assure that stormwater impacts are not an issue. If you have any questions or need additional information concerning this matter,please contact Mr. Robert Tankard at (252) 946-6481, extension 233. Sincerely, Jim Mulligan Regional Water Quality Supervisor cc: Craven County Inspections Washington Regional Office Cent Files oug Huggett 943 Washington Square Mall,Washington,North Carolina 27889 Telephone 252-946-6481 FAX 252-946-9215 An Equal Opportunity Affirmative Action Employer [Fwd:permits] Subject: [Fwd: permits] Date: Mon, 16 Jul 2001 15:14:50 -0400 From: Jeff Schaffer<Jeff.Schaffer@ncmail.net> Organization: NC DENR DCM To: Cathy Brittingham <Cathy.Brittingham@ncmail.net> Original Message Subject: permits Date: Mon, 16 Jul 2001 13:59:29 -0500 From: "Bland, Raleigh W SAW" <Raleigh.W.Bland@saw02.usace.army.mil> To: "Doug Huggett (E-mail)" <doug.huggett@ncmail.net> CC: "Jeff Schaffer(E-mail)" <jeff.schaffer@ncmail.net> Department of Transportation State Road 1704 in Craven County AID No. 200110782 Nationwide Permit No. 18 Issued 16July01. NC Department of Transportation State Road 1343 in Pamlico County AID No. 200110641 Nationwide Permit No. 18 Issued 16July01. 1 of 1 7/16/01 5:13 PM illCiA State of North Carolina 1 • � Department of Environment f and Natural Resources Division of Marine Fisheries I*ICDEIIR Michael F. Easley, Governor NORTH CAROLINA DEPARTMENT OF William G. Ross, Jr., Secretary ENVIRONMENT AND NATURAL RESOURCES Preston P. Pate, Jr., Director RECEIVED JUN 1 8 2001 COASTAL MANAGEMENT MEMORANDUM TO: Doug Huggett Major Permits Proc si Coordinator FROM: Mike Stree DATE: 06/15/2001 SUBJECT: CAMA/DREDGE AND FILL PERMITT NCDOT/SR 1704 and Great Neck Creek in Bachelor from SR 1700 to the end Attached is the Divisions' reply for the above referenced project. If you have any questions, please do not hesitate to contact me. MS/sw P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper , North Carolina Department of Environment and Natural Resources Al9rilrA Division of Coastal Management witir Michael F. Easley, Governor ' ,R William G. Ross Jr., Secretary Donna D. Moffitt,Director RECEIVED L-1-tti 5LOJtJ JUN 18 2001 May 30, 2001 COASTAL MANAGEMENT D I'-1-1/1 B i TA T MEMORANDUM: JUN - CUB, TO: Mr. Preston P. Pate, Jr., Director Division of Marine Fisheries FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC DOT/ attn: Jay Johnson Project Location: Craven County, SR 1704 and Great Neck Creek (tributary to the Neuse River), in Bachelor from SR 1700 to the end. Proposed Project: Proposes to widen and pave SR 1704 and replace culverts at Great Neck Creek (tributary to the Neuse River), in Bachelor from SR 1700 to the end. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 20, 2001. If you have any questions regarding the proposed project, please contact Bill Arrington at(252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: \ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED I� tilrcc,�. 2 DATE � //5 / U I Morehead City D strict C151-B Hwy. 24, Hestron Plaza II Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER CAMA major comments Subject: CAMA major comments Date: Fri, 08 Jun 2001 10:09:43 -0400 From: Pat McClain<Pat.McClain@ncmail.net> Organization: NCDENR To: Doug Huggett<doug.huggett@ncmail.net> Doug: Below are comments on several permit applications from DOT. NCDOT - SR 1136 on a manmade canal contiguous with Fodrey Creek, Swan Quarter, Hyde County --- This project is in a High Quality Water Zone and must comply with the special standards of 15A NCAC 4b.0124 - Design Standards in Sensitive Watersheds. NCDOT - Taylors Beach, SR 1124, Tyrrell County --- No Comment 1re."- NCDOT - Great Neck Creek - SR 1704 , Craven County --- 575 feet on either side of the Creek is designated a High Quality Water Zone. Any work within this Zone must comply with 15A NCAC 4B. 0124 . Unless otherwise exempted, approval from DWQ could be required due to the Neuse River Riparian Buffer Rule. Pat McClain c1i-, 1 of 1 6/29/01 4:08 PM SR 1704,Craven Co.(Becton Rd.),wideni...culverts at Great Neck Creek in Bachelor Subject: SR 1704, Craven Co. (Becton Rd.), widening, paving and replacing culverts at Great Neck Creek in Bachelor Date: Fri, 20 Jul 2001 15:22:05 -0400 From: Bill Arrington <Bill.Arrington@ncmail.net> Organization: NC DENR DCM To: Cathy Brittingham <Cathy.Brittingham@ncmail.net> The proposed widening and paving of NCSR 1704 and replacement of the culvert at the Crossing of Great Neck Creek in the community of Bachelor, Craven County is consistent with the Craven County Land Use Plan provided that all local, state and federal guidelines are followed during construction. Bill Arrington 1 of 1 7/20/01 3:30 PM 1111 North Carolina Department of Environment and Natural Resources A: A • Division of Coastal Management wlfr Michael F.Easley,Governor NCDENR William G.Ross Jr.,Secretary Donna D.Moffitt,Director July 18, 2001 RECE \/ L• 'JUL 2 6 2001 State Property C, MEMORANDUM RECEIVED Mr. Joseph H. Henderson, Director • AUG 01 2001 State Property Office Department of Administration COASTAL MANAGEMENT FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL PERMIT APPLICATION REVIEW APPLICANT: NC DOT—JAY JOHNSON PROJECT LOCATION: Widen and pave SR1704 and replace culverts at Great Neck Creek, in Bachelor, Craven Co. PROPOSED PROJECT: To upgrade existing secondary road to a 2 lane, paved road, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 9,2001. If you have any questions regarding the proposed project,please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY ✓ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED /204-1- re2r-et, LJCDATE 11 • 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER 111 North Carolina A•i Department of Environment and Natural Resources Alp Division of Coastal Management Michael F.Easley,Governor NCDENR . WiIIiam G.Ross Jr.,Secretary Donna D..Moffitt,Director July 13, 2001 MEMORANDUM RECEIVED Mr. John Sutherland, Chief AUG 2 2 2001 Water Planning Section . Division of Water Resources COASTAL MANAGEMENT FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL PERMIT APPLICATION REVIEW APPLICANT: NC DOT—JAY JOHNSON PROJECT LOCATION: Widen and pave SR1704 and replace culverts at Great Neck Creek, in Bachelor, Craven Co. PROPOSED PROJECT: To upgrade the existing secondary road to a 2 lane, paved road, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 9,2001. If you have any questions regarding the proposed project,please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. - This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 8/ /oi 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER North Carolina Department of Environment and Natural Resources A11ClirziA • Division of Coastal Management Michael F. Easley,Governor CD Et R William G. Ross Jr., Secretary Donna D.Moffitt,Director July 18, 2001 I:FUER MEMORANDUM JUL 272001 RECEIVED DIVISION OF HIGHWAYS Mr. L. A. Sanderson, P. E. HYDRAULICS UNIT Highway Administrator AUG 2 9 2001 Division of Highways COASTAL MANAGEMENT FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL PERMIT APPLICATION REVIEW APPLICANT: NC DOT—JAY JOHNSON PROJECT LOCATION: Widen and pave SR1704 and replace culverts at Great Neck Creek,in Bachelor, Craven Co. PROPOSED PROJECT: To upgrade the existing secondary road to a 2 lane,paved road, etc. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 9, 2001. If you have any questions regarding the proposed project,please contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY A__ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to a project for reasons described in the attached comments. U SIGNED /� DATE 1638 Mail Service Center,Raleigh,North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER Re:SR 1704,Craven County Subject: Re: SR 1704, Craven County Date: Mon, 13 Aug 2001 18:11:07 -0400 From: Renee Gledhill-Earley erenee.gedhill-earley@ncmail.net> To: Cathy Brittingham <Cathy.Brittingham@ncmail.net> Cathy: I'll check on it and get back to you. Since I am doing three jobs it is very likely to be on one of my other desks at the Lewis-Smith House. Sorry, Renee Cathy Brittingham wrote: > RE: SR 1704 at Great Neck Creek, widening, paving and culvert > replacement, Craven County > DCM is preparing to issue the CAMA permit for the above referenced > project proposed by NC DOT. I do not have a record of receiving > comments from your agencies. Do you have any > comments or concerns? > Thank you. > -- > Cathy Brittingham > Transportation Project Coordinator > NC Division of Coastal Management > 1638 Mail Service Center > Raleigh, NC 27699-1638 > (919) 733-2293 X238 phone > (919) 733-1495 FAX 1 of 1 8/20/01 5:29 PM North Carolina ;:qpr 4 Department of Environment and Natural Resources 4 • Division of Coastal Management A Michael F. Easley,Governor NCDENR William G.Ross Jr.,Secretary Donna D.Moffitt,Director July 18. 2001 NC DEPARTMENT OF TRANSPORTATION PO BOX 1587 GREENVILLE NC 27835 • Dear Sir: This letter is with reference to your application for a Coastal Area Management Act Major Development and state dredge and fill permit to carry out construction on property located at Great Neck Creek,in Bachelor,Craven County.However,processing of the application is nearing completion,additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make September 29, 2001 the new deadline for reaching a decision on your request.However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact this office. Very sincerely,dLijL/Larv- e� f Cathy Brittingham Transportation Project Coordinator CB/aw cc: Bill Arrington DCM—Morehead City 1638 Mail Service Center,Raleigh, North Carolina 27599-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNTIY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER North Carolina Department of Environment and Natural Resources I Division of Coastal Management „wily Michael F.Easley,Governor NCDENR William G.Ross Jr.,Secretary Donna D.Moffitt,Director G 47 MEMORANDUM � °I\ 41PAsle-LiRd TO: John Hennessy, NC Division of Water Quality P n Jo- ` Raleigh Bland, U.S. Army Corps of Engineers G\5��S� y,V uO I CC: David Cox,NC Wildlife Resources Commission 0 Bill Arrington, NC Division of Coastal Management Jay Johnson, NC Department of Transportation FROM: Cathy Brittingham, NC Division of Coastal Management % DATE: July 17, 2001 SUBJECT: SR 1704, widening, paving and replace culverts at Great Neck Creek (tributary to the Neuse River) in Bachelor, Craven County, from SR 1700 to the end. The attached revised site plan map for the above referenced project was prepared by DOT in response to a request from DCM to better define which wetland impacts on this project are to CAMA wetlands versus 404 wetlands. DOT conducted a wetland survey on July 9, 2001 which resulted in the attached revised site plan map. Please note that the estimate of wetland impacts has changed from the original site plan map submitted with the CAMA permit application as follows: Estimate of fill in CAMA wetlands: Original was 1597 square feet. Revised is 298 square feet. Estimate of fill in 404 wetlands: Original was 1451 square feet. Revised is 2892 square feet. Grand total of estimated fill in wetlands: Original was 3048 square feet. Revised is 3190 square feet. As you will note, the grand total of estimated fill in wetlands has increased by approximately 142 square feet. A 401 Water Quality Certification was issued for this project on June 22, 2001 authorizing 0.075 acres of fill in wetlands and shallow bottom. A Nationwide Permit 18 was issued on July 16, 2001. The CAMA permit application is currently circulating to state agencies for review and comment. Please let me know as soon as possibly if the revised estimate of wetland impacts in any way changes the already issued 401 Water Quality Certification and Nationwide Permit 18. Thank you. 1638 Mail Service Center,Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER • Development Type FEE DCM°!° DWQ 14300 1601 435100093 1625 6253 24300 1602 435100095 2341 I. Private,non-commercial development that does not involve $250 100%($250) 0%($0) the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not involve the filling or $400 100%($400) 0% $0 excavation of any wetlands or open ° ( ) water areas: Ill. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas,determine if A,B,C,or D below applies: III(A). For Private,non-commercial development,If General water Quality $250 100%(S250) 0%(SO) Certification No.3301(see attached) can be applied: III(B): For public or commercial development,if General water Quality $400 100%($400) 0% 50 Certification No.3301(see attached) ° ( ) can be applied: I11(C). If General Water Quality Certification No.3301(see attached) could be applied,but DCM staff determined that additional review and $400 60%($240) 40%($160) written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No.3301 (see attached) $400 60%(5240) 40%($160) can not be applied: IV. For development that involves • the filling and/or excavation of more $475 60%($285) 40/o $190 than one acre of wetlands and/or ° ( ) open water areas: , e - , 9 . ,-` ,E COMA 'SA1 A=T CA W. E- q -'O 'AT I •1G -Rkok ; r DEPARTMENT OF TRANSPORTATION DATE 10/18/2 0 0 0 DIVISION 02 OFFICE 66-1059 STATE TREASURER,RALEIGH,NORTH CAROLINA P. O. BOX 1587 531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM GREENVILLE, NC 27835 // //�� * I I * I * * * * * I * * I * * * I * * * * * • * ♦ I * ✓ * * I * I * Pay our • undreal _a o[/arJ and 00/1 00 ttitASIO Pay N.C.D.E.N.R. to the GREENVILLE, NC 27835 Order of i\ACI-04.) ,, n AU1I IOI1I7FI)SIGNA IIRI ii'00008 L 900 1:0 5 3 L L0 5 9 41: 9'110001"G 4 211' o SENDER: I also wish to receive the 9 •Complete items 1 and/or 2 for additional services.re •Complete items 3,4a,and 4b. following services(for an •Print your name and address on the reverse of this form so that we can return this extra fee): L card to you. g ?411 •Attach this form to the front of the mailpiece,or on the back M space does not 1.❑ Addressee's Address permit. •Write"Return Receipt Requested'on the mailpiece below the article number. 2.❑ Restricted Delivery ■The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. a g 3.Article Addressed to: 4a.Article Number m 70()9 3.2020 ooe,2,t/iv3 5,i 1 IL 4b.Service Type Weyerhauser Company ❑ Registered Certified PO Box 1391 ❑ Express Mail El Insured New Bern, NC 28563 ❑ Return Receipt for Merchandise ❑ COD 7. Date of Delivery! 5.Received By: (Print Name) 8.Addressee's Address(Only if requested 0 t and fee is paid) C fC_=c k i �.,t�A u' 6. Signature/: a or gent) i- o >. X s�L� —/ `.. w PS Form 381'kkr mber 1994 102595-98-8-0229 Domestic Return Receipt Sg 17014 9'` SENDER: I also wish to receive the •Complete items 1 and/or 2 for additional services. followin services(for an • ■Complete items 3,4a,and 4b. 9 ■Print your name and address on the reverse of this form so that we can return this extra fee): card to you. g •Attach this form to the front of the mailpiece,or on the back if space does not 1.❑ Addressee's Address permit. a •Write"Return Receipt Requested"on the mailpiece below the article number. 2.0 Restricted Delivery a •The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. a g 3.Article Addressed to: 4a.Article Number 1 ca 70'9 Vdto 000a qiv3.58/� 4b. Service Type Geneva Tyndall Moore ❑ Registered X Certified 4 2260 Wilmar Road CI Express Mail ❑ Insured g° Vanceboro, NC 28586 ❑ Return Receipt for Merchandise ❑ COD 7.Date of Delivery w&-tiet is w�i .WO_(*) l[2i C a Received By:(Print lame 8.Addressee's Address (Only if requested Y and fee is paid) 6.fl,..), Signature: (Address or Agent) E X 2 PS Form 3811, December 1994 102595-ee-e-0229 Domestic Return Receipt SR 17611 CONSISTENCY PRO ' • - PROJECT DATA TRACKING SHEET North Caro .na Division of Coastal Management PROJECT NO: DCMO -1-. Applicant : Department of Tr. sportation K-4003 , ROANOK IS ► • D VISITOR INFS'MATION CENTER AND 'EST AREA Document Date - 04/1 '/2001 Received Date : 04/10/2001 Govt Agenc : U. S . Arm Corps of Engineers Action: Federal Li. enze Progr. : U. S . Army So tion 10 & 404 Loca' ion: Roanoke I ano Cou• y: Dare DUE DATES Response To: U. S Army Corps of ngi 'eers Due D e : 05/08/2001 Exten To: Response Fro . Reviewers Du- . 04/30/2001 onsisten Deadline : 05/08/2001 Extended 'o : Extended To : CON ACT Colonel Jame W. DeLony, Dist ' t Engineer U. S . Army Corps of Engineer- Wilmingto- District P.O. Bo- 1890 Wilmington, NC 28402 Telephone : Review Active Tracking Sheet Printed: 04/11/2001 SENDER: I also wish to receive the r Complete items 1 and/or 2 for additional services. • ■Complete items 3,4a,and 4b. following services(for an ■Print your name and address on the reverse of this form so that we can return this extra fee): card to you. a •Attach this'form to the front of the mailpiece,or on the back if space does not 1.❑ Addressee's Address�eunit. m •Write'Return Receipt Requested'on the mailpiece below the article number. 2.❑ Restricted Delivery r ■The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. _� S 3.Article Addressed to: 4a.Article Number I 7 3 70 z)O 1 o3 5-865 E 4b.Service Type m a Earl B. Harris V EL 0 Registered el 3560 Adams Creek Road X\ �0 Certified ►� Express Mail 0 Insured r Havelock, NC 28532 B A Return Receipt for Merchandise ❑ COD 1 .49Date of Delivery p 5.Receiv:. :y: (Print Name) sps/ :.Addressee's Address(Only if requested Y and fee is paid) ' 6.Sign. :: (Ardre a or Agent) 2 PS Form 381 ,December 1994 102595-se-e-o229 Domestic Return Receipt R 17o1-f `` SENDER: •Complete items 1 and/or 2 for additional services. I also Wish to receive the p ■complete items 3,4a,and ab. following services(for an W •Print your name and address on the reverse of this form so that we can return this extra fee): k .card to you. e I tw ■Attach this form to the front of the mailpiece,or on the back if space does not 1.El Addressee's Address C1 permit. ■Write it; Receipt Requested'on the mailpiece below the article number. 2.0 Restricted Delivery •The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. E. 8 3.Article Addressed to: 4a.Article NumberTo 4b.Service Type William Bradley, Jr. ❑ Registered likrbertified i 351 Becton Road1 0 Express Mail ClInsured c Havelock, NC 28532 ❑ Return Receipt for Merchandise 0 COD 1 7.Date of el?/ f g 5. Received By:(Print Name o / lQ i y 8.Addressee's Address(Only if requested E7/,7,& and fee is paid) 6.Signature:( e or Agent) F g X j L. Form 3811,December 1994 C (/ 102595-98-B-0229 Domestic Return Receipt� s R \7011 CONSISTENCY PROGRAM - COMMENT Di " TRACKING SHEET North Carolina Division of .astal Management DCM01-'.6 NC Department of Transportation K-4003 , 'SANOKE ISLAND VIS 'OR INFORMATION CENTER A.'AI REST AREA Document D.te : 04/09/20s Received sate : 04/10/2001 DUE DATES Response To: U. S . Army Corps of Engine- s Due Date : 05/08/2001 Extended To: RESPONSE FROM . VIE . RS DUE : 04/30/ 001 Consistency Deadline : 5/08/2001 Exten.-d To : Extended . COMMENTS Date Co nts Objections Divis ' .n Revie -r Resp . Recd. Y/N Y/N I'M Field S. pson / / _ _ DCM Planner ' hayer _/ _ DCM Other. . . . . . .Williams / _ _ Div Mar Fish " _/_/ _ _ - Div Land Q 1 . . . . / / _ _ Wildlife es _ / _ _ Div Wa Qual _ / _ _ Div alth Ser _/ / _ _ NC OT /_ _ _ ate Prop Off / / _ _ Div Water Res . . . / / _ Div Comm Asst /_/ _ _ Arch & Hist. y / / _ _ Parks & R.: / Under W. Arch / / OTH ' REVIEWERS . . . (Not Enter-: in Tracking Database Date Comme s Ob ' ions Division Revie -r Resp. Recd. Y/N Y/N \, / / / / — — Review Active Tracking Sheet Printed: 04/11/2001 North Carolina Department of Environment and Natural Resources A7A Division of Coastal Management — — Michael F. Easley, Governor NCDENR William G. Ross Jr., Secretary Donna D. Moffitt, Director May 23, 2001 NC DOT C/o Jay Johnson Division 2 P.O. Box 1587 Greenville, N.C. 27835 Dear Jay: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located at SR 1704. It was received on May 4, 2001, and appears to be adequate for processing at this time. The projected deadline for making a decision is July 18, 2001. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Bill Arrington NC DOT Field Representative - Enclosure Charles Jones cc: Doug Huggett Ted Tyndall, District Manager Morehead City District\ 151-B Hwy. 24, Hestron Plaza II Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY\AFFIRMATIVE ACTION EMPLOYER-50%RECYCLED/10%POST CONSUMER PAPER .t',.: ‘ -' '''.: I r 1 i 4114) ::t ,,, ; _ 1 k, m, 4. 3 ., 'f", '' i A CAMA PERMIT APPLIED FOR PROJECT. 142efdatie -eu►b t , Culue�s a4 .11.�1- IJ�0.1 Cr eC.L crt~cs. COMMENTS ACCEPTED TI-IROUGH -31 , 1s 1aOl APPLICANT FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Vi_ bppi-- al Tame 0 -bt+( Avvin ( ►� T- r[ei� - c_ib (\ili Jarysty _ 'kw_ bioibi Ink- biulstr-v__) .2 �6� 1az _IL #}- , lsl-E. 4 - Isirl \ôekb C G ,u i I It, '}( av?3 sl-- ��)c (asc..) WV- a-�oV