HomeMy WebLinkAboutNCDOT 60-93 Bridge #63 SR 1118 Jady Creek . ,�oxoxoxa
Permit Class Permit Number
NEW 60-93 '
STATE OF NORTH CAROLINA '
Department of Environment, Health&Natural Resources '
and
Coastal Resources Commission nri)(r/ nt ' �` •'
t trmtt cor L 1 4 1993 ;
for -� lt� �LJ
X Major Development in an Area of Environmental Concern ----( ,
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to NC Dept. of Transportation, Div. of Highways, P.O. Box 25201, Raleigh, NC 27611
' authorizing development in Gates County at Jady Creek, SRl 118, Bridge #63
/ as requested in the permittee's application dated 2/12/93 and attached '
' wnrkplan drawings, sheets 2 and 3 of 3 dated 1/29/93. '
I /
/
This permit,issued on May 25, 1993 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be
subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
I
Bridge Construction
1) A silt fence will be placed along the permimeter of the bridge project and the adjacent wetlands.
The fence will be left in place until the project is completed and the site is stabilized with '
, vegetation.
. 2) The three concrete culverts will be designed to prevent the restriction of, and to withstand, ,
expected high flows and provide for the movement of aquatic organisms.
3) Measures shall be taken to prevent live or fresh concrete from coming into contact with waters '
of the state until the concrete has hardened.
. 4) The box culverts will be installed with the bottom of the culverts slightly below the existing ,
stream bottom to allow for establishment of natural substrate.
' (See attached sheet for additional conditions) '
• This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEITNR and the '
' other qualified persons within twenty (20) days of the Chairman of the Coastal Resources Commission. /
' issuing. date. An appeal requires resolution prior to work
' initiation or continuance, as the case may be. .
/�
• This permit must be accessible on site to Depar t,�rent i--1:::'� /
personnel when the project is inspected for compliance.
,?__ Ro T. Schecter, Director '
, Any maintenance work or project modification not Division of Coastal Management '
, covered hereunder requires further Departmental approval. ,
' All work must cease when the permit expires on This permit and its conditions are hereby accepted. #
December 31 . 1996
, hn issuing this permit,the State of North Carolina agrees ,
that your project is consistent with the North Carolina ,
, Coastal Management Program.
Signature of Permittee '
.
v-o-ao,a o�owa,c- oxo o„ a- „Ks,,�a,,o, xa �� oNo� o,,o�o,,c
$ ,.
•
NC Dept. of Transportation 60-93 ,
Page 2 of 2
ADDITIONAL CONDITIONS ,
Excavation and Filling
5) No relocation or armoring of the stream channel shall occur.
6) No work or filling will take place in wetlands outside of the alignment shown on the
/
workplan drawings. /
/
7) All unsuitable, excavated materials will be confined landward of the normal water /
elevation contour and any vegetated wetlands. '
8) The fill material will be clean and free of any pollutants, except in trace quantities. ,
NOTE; The proposed fill is covered by General Water Quality
, Certification #2732 issued by the N. C. Division of
. Environmental Management on 1/21/92.
.
Erosion and Sedimentation Control
.
9) Appropriate erosion and sedimentation control devices, measures, or structures will be
used to prevent sediment from entering the adjacent wetlands/watercourses/property
. (e.g., silt fence, diversion swales/berms, sand fence, etc.).
10) A ground cover sufficient to restrain erosion will be provided within 30 working days
of completion of any phase of grading on cut or filled slopes.
Operation and Maintenance
11) The permittee will maintain the authorized work in good condition and in conformance
with terms and conditions of this permit. The permittee is not relieved of this
requirement if he abandons the permitted activity without having the permit transferred
to a third party.
.
12) The authorized structure and associated activity will not cause an unacceptable .
OA interference with navigation. /
/ /
/
/
/
/
/
/
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL/PROCESSING RECORD
A) APPLICANT: N.C. Department of Transportation COUNTY: Gates
LOCATION OF PROJECT: Bridge No. 63, S.R. 1118, Gates County on Jady Creek °/1)
DATE APPLICATION RECEIVED COMPLETE BY FIELD: February 18, 1993
FIELD RECOMMENDATION: Attached - No To Be Forwarded - Yes
CONSISTENCY DETERMINATION: Attached - No To Be Forwarded - Yes
FIELD REPRESENTATIVE: Richard Watts DISTRICT OFFICE: Elizabeth City
DISTRICT MANAGER REVIEW:
B) • DATE APPLICATION RECEIVED IN RALEIGH: FEE REC'D: $
PUBLIC NOTICE REC'D: END OF NOTICE DATE:
ADJ. RIP. PROP NOTICES REC'D: DEED REC'D:
APPLICATION ASSIGNED TO: ON:
C) 75 DAY DEADLINE: 150 DAY DEADLINE:
MAIL OUT DATE: STATE DUE DATE:
FEDERAL DUE DATE: FED. COMMENTS REC'D:
PERMIT FINAL ACTION: ISSUE DENY DRAFT ON
AGENCY DATE COMMENTS OBJECTIONS NOTES
RETURNED YES NO
Coastal Management Dist. Office
Div. of Community Assistance
Land Quality Section
Div. of Env. Management
State Property Office
Div. of Archives & History
Div. of Env. Health
IP1Div. of Highways
Wildlife Resources Commission
Div. of Water Resources LEL- L,1-5L3131251±
Div. of Marine Fisheries
1711
Uw 1�
State of North Carolina •••••• ses••""#'Department of Environment, Health, and Natural Resource
512 North Salisbury Street • Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor Jonathan R. Howes, Sccretaty
MEMORANDUM:
TO: John Parker
FROM: Richard L. Watts 6J
SUBJECT: Recommendations for NC DOT Bridge #63 Project Major Permit Request
DATE: April 7, 1993
I have no objections to this project. However, I am concerned that looking into the
future, the public may increasing want to utilize lady Creek for canoeing, etc. and the
culvert system will restrict this use. Admittedly, the current boating use of this portion of
Jady Creek is minimal.
I do not feel this project's wetland impacts warrant mitigation.
The Gates County Water main relocation can be handled under a separate General
Permit.
I recommend the following conditions be imposed on this permit:
(1) A silt fence should be placed along the perimeter of the bridge project and the
adjacent wetlands. The fence will be left in place until the project is
completed and the site stabilized with vegetation.
(2) No work or filling will take place in wetlands outside of the platted work area.
Hox 276R7, Ralciph, North( a,.,lina 27611 7037 Telcrl one'910 733 4984 lax I nin 7a 3 11c1;
An Equal Opportunity Affirmative Action Employer
}isv►rF
Q''ya„Mvc"'� ILA tc.., � s 1993
State of North Carolina U"
Department of Environment, Health, and Natural Re> tE.e,------- " -y
512 North Salisbury Street • Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor Jonatlmn R. Howes, Secretary
MEMORANDUM:
TO: John Parker
FROM: Stephen Gabriel
SUBJECT: NCDOT Bridge #63 (Gates) Major Permit Application Land Use Plan
Consistency Review
DATE: April 2, 1993
This proposal involves the replacement of an old wooden bridge over Jady's Creek
using three concrete culverts. This portion of Jady's Creek is navigable and is considered
public trust waters. The Gates County land use plan has no specific policy regarding public
trust waters other than to place such waters in the Conservation classification. There, the
County indicates that it finds acceptable all uses that can be permitted by existing local, state
and federal regulations. Therefore, so long as this proposal meets all local, state and federal
requirements, it will be consistent with the Gates County land use plan.
P.O. Box 276R7, Raleigh, North Carolina 27611 76R7 Telephone 919 721-49R4 rax 919-jai nc1;
An Equal Opportunity Affirmative Action Employer
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: NC DOT
2. LOCATION OF PROJECT SITE: Bridge No. 63, S.R. 1118, Gates County on Jady Creek
Photo Index - 1989: N/A 1984: N/A
State Plane Coordinates - X: 2639700 Y: 977950
3. INVESTIGATION TYPE: CAMA/D&F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 03/05/93
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - February 18, 1993
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Gates County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT
(C) Water Dependent: Yes
(D) Intended Use: Public road crossing of creek
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - Piling supported wooden bridge
Planned - Three concrete culverts
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands 2,614 square feet
(.06 acre)
(B) Non-Vegetated Wetlands
(C) Other 1,386 square feet
Creek bed
(D) Total Area Disturbed: 4,000 square feet
(E) Primary Nursery Area: No
(F) Water Classification: C NSW Open:
8. PROJECT SUMMARY: The applicant desires to replace a deteriorated wooden bridge with three
concrete culverts. Placement of the culverts will require excavation of approximately 550 cubic yards
of the creek bed. An existing water main will be removed prior to the demolishing of the bridge and
replaced after the culverts are in place.
NC DOT
Bio Report
Page Two
Site Report
The NC DOT proposes to replace bridge NO. 63 over Jady Creek on S.R. 1118 west of Gatesville.
Jady Creek is a natural, navigable creek which connects with the Chowan River. The creek is
approximately 45 feet wide under normal water levels and has a normal depth of approximately 5". The
creek flows at a normal rate of 10.3 C.F.S. and is part of the Public Trust category of the Estuarine
System Area of Environmental Concern.
The applicant proposes to replace bridge No. 63 with three reinforced concrete box culverts (@ 14' x
12') and make unspecified improvements to both approaches to the bridge. The 86 foot long bridge is
constructed of treated timber, and is paved with asphalt. NC DOT maintains a 12 foot margin on each side
of the road approaches to the bridge. Approximately 550 cubic yards of spoil will be removed from the
creek and its flood terrace to facilitate the placement of the three box culverts. Approximately 100 cubic
yards of uplands will be excavated for the same purpose. Backfilling the culverts to road grade will require
1,500 cubic yards of clean fill. A 2,614 square foot area of presumed wetlands will be filled in this
process. Vertical clearance under the bridge is approximately 6 feet and will be reduced to approximately
5 feet under normal water levels. Presently the width of passage between pilings is 18 feet. The width of
passage with the culverts will be reduced to 14 feet. A 4" county water line runs parallel to the existing
bridge approximately 23 feet south east of the roads center line. Gates County will have to temporarily
remove this pipe during the construction phase of this project.
Anticipated Impacts
This project will result in the filling of approximately 2,614 square feet of wetlands. The use of
culverts will constrict the area of passage for canoeists. Excavating and backfilling the creek bed and
adjacent terraces will temporarily increase the level of creek turbidity. NC DOT claims the proposed
culverts will be able to handle the stream flow of Jady's Creek. The Gates County government will be
required to remove their existing 4" water line during the construction phase. The would like to suspend
the waterline above the creek along the proposed culverts.
CAMA REVIEW
The placement of the Gates County waterline across Jady Creek could be authorized under CAMA's
General Permit conditions is request as a separate project from the NC DOT Bridge project.
The replacement of Bridge NO. 63 is in the public's interest. The use of culverts will reduce the
navigability of Jady Creek, however this area is rarely traveled boaters and only then primarily by
canoeists.
The wetland impact will be limited to an area of 2,614 square feet (.06 acre). USCOE may authorize
this activity under their Nationwide 14 Permit.
Submitted by: Richard L. Watts
Date: April 6, 1993
•
•
• Please type or print_-Carefully describe all anticipated
development activities.including construction,excava- • •
•" _' •'""' ...
lion,filling,paving,land clearing,and stormwater con-
troL If the requested information is not relevant to your If you plan to build a marina, also complete and
attach Form DCM-MP-2.
project,write N/A(not applicable).Items 1-4 and 8-9 •
must be completed for all-projects. b. Is the proposed activity maintenance of an
existing project,new work,or both?
• both
1 APPLICANT
c. Will the project be for community,private,or •
B.J. O'Quinn, P.E. -• • commercial use?
a. Name •
NC Ocportmcnt of Transportatiuii . - . public
Address P.O. Box 25201
City Raleigh State North Carolina d. Describe the planned use of the project.
public transportation
Zip 27611 Day phone (919)733-9770
mGr 5)
Landowner or X Authorized agent
b. Project name(if any)Gates County, Bridge FEB 8 '93
No. 63 On SR 1118 over Jady Branch 4 LAND AND WATER
•
c. If the applicant is not the landowner, also give the CHARACTERISTICS
owner's name and address. .
N/A a. Size of entire tract N/A
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
2 LOCATION OF PROPOSED Approximate elevation 15' above mean sea
level (from USGS Quad)
PROJECT d. Soil type(s) and texture(s)of tract
sand and muck
a. Street address or secondary road number Maintained grassyright-of-
- SR 1118 e. Vegetation on tract
way plus sparse wetland herb laver
b. City,town,community,or landmark
Eure, near Gatesville f. Man-made features now on tract road and bridge
c. County Gates g. What is the CAMA Land Use Plan Classification of
d. Is proposed work within city limits or planning the site? (Consult the local land use plan.)
jurisdiction?NO, other than Gates Cnunty X Conservation Transitional
ie. Name of body of water nearest project Developed Community
z. Jady Branch Rural Other
0
o h_ How is the tract zoned by local government?
NO
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT i. How are adjacent waters classified?
C-NSW-
a. Describe all development activities you propose(for j. Has a professional archaeological survey been
example,building a home,motel,marina,bulkhead, carried out for the tract? NO If so, by whom?
or pier).Replace existing bridge with
3@ 14' x 12' Reinforced Concrete
Box Culverts
5 UPLAND DEVELOPMENT ... - �.{
1
Complete this section if the project includes any.land . g
development. l-6 .,
•
a. Type and number of buildings,facilities,or m. Water supply source N/A �°ti;,,r,
structuresproposed N/A
n. If the project is oceanfront development,describe
the steps that will be taken to maintain established
b. Number of lots or parcels N/A public beach accessways or provide new access. .
c. Density(Give the number of residential units and the A
units per acre.) N/A
d. Size of area to be graded or disturbed o. If the project is on the oceanfront, what will be the
N/A
elevation above mean sea level of the first habitable
e. If the proposed project will disturb more than one floor? N/A
acre of land,the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable,has a sedimentation and erosion 6 EXCAVATION AND FILL
control plan been submitted to the Division of Land INFORMATION ,
Resources? N/A
f. Give the percentage of the tract within 75 feet of a. Describe below the purpose of proposed excavation
mean high water to be covered by impermeable or fill activities (excluding bulkheads,which are
surfaces,such as pavement,buildings,rooftops. covered in Section 7).
Length Width Depth
g. List the materials,such as marl,paver stone,asphalt, Access channel .
or concrete,to be used for paved surfaces. (MLW) or(NWL) N/A N/A N/A
N/A
Boat basin N/A N/A N/A
h. If applicable,has a stormwater management plan Other(break-
been submitted to the Division of Environmental water,pier, 40' 80' 4.6'
Management? N/A boat ramp, AVERAGE
rock jetty)
i. Describe proposed sewage disposal and/or waste Muck, site prep,etc r.
water treatment facilities. F. • aced in N/A '"::y;:;.:<;,,<' `
etlan. •r below 55 45 :<�� .y
.• :4 <::
�j. Have these facilities received state or local approval? Upland fill WOW*
f
areas ;. ;;:.K '0,:.
2.
b. Amount of material to be excavated from below
k. Describe existing treatment facilities. . water level in cubic yards 550 c.y.
N/A
c. Type of material muck
d. Does the area to be excavated include marshland,
1. Describe location and type of discharges to waters of swamps,or other wetlands? yes
the state(for example, surface runoff, sanitary
wastewater, industrial/commercial effluent,"wash
down").Surface runoff along rnadwa e. High ground excavation/,in cubic yards
g y- +/- 100 c.y. -
2 3/91
•f. Dimensions of spoil disposal area _ c. Shoreline erosion during preceding 12 months,in
..•�lnYatlfi' arp `�:'r1 tit' `'sP1 E�i Prl` a ' a' feet Ni
later date ,
g. Location of spoil disposal area d. Type of bulkhead material .N/.A
above wetlands
e. Amount of fill, in cubic yards,to be placed below
h. Do you claim title to the disposal area? N/A mean high water • N/A
If not,attach a letter granting permission from the
owner. f. Type of fill material N/A
i. Will a disposal area be available for future •
maintenance? N/A
If so,where? 8 ADDITIONAL INFORMATION
j. Does the disposal area include any marshland, In addition to the completed application form,the follow-
swamps,or water areas?
It will not. ing items must be submitted:
k. Will the fill material be placed below mean high A copy of the deed(with state application only)or other
water? no instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
1. Amount of fill in cubic yards 1500 c.y. total the owner of said property,then forward a copy of the
m. Type of fill material Suitable back fill material deed or other instrument under which the owner claims
(sand, soil or rock) title,plus written permission from the owner to carry out
n. Source of fill material t vcal borrow pit the project.
above wetlands
o. Will fill material be placed on mars or oter
wetlands? .yec An accurate work plat (including plan view and cross
sectional drawings)drawn to scale in black ink on an 8
p. Dimensions of the wetland to be filled 1/2 x 11 white paper. (Refer to Coastal Resources
Approximately 55' x 45' Commission Rule 7J.0203 for a detailed description.)
q. How will excavated or fill material be kept on site
and erosion controlled? Please note that original drawings are preferred and
By stringent ernsi nn cnntrnl mnthnrIG only high quality copies will be accepted.Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
r. What type of construction equipment will be used use of larger drawings.) A site or location map is a part
(for example,dragline,backhoe,or hydraulic of plat requirements and it must be sufficiently detailed
dredge)? Bridge construction equipment. to guide agency personnel unfamiliar with the area to the
site. Include county road (SR)numbers,landmarks, and
s. Will wetlands be crossed in transporting equipment the like.
to project site? nn If yes,explain steps that will
be taken to lessen environmental impacts. A stormwater management plan,if applicable,that
may have been developed in consultation with the
0 Division of Environmental Management.
0
A list of the names and complete addresses of the
adjacent waterfront (riparian)landowners. These
individuals have 30 days in which to submit comments
7 SHORELINE STABILIZATION on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
a. Length of bulkhead or riprap N/A that opportunity. REcUpI D
b. Average distance waterward of mean high water or
normal watcrlevel N/A TB j B '93
C',
3I91 F,,r.,,.,,.,rr
3
• Name "; ,. : Wihbri ahscn;
Address Route- 1 -Box 242- I:;;`' 9_ CERTIFICATION AND PERMISSION
Gatesville, NC, 27938 TO ENTER ON LAND
Name Thnmas Mi se .Ir Any permit issued in response to this application will
Address Route 1, Box 134 allow only the development described in the application.
Eure, NC, 27935 The project will be subject to conditions and restrictions
contained in the permit.
Name
Address I certify that to the best of my knowledge,the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
A list of previous state or federal permits issued for ducted in a manner consistent with such program.
work on the project tract Include permit numbers,
permittee,and issuing dates. I further certify that I am authorized to grant, and do in
fact,grant permission to representatives of state and
N/A federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
A check for$250 made payable to the Department of project
Environment,Health,and Natural Resources to cover qq....,,
the costs of processing the application. This is the /2-- day o . !•------ , 19 d-f
X o
A signed AEC hazard notice for projects in oceanfront
and inlet areas. Lando er or uthori d agent
Assis . M. •er,
A statement on the use of public funds. If the project Planning & Environmental Branch,
involves the expenditure of public funds, attach a state- North Carolina Department of Transportation
ment documenting compliance with the North Carolina
Environmental Policy Act(N.C.G.S. 113A-1 to 10).
FlE✓F_IVED
FEB 1 8 '93
0
z
a
0
4
4 3N1
. ewt
,. �,• V I �;y ,tl;•r. y� ►;;1\�' Sullolk 'i' ' ).1A. .il'c, ;. 'RE- ' -
t I �M 17 . 1 .••�11 , )• ��J 1,`.II.. 'f k* 1� t ';' J.'t*. ., l j U rm ,•61 I I 'S1
1� '' If;t l: , �5 r ;.;1 '�;�• I'.' . I tin �:'M �. 1 7? J lu I: 7
wrrzi ) F, 14 e1'4 i, F 4,,.n' '; l e.F.,.�p,niliea• In • a.errlll� t, , ,.,r' A,6 . . .
r BteM 'ill .�• io ��33" ' I• +. 4 1 !'
.IQ1 ••.ww.• . O,um Mill •Ca . .e
CAROLINA 1 ernold'nn
■�Ndl,� •erg bville,1. 1 Geiu I
erY. 4Iil., • lid•ome f A; T E S R-ol. site 1 •1
II' CO2
' beboe ` ►endlelo• 'o•vco•BOekUnd i1116111R•r• !e pp
l IdNI,?r /rt
f• 't' ® 1 Q1 J�y. -`• can " p7—.5, 63
con...r •�lit'whies.ad .. � '1 e• ••.."y,,,•, .Hn,.ne r
•seN�'� T•AMPTOf�.' � I L• 1 J. � c•aevine+ 1 _
Mi1w.ulle.J 1 w,nior . Trolville Q
It \■j v 1 J; 41) ,'.. , , 1 I 1
lack .n iI Potrero Tual - . 'vAle ('
1 + 11 1 esker,. tabs'�Men1 ll , 6�1., I \ J �� .
11 Woodn Er. 41mo . ,.
C•a. E Tk F ro Her• ellfviHe Rrhn •BetviAere C•��1 li44
'11 I I 1)
1, r/`++ nnl ,oh . ;Ahoski I , r . k ch. ealA '
R
.own RR��
id1�r1Y Rich Sou 4�11 ' P e•/. II) Iyner y•Ilnlelt 17 'i• , „_1,.
r 1 e ,J Auul�lAc A f J tc• I Colersln• �.•ia` / Jolla )
X Ro hel• f1 ECHO AN "`-'� '�t '1:,.,�� 1 ........,..,„if '�
5•Dr1n.Hill , R, •Connerit e i // '11 iw ,
7 •Kollar)MP•� II 6 Regylgc.1I 7 lS� a,.:,Our.nl I I
158 •DOH. J/ ., � ,
1� y J irdhelte• 1 g 7 -, 1 ,L •, nr •u•'•' t 1.
,. consort Neck • '�1 -Mount could• `,, k td'.�.. •r r I
I. ton- i.1,.....a. I •
"f ll!�eec r +sK L ,.._f— 1 .
1 I 6 0 Ile. a , ::' ° :
•,~d..,......r •t •
30 .• 1i,40 48 I •
• "
Scats of Kilometers I
rem ..,.,.. I .
y.. ) J Der :7
-
/ ) .b ievr i 1� o.ey yte� 1717 i 3
• -4{ 11f1 • 1101 1'1 ` E • i ) wln.y,c..
171r a .ULI E
m
/
/ WIIMEOAX 1 !'OCOSIN le, 11,
llo/ J�• /
Sorer,
3 , I 117E '�' ll7f I
18:1
1)00
A
11t S11 US 1♦
' 1st` Ii ll
f/ `"i�Llol f.I ‘ .,duce t777 - \
I , 7A !. ••7 Jill
e • • Tnd.e.1 ��•I`0
Ili
I\Upp Ce,n•r High • 1111 e ; -llil 1Ll •' 1 - ' 1 ,1
r \ U• Jf17 I
,t/ /I 11• a. j7 Moen. i 1 _
1'/V•!A'•�\ I I. ',\` 11f1 „ • I•eAr Crdvoo d, err .f• \ Srayr /Lflhtlf (� 1'f -ISLE IJ ll1e • M1 w ,r Ile • j10 ' •
_ 11I
4 Y I I r • JAI 111t A ^ W ;
t'7'
I •./
11t1t \1171 / �0,0.•'0 Lug
/ \1/ /`y 111! '�1 ''7 a le GAfESV111E i
1 1 C c� . Ituf ‘ s t, /
�O' �i i •fO
13 Its,
` s.,`w
17. \ l v.•
Pro'. 6% e r
t�rg b1 l,ee r V1
j ' -�'_� h ,
•.._ _� �r till Ills
` `, rn) LI 11
1 r
H e a r F 1 I
\�� / ,Ilk, , I . ,�
R, o a�"�� NCDOT .
t DIVISION OF HIGHWAYS , ••
' - - GATES CO.
, SIatE " o U REPLACEMENT OF I3RG.N0.0 3 '
I i o I f f I AVM
- OVER JADY BRANCH
SHEET 1 OF 3
- - . . , . __,.__ e,9}e /-a 9-9
•
0/ic SON A.9SC 0 J!>' 77/0/nAS G✓. J77'SE,-JrP
fi1./ .BOX24 - M/ ,84Xi3f�
6.9 TfJLi!!E,N. , EURE, iv.C.
N.
- .
,cam 4;41.34'/ ,,c I'I��',`'
nQJj 1
q
I (April EW0VNACL
r� y -�c>?sv r
a Tv i s I _ WOODS 1
'`i`7'/A,y,D I I 1 Q : NDW LL. TLAN
�- k - i� 1 Co , 1 t :-i.,--:--.;__, ` EDGE 0FW. �D
— __. __ % ' r -*wpm ii•j4; 4, 7
0 v • : v.AN,
—__-___ _, .....„ ; -
,„ ,
_ _ _ _ _ _ _ _ _ _ .
_ , ,,,r,' '%'�." ! ! L ►`red \ i 'BST 5R.1118 TO /YC 37 _
.( • ,.___ . .. 1
• - \ •�JAI ! ►���,•
�0Gc" OFETLANp� - rfrolk, - -
oC \' f 1 E Or !J£TLAN D .
(�'-7 r m aO ' ,�r i I �De�oies: .�i���i; 10, 4-Xc�AA vim_.ee%r./ 0 Alt,
—
e --c-• CI 0 I...:±j 1 .: ,
G7 2 O I _
"i G7 `r7 -
_ZQP_ C1FQ,QN.� •a (- a JAT� z__ _
i " > O
'3 z -r c? waso�v RASCO, sa. Rue. D,9il ��0 s _ 0 o6.gc - 10/'1,45 l</. 711/S4T,�
,e = R �- Re: / QOX ,24z2 F;ll i,�/ G!/ t t - /Qf�/ QOX /35�
," GATES GL /Y. _ "' - aIRE., N.C, ..r,
c� cn 2'79E - ,no Fug ►w R 27936—
- - . SCAi• ' /"_-S0' a 2.
-o O _ ..
S4 . - 91-00 /Of 00 - 1I flk. /1fo0 `
C
- -- QSTA /0+So,
-- • - ---- - - _ 3 @ PA x/z RcBc wirH EdDt✓ACCr
_q ROADWAY 90°SKEW
i C R:(,RADE E :__u 9
5C0 ---7/..--,r• - ••••-______:----7 i r 1 ...--,----
rN ,Rf,
- N� 4TU,4AL_GRoun o Rr. 1 1 ' nro�ivat Ws-El- 'Jf3 v N,�.1J�
le /':5o"Nof/Jo,�fA1
NATURAL GROUND LT ExisTd✓6 ,57NuCTuRC -- EL �41.0 �� - �9�
�90 a-r-4
_ �x/Sf,•N, ST kcfucE
- - De.�otes:-- - -_ xeAURf;o� ge/o„ONwl
A.�s /neat ,EAhu,� ' ` 4�g4
' I I♦ /0" I 0
�� - E STA 10t30 -
AS.5uoe,L DAtur► - - -
3 e /�z /2iRcec WrrN aL<-- •
-
I 90°. slow 500
2 CR.Gill PE EL.cm?
S00 A/lam*- 2:t
E,vdw
1 NORmAL WS. EL.. V93 Edatthq ll
� NG
^� _.. UJATER SURFS E�.�F9►.0
f e z 1 _ . . _.. _. q90 B-r-92
- =-0ac5 .. ,�� —
}} mm •v --1 ,... .- BED
3, c▪ a.. rii vl z-I ; B� .../ EXGAu,9 o•� Be%..�ON/�
Wooz BED EL. S<85. 7 A�aote:
� Citl -I � G R.o.7 °/a -.
W =
48o SCALE
f a ° -
480
z , l ,�r l , / 50' HORIZONTAL .
\ s i ,1, t so /oo /a _ /0 VERT/\ G; 0 L
G7 ca _..,
z SECTION A-A .
T