Loading...
HomeMy WebLinkAboutNCDOT 116-80 Modifcation Hwy 421 Cape Fear River R> •,c,oxOxOYO 1ti O OwOxOkO,v,,..-v+wv v,v�v,,,,,.+.v 4*v+:w v1v: Permit Class Permit Number ' Modif ica tion STATE OF NORTH CAROLINA 116-80 / Department of Natural Resources and Community Development Page 1 of 2 ' and ' RECEIVED Coastal Resources Commission '14trnntt for APR 00 1983 Major Development in an Area of Environmental x / Concern pursuant to NCGS I13A 1]S n., e, . Q x Excavation and/or filling pursuant to NCGS 113-229 !' i 0 i i Issued to Department of Transportation, Division of Highways, P. 0. Box 25201, Raleigh, NC / ' 27611 / • authorizing development in Brunswick & New Hanover County at Cape Fear River (U.S. 421 / Highway) ' / as requested in the permittee's application dated 5/1/80 including/ attached plats described in plat schedule in condition #1 / • This permit,issued on April 13, 1983, , is subject to compliance with the application (where consistent • with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject • permittee to a fine,imprisonment or civil action;or may cause the permit to be null and void. / (1) The project must be carried out in accordance with the following plats: . / a) sheets 1-6 of 6 with sheets 1, 2, 3 & 6 dated rev. 7/80 and sheets 4 & 5 / dated rev. 1/83 and added 4A dated 1/83 b) sheets 1 & 2 dated 10/82 c) "Coffer— ' dam methods" dated rev. 2/8/83. ' (2) All muck will be placed in an approved highground disposal area. (3) All fill material will be obtained from a highground source. (4) The toe of all fill will be stabilized in order that the material remains within the proposed alignments. i / (5) All abandoned causeways on the south side of the river will be removed to ' the existing grade of adjacent wetlands. (6) Siltation control devices will be used during all phases of construction. A ' (See attached sheet for Additional Conditions) / This permit action may be appealed by the permittee Signed by the authority of the Secretary of DNRCD and ' / or other qualified persons within twenty (20) days of the the Chairman of the Coastal Resources Commission. / 1 issuing date. An appeal requires resolution prior to work / • initiation or continuance,as the case may be. - / This permit must be accessible on-site to Department . _ . . / personnel when the project is inspected for compliance. , Any maintenance work or project modification Kenneth D. Stewart,Director Office of Coastal Management ' not covered hereunder requires further Departmental/ , approval. _ / All work must cease when the permit expires on This permit and its conditions are hereby acybpted. / December 31., 1983 I / in issuing this permit, the State of North Carolina ' / agrees that your project is consistent with the North i , Carolina Coastal Management Program. Signature of Perniittee QQ NC Dept. of Transportation Permit No. 116-80 Div. of Highways Page 2 of 2 , ADDITIONAL CONDITIONS / (7) All fill will be seeded, grassed or otherwise stabilized within thirty (30) days following completion of construction. / (8) In order to protect water quality, runoff from the construction area must not visibly increase the amount of suspended sediments in the adjacent waters. , • (9) The temporary detour will be removed within 30 days following completion of , the project. / (10) The fill road within all wetland areas must be within a fabric matrix to / facilitate the removal. / • (11) If any unusual subsidence occurs under the roadbed, that area must be i returned mechanically to pre-construction grade. (12) To maintain natural flow, a large diameter culvert will be installed / through the temporary road where it crosses the tidal creek on the south / side of the river. / / i / / , / / L