HomeMy WebLinkAboutNCDOT 101-95 Refinement Bridge #8 SR 1245 Coinjock Bay (2) State of North Carolina
Department of Environment,
Health and Natural Resources 1 •
Division of Coastal Management
James B. Hunt,Jr., Governor
Jonathan B. Howes,Secretary H R
Roger N. Schecter, Director
August 30, 1996
Randy Turner
NC DOT
P. O. Box 1405
Elizabeth City, NC 27909
Re : Major Permit #101-95
Dear Mr. Turner :
As you know, we have had several discussions concerning proposed
changes to the existing construction details as approved by the
subject permit . These changes involve the two temporary work
structures . Your proposed changes would increase the length of one
structure and entirely delete the second structure .
These proposed changes will not interfere with navigation and will,
in essence, probably decrease the impacts of this project to the
adjacent marsh.
So long as these changes do not interfere with navigation, I concur
with your proposed changes . This letter will serve to refine the
subject permit. This letter and the attached plat, REF 1, should
be kept at all times with Major Permit #101-95. All other permit
conditions shall remain in force.
If you have questions concerning this refinement, please feel free
to contact me at (919) 264-3901 .
Since
/(,)(0 —,41
1A) SEP;� 1996 I�ECEsvFO11
Richard L. Watts Gu/iy,,.L
District Manager MANAGEMENT
cc : P . Pate
D. Huggett
Mike Bell, USCOE
Tom Brite, NC DOT
J. Grantham, TALCO
1367 U.S. 17 South,Elizabeth Ctty,North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723
An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper
TAL CO
T. A. LOVING COMPANY o hE,:\
0
CEIFr,R4 GENERAL CONTRACTORS
9 a„,..
DRAWER 919 •GOLDSBORO, N.C.27533-0919.919-734-8400 s Sa
AMEF
August 22, 1996
Auc � .
Mr. T. E. Brite, Resident Engineer
N.C. Department of Transportation
P.O. Box 1405
Elizabeth City, NC 27909
Re: Currituck County
Project No. 8.2040101
Subject: Temporary Access Bridge Sketch Location
Dear Mr. Brite:
Attached please find a location sketch our proposed temporary access bridge. Please note that we
propose to build all the bridge from the south bank to approximate station 1+225. I met with
Dennis Hawthorn of DCM on 8/20/96 at the site to verify that this was in accordance with the
permit. Mr. Hawthorn felt that this approach would be at most a refinement of the permit and
would impact the wetlands less than building a bridge from both banks. He asked that we submit
a sketch of our proposed layout for review. Please forward a copy to DCM and advise if this is
acceptable a soon as possible.
Sincerely,
i � \
John Grantham
Regional Project Manager
Enc.
as
cc: Mr. Dennis Hawthorn
AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER.
FAX 919-736-2148 FAX 919-731-7538
BUILDING DIVISION•BRIDGE DIVISION•ACCOUNTING
UTILITY DIV.•SAFETY•EQUIPMENT•RISK MANAGEMENT
END BRIDGE STA PP235.696 \ car �,ti;�p J • //„
_ • I, it--(1.r3 41.1:5() -s
- I . it; )`C) k, 7" ,, 0 ...„12
/ „.„47,. .--,"'
1 ft,..! i G- 0(-1
`�/ PROP. CONC. FLUME I-�ND FUNNEL DR,4(JY ,, . . 7 F., -
300mm CSP VI/ ELBOW ,,, �('� \ , '( I / tri 46 ,, g 4 0 gi y a
ELEV. ti a o • -,v N `\ �, t . `' p- p•
u s ?) '>'..Q.i..-ju vi
1-- m v -ti• rlilOrr
II
.Z g u 2 i.--- / ,, #....sp # at *
(.1 X a
•
a w PR P. ANCHOR ! "E X - '.:1)14 rE./-•
J� '* 1
1•\' • **4104.‘ Ifr.4 /I,
Mt\ co tiel r 111 • \ ,4*• . nitirit;:;. : 5 5
I
to
/notoutwig,
1 f �• L� A a1 made of ; ram;} a ��• n-c concr'10 ploQes r, •;
1� i\ '- 4 S<' / / ram,1 i
a .•.•5,v, .•;:ne,... /I. ' • 1: _p--ivati ,'t! 17PROP.
S MG♦ • / �j
-V. '' '''''' A. A - #4010,0 110'Orr
//Ct://
::-,-. i's :
.. .......,••• . . \
. -d,;(;
5 ..-ice" r':' ''• ; ✓• f , '��•q IV �_
ram- 1 i ��. wt i c cc, --- PROf
• -�"I r � tx ' F Pnr>�. �rlclloft TYPE XI EST.
l .•: �.- . — EST.