Loading...
HomeMy WebLinkAboutNCDOT 101-95 Refinement Bridge #8 SR 1245 Coinjock Bay State of North Carolina Department of Environment, Health and Natural Resources A4711il'A Division of Coastal Management wit"' ___ James B. Hunt,Jr.,Governor CO E H N R Jonathan B. Howes,Secretary Roger N. Schecter, Director 44 rr" March 19, 1997 M. Randall Turner Division Environmental Officer Planning&Environmental Branch-Division One N. C. Department of Transportation 113 Airport Drive Suite 100 Post Office box 850 Edenton,North Carolina 27932 RE: Refinement of CAMA Major Permit No. 101-95; Replace Bridge No. 8 on SR 1245 Dear Mr. Turner: The Department of Transportation's request to refine the above permit will allow "in-water" construction to occur beyond the April 1' cut-off. Our office has discussed the request with Sara Winslow with the Division of Marine fisheries and agree to the refinement with the condition that the Department of Transportation will be required to maintain sediment curtains around all bottom disturbing activities. If you have any questions do not hesitate to contact me. Sincerely, /116,..1 Richard Watts District Manager V2' RW/Im ` leq94? % ,sue c O CC: File f } -� 9 • `- `9/1' 4I 9 aiV 1367 U.S. 17 South,Elizabeth City,North Carolina 27909 Ntit,C An Equal Opportunity/Affirmative Action Employer Voice 919-264-3901 FAX 919-264-3723 50%recycled/ 10%post-consumer paper o • MSU7t... . 4 is c--- STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. GOVERNOR SECRETARY 113 Airport Drive Suite 100 P.O. Box 850 Edenton, NC 27932 March 10, 1997 N. C. Department of Environment, Health and Natural Resources Division of Coastal Management 1367 U.S. 17 South Elizabeth City, NC 27909 ATTENTION: Ms. Lynn Mathis; Coastal Field Representative SUBJECT: Request for Refinement to CAMA Major Development Permit No. 101-95; Replace Bridge No. 8 on SR 1245 over Coinjock Bay, Currituck County TIP No. B-2536; State Project No. 8.2040101; Federal Aid No. BRZ-145(1) The Department of Transportation requests that the subject permit be refined to allow"in-water construction activities to continue beyond the April 1 moratorium cut-off. While all or most of the planned "in-stream" construction may be completed by April 1st, there is a real possibility; due to weather, etc.; that this goal may not be achieved. In anticipation of this contingency, the Department met with Ms. Sara Winslow, Biological Supervisor with the Division of Marine Fisheries, at the work site on February 26, 1997. The Department agreed to agressively maintain all sediment curtains during any bottom-disturbing activities whether they occur before or after the moratorium. Please issue a refinement letter authorizing the Department to continue construction activities beyond the moratorium start-up on the condition that all existing sedimentation controls are strictly enforced. Thank you for your assistance in this matter. Please call me if you need additional information. Sincerely. 6 ✓ aMtet/7- M. Randall Turner, Division Environmental Officer Planning & Environmental Branch-Division One cc: D. R. Conner, RE. H. Franklin Vick, P.E. Phone:(919)482-7977 Fax: (919)482-3826 Courier: 10-62-26