HomeMy WebLinkAboutNCDOT 95-95 Refinement Bridge #38 NC 118 Swift Creek State of North Carolina
ATDepartment of Environment,
Health and Natural Resources • •
Division of Coastal Management p
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
November 1, 1995
Mr. M.W. Nottingham, P.E. RECEIVED
Resident Engineer 9 NOV 2 1995
Department of Transportation
P.O. Box 1587 MAf ^GFkktIT
Greenville, NC 27835-1587
RE: CAMA Permit #95-95: Bridge #38 on NC 118 :44"t4 Creek,
Craven County
Dear Mr. Nottingham:
This is in reference to your letter dated October 23, 1995,
concerning Condition #2 contained in CAMA Permit #95-95. This
condition requires silt curtains to be in place upstream and
downstream from the project site while construction activities are
underway. According to your letter and attached drawing, the
Department of Transportation would like to be relieved of this
requirement since cofferdams will be in place prior to the driving
of pilings, thus minimizing turbidity impacts in Swift Creek.
Additionally, your letter notes other erosion control measures
which will be utilized during project construction to prevent
sediment run-off from entering adjacent wetland and water areas.
Please be advised that CAMA Permit #95-95 is hereby refined to
allow for the deletion of Condition #2 as long as those measures
described in the above letter are utilized during project
construction. Please attach a copy of this letter to your permit
so that it may be made available to Department personnel when
making routine monitoring inspections of the site.
S ' cerely,
Charles S. Jo
District Manager
cc: Preston Pate
Doug Huggett (w/enclosure)
Raleigh Bland, COE (w/enclosure)
Cyndi Bell, DOT (w/enclosure)
P.O. Box 769,3441 Arendell St.,Morehead City,North Carolina 28557 Courier#11-12-09
Telephone 919-726-7021 FAX 919-247-3330
An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper
••
rut : SAWCIRD CaET c3 PPCHE NG. : 91.S 775 4595
XIS 8, I 1 "LI 2 o r C ZAV a_N
SANFORD CONSTRUCTiON COMPANY
ate=No. Ef.etm. Ez_ 6ps
P.O. Box 3427 arr.-
,.- , SANFORD, NO 27331-3427 CA.CULATE0 pr.
Avg
.-1P;•.: .r: 019} 775-222.5
,........it4. FAX (919) 775-4S95 =coma Mi•
!UT! 4/0..
-•
•
scAcE Not(
• . • - - • -• , 7 . • = - • •:. • • • • • , • = : 4 : .71t 21434 ' 6 o.tar .7373 ' ,pg ..
- ..— ..... ..—.
!
_
i
-
. — ... .--- ,rip. A
Imr. ,.. ..........__. •
1,2.s Aokci.• .
— .
. . •
1
t
lqi "
. _
0
.
( t
I .
• .
...._
I 1"%,... .
•
tiP'30:07i7i -
•
F.
LA
-
.
, . .
_.•...... ......___....
-7:
• --........_
i
.
db• • - .
!...—!MI::-.) f---1 • _
. .
•
, .
...— ,
"---- -
w
. . - -
. . .
,.. .
11' .
. t
_
• _ . .
_ _
.. .
..•
cez•g-tg• Pkftr-Fc77.5,..,
. . .
.. .
. .a
r —.....---
. A• A'' . ,
J
... —
.
..•
. ... - . •
- - _
. ...-
.. -,-..
. - ... .
• ••
. .
••
7r
•..11•1•••••11
• I ,• r . 2 . .. .• *. r •••• ... -,. r. r r . . . . . ,•• r ... -- ...t . . As . 7[ •• •11 . 4
— .- - .—
11/01/95 09:28 698308556 ?003
Mr. Charlie Jones
Page 2
-October 23, 1995
Thank you for yourhelp to clarify the special conditions of this permit
Should your.have any questions,please advise. My phone number is(919)830-3495.
Sincerely,
/1-(4/
M.W.Nottur am, .
RESIDENT ENGINEER
MWN:bhh
Attachment
xc: G.R.Shirley,Jr.,P.E_
I C.Maiming,P_E,
4 Ryr
STATE OF NORTH CAROLINA
. DEPAFCIMENT Or TRANSPORTATION
JAMS B.HUNT.J R DIVLSION OF HIGHWAYS
Govsusion.
P.O.Box 1587
Greenville,NC 27835-1587
October 23, 1995
STATE PROJECT`: 8.1171201
F.A PROJECT: BRS-3163(2)
COUNTY: Craven
DESCRIPTION: B-2019,Bridge over Swift Creek and Approaches on NC 118
West of Vanceboro
NC Dept.of Environment,
Health&Natural Resources
and Coastal Resources Commission
Attn: Mr. Charlie Jones
P.O.Box 769
Morehead.City,NC 28557
Dear Mr..Jones:
It is requested that Special Condition Number 2 be deleted from Permit Number 95-95 on
the above referenced project.
The following sedimtsarion and erosion control measures will be emphasized during
construction:
�. Cofferdams will be constructed per attached sketch from the Contractor. The
coffin dams will control the movement of disturbed earth material.
2 Silt fence and other erosion control measures will be installed prior to earth moving
activities as per the erosion control plans.
3_ The bridge fill face slope will be stabilized with rock rip-rap immediathly upon
completion of grading operations_
11/01/95 011
9:27 98J08556 a 001
Division of T�hways
Construction Unit
P.O.Bo=15S7
Greenvale.NC 27535-1587
Phan (919)830.3495
Far. (919)R30-S5556"
Da l 1— Ci
Ple--ase Deliver to:
NAME: � � n
ADDRESS OR ROOM NUMBER: D
FAX NUMBER: '1- 33 CD
This fax is being sent by:
NAME: U3
Number ofpa.a-es(i id covzT3:
if YOU DO NOT RECEIVE ALL
AS PAGES CLEY OR HAVE
ALA NK Oil?A Q S'ION,
PLEASE CALL BACK AS SOON
Additional R ri-