Loading...
HomeMy WebLinkAboutNCDOT 7-98 Minor Mod US 264 Croatan Sound, Spencer Creek 1 , Permit Class Permit Number MODIFICATION/MINOR 7-98 STATE OF NORTH CAROLINA Department of Environment and Natural Resources , and , Coastal Resources Commission 4 Iermtt , ,f g for ,, Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Y Excavation and/or filling uant to NCGS 113-229 Issued to N.C. Dept. of Transportation, P.O. B ' 01, Raleigh.NC 27611 authorizing development in Dare G�;' ounty Croatan Sound and Spencer Creek, US 64-264, Manns Harbor to Manteo / "���!,� letterdated5/14/99,includingattached , as requested in the pe itte�s ap,prication fitted location chart, dated received 5/14/99. 'N./ / �--� �/. ,�-, 1 This permit, issued on '�1/779 is s bjt to mph e with the application(where consistent with the permit), all applicable regulations, special conditions es set o b low. Anyviolation of these terms may PP � be subject to a fine,imprisonment or civil action; or may cause the pe to 1 and void. J.L., 1) This minor modification authorizes the placement o our (4) 24" diameter steel piles in Spencer Creek, as depicted in the attached location chart, for the purposes of providing safe and secure '� mooring for crane barges during storm events. 4/ 2) The permittee must install and maintain at his expense any signal lights or signals prescribed by the ' U.S. Coast Guard and/or the N.C.Wildlife Resources Commission, through regulation or otherwise, ' on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure , in order to make it more visible during hours of darkness or inclement weather. , 3) The temporary piles shall be removed within six (6) months of project completion. (See attached s This permit action may be appealed by the pennitteeheet or for Additional Conditions)Signed by the authority of the Secretary of DENR and the ' other qualified persons within twenty (20) days of the Chairman of the Coastal Resources Commission. ' issuing date. An appeal requires resolution prior to work initiation or continuance,as the case may be. This permit must be accessible on-site to Department ' personnel when the project is inspected for compliance. 0K��4 9 y P Donna D.Moffitt,Director Any maintenance work or project modification not Division of Coastal Management . covered hereunder requires furtherDepartmental approval. . , ,. 11 work must ce e'hh ew ' nnit expires on This permit and its conditions are hereby accepted. • , ecember 31. 20 , In issuing this permit,the State of North Carolina agrees , that your project is consistent with the North Carolina I. C-. a /4A, i f,' 1, 6-/..tcrA , Coastal Management Program. Signature of Permittee ' N.C. Dept. Of Transportation Permit#7-98 Page 2 of 2 ADDITIONAL CONDITIONS 4) The permittee shall be responsible for en 'ng that all barges or similar equipment associated with this project are removed from th o' t location following project completion. regardless of ownership of such equipmen This Requirement shall also apply to any barges or equipment that , may become partially or totally submerged during any storm event. 5) This permit does not authorize any dredgn,;including propeller "kicking", within Spencer Creek or any other area not previously author zed. __. 6) This minor modification shall be attached tlp the 'or 1 'fication of Permit No. 7-98, which was issued on 9/23/98, and all documents be r a ' y available on site when a Division , representative inspects the project for complian . 7) All stipulations and conditions of the active perms remain in force under this modification unless altered herein. MAY-14-'99 FRI OE:27 ID:PLANNING AND ENV IRON TEL NO: 4096 PD2 ‘JO-711) STATE OP NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. E. NORRIS TOLSON GOVERNOR SECRETARY May 14, 1999 North Carolina Department of Environment And Natural Resources Division of Coastal Management _ 1367 U.S. 17 South Elizabeth City,North Carolina 27909 A'1 thNTION:Mr. Frank Jennings, Coastal Management Field Representative The Department of Transportation requests authorization for the installation of four (4) 24" diameter steel piles in a section of Spencer Creek near the Ferry Division Maintenance Facility on SR 1105. The purpose of the mooring piles is to provide a safe and secure harbor for crane barge(s) during storm events. Balfour Beatty, whose crane barge(s) that are in use at the Manteo Bypass construction project, will make use of the mooring facilities. It is requested that you approve this activity as a Minor Modification to the existing CAMA Major Development Permit. The Department assures the Division of Coastal Management that there are no plans to excavate, dredge, or otherwise modify bottom contours in the vicinity of the proposed piling locations. Furthermore, the Department (or its contractor) will provide location information to the U.S. Coast Guard so that it can issue a notice to mariners. A check for$50.00 to cover the Minor Modification application fee, copies of letters and notification forms sent to adjacent riparian landowners and maps depicting pile locations are submitted for your consideration. Note that state plane coordinates have been provided for each proposed piling. Please issue the modification at your earliest opportunity. Feel free to contact me if you need any additional information. As always, your time and cooperation and are greatly appreciated. S CC 1 , S nior n 'ronmental Officer Project Development and Environmental Analysis Branch Enclosures Cc: D.R. Conner, P.E. P.O. Box 850, Edenton, NC 27932 (252)482-7977 Fax: 125Z) 482.3826 ASS^^: NORTH CAROLINA DEPARTMENT OF e, ENVIRONMENT AND NATURAL RESOURCES DIVISION OF COASTAL MANAGEMENT A:7111711S, NCDENR \lay 17. 1999 JAMES B.HUNTJR. GOVERNOR NC Dept.of Transportation P.O.Box 25201 Raleigh,NC 27611 WAYNE MCDEVITT y} Dear Sir: SECRETARY i �iltt ': ,f'_f' The enclosed permit constitutes authorization under the Coastal Area Management Act,and where applicable, •' J` +.'/ the State Dredge and Fill Law,foryou toproceed withyourproject proposal.The original uff-colored form)is g P Po �` � I •1 ` retained by you and it must be available on site when the project is inspected for compliance.Please sign both the • original and the copy and return the copy to this office in the enclosed envelope.Signing the permit and proceeding DONNA D.MOF FtTT ' means you have waived your right of appeal described below. DIRECTOR i If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of P.O.Drawer 11666,Raleigh,NC 27611,(919)733-2698 within twenty(20)days of this �s� ��; � ,i h Administrative Hearings, ^;} i decision on your permit.You should also be aware that if another qualified party submits a valid objection to the "' issuance of this permit within twenty(20)days,the matter must be resolved prior to work initiation.The Coastal s �" • Resources Commission makes the final decision on any appeal. s 1.,4, The project plan is subject to those conditions appearing on the permit form.Otherwise,all work must be it carried out in accordance with your application.Modifications,time extensions,and future maintenance require additional approval.Please read your permit carefully prior to starting work and review all project plans, as y approved.If you are having the work done by a contractor,it would be to your benefit to be sure that he fully t AkIt understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at a i 1 any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. ..,..._"w atiw ,„rn.... y,.�.,. ,. ^Very sincerely, ...0\iksoiNc:)...4c:),Ax,k-N r! • tea.. A = John R.Parker,Jr. . "-t Major Permits/Consistency Manager ' • 'C:::` JRP:jr/amw ,, - Enclosure jam '' -NI' • '— �It' 116M30' "le- ». _. ' P.O.Box 27687, RALEIGH,NC 2761 1-7687/2728 CAPITAL BLVD., RALEIGH,NC 27604 '+.*'I.s- PHONE 919-733-2293 FAX 919-733-1495 ,,�"-1"-:: AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-50% RECYCLED/10% POST-CONSUMER PAPER J e25?1eche. MEMORANDUM: MAY 1 COA$TA I MANAGEMENT TO: Doug Huggett, Major Permits Coordinator, DCM THROUGH: Charles S. Jones, Assistant Director FROM: Frank A. Jennings, III, DCM SUBJECT: NCDOT Modification Request for CAMA Permit No. 7-98, Modification III DATE: May 14, 1999 The NCDOT is requesting a modification of CAMA Major Permit No. 7-98, Croatan Sound Bridge, Dare County to install four storm mooring pilings in Spencers Creek across from the state ferry maintenance facility. The purpose of the moorings is to provide a safe mooring during a storm. A chart indicating the proposed location of the mooring pilings has been received in this office as well as copies of the adjacent riparian notification letters and a check for $50.00 (#5328). It is recommended that the notification request be approved with the following conditions: 1. The authorized structure and associated activity must not cause an unacceptable interference with navigation. 2. The permittee must install and maintain, at his expense, any signal lights, signs and/or signals proscribed by the US Coast Guard or the North Carolina Wildlife Resources Commission through regulations or otherwise, on the authorized structure. 3. Structure must be removed within 6 months of completion of the Croatan Sound Bridge project. North Carolina Department of Environment and Natural Resources • James B.Hunt Jr.,Governor • Wayne McDevitt,Secretary Division of Coastal Management • Donna D.Moffitt,Director Elizabeth City Office • 1367 US 17 South • Elizabeth City,NC 27909 • Phone 252-264-3901 t1AY-,14-1999 FRI 04:21 PM DCM-DMF E. CITY FAX NO, 252 264 3723 P. 06 • • STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 5328 WARRAN NC CliA DIVISION ONE OFFICE P . C . pox 850 EDENTON, NC, 2793/ PRES2NT TO!STATE TREASURER PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM PTO NCDENR 04/2 ;99 $50 . 00 THE 1367 US 17 SOUTH ORDER ELIZABETHo(J CITY , NC 27909OF _ 7 /M1i/it Mit*7-`r A II'00 S 3 280 1:0 5 3 1 10 5 9 41: L"",000,,,6 4 Ill' UAY-14-1999 FRI 04:21 PM DCM-DMF E. CITY FAX Na 252 264 3723 P. 05 Y w ENDER: W Ph Ptete iteComplete ms 3,4a. nd 4b.r additional eorvicos, W earn tolh a foml to tour name he address on the reverse of ihts form so! receive the 1.11? "Attach I also wish to Permit. he franc of the nal wo can'MUM thi; foffowing SerVices(for an b •Atta•R ft Wowece,or on the back if s does extra arum A fee): C rdel v Pie eredm Roco Receipt ow�°o°ho the ntalIp sea below the article got 1. Q Addressee's° m e an cte Was f number Address • delivered and ih°tlato 2 b Restricted Deliveryc 3.ar Aritcfe Adores9ed to; �' Consult postmaster v E 1 19 �` I • ' I ' 4a.Article Number for lee, ` ,1` ' `, I i4 i )-arc-.tom Syp v Gj H4b.Service Type r l ' c j32-4.4\ q �' (:_ --/, p Registered C- a- in /U G �4 Q Express Mall Certified a I d Rerum •eog;Pt for Merchandise ei p l�s4red 7 ry y a 5. Fexeived ey;(PrrntN ) Date , p; f e (7 COD o ' ,�/ e re 7• a .,S; '/�f ` r v 8,Addressee's Address ' a°. o 9natur (Address=-;,.or A9en Agent)' " and fee i7 peld) (Only it reques,.d x Xc PS rm 3811, December ~ 994 a SEND Domestic Return Receipt •1• ple��m.. e`r 'Co'Co too4r name andor to,adtlil(ohat den cos, tipe.lch!h (off to address on the reverse of this form 9 f... wish to receive rmlf. of o thot wo can rein s llo j Seryic m to fo wtn (fo the .� •write Return Re the mei1piec°•or on tho back�t s Ok2 eS(for an M The gelum coI the front nesr pace does ra fog C delivoreq. Aeeeipt will show tom•°n iho moirweea bof o s not °whom the ankh ow the anlcte n 1' Q Addr w.ts depvelpn an umoer, eSsgo's Address .ei�' 3.Article Addressed d tho data �2. Q l/`�_.,.�q� Sed to: Cor,gult Restricted Delivery h Q .e C 14 m�i�v,-� CvG __ .\ 4a.Articla Nunlbor postmaster fOr fee �i E to 1 , m�,�r, �`^— cv u trr , 4b.4 Zd z C ❑ Express mail k Certified CC j �f / �h 1��5-� d Return Receipt for Q Insurod e Received By: d 7. Date of Delivery Merchandise p COD 6, ` � • I mature: B.Addressee's r �, (Addrassea•r'gent~ �`���� dgress and lee is p,id) II (0 lyil o.Uested x 44 c PS Form 3811, December 1994 t~ Domestic Return Receipt � (/L. 5 Z./z.. /� A � � STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. E. NORRIS TOLSON GOVERNOR SECRETARY May 3, 1999 Don Chapman, Assistant Director Ferry Division North Carolina Department of Transportation P.O. Box 40, SR 1105 Maims Harbor,North Carolina 27953 Dear Landowner: The North Carolina Department of Transportation is proposing to install four (4) metal pilings in the Spencer Creek channel located near the entrance to the Ferry Maintenance Facility basin at Manus Harbor. These pilings will be used to moor crane barge(s) during storm events. The pilings will be in place only during the construction of the Croatan Sound Bridge. The proposed work will occur within Estuarine and/or Public Trust Waters, which are Areas of Environmental Concern (AEC). This proposed action falls under the regulatory authority of the Division of Coastal Management (DCM). The DCM regulates development within AECs in accordance with the Coastal Area Management Act(CAMA). The CAMA requires that adjacent riparian landowners be given an opportunity to review the proposals that would constitute development in an AEC, and to comment, if they choose to do so. Since the proposed action will require a General Permit from the DCM, the law provides for a 10-day comment period (unless you choose to respond sooner). The attached form is designed to provide you a convenient and expeditious way to signal whether you have any objections (or other comments) to the proposal. Should you want to comment,you may call or write to: Mr. Frank Jennings, Coastal Field Representative N.C. Department of Environment and Natural Resources Division of Coastal Management 1367 U.S. 17 South Elizabeth City,North Carolina 27909 Phone: (252)264-3901 Thank you for your time. Please call me if you have questions. Mre/1-y;') • ---"clIMida M. Randall Turner, Senior Environmental Officer Project Development& Environmental Analysis Branch Enclosures Cc: Mr.Frank Jennings,DCM Mr. D.R. Conner,P.E.,NCDOT P.O. Box 850, Edenton, NC 27932 (252) 482-7977 Fax: (252) 482-3826 ADJACENT RIPARIAN LANDOWNER STATEMENT (Dare County: Install Temporary Pilings in Spencer Creek) The Department of Transportation is proposing to install four (4) metal pilings in Spencer Creek near the entrance to the Ferry Maintenance Facility basin at Manns Harbor. The 24" diameter pilings will be used to moor crane barge(s) during storm events throughout the construction of the new Croatan Sound Bridge. The attached drawings and maps depict the proposed location of the pilings and their relationship to adjacent landowners. This form allows you, the adjacent riparian landowner/manager to express either: (1) that he/she objects to the project; or, (2) that he/she does not object. Of course, the adjacent riparian landowner need not sign this form at all if he/she so chooses. No response within 10 days will be construed to mean the adjacent riparian landowner has no objections. I, nrAv q c P i`/AN , am an adjacent riparian property owner/manager and am aware of the North Carolina Department of Transportation's plans to install four metal pilings in Spencer Creek, as depicted on the enclosed map. I am further aware that this work will occur in one or more AEC's and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (CAMA). I have no objection to the project as presently proposed. I have objections to the project as presently proposed and my comments are attached Signature of Adjacent 'pariantandowner/Manager Date: S^