HomeMy WebLinkAboutNCDOT 7-98 Minor Mod US 264 Croatan Sound, Spencer Creek 4 / Permit Class Permit Number
• 5th MODIFICATION/M1NOR 7_98
' STATE OF NORTH CAROLINA '
' Department of Environment and Natural Resources /
and /
Coastal Resources Commission
Icrmit
.
, .
for '
X Major Development in an Area of Environmental Concern ,
pursuant to NCGS 113A-118 ,
/ /
X Excavation and/or filling pursuant to NCGS 113-229 /
/ /
Issued to N.C.Department of Transportation, P.O.Box 25201, Raleigh,NC 27611
/ Authorizing development in Dare County at Croatan Sound and Spencer Creek, US 64- '
/ 264. Manns Harbor to Manteo , as requested in the permittee's application letter dated 5/30/00. including .
the attached workplan drawings (2): 1 dated 5/30/00; 1 dated 5/2/00
/ This permit, issued on 7/ /97°0 , is subject to compliance with the application (where consistent '
' with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may '
' be subject to fines,imprisonment or civil action; or may cause the permit to be null and void. '
,
' 1) This minor modification authorizes 4 additional temporary 24.0" steel pipe piles in Spencer Creek for /
additional storm mooring capacity and 14 additional temporary 24.0" steel pipe piles adjacent to bridge '
span 22 in the Croatan Sound to assist barge operations associated with the loading and unloading of '
construction equipment and materials. This minor modification also authorizes delaying the planting
schedule for the Mashoes Road mitigation site from spring of 2000 to spring of 2001 to allow more time ,
to control Phragmites australis.
2) This minor modification must be attached to the original of permit No. 7-98 as well as subsequent /
' modifications dated 9/23/98, 5/17/99, 5/20/99 and 5/1/00, and all documents must be readily available '
on site when a Division representative inspects the project for compliance. '
, 3) All conditions and stipulations of the original permit and subsequent modifications remain in force ,
under this minor modification unless altered herein. ,
'' This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the '
' other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. /
' date. An appeal requires resolution prior to work initiation or /
' continuance as the case may be. '
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance. 5:7, V , ,T
Do
,• Any maintenance work or project modification not covered
�d D. Moffitt, Director
Division of Coastal Management
, hereunder requires further Division approval. g
' All work must cease when the permit expires on This permit and its conditions are hereby accepted. /
December 31, 2001
' In issuing this permit, the State of North Carolina agrees '
' that your project is consistent with the North Carolina Coastal /
Management Program. Signature of Permittee '
47;64
RECEIVED
�r -
rr ` JUN 0 6 2000
COASTAL MANAGEMENT
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B.HUI'.T JR. DAVID McCOY
GOVENOR SECRETARY
May 30, 2000
Michael F. Bell, P.W.S., Regulatory Project Manager
U. S. Army Corps of Engineers
Washington Regulatory Field Office
P.O. Box 1000
Washington,North Carolina 28779
Dear Mr. Bell:
SUBJECT: Proposed Minor Modification to Department of the Army Permit
No. 199502334: Improvements to US 64-264, Including the construction of a new
Croatan Sound bridge, from west of Maims Harbor to NC 345, south of Manteo,
in Dare County; Federal Aid Project No. NHF-64 (6); State Project No.
8.T051401; TIP No. R-2551.
Please reference previous correspondence dated January 14, 1999 and a subsequent modification
to Department of the Army Permit No. 199502334 issued February 24, 1999. As noted in the
referenced permit modification. the planting of the Mashoes Road mitigation site was previously
scheduled to be complete by spring of 2000. However, the control of Phragmites australis has
not been successful. Since the removal of this species is a permit condition, the NCDOT feels
that additional time is necessary to control the Phragmites and to get the entire mitigation site
planted.
The NCDOT proposes to revise the planting schedule to reflect planting the site during the spring
of 2001. The presence of Phragmites within the site warrants herbicide treatment of this species.
The Phragmites was treated in June of 1999. However, the site remains contaminated with this
species. Since a non-selective herbicide treatment is not presently available for Phragmities, any
treatment after planting will damage the desired species. Therefore, the NCDOT requests that
the Department of the Army Permit be modified to allow continued treatment of the Phragmites
and to plant the site in the spring of 2001.
Additionally, the contractor has identified the need for 4 additional temporary 24.0" steel pipe
piles in Spencer Creek and 14 additional temporary 24.0" steel pipe piles adjacent to bridge span
22 in the Croatan Sound. The additional piles in Spencer Creek are similar to the previously
permitted safe harbor mooring piles in Spencer Creek. The extra piles are necessary to
accommodate additional equipment that has recently been employed in the construction of the
new bridge over the Croatan Sound. The location of these piles is depicted on sheet 2 of 2 in the
attached drawings. The piles will be used as a safe harbor mooring location in the event of
severe weather such as a hurricane or tropical storm. The 14 temporary 24.0" steel piles adjacent
to bridge span 22 will be used to assist in barge operations associated with the loading and
unloading of equipment and materials during bridge construction. The centerline of span 22 is
located at Station No. 46+36.06 and is approximately 2078.58 feet east (along the new bridge) of
the first bent on the western bridge terminus. All proposed piles are depicted in sheet 1 of 2 in
the attached drawings. -
Thank you for your time and consideration. The Department respectfully requests that
processing of this modification request proceed as soon as possible. By copy of this letter, the
Department also requests that the Division of Water Quality and the Division of Coastal
Management also modify the 401 Water Quality Certification and the CAMA Major
Development Permit respectively. If you have any further questions or would like additional
information, please don't hesitate to call. Thank you for your time and consideration.
Sincerely,
D. R. Conner, P. E.
Division Engineer-Division One
%%
T. Lindsey ddick, Jr.
Division Environmental Officer-Division One
Enclosures
Cc: David R. Cox, NCWRC
Tom McCartney, USFWS
John Hennessey, NCDWQ
Sara Winslow, NCDMF
Ron Sechler, NMFS
Mr. Bill Gilmore, P.E., DOT
Mr. Frank Jennings, NCDCM
Mr. R. W. Midgett, P. E.
Mr. R. E. Capehart, P. E.
Mr. Ted Bisterfield, EPA
Ms. Cathy Brittingham,NCDCM
0
3
n
S NEE T SCAt i:• 1124 Cf tJT E RI INC NF N i ?2 ��
NCDO7 51301O0 File locatbns for — 3,856 M PwsEa 2`i
8Crouton Sound Brkige I Of Z Material Loudout ?sue
O ProJecb 0.T051403 (R 2551>, N}iF-6.1(:TE1i
Drawn Hy,JLNode. _ t.1
e1 2' J 14 STEE`
—_ —11 ?14 1-- -
..�� . _. __. -- - .____ _--`� —
15 �; -. 'I 3 STA 46+44.84
•
0O _ --- STA 404333 0
O 9
`/ P4• 14
'- = SILLL A Upstalbn
proP ".sEa pi PIPE PILE
Shit eIlb al?)
N .Sto y(at 34,0(!
1 .1" E3 H CENTERLINE: - SPAN 22
N EXISTING
STRuClURE
STA 46+21:L19 p
`� ° '7 ° 'MI
—18.288
8.288 -STA 46427.20 0,914 M- t.-
j m ao�S.s 8
4.57" M FEET
..096 M �.
21 DENT 21
u
1o3
(1%-\ "t'o ,0 a
ST'EEI. P ?E 1�S LE.S Z
o: Z`1' N
®: PzPE ? .L.-E.. 2.1AuktA3E4Z Z - f Jb gEr►t Writ' Er�4 -
A to1.s
tfro STA. �o
N
0
1
a
+/- 100'
+/- 100`
horsline
•
proposed temporory moorings -+/- 100'
4011
+/ 22' existing temporary mood s
9
Sketch pion showing opproximcte area of
proposed, temporary storm moorings
�GpoT SNeEr 2 of 2 e
NOWT Ferry Atolntenonce Arse
NOT TO SCALE
Drawn by: PER 5/02/00
+ ., rr... CC..li..'__ --7
3:fr 1 4.• .'...••••••••••.;C. 1\kt
K E 12.--____
- 'Sm•ertint 0
,h ,Duct , ---"-% BAG
L• END PROJECT 2L Xlr 0
�`� S Southern
n t ro.,.�JC-
y
tirrl S es
` � b Ti.
:. ,.xur S _�\ \l } rsler:yrt�� Gtl . Hills rG.��,'� \ 0.�0Q" f/ w. � \ r..... ... •Lnttan gy �� OK WS/..
f.oV�eu+r td.
�-1�y--••�� h. .1. �r.S ..I . A..9a... �-+i.
•
r sy,-" — l w..r.•.Vats He■ •• t.e•.,•.r a...ew..e... syk �^
1 n ` Manns l M nEdb y 9. /
r U►e �•7 HuOor +tOL\ t t ►.t.., "•
I o
ee: /
I •n .,.n.OUSe 'Orroon!new /
1 D A R E ,q-:•1: �oJ a A tv s
r S
RocIsnru:
.F „cans I F L
t • 7 \\ BEGIN PROJECT
F ::f� 4r•- :r. 7 F L•'� P 2---„ •i.:;,...1,:,•-•:.•,.•.• .....,•• ,.....7..''.- : t.‘L'..-.-ft1.4, / ....
•
1 ROANOK
tc,1•.✓i .• 1 : . �`:: Avon ALLIGATOR / RIVES/
t }}3 ei
' ^',1r�S•; • ," ••• '\• :":, r'Huon -1;,.-: :_;'Narr�as in/d•..:, ✓
G �'wo N. C. DEPT.OF TRANSPORTATION
DIVISION OF HIGHWAYS
DARE COUNTY
,y'�•a.ns���„ PROJECT:8.T051401 (R-25SLA & E)
_ce r�� 1 US 64 - 264 FROM US 264 TO WEST
owi&UAIM��,� OF NC 545 EAST OF NIANTEO
�i '
SHEET OF—_____
" ' NORTH CAROLINA DEPARTMENT OF
�' • ENVIRONMENT AND NATURAL RESOURCES
y• 'S \¢ DIVISION OF COASTAL MANAGEMENT
r'
LTf=NCDENR
.
July 21,2000
1 ..*
•
vf'�,"JAMECIE.ifititiT JR
'>r
`;`•'GOVERNOR - '`J.
NC Dept. Of Transportation
• P. O.Box 25201
;:Y 5 ,-; : Raleigh,NC 27611
• yL�L-HOLMAN
A.i .- kCRETARY • Dear Sir:
+ 10 The enclosed permit constitutes authorization under the Coastal Area Management Act,and where applicable,
., ,�� r the State Dredge and Fill Law,for you to proceed with your project proposal.The original(buff-colored form)is
.8 ' ~,`,, s W 4; retained by you and it must be available on site when the project is inspected for compliance.Please sign both the
' +,�r:�i• original and the copyand return the copyto this office in the enclosed envelope.Signingthe permit and proceeding,
4
4`‘ A, I • means you have waived your right of appeal described below.
I !
0,; , P,
"' If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1
„, or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
'* Administrative Hearings,P.O.Drawer 11666,Raleigh,NC 27611,(919)733-2698 within twenty(20)days of this
I :.'t decision on your permit.You should also be aware that if another qualified party submits a valid objection to the
a '
-, .:� ~14�j, y "' issuance of this permit within twenty(20)days,the matter must be resolved prior to work initiation.The Coastal
t �.• c Resources Commission makes the final decision on any appeal.
,I„. ` �': ...
` The project plan is subject to those conditions appearing on the permit form.Otherwise,all work must be
itli al;:+ - iiiik 4 a, '0 carried out in accordance with your application.Modifications,time extensions,and future maintenance require
; : 'Ml;. additional approval.Please read your permit carefully prior to starting work and review all project plans,as'= approved.If you are having the work done by a contractor,it would be to your benefit to be sure that he fully
�. understands all permit requirements.
t gaii From time to time,Department personnel will visit the project site.To facilitate this review,we request
• x - that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise
• _ • + , concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at
any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally
important coastal resources.
' Very sincerely,
()P-amdietv4., V tbordalt.
Douglas Huggett'�� Major Permits/Consistency Manager
-— -"- DH/amw
' ., — •-may►,OC'' Enclosure
MC ICIICOLS
FlgST
ate, 1...
Q Itanommui
MAILING: 1638 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1638
PHYSICAL: 2728 CAPITAL BLVD., RALEIGH, NC 27604
i`�` `>+-." _ PHONE:919-733-2293 FAX:919-733-1495
v..• ""' .- AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST-CONSUMER PAPER
DENR TOLL FREE HOTLINE: 1-877-623-6748
ANT OF\
DEPARTMENT OF THE ARMY
Qe -
skl Et WILMINGTON DISTRICT, CORPS OF ENGINEERS
c m
PO. BOX 1890
`j
NILMINGTON, NORTH CAROLINA 28402-1890
IN REPLY REFER TO June 14, 2000
Regulatory Division RECEIVED
Action ID No. 199502334 JUN 1 6 2000
COASTAL MANAGEMENT
Mr. William D. Gilmore, P.E., Manager
North Carolina Department of Transportation
Project Development & Environmental Analysis
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Mr. Gilmore:
Reference the Department of the Army(DA)permit issued to you on March 5, 1998,
associated with the widening of approximately 10 miles of U.S. 64-264, including constructing
a new bridge over the Croatan Sound and adjacent marshes, from US 64-264 West of Manns
Harbor to NC 345 South of Manteo, in Dare County, North Carolina(TIP No. R-2551, Federal
Aid Project No. NHF-64(6), State Project No. 8.T051401). Also reference your subsequent
written request dated May 30, 2000, for a permit modification to:
a. Revise the planting schedule to reflect planting the eastern side of the Mashoes Road
Mitigation Site (MRMS) during the spring of 2001. The planting of marsh species at the MRMS
was scheduled to be completed by the spring of 2000. However, on the eastern side of the site,
Phragmites australis colonization is still a problem. Because the removal of Phragmites australis
is a permit condition, NCDOT proposes to delay planting one year to allow NCDOT two
additional opportunities (spring 2000 and fall 2000) to eliminate the Phragmites australis on the
site prior to planting the site with marsh grass.
According to the permittee, this action would still run concurrently with the construction
of the road project and would provide better opportunity to eliminate Phragmites australis.
This modification request was coordinated during the annual interagency mitigation
meeting on February 18, 2000, with the North Carolina Division of Water Quality, and other
appropriate State and Federal agencies. This coordination revealed no objections to this
modification request. Therefore, the permit is hereby modified in accordance with the specific
work activities described above. It is understood that all conditions of the original permit remain
applicable and that the expiration date is unchanged.
-Air •
Any questions regarding this correspondence may be directed to Mr. Michael Bell,
NCDOT Coordinator/Regulatory Project Manager at the Washington Regulatory Field Office,
telephone (252) 975-1616, extension 26.
Sincerely,
G. Wayne Wright
Chief, Regulatory Division
Copies Furnished:
Mr. Lindsey Riddick Mr. Larry Hardy
North Carolina Department of National Marine Fisheries Service
Transportation Pivers Island
Division I Environmental Officer Beaufort, North Carolina 28516
113 Airport Drive, Suite 100
Post Office Box 850 Mr. Tom McCartney
Edenton,North Carolina 27932 U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Ms. Cathey Brittingham / Post Office Box 33726
Division of Coastal Management Raleigh, North Carolina 27636-3726
1638 Mail Service Center
Raleigh, North Carolina 27699-16387 Mr. William L. Cox, Chief
Wetlands Regulatory Section - Region IV
Mr. John Hennessy U.S. Environmental Protection Agency
NCDENR-DWQ Atlanta Federal Center
Wetlands Section 100 Alabama Street, SW
1621 Mail Service Center Atlanta, Georgia 30365
Raleigh, North Carolina 27699-1621
2
NORTH CAROLINA DEPARTMENT OF
AVA
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF COASTAL MANAGEMENT
NCDENR
c., RECEIVED
JAMES B. HUNT JR. / JUN 1 6 2000
GOVERNOR
MEMORANDUM: COASTAL MANAGEMENT
' "'-ILL HOLMAN TO: Doug Huggett, Major Permits Coordinator, DCM
1 s=ECRETARY
THROUGH: Ted Sampson, District Manager, DCM
4,, ' (o`.' ; 4,-d FROM: Frank A. Jennings, III, DCM
• r„ t +'+ ,4, r
t' ' >> SUBJECT: NCDOT Modification Request for CAMA Permit No. 7-98,
• ':`e' Modification V
� ,.:'"
3 .ti•.
';
' , DATE: June 13, 2000
4 _
K
`� ^y 41 „t" ��, i .
M tf._ �` `J' r7 ''
The North Carolina Department of Transportation has submitted a modification
5N( ,< request for Major CAMA Permit #7-98, Croatan Sound Bridge, Dare County, issued to
` ; NCDOT on 20 January 1998 with a 31 December 2001 expiration date. The Department
requests that the existing permit be modified to (1) authorize the delay in the planting at the
1 Mashoes Road mitigation site until spring 2001 to allow more time to control Phragmites
onsite, (2) authorize the placement of 4 temporary mooring pilings in Spencers Creek for
additional storm mooring capacity; (3) authorize the placement of 14 temporary pilings
1 adjacent to bridge span #22 to assist barge operations associated with the loading and
unloading of construction equipment and materials. A copy of the modification request is
s it � - forwarded as an enclosure. The request includes check#6429 for $50.00. It is recommended
9 0 : �lir
that the modification request be approved with all current conditions to remain in effect.
.fir'" .. .
'"' ' ' ' Fl KST
i,: Aat EAI A
t14 ► 1
ELIZABETH CITY REGIONAL OFFICE
1367 US 17 SOUTH, ELIZABETH CITY, NC 27909
4, PHONE:252-264-3901 FAX:252-264-3723
",.... `
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST-CONSUMER PAPER
DENR TOLL FREE HOTLINE: 1-877-623-6748
NC DEPARTMENT OF TRANSPORTATION
DIVISION 01 OFFICE
252.482.7977
WARRANT NO. 6429 DATE 06/01/2000
INVOICE NUMBER INVOICE DATE INVOICE AMOUNT NET AMOUNT
0601164446 06/01/2000 $50 . 00 $50 . 00
•
Detach Stub Before Depositing TOTAL: $50 . 00 $50 . 00
• Thr. ^,'PENT CONT ARTIFICIAL WATERMARK•HOLD AT AN ANGLE
DEPARTMENT OF TRANSPORTATION DATE 06/01/2000
DIVISION 01 OFFICE 115-1050 STATE TREASURER.Rom.NORTH CANOLP A
P. O. BOX 850 $31 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM
EDENTON, NC 27932
Pay ..Wly 2o6[ar3 and 00/100
Pay NCDENR
to the P.O. BOX 27687
Order of RALEIGH, NC 27611-7687
•
AUTHORIZED SIGNATURE
U6000064 2911. I:0 5 3 L LO 5910: log.00018.64 Le
_ • .
VICINITY MAP
\ .
...,,,,,,... ,.._ Cr.:imam..
...GA MAO 1• • .�r �"w.��.
pi
_...-.<z..,.....:• " --- .'‘..."--" -'--...r.1.!..7.1., .. L.
.......%%C:::L.s4...''`......... .. .1#71.'".;;;;:....... --•—....-' -' Cj Z wik-`0
K
c21 Cr
'sa...wom .,, —1 ---�-
10 • a..•. ti. ALLOWSAC.
:pothers ND PRCJEC i 7 ,O
. - A'i...w_.. . CTl
/.mew a.a.........Yr. — ) r...vats Mel • a-..—.--........ :J'
.a. 1_�. M A n�DN s▪ \ D ._ - •r. .�
moo
i ; ' \ .. $ ".
, .....•• -2'...'.............\".. I \ i-. - -.1. Z...1--" ',...„....<
1... .4. r..,
-11
r .▪ t:;.- :rs. -a 0--sw;i•• f ��r
__- _ ▪ 'yam- ;� `... 1f
`,�% •:::- \ :;vet,'=:."-• A..• -is AL,.:GA....• Q1VE.?
j r� +�Y ram-; �.
•
\!jT -•may•:- �"'.,i.aer .• � Jo_,
Woll.ress 1M.f i•• '
L«ti.ti �a.4..0.
• N. C. DEPT.OF TRANSPORTATION
DIVISION OF HIGHWAYS
DARE COUNTY
41? 2ROJECT:a•T051401 (R-2551A & B)
sapreggiii. Si
�,.�.►' ;„� . 6.4 — _G4 FROM US 26 TO WEST
AMP .
•� CF `C. 545 EAST OF ANTEO! A a.
SHEET OF —