Loading...
HomeMy WebLinkAboutNCDOT 45-94 Renewal Bridge #88 SR1122 Bee Tree Canal Pa Permit Number Permit Class RENEWAL 45-94 / ' / / STATE OF•NORT:CAROLINA - •Department of Environment,Health"&Natural Resources and _ Coastal Resources Commission / / t el RECEIVED I JUL 0 , for_,, _ 8 1998 X Major Development in an Area.of Environmental ConceIODASTAL MANAGEMENT pursuant to NCGS 113A-118 Excavation and/. n'•: pursuant to NCGS 113-229/ — , ' Issued to NC Dept. Of Transportation, b ' ' o, of Highways, PO Box 25201, Raleigh, NC 27611 authorizing development in Tyrrell a Bee Tree Canal, Bridge 88 on SR 1122 , . , as requested in the pe i 's letter dated 12/14/97. y , This permit, issued on \ — \S —`i , is su rot to co e with the application(where consistent with the permit), all applicable regulations, special conditions and n to set'fo below. Any violation of these terms may be subject to a fine,imprisonment or civil action; or may cause the rmi be null and void. 1) This renewal must be attached to the original of Permit No. 45-94, as well as the 7/21/97 letter of refinement, and all documents must be readily available on site when a Division representative $, inspects the project for compliance. 2) All conditions and stipulations of the refined permit remain in force under this renewal unless altered ' herein. ' This permit action may be appealed by the pennittee or Signed by the authority of the Secretary of DEHNR and the ' ' other qualified persons within twenty (20) days of the Chairman of the Coastal Resources Commission. / ' issuing date. An appeal requires resolution prior to work ' initiation or continuance, as the case may be. • This permit must be accessible on-site to Department / personnel when the project is inspected for compliance. ________--)\,--0--- .C3--?,-..kci--, / __- "-'Roger N. ecter, Director ' , Any maintenance work or project modification not Division of Coastal Management ' , covered hereunder requires further Departmental approval. / ' All work must cease when the permit expires on This permit and its conditions are hereby accepted. ' / December 31, 1999 , In issuing this permit,the State of North Carolina agrees c�i�/1�1, that your project is consistent ,with"the North Carolina V I�'�- - , , Coastal Management Program f! Signature of perinittee . +=' } cr Tom-L? F"`�xEr^ �L,. .-''" ..:x : Y^,4 '-' 4." ?1-,,' * -:'-4- g rr..c�..c�..a�..c� ic.Y4�.:a\.:aerial.:lw':iAx.a\':.Zl ".:e.::a�. .. .. ..1....:.:. ..a . ...1.. ..... ....e...a�..� t".w� State of North Carolina s Department of Environment, ,14 Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Q E H N F. Wayne McDevitt, Secretary Roger N. Schecter, Director January20, 1998 NC Dept.Of Transportation Division of Highways P.O.Box 25201 Raleigh,NC 27611 Dear Sir: The enclosed pennit constitutes authorization under the Coastal Area Management Act,and where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal.The original(buff-colored form)is retained by you and it must be available on site when the project is inspected for compliance.Please sign both the original and the copy and return the - copy to this office in the enclosed envelope.Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition fora hearing must be filed in accordance with NCGS Chapter 150B with the Office ofAdministrative Hearings,P.O. Drawer 11666,Raleigh,NC 27611,(919)733-2698 within twenty(20)days ofthis decision on yourpemut You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days,the matter must be resolved prior to work initiation.The Coastal Resources Commission makes the fmal decision on any appeal. The project plan is subject to those conditions appearing on the permit form.Otherwise,all work must be carried out in accordance with your application.Modifications,time extensions,and future maintenance require additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved.If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Very sincerely, John .Parker,Jr. Major Permits Processing Coordinator JRP:j r/amw Enclosure P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer 50%Recycled/10%Post-Consumer Paper State of North Carolina /suvE _ Department of Environment ,� .00,20 0 m n, and Natural Resources , Division of Coastal Management ly,,Y ��\ James B. Hunt, Jr., Governor � ,.R,�,z.� =' SEC 19 1997 Wayne McDevitt, Secretary �'�� `� ^_"' =_ Roger N. Schecter, Director COASTAL MANAGEMENT L � � - ate MEMORANDUM \— `ku — TO: John Parker FROM: Terry Moore q in DATE: 17 December 1997 SUBJECT: Renewal of Permit No. 45-94 issued to N. C. DOT for Bridge No. 88, Hyde County CAMA Major Permit No. 45-94 was issued to the N. C. DOT for the replacementtof of bridge No. 88 on SR 1122 over Bee Tree Canal in Tyrrell County, North Carolina. I support renewal of the permit. The $50 fee to cover the cost of the'renewal pas been deducted from the outstanding balance that DOT has with us. This leaves the iia°laife at $50. If you have any questions, please give me a call. ATTACHMENTS TEM/dwm cc: Charles Jones A �D STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B.HUNT JR. DIVISION OF HIGHWAYS GARLAND B.GARRETT JR. GOVERNOR P.O.Box 850 Edenton,NC 27932 SECRETARY Division One Office December 14, 1997 N. C. Department of Environment and Natural Resources Division of Coastal Management Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 ATTENTION: Mr. David Moye, Coastal Field Representative SUBJECT: Renewal/Reissuance of CAMA Major Permit No. 45-94 for the Proposed Replacement of Bridge No. 88 on SR 1122 over Bee Tree Canal in Tyrrell County; TIP No. B-2303; State Project No. 8.2130201; Federal Aid No. BRZ-1122(3) The existing CAMA major permit, issued on March 25, 1994 and refined on July 21, 1997, will expire on December 31, 1997. Since construction is scheduled to begin in 1998 on this project please issue a renewal of the permit. If there are no objections, please deduct the $50.00 renewal application fee from the Department's outstanding credit balance. Thank you for your time and prompt attention to this request. Please call me if I can provide any additional information. Sincerely, M• 4e14 // 7/al/ M.Randall Turner, Division Environmental Officer Planning & Environmental Branch-Division One cc: H. Franklin Vick, P.E. D. R. Conner, P.E. Phone: (919)482-7977 Fax: (919)482-3826 E-mail: mrturneramail.dot.state.nc.us State of North Carolina Department of Environment, Health and Natural Resources A:Trx-mviA Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary L E H N Fl Roger N. Schecter, Director RECEIVED 21 July 1997 JUL 2 2 1997 COASTAL MANAGEMENT Mr. Randall Turner, Division Environmental Officer Division One Office North Carolina Department of Transportation 113 Airport Drive Suite 100 Edenton, North Carolina 27932 Dear Mr. Turner: This letter is in reference to your 14 July 1997 correspondence requesting a change in CAMA Major Permit No. 45-94. CAMA Major Permit No. 45-94 was issued to the Department of Transportation on 25 March 1994 for the replacement of Bridge No. 88 on SR 1122 over Bee Tree Canal in Tyrrell County, North Carolina. The NC DOT is requesting that the permit be modified to change from the permitted bridge to the design depicted in the attached plats dated 7 July 1997. The modified plan shows that the bridge proposed in the plat dated 7 July 1997 is identical to the one originally permitted except that the new design maintains the existing vertical clearance at ±5.1'. The original bridge that was permitted by CAMA Major permit No. 45-94 had a proposed vertical clearance of ±4.7'. This letters serves as a refinement to CAMA Major Permit No. 45-94 reflecting the aforementioned change. Your modified plats dated 7 July 1997 will become a permanent part of the file and construction should be carried out accordingly. All previous permit conditions including the 31 December 1997 expiration date still apply and remain unchanged. If you are unable to complete construction by the 31 December 1997 date you should apply to renew the permit for a two year time frame and include a check for $50 to cover the cost of renewal with the request. Thank you for your time and cooperation in this matter. If you have any questions, please don't hesitate to contact me or David Moye in the Washington Regional Office (919) 946-6481 ext. 277. e.. Te . Moore District Manager Washington Regional Office cc: David Moye - DCM Pres Pate - DCM min Parker- DCM Raleigh Bland - USACOE 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper