No preview available
HomeMy WebLinkAboutNCDOT 101-97 Bridge #70 NC 99 Smith Creek Permit Class Permit Number NEW 101-97 ' STATE OF NORTH CAROLINA ' ' ' Department of Environment,Health&Natural Resources and Coastal Resources Commission ' IL., ermtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation ang/or •ng pursuant to NCGS 113-229 • Issued to N.C. Dept. of TransportationF.O. 25201, Raleigh, NC 27611 ' authorizing development in Beaufort County a�, nith Creek B, ridge No. 70 on NC 99 , as requested in pe iyte�'s�ppl' at ted 5/13/97 including attached workplan , drawings, 1-8 of 8, dated Revised 5/8/97. •• , This permit, issued on 1 - a-' - 91 ,is subj co iar&e ith the application(where consistent with the permit), all applicable regulations, special conditions and notes s elow. Any violation of these terms may be subject to a fine,imprisonment or civil action; or may cause the permit to ull and void. Excavation and Fill 1) In order to protect juvenile shrimp and fin fish populations,no excavation or filling will be permitted t, between April 1 and September 30 of any year without the prior approval of the Division of Coastal Management, in consultation with the Division of Marine Fisheries. . 2) No excavated or fill material will be placed at any time in any marsh or surrounding waters outside , ' of the alignment of the fill area indicated on the workplan drawing(s). , 3) The fill material will be clean and free of any pollutants except in trace quantities. ' 4) The riprap material must be free from loose dirt or any pollutant. It must be of a size sufficient to , prevent its movement from the site by wave or current action. , (See attached sheet for Additional Conditions) , • This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEHNR and the ' ' other qualified persons within twenty (20) days of the Chairman of the Coastal Resources Commission. / ' issuing date. An appeal requires resolution prior to work / ' initiation or continuance,as the case may be. _____4 / This permit must be accessible on-site to Department 1 { / • personnel when the project is inspected for compliance. �"'-L ' Any maintenance work or project modification not --Roger N. ester, Director ' Division of Coastal Management / covered hereunder requires further Departmental approval. / All work must cease when the permit expires on This permit and its conditions re ereby accepted December 31,2000 , In issuing this permit,the State of North Carolina agrees . , that your project is consistent with the North Carolina "7, ./ . , Coastal Management Program. Signature of Permittee / N.C. Dept. Of Transportation / / ADDITIONAL CONDITIONS Permit#101-97 Page 2 of 2 / 5) All riprap material must consist of clean rock or masonry materials such as, but not limited to, granite or broken concrete. / ' / 6) The temporary placement or double h. . g of excavated or fill material within waters or vegetated wetlands is not authorize. / Sedimentatio a " osi rol ' 7) Appropriate sedimentation and erosion control d -iie5s s 11 b' ' ed to eliminate the possibility of erosion into surrounding wetlands o rs. • 8) All disturbed areas shall be properly graded and provided : gr. .nd cover sufficient to restrain ' erosion within thirty days of project completion. / / / ' Mitigation / 9) As proposed by the permittee, an upland area approximately 125' by 17' located at the northeast corner of the bridge will be graded to the elevation of the adjacent marsh. The permittee shall / monitor the site for two growing seasons to determine if the graded site is colonized by native / marsh plants. If the permittee, in consultation with the Division of Coastal Management, / determines that sufficient vegetation has not colonized the site after two growing seasons, the ' permittee shall plant the area with native marsh plants. All monitoring reports shall be provided / to the Division. General 10) This permit does not eliminate the need to obtain any local, state or federal permits, approvals or authorizations that may be required. NOTE: The permittee is encouraged to contact the Public Health Pest Management Section at / (919) 733-6407 to schedule a pre-construction conference to discuss mosquito control / // measures. / NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. 198200031 (COE Action Id. No. 199705827). ' NOTE: The N.C. Division of Water quality has authorized the proposed project General Water Quality Certification No 3112 (DWQ Project No. 970553), which was issued on 7/22/97. / _s AA7Fv:.-046 , l STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. GOVERNOR P.O.BOX 25201,RALEIGH,N.C. 27611-5201 SECRETARY May 13, 1997 Dept. of Environment, Health and Natural Resources Division of Coastal Management 1424 Carolina Avenue Washington, North Carolina 27889 ATTN: Mr. Terry Moore Dear Sir: SUBJECT: CAMA MAJOR PERMIT APPLICATION FOR REPLACEMENT OF BRIDGE NO. 70 OVER SMITH CREEK ON NC 99, BEAUFORT COUNTY, TIP NO. B-2805. The North Carolina Department of Transportation (NCDOT) proposes to replace the referenced structure on existing location, along with associated approach improvements. The new bridge, consisting of a three span cored slab on a concrete substructure, will be approximately 25 meters (82 ft) in length with a 7.2 meter(24 ft) wide travelway plus a 2.4 meter (8 ft) wide offset on each side and 1372 millimeter (54 inch)bicycle-safe rails. Traffic will be detoured onto existing roadways during construction. Whenever NCDOT replaces an existing bridge, it is the policy of the American Association of State Highway and Transportation Officials that the roadway and approaches be up-graded to conform with current design standards. The standards for this type of new bridge require an increase in width of approximately 5 meters (16.4 ft). NC 99 is also a bicycling highway that normally requires a 4.2 meter (14 ft) travelway. In order to reduce wetland impacts, the NCDOT Bicycle and Pedestrian Unit agreed that the narrower, 3.6 meter (12 ft) travelway would be sufficient for bicycle traffic. • �r The project will require the fill of 0.156 acres of estuarine surface waters and 0.006 acres of wetlands. The dominant vegetation in the wetlands is smooth cordgrass (Spartina alterniflora), saw grass (Cladium jamaicense), and black needlerush (Juncus roemerianus). No temporary fill in wetlands, stream relocation, or channel change will be involved. In order to mitigate for these impacts, NCDOT proposes to grade approximately 0.05 acres of upland to the level of the adjacent salt marsh. This area is located north of the bridge on the upstream side of Smith Creek between the edge of the fill slope and the existing salt marsh. It is indicated as cross hatching on sheets three and four of the permit drawings. The area to be graded is small, approximately 125 feet x 17 feet. After grading is complete, the NCDOT proposes to monitor this site for two growing seasons to determine if natural vegetation has colonized the site. If sufficient vegetation has not reclaimed the area at that time, then NCDOT will replant the area with native marsh plants. The navigational clearance of the bridge will basically remain the same since no recognized demand for navigation exists. Smith Creek is not susceptible for use as a means to transport interstate or foreign commerce and there is no evidence that boats greater than 6.4 meter (21 feet) long cross under Bridge No. 70. Therefore, the Federal Highway Administration has determined that the project does not require a U. S. Coast Guard Permit in accordance with 23 CFR 650.805(c) Smith Creek flows east into Pungo Creek which is part of the Tar-Pamlico River Basin. It is classed as SC NSW , indicating a supplemental classification of Nutrient Sensitive Waters, which requires limitations on nutrient inputs. NCDOT's Best Management Practices for the Protection of Surface Water, which implements stringent erosion and sedimentation control, will be employed throughout construction. During project planning, it was determined that no anadromous fish spawning areas occur within 175 meters (575 feet) of the project, so no construction moratorium is proposed. The scope of work for this project was documented as a Categorical Exclusion approved by the Federal Highway Administration (Federal Aid Project BRSTP-99(1), State Project 8.1150801) on 10 April 1995. It was distributed to the resource agencies 30 August 1995. More copies of this document are available upon request. Application for a Major CAMA Permit is hereby made. Permit drawings depicting the proposed work are attached. A check in the amount of$250.00 (Warrant No. 980744) is enclosed to cover the CAMA processing fee. The adjacent property owners have been notified of this permit request. Copies of the letters sent to the property owners and the certified mail receipts are attached. The signed return receipts from these property owners will be forwarded to you as soon as possible. — • s Thank you for your assistance. If you have any questions, please contact Mr. Michael Wood at (919) 733-7844, Extension 306. Sincerely AnNvi /14/ 72 H. Franklin Vick, P. E., Manager Planning and Environmental Branch cc: Mr. John Parker, DCM Mr. David Lekson, COE Mr. Mike Street, DMF Mr. G. T. Shearin, P. E., Roadway Design Mr. Kelly Barger, P. E., Program Development Mr. D. R. Morton, P. E., Highway Design Mr. A. L. Hankins, P. E., Hydraulics Mr. William J. Rogers, P. E., Structure Design Mr. Ed Latham, Division 2 Construction Engineer ,FOR1'DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT c. Street address or secondary road number a. Landowner: NC 99 Name N.C. Dept. of Transportation d. Is proposed work within city limits or planning jurisdiction? Yes X No Address P. O. Box 25201 e. Name of body of water nearest project (e.g. City Raleigh State NC river, creek sound, bay) Smith Creek Zip 27611 Day Phone (919) 733-3141 3. DESCRIPTION & PLANNED USE Fax (919) 733-9794 OF PROPOSED PROJECT b. Authorized Agent: a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, Name and excavation and/or filling activities. Bridge replacement and approach work on Address roadway. City State Zip Day Phone b. Is the proposed activity maintenance or an existing project, new work, or both? Both Fax c. Project name (if any) T.I.P. No. B-2805; c. Will the project be for public, private or State Project No. 8.1150801 commercial use? Public Transportation d. Give a brief description of purpose, use, Note: Permit will be issued in name of landowner(s), methods of construction and daily operations and/or project name. of proposed project. If more space is needed, please attach additional pages. The project consists of replacing the existing bridge over Smith Creek and improving the 2. LOCATION OF PROPOSED approach roadways. PROJECT a. County Beaufort Revised 03/95 FORM.DCM-MP-1 - m. Describe existing wastewater treatment facilities 4. LAND AND WATER N/A CHARACTERISTICS a. Size of entire tract N/A n. Describe location and type of discharges to b. Size of individual lot(s) N/A waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial c. Approximate elevation of tract above MHW effluent, "wash down", and residential or NWL +/- 2 m discharges.) Highway surface runoff d. Soil type(s) and texture(s) of tract N/A o. Describe existing drinking water supply source. e. Vegetation on tract N/A f.. Man-made features now on tract Road and bridge 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use In addition to the completed application form, the plan.) following items must be submitted: Conservation Transitional Developed Community * A copy of the deed (with state application only) or X Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then N/A forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the from the owner to carry out the project. applicable zoning? Yes No (Attach zoning compliance certificate,if-applicable.) * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black j. Has a professional archaeological assessment ink on an 8 1/2" by 11" white paper. (Refer to been done for the tract? Yes X No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Please note that original drawings are preferred and Historic District or does it involve a National only high quality copies will be accepted. Blue-line Register listed or eligible property? prints or other larger plats are acceptable only if an Yes X No adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of 1. Are there wetlands on the site? X Yes _No Engineers regarding that agency's use of larger Coastal (marsh) X Other drawings.) A site or location map is a part of plat If yes, has a delineation been conducted? Yes requirements and it must be sufficiently detailed to (Attach documentation.if available) guide agency personnel unfamiliar with the area to the Revised 03/95 FORM DCM-MP-1 site. Include highway or secondary road (SR) number, landmarks, and the like. 6. CERTIFICATION AND PERMISSION TO ENTER ON * A Stormwater Certification, if one is necessary. LAND * A list of the names and complete addresses of the I understand that any permit issued in response to this adjacent waterfront (riparian) landowners and application will allow only the development described signed return receipts as proof that such owners in the application. The project will be subject to have received a copy of the application and plats conditions and restrictions contained in the permit. by certified mail. Such landowners must be advised that they have 30 days in which to submit comments I certify that to the best of my knowledge, the proposed on the proposed project to the Division of Coastal activity complies with the State of North Carolina's Management. Upon signing this form, the applicant approved Coastal Management Program and will be further certifies that such notice has been provided. conducted in a manner consistent with such program. Name **SEE PERMIT DRAWINGS I certify that I am authorized to grant, and do in fact, Address grant permission to representatives of state and federal Phone review agencies to enter on the aforementioned lands in connection with evaluating information related to this Name permit application and follow-up monitoring of the Address project. Phone I further certify that the information provided in this Name application is truth to the best of my knowledge. Address / „/ Phone This is the /-> q day of 19 /7. * A list of previous state or federal permits issued Print Name H. Franklin Vick, P. . for work on the project tract. Include permit numbers, permittee, and issuing dates. Signature a ow er or Authorized Agent * A check for $250 made payable to the Department Please indicate attachments pertaining to your proposed of Environment, Health, and Natural Resources project. (DEHNR) to cover the costs of processing the application. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development * A signed AEC hazard notice for projects in DCM MP-4 Structures Information oceanfront and inlet areas. X DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development * A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to NOTE: Please sign and date each attachment in the 10) If the project involves the expenditure of space provided at the bottom of each form. public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 • Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major (4)Will all,or a part of,the existing culvert be Permit, Form DCM-MP-1. Be sure to complete all removed?(Explain) N/A other sections of the Joint Application that relate to this proposed project. g. Length of proposed bridge 22.9 m 1. BRIDGES h. Width of proposed bridge 12.19 m a. Public X Private i. Height of proposed bridge above wetlands b. Type of bridge(construction material) +/- 1.5 m 3-span cored slab on concrete substructure j. Will the proposed bridge affect existing water flow? Yes X No c. Water body to be crossed by bridge If yes,explain Smith Creek d. Water depth at the proposed crossing at MLW or NWL k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? X Yes No If yes, 1. Will the proposed bridge affect navigation by (1)Length of existing bridge 22.9 m reducing or increasing the existing navigable (2)Width of existing bridge 7.2 m opening? Yes X No (3)Navigation clearance underneath existing If yes,explain bridge 3.6 m _ (4)Will all,or a part of,the existing bridge be removed? (Explain) All of the existing structure will be removed. m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No f. Will proposed bridge replace an existing culvert(s)? If yes,explain Yes X No If yes, (1)Length of existing culvert N/A (2)Width of existing culvert N/A (3)Height of the top of the existing culvert above n. Have you contacted the U. S. Coast Guard the MHW or NWL N/A concerning their approval? Yes No If yes,please provide record of their action. Revised 03/95 Form DCM-MP-5 j. Will the proposed culvert affect existing navigation 2. CULVERTS N/A potential? Yes No If yes, explain a. Water body in which culvert is to be placed b. Number of culverts proposed 3. EXCAVATION AND FILL c. Type of culvert(construction material, style) a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No d. Will proposed culvert replace an existing bridge? If yes, Yes No (1)Length of area to be excavated If yes, (2)Width of area to be excavated (1)Length of existing bridge (3)Depth of area to be excavated (2)Width of existing bridge (4)Amount of material to be excavated in cubic (3)Navigation clearance underneath existing yards bridge (4)Will all, or a part of, the existing bridge be b. Will the placement of the proposed bridge or culvert removed?(Explain) require any excavation within: NO _Coastal Wetlands _SAVs _Other Wetlands If yes, (1) Length of area to be excavated e. Will proposed culvert replace an existing culvert? (2)Width of area to be excavated Yes No (3) Amount of material to be excavated in cubic If yes, yards (1) Length of existing culvert (2)Width of existing culvert c. Will the placement of the proposed bridge of culvert (3)Height of the top of the existing culvert above require any highground excavation? the MHW or NWL Yes X No (4)Will all,or a part of,the existing culvert be If yes, removed? (Explain) (1) Length of area to be excavated (2)Width of area to be excavated (3)Amount of material to be excavated in cubic yards f. Length of proposed culvert d. If the placement of the bridge or culvert involves g. Width of proposed culvert any excavation,please complete the following: (1)Location of the spoil disposal area h. Height of the top of the proposed culvert above the N/A MHW or NWL (2) Dimensions of spoil disposal area N/A i. Will the proposed culvert affect existing water flow? (3)Do you claim title to the disposal area? Yes No Yes No If yes, explain If no,attach a letter granting permission from the owner. Revised 03/95 Form DCM-MP-5 (4)Will the disposal area be available for future b. Will the proposed project require the relocation of maintenance? Yes No any existing utility lines? Yes X No (5)Does the disposal area include any coastal If yes,explain in detail wetlands (marsh), SAVs, or other wetlands? Yes No If yes,give dimensions if different from(2) above. c. Will the proposed project require the construction of (6)Does the disposal area include any area below any temporary detour structures? the MHW or NWL? Yes No Yes X No If yes,give dimension if different from No. 2 If yes, explain in detail above. e. Will the placement of the proposed bridge or culvert result in any fill(other than excavated material d. Will the proposed project require any work described in Item d. above)to be placed below channels? Yes X No MHW or NWL? X Yes No If yes, complete Form DCM-MP-2 If yes, (1)Length of area to be filled 250 m+/- e. How will excavated or fill material be kept on site (2)Width of area to be filled 2.5 m+/- and erosion controlled? Standard NCDOT (3) Purpose of fill Roadway Construction Erosion and Sedimentation control practices f. What type of construction equipment will be used f. Will the placement of the proposed bridge or culvert (for example, dragline,backhoe, or hydraulic result in any fill(other than excavated material dredge)? Backhoe,dozer,pile driver described in Item d. above)to be placed within: x Coastal Wetlands _SAVs _Other Wetlands If yes, (1)Length of area to be filled 40 m+/- g. Will wetlands be crossed in transporting equipment (2)Width of area to be filled 1.5 m+/- to project site? Yes X No (3)Purpose of fill Roadway Construction If yes,explain steps that will be taken to lessen environmental impacts. g. Will the placement of the proposed bridge or culvert result in any fill(other than excavated material described in Item d. above)to be placed on h. Will the placement of the proposed bridge or culvert highground? X Yes No require any shoreline stabilization? If yes, X Yes No (1)Length of area to be filled 140 m+/- If yes,explain in detail Rock fill will be used up (2)Width of area to be filled 2 m+/- to elevation 0.40 m(See permit drawings- (3)Purpose of fill Roadway Construction Sheet 6 of 8). NCDOT-TIP No. B-2805; State Proj. No. 8.1150801 4. GENERAL Applicant or Project Name • a. Will the proposed project involve any mitigation? Yes X No /c/72A-61A-vAl If yes, explain in detail ignature s i3 97 Date Revised 03/95 _ 2 -—- _ • 1 IV A I M P t1 1 •-• Si .Maar C G r.2.uarPM1 < u I.' 21 ay I RotEN 1-- _ . .1;;:::,..„. ID 26.1 te5 Wity I 1 f s. 177 �. :''\ > t I \ M1 F.Union I 1 J •3 'all '1:1 •l'' �` • .• 7 •--- `\—�` Point gli �C �° \b � ) .30 • •G •, ...."1.-- - _ n INTRACOASTAL Ilia -- eI. �s , — % %� P U N it*o, C\\ �2f Iy1 l 1z 10nrrarrr Parr 1111-; I ( 2.6 o�l ."�'' 1717 p 3.0 31 /P 1712_sera, 4°V.:ock / `Z. , 'V P 7 S• y •i•• 17, 1 \\ A C K S o N ITE ` iz3P� ) c s c a G'•t * , �'f S W A M P i V07 tt 1747 Wkut.advill. • Q /:\r : • i Y 1 '.'test 1 i �\. ,. ' 123E ),1.',1Ztt / , t i..,t.'�t: _ /(:<.� _ e ' 1 • :21 1,1. UN 3 .6-/ Ranramrin•• t. ordrn / /^ flarbo0•Croesoad' • ,D a 4 I _Church afar,i$ I > / SC AI E I 0 I 3 --- MREs 0 _ 0$ __ I"III nSto r rden A Plymouth `� SCAIE fOR ErIIARGEMENIS / ` lmesvd� /� t5 J 6* • Soar.n.r Mee. WAS�INGTON ••P.rigrew5,Pk p P^4r' Lai:- T Y R E Hinson 1 ® ® .:.A..;8. r. 1 9 Wenona J I.' I t� _ _ •n_ Pu °Lake _,_- • .6 Pike Road 2 Allia eta ' .....,' Lake I 1 Kilkenny• c„, © Ic Pmelow • " �;a •!Pa✓,telo H hill 011+ .2®l Acr Ce a ��/III )Leechnlle �' intr°c°°sl Farrliel© gt (J.... ,*6 le, • Yeatesrille• e :1l1 I. © attar 3 0 i0 6 Scranton4.7.- .6 .f R r— eT‘ P eeer•a.• Batht • ns ead 1 63• v v w ' H,rm.,eeam 1,pa,,r//r+ 1� 1 •. c Sb lfnll! t New Holt o•"_"T__1 JJJ _ 1 ® + OaYv, an So�r,�41R '14 \ P: • Swan Quarto) Core ',Rif ElMlltr R.r•�(n • ` .� ,• --- 1 P. .08e ��.; RweBav 'rent ad • Bonne n • �^ .1. NAT'l WKDUFEaIII��� - r reek tiotik ��� Saul `' \ ` --\ GafArI •Edward Creek A • 0 , troy' O I2 '—rii _ �> Royal v. f , r • Hab' SITE C'Ylon 4!p > ' ` Hollysille Mesrc• 3 - \ (Cash Corner I•;Vrjjnd ... 1e11 /� \ N.0 DEPT OF TRANSPORTATION I + Mantle • e-1�R. C` at . ��� DIVISION OF HIGHWAYS OIymD,a Crantsb0ra•2B h anc • Lonaw �f s-,,() • / BEAUFORT COUNTY •Stonelw _ it rrdeetonP A M n°e L I C/" f3 / in esC,Ii Mernit• %►Wortonsvllld �. �� e lip .�n"i;a/ Ra„aa �\ 1a''� PROJECT 8.1150801 (B-2805) Bay � •Orientay 1• annnn.• - ..i- 1W441841, 417 ��• PROPOSED Scale of Miles BRIDGE REPLACEMENT 0 5 10 20 30 • ■ at mismommeimiti 0 10 20 30 40 48 • Scale of Kilometers SHEET 1 OF 8 6/9s - - R1•II902\82005\PROPOWN11.ftfN - - -- ------- ___ 54 BST - r t � ___ / 1 1, +81.75 -L-EL 4—'375 CONC 16.376 (LT). 45 (L- N 10 30 m TAPES 07954 -L- 10.9435 (LT) lol 53'22"W9164 (LT) 40 s77 L I 0 0 •07.953 -L- 9J439 (LT) 1 1 -- 9.1439 (LT) E E E ± F —— 'T-'_ T T7+0V / T t i` 4� T T ,.i-4 �, T T FO i FO T - �- —- CO T ...I_ —— I I I I 1 I. i , 41. Ej)_.0., - Vi. . BE i f,C7-;A-=') _ 1''1 E. MEL ii)' .20.004 -L- , F Ar____ isl9J440 (RT) caNAL /3° 57' 43.0" W I Z I^° •07.966 -L- •20.006 -L- 147. 3 7 65 I 9.1439 (RT) 12.825/(RT) — — BEGIN ROCK FILL ,\ / N15°47'18"W 34.187 //'20.00 (RI BEGIN F.A.PROJECT BRST -99(I) I BEGIN STATE PROJECT 81 150801 STATION 11+08 -L- DI A\ VIEW SIT 7 1 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS BEAUFORT COUNTY 1\\\ DENOTES FILL IN SURFACE WATERS 10 10 20 PROJECT 8.1150801 (B-2805) LIJI_PU :11_____FM11 PROPOSED ICI_-I SCALE: 1:500 BRIDGE REPLACEMENT I I=III DENOTES FILL IN WETLANDS `f r-e-y7 SHEET 2 OF 8 R.11902\92805\PLAN.DGN uy \.._ WOOD BULKHEAD i END BRIDGE ± ___ ; I2'3106 -L- ' - ! BEGIN ROCK FILL - .81.75 -L-M,� I 30 m TAP R 16.376 (LT) 11'80.00 (L) END SLAB o N�GA DEATION TO MARSH 30 m TAPE 12'35.0/7 -L- �o E L.F F ` y' � ����-, ° 3317W i . y�r 1::.:4 �� . . �i v_k_1::..'" Arra': r T r '1 b-F _ •ELT - - �_ � Q� - . Fo _ _ MI� as -F0 , _ i I CONC ! & FUNNEL DRAIN-' : 4 a ilm CONC WW'S r,(,1 N >c Lu I ---1---g-- -Infinr-r, ....._ 1 1 i�� #12 1 I 1 1 1 l 4, L 3 ....._ _ .r ‘,,k-- [...L.._ , . , ,,, 14:7-7— 4,114111kk 'V 111", 114111)..,N. .6. , .,.,,J :N.. 10**,4116.1k . . .. * 1! ".""17.-;J.---:' .- - _ . , ";+fit 46. - ' 4‘..- ' ca: - ' •i&k• '' .4*. - F F 71. co co N . r E— o _r BEGIN SLAB ° rn .67.65=L- � � END ROCK FILL / �80.37 14.737 (RT) 12.04.844 -L- SMITH CREEK + I2464.00 (R) i � 13.632. ( OD w BEGIN BRIDGE iv ui 1 , 12.08.50 -L- i 1 co (A 1 i ! P I A\ " I F " " S I TF 1 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS BEAUFORT COUNTY LUG DENOTES FILL IN SURFACE WATERS PROJECT 8.1150801 (B-2805) 1l0 10 20 L fir - PROPOSED Iw.I SCALE: 1:500 BRIDGE REPLACEMENT I�`i�:ilL DENOTES FILL IN WETLANDShew,set r-r_77 SHEET 3 OF 8 R•11902\62805\PL AN.DGN _ _ -_--_-r---r- `•901-L- TREES \.., , M . *15.02 HN14 : k : * ***,* R - 726.689 - SOIL OR � 8 _ - ;23: -L PT Sta.13+54.481 -L- .14 LT) � \ `� 11 T • w �� ' F -`- -- _ \`E - h 4- 60 BST - I_____ -_ - _-- _= - -- FT - --------- ``'''' . - - �� BST TREES �;=-_ �_ ____ 9.144 (RT) RT)\\l \� • ±, --- _ I • i END F.A.PROJECT BRSTP-99(1) / END STATE PROJECT 8J/5080/ i STATION /3+32 -L- . E A\ VIEW SITE 1 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS BEAUFORT COUNTY \\N DENOTES FILL IN SURFACE WATERS 1„ n 10 20 PROJECT 8.1150801 (B-2805) L�,�,��1( :llF*'Aj—mil PROPOSED SCALE: 1:500 BRIDGE REPLACEMENT DENOTES FILL IN WETLANDS SHEET 4 OF 8 R:•11902\82805\PLPN.DON .I. i ol c_ STA = 12+19.93 N Cr 3 @ 7.62 m, 450 mm CORED SLAB SECTIONS + N N �� ELEV = 2.223 Ili w PROPOSED GRADE EXISTING GRADE (+) 0.6933% w (-) 0.9405% i - 11 .5 EXISTING BRIDGE OPENING = 47.5sm 1 11� PROPOSED BRIDGE OPENING = 49.3sm — 0 _ [ MLT=-1.90.6m (TYP. ) � 3 j a / I -L1- LINE NATURAL GROUND , � � CLASS 'B' VERTICAL CURVE DATA @ U.S. FACE \ g . ' ! - -2I n,-1, I / RIP RAP PVI STA = 12+12.595 # PVI ELEV = 2.489 VC = 124.000 MLT = MEAN LOW TIDE (PER C.O.E. ) OVERTOPPING - -4 MHW = MEAN HIGH WATER (PER C.O.E. ) SCOUR 11+60 /1.80 12+00 12+20 /2+40 /2.60 /2+80 I I I I I I 1 PROFILE VIEW SITE 1 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS 10 10 20 BEAUFORT COUNTY kik , DENOTES FILL IN SURFACE WATERS I Q I PROJECT 8.1150801 (B-2805) HORIZ. SCALE: 1:500 PROPOSED �j-jig DENOTES FILL IN WETLANDS 4 Q 4=mmi 8 BRIDGE REPLACEMENT VERT. SCALE: 1:200 SHEET 5 OF 8 C_q6 W.110:2\62805\PROFILE.OGN STA. 12+00.000 2 m 2 m cc w w 0a / `\ CD F� \\ Z .O w ROCK FILL w� \\\ w ROCK FILL 0 / \ C� / \ w / i \/ \ _ \ v*. 0 m MHW s 0.08m + ���4°414Q;.% \''A�,4e!io v MHW - 0.08m 0 m ♦7ster•'2 :cow•• _ • s♦♦R♦ �� \ -2 m -2 m 20 mLT 15 mLT 10 mLT 5 mLT c_ 5 mRT 10 mRT 15 mRT 20 mRT 1 1 S E C T I 0 \ A- A SITE I N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS =111=1 DENOTES FILL 0 2 5 0 .625 1.f5 BEAUFORT COUNTY _01iii; 11=III- IN WETLANDSiii HORIZONTAL SCALE: 1:200 VERTICAL SCALE: 1:50 PROJECT 8.1150801 (B-2805) rvv DENOTES WALER TES FILL IN SITE QUANTITIES FILL IN WETLANDS 0.005 HECTARES PROPOSED FILL IN SURFACE WATERS 0.063 HECTARES BRIDGE REPLACEMENT HIGHGROUND EXCAVATION 0 CUBIC METERS TOTAL FILL 1355 CUBIC METERS SHEET 6 OF 8 6/96 Ro 11902\B2805\B 2595 X S.OGN SUMMARY REPORT FILL IN FILL IN PERMIT WETLANDS SURFACE HIGHGROUND TEMPORARY TOTAL ABOVE/BELOW SITE STATION TYPE (ha) WATERS (ha) EXCAVATION (m ) IMPACT (ha) FILL (m ) HEADWATERS 1 11+08000 TO CAMA .0023 0.063 0 0 1301 13+32.000 N.C. DEPT. OF TRANSPORTATION • DIVISION OF I IIGH WAY S BEAUFORT COUNTY PROJECT 8.1150801 (E3-2805) PROPOSED BRIDGE REPLACEMENT SHEET 7 OF 8 ReS.) J S—r-1 ) ,_---- ---.._...--- ---•---._—.— .—._....—.—..-------- ..----'—'—'--- -----.. _---�— R.ltgo7\82e05\PVr1xN • LIST OF PROPERTY OWNERS 1. CHARLES 0. BOYETTE P.O. BOX 310 BELHAVEN, NC 27810 2. LEE THOMAS SPENCE 110-27 19TH STREET ST. ALBANS, NY 11412 N.0 DEPT OF TRANSPORTATION DIVISION OF HIGHWAYS BEAUFORT COUNTY PROJECT 8.1150801 (B-2805) PROPOSED BRIDGE REPLACEMENT SHEET 8 OF 8 6/96 R:•11902\B2805\PROPOWNR.OGN State of North Carolina 46111111YIVA Department of Environment, Health and Natural Resources 1 • Division of Coastal Management wIllor James B. Hunt, Jr., Governor la H N R Jonathan B. Howes, Secretary Co Roger N. Schecter, Director July 30, 1997 Mr. H. Franklin Vick NC Dept. of Transportation Planning&Environmental Branch P. O. Box 25201 Raleigh, NC 27611 Dear Sir: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff-colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh,NC 27611, (919) 733-2698 within twenty(20)days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval.Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, John R. Parker,Jr. Major Permits Processing Coordinator JRP:jr/amw Enclosure P.O. Box 27687, Niefli FAX 919-733-1495 Raleigh,North Carolina 27611-7687 An Equal Opportunity/Affirmative Action Employer Voice 919-733-2293 Reduce Reuse Recycle 50%recycled/10%post-consumer paper " DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: North Carolina Department of Transportation 2. LOCATION OF PROJECT SITE: Beaufort County, on NC 99 at Bridge No. 70 over Smith Creek Photo Index - 1995: No photo 1989: No photo 1984: 79-965, S9 State Plane Coordinates - X: 2,712,000 Y: 646,400 Pantego LR 3. INVESTIGATION TYPE: CAMA/Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10 June 1997 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 9 June 1997 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP - Rural (B) AEC(s) Involved: Public Trust Area, Coastal Wetlands (C) Water Dependent: Yes (D) Intended Use: Public highway (E) Wastewater Treatment: Existing - N/A Planned - N/A (F) Type of Structures: Existing - Bridge Planned - Bridge (G) Estimated Annual Rate of Erosion: None Source - DCM staff observation 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands Coastal wetlands ±261.36 sq. ft. (B) Non-Vegetated Wetlands (C) Other Open Water ±6,795 sq. ft. (D) Total Area Disturbed: ±7,056.36 sq. ft. or 0.16 acres (E) Primary Nursery Area: No (F) Water Classification: SC-NSW Open: No 8. PROJECT SUMMARY: The applicant is proposing to replace an existing bridge with a new 82' long bridge which will have a 24' wide travelway and 8' wide offsets on each side. • NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Bridge No. 70 over Smith Creek Beaufort County ENVIRONMENTAL SETTING The project site is at Bridge No. 70 over Smith Creek on NC 99 in Beaufort County. Located at the site is a 75' long by 23. 61' wide bridge. The bridge has a 11.80' clearance between the bottom of the bridge and the NWL. The existing approaches to the bridge are stabilized with riprap. Adjacent to the northeast, southeast and northwest road shoulders are areas of coastal wetlands which is dominated with Distichlis spicata, Juncus roemerianus, and Cladium jamaicense. The shoulders are vegetated with various upland grasses. PROJECT PROPOSAL The applicant is proposing to replace the existing bridge with a new bridge along the same alignment. The new bridge will consist of a three span cored slab on a concrete substructure and will have a length of approximately 82 feet. There will be a 24' wide travelway plus 8' wide offsets on each side. The navigation clearance will remain. The environmental impacts which will be discussed later will be the result of the approach widening. No temporary detours, stream relocation or work channels will be involved ENVIRONMENTAL IMPACT The following environmental impacts will occur if the project is conducted as proposed : 1) Approximately 261.36 square feet of coastal wetlands will be filled at the northwest corner of the bridge due to approach widening. 2) Approximately 6,795 square feet of open water area will be filled due to approach widening and riprap stabilization. 3) An upland area approximately 125' by 17' located at the northeast corner of the bridge, between the approach and an area of coastal wetlands, will be graded to the elevation of the adjacent wetland. The site will be monitored for two growing seasons to see if natural vegetation has colonized the site. If sufficient vegetation has not reclaimed the area after that time then the applicant will replant the area with native marsh plants. David Gossett - Washington Regional Office - 12 June 1997 APPLICATION TRANSMITTAL/PROCESSING RECORD I �r A) Applicant: N.C. Department of Transportation County: Beaufort Location of Project: On NC 99 at Bridge No. 70 over Smith Creek Date Application Received Complete by Field: 9 June 1997 Field Recommendation: Attached X To be Forwarded Consistency Determination: Attached To be Forwarded X Field Representative: D. Gossett District Office: Washington District Manager Review: B) Date Application Received in Raleigh: (o— ► 49—cn Fee Rec'd: $ Public Notice Rec'd: End of Notice Date: 7_11- ` Adj . Rip. Prop Notices Rec'd: Deed Rec'd: Application Assigned to: on 6 - )') -- 91 C) 75 Day Deadline: �'9� 150 Day Deadline: Mail Out Date: 6 q 7 State Due Date: Ll--// ' 97 (.P I'W'('oo a 1 Federal Due Date: Act,1D q 1O SYt7 Fed. Comments Rec'd on — Permit Final Action: Issue ✓ Deny Draft on 7 D) AGENCY DATE COMMENTS OBJECTIONS NOTES RETURNED YES NO Coastal Management District Office Division of Comm. Assistance ( '7 ` f 7 i{/f Land Quality Section Div. of Env. Management���Y�7 State Property Office q 7 Div. of Archives & History 7_ 7 9 7 L Div. of Env. Health / (,) Div. of Highways _5 J, ✓ RV' f I Wildlife Resources Commission Div. of Water Resources 7 _Z -`I7 RECELVED Marine Fisheries 1 - 1 I (7- JU.JN 16 1997 COASTAL MANAGEMENT MEMORANDUM TO: John Parker FROM: David Gossett 9 THROUGH: Terry Moore'(\ DATE: 10 June 1997 SUBJECT: Application for State Permits North Carolina Department of Transportation Bridge No. 70 over Smith Creek Beaufort County, North Carolina Enclosed is the subject application from the North Carolina Department of Transportation. I have reviewed the proposal in regards to the NCAC 7H guidelines, specifically the general and specific use standards, and have found the proposal to be consistent. I recommend the permit be issued with the following conditions: 1) The riprap material must be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. 2) The riprap material must consist of clean rock or masonry materials such as but not limited to granite or broken concrete. Materials such as tires, car bodies, scrap metal, paper products, tree limbs, wood debris, organic material or similar material, are not considered riprap. 3) No marsh grass will be excavated or filled other than that shown on plat 3 of 8. If you have any questions do not hesitate to contact me. State of North Carolina Department of Environment, Health and Natural Resources ,11 • • Division of Coastal Management p JamesnahaB. Hunt, Jrw„ , Secrnor etary ED F Jonathan B. Howes, Secretary C Roger N. Schecter, Director MEMORANDUM June 16, 1997 RECEIVED TO: John Parker, Major Permits Coordinator J U N 1 7 1997 THROUGH:+Tiiy Moore, District Manager COASTAL MANAGEMENT FROM: Jane Daughtridge, District Planner RE: MAJOR CAMA PERMIT CONSISTENCY REVIEW Bridge Replacement, Bridge#70 NCDOT NC Hwy. 99, Smith Creek, Beaufort County, NC This project is subject to the 1993 BEAUFORT COUNTY LAND USE PLAN. The county's policies generally rely on the rules of state and federal agencies for resource protection. Policy Al.a. (Page VIII-4)"Preserve and Protect AECs within Beaufort County" states that the county will support and complement CRC efforts to protect, preserve, and manage areas of environmental concern and c. Support development in AECs only if such development meets the management objectives of 15A NCAC 7H.0203 and use standards in 15A NCAC 7H.0208 and .0209. There is no specific mention of 7H.0205, dealing with coastal wetlands. Again in Policy C8.d. (page VIII-1 S) "Quality of Life issues within the county" the county states that it will provide active leadership in ensuring that NCDOT roads and streets are adequately maintained and upgraded consistent with the 1993 Land Use Plan. Policy C9(page VIII-19) "Other Economic and Community Development Policies" states that the county remains committed to State and Federal programs in planning areas, where applicable, related to community and economic development, including erosion control, public access, highway improvements, port facilities, dredging, and military facilities. This project is located in a hazard area subject to storm surge flooding by Category 1 and 2 storms; however, the county's policies associated with coastal storm mitigation simply support enforcement of CAMA and 404 permitting processes in such areas. In policy E2.d. "Policies related to citizen evacuation" the county does not mention, but implies support of efforts to improve evacuation efforts. Maintenance of roads and bridges would contribute to such efforts. The landward area of the project is classified as Community (Land Classification Map). The water area and coastal wetlands are classified as Conservation because of their status as Public Trust Waters AEC and Coastal Wetlands AEC (Page IX-9). The Community classification is suitable for low density development without public water and sewer. It is intended for cluster residential and for commercial areas in a predominantly 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 60%recycled/10%post-consumer paper rural landscape. The Conservation classification limits development in public trust waters and coastal wetlands to those which are water dependent in accordance with 15A NCAC 7H. Although use standards for coastal wetlands identifies highways as an unacceptable use within this type of AEC, NCDOT will perform mitigation activities in close proximity to this site which will result in no net loss of coastal wetlands. Insofar as the letter and intent of stated local policies appears to be unoffended, it is my opinion that the proposed project is consistent with the 1993 Beaufort County Land Use Plan, provided it is constructed in accordance with all applicable state and federal rules and requirements, and provided the wetlands mitigation activities are timely. Cc: David Gossett . State of North Carolina • Department of Environment, Health and Natural Resources � • • Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary ED E H N F{ Roger N. Schecter, Director 13 June 1997 MEMORANDUM TO: Mr. Michael G. Buhl, Interim Director Division of Marine Fisheries FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/Dredge and Fill Permit Application Review Applicant: North Carolina Department of Transportation Project Location: On NC 99 at Bridge No. 70 over Smith Creek in Beaufort County, North Carolina Proposed Project: To replace an existing bridge with a new 82' long bridge which will have a 24' wide travelway and 8' wide offsets on each side. Please indicate below your position or viewpoint on the proposed project and return this form by 4 July 1997. If you have any questions regarding the proposed project, please contact David Gossett at 946-6481. When appropriate, in-depth comments with supporting data is requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. RECEIVED ON Signed 2 w Date (/ L 3 77 JUN 2 51997 by DMFMAINTAT 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper State of North Carolina • Department of Environment, Health and Natural Resources AT:7A Washington Regional Office witr Division of Marine Fisheries James B. Hunt, Jr., Governor ® � Jonathan B. Howes, Secretary Michael G. Buhl, Interim Secretary MEMORANDUM: TO: John Parker • FROM: Katy West 2(66i DATE: June 23, 1997 SUBJECT: CAMA Major Permits,NC DOT Bridge No. 70, Smith Creek, Pungo Creek, Beaufort County The following comments by the North Carolina Division of Marine Fisheries (NCDMF) on the subject permit are offered pursuant to G.S. 113-131. The lower coastal waters of Pungo Creek are designated as a special secondary nursery area. From this designation it would appear that the inland water upper reaches of Pungo Creek, including Smith Creek, function as an important nursery habitat for estuarine finfish, shrimp and blue crabs. The Smith Creek site has the physical characteristics (surrounding marsh, soft mud bottom, water depth) of primary nursery area habitat. Therefore,the NCDMF recommends a construction moratorium from 1 April to 1 October to minimize projects impacts on these estuarine species. The permit should also stipulate the use of appropriate erosion and sedimentation control measures. 943 Washington Square Mail. Washington. North Carolina 27889 Telephone 919/94F-6481 FAX 919/975-371 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper • State of North Carolina Department of Environment, CiloCilirA Health, and Natural Resources 44if Division of Marine Fisheries James B. Hunt, Jr., Governor p E H N Jonathan B. Howes, Secretary Michael G. Buhl, Interim Director 10 July 1997 RECEIVED JUL 111997 MEMORANDUM COASTAL MANAGEMENT TO: John Parker, Jr. Major Permits Processing Coordinator FROM: P.A. Wojciechowski qv) SUBJECT: CAMA/DREDGE & FILL Permit Application Review North Carolina Department of Transportation Attached is the Division's reply for the above referenced project. If you have any questions, please don't hesitate to contact me. PAW/bc permits\a dm i n\jp cove r.ltr P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post-consumer paper . wig JUL .............,..— ' &.tate of North rolina , De:partrnent 0 nviro; lent, ; Health and N cal , sources As •A p_,..;,.. Division of Coast M,, ()gement law \ Jcirric-s B, Hunt, Jr„ Gove Jonathan B, Howes, Seci \ ,Lh Rogerce N. Schtt. Direr e -'' ,-2 5 . ,. , -14-r- - .. ...,,,, i :4,- i , ',',4 '`v "tt)t,k," 11 , ', r1.1 .,--/NIT 10RANDUV i .., i 1 \ ,LV, 4., p,v (TO Ms.Division • k '-se/ , - 1 •i; //,'1.,--- i 1 ilii/i) 4)„,t- (,,.--- ,,r . I V .. I\ fr , 1-1 / I 1 ' ,t,6 LI (1,011 t FROM: John Park 0e'(A) /2/ ,i---,:i ,; ' Major Per SUBJECT: CANLVDREDGE & FILL Permit Application Review APPLICANT: is NC DOT [ PROJTAt LOC A r ION: On NC94 at Bridge #70 over Smith Creek, Beaufort Co. -,_ t'1-,;(. l P OS f.0 PROJECT: to replace ar existing bridge with a nev 82 ton4 bridge. t ' Pl..eas:.• in-Ii:::3te '',7.'li--!.\- Your ageno's position or viewpoint on the proposed project and realm ibis form b: Jul 11. 199'7 If-,ou have any questioris regarding the proposed project. please contact John Parker at 7-13- )-: . When appropriate, in-depth comments with supporting dat.a are requel.ted, REPLY This agency has no objection to the project as proposed. __ This agency has no comment on the proposed project. 4110 --)C---- This agency approves of the project, orJ if the recommeuded chtmges. ar= incorpora ted. See attached. r3 ,ei :-/;-),:, i'l:'/"/i .. ,i__,,t_f /---/„.,-1,7 •-•-'14../z,6/27,t41" e"-11;1/ rL, -cy ,...- L„ _,,, This agencyobjects to the project for reasons described in tie attached coidhents. ---- e2:-) ---1;',74-....70etA -./, / . - , 6. -- , (11. .:(4(fa Skirled / / , , „, -,,,,,'._t.-.,77. Date Ilkn/ .i; ,../__/ i.,,, / ___.... , P. ier%c 0 Box -::: FAX 919-7.33-1495 ko0i-vp, Norl'-.C::!:o.lino 2;6 1-7:587 VI* A.r: E q,....; C.,,pDcrunityiAtfirmativo AL;ion Emr,,,,,,,. vo.ce 914-.73,',.-2293 topluce Kisitiee garycis ...,..111,C. 1./4.0.rec•VCt•;:,4!i I u-x,post-c,..,-risumr,-.•_r paper. INISIMMINEIN iresiniffita, . State of North Carolina • Department of Environment, • Health and Natural Resources Alfr Division of Water Quality James aB. Hunt, we , Sec Governor a LEHNFt Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director July 22, 1997 Beaufort County WQC 401 Project#970553 APPROVAL of 401 Water Quality Certification Mr.Franklin Vick RECEIVED N.C.Dept.of Transportation Planning and Environmental Branch JUL 2 3 1997 P.O. Box 25201 Raleigh,NC 27611-5201 COASTAL MANAGEMENT Dear Mr.Vick: You have our approval,in accordance with the attached conditions,to place fill material in 0.16 acres of wetlands or waters for the purpose of replacing a bridge with a bridge at NC 99,Bridge#70 over Smith Creek, as you described in your application dated 24 June 1997. After reviewing your application,we have decided that this fill is covered by General Water Quality Certification Number 3112. In addition,you should get any other federal,state or local permits before you go ahead with your project including(but not limited to) Sediment and Erosion Control,Coastal Stormwater,Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project,you must notify us and you may be required to send us a new application. If total wetland fills for this project(now or in the future)exceed one acre,compensatory mitigation may be required as described in 15A NCAC 2H .0506(h). For this approval to be valid,you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification,you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings,P.O.Box 27447,Raleigh,N.C.27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions,please telephone John Dorney at 919-733-1786. Sincerely, V 41jr.P.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DWQ Regional Office Mr.John Domey Central Files John Parker,DCM 970553.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch,4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX#733-9959 An Equal Opportunity Affirmative Action Employer • 50%recycled/10%post consumer paper State of North Carolina Department of Environment, Health and Natural Resources Aig":11147A Division of Coastal Management Jamesw‘r natB. Hunt, Jrw., , Secretr ary p E H NR Jonathan B. Howes, Secretary Roger N. Schecter, Director June 19, 1997 RECEIVED MEMORANDUM JUL 2 1 1997 TO: Mr. Charles R. Fullwood, Jr., Director COASTAL MANAGEMENT Wildlife Resources Commission Attn: Habitat Conservation Program FROM: John Parker, Jr. • Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: On NC99 at Bridge #70 over Smith Creek, Beaufort Co. PROPOSED PROJECT: To replace existing bridge with a new 82' long bridge. Please indicate below your agency's position or viewpoint on the proposed and return this form by July 11, 1997. If you have any questions regarding the proposed project,please contact John Parker at 733- 2293. When approp ' e, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached memo. 7(/ c1C SignedC Date 7//7/�7 P.O.Box 27687, ��� FAX 919-733-1495 Raleigh,North Carolina 27611-7687 An Equal Opportunity/Affirmative Action Employer Voice 919-733-2293 Reduce Reuse Recycle 50%recycled/10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources 4 • • 4 Division of Coastal Management wifir James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary LD E H N F=3. Roger N. Schecter, Director 13 June 1997 RECEIVED • JUN 17 1997 MEMORANDUM COASTAL MANAGEMENT TO: Mr. William McNeil, Director Division of Community Assistance FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/Dredge and Fill Permit Application Review Applicant: North Carolina Department of Transportation Project Location: On NC 99 at Bridge No. 70 over Smith Creek in Beaufort County, North Carolina Proposed Project: To replace an existing bridge with a new 82' long bridge which will have a 24' wide travelway and 8' wide offsets on each side. Please indicate below your position or viewpoint on the proposed project and return this form by 4 July 1997. If you have any questions regarding the proposed project, please contact David Gossett at 946-6481. When appropriate, in-depth comments with supporting data is requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date -14L2-t / 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper . State of North Carolina • Department of Environment, Health and Natural Resources � • Fis, 4 Division of Coastal Management wtr James B. Hunt, Jr., Governor p E H N F� Jonathan B. Howes, Secretary Roger N. Schecter, Director 13 June 1997 RECEIVED JUN 2 3 1997 MEMORANDUM COASTAL MANAGEMENT TO: Mr. Charles Gardner, Director Division of Land Resources FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/Dredge and Fill Permit Application Review Applicant: North Carolina Department of Transportation Project Location: On NC 99 at Bridge No. 70 over Smith Creek in Beaufort County, North Carolina Proposed Project: To replace an existing bridge with a new 82' long bridge which will have a 24' wide travelway and 8' wide offsets on each side. Please indicate below your position or viewpoint on the proposed project and return this form by 4 July 1997. If you have any questions regarding the proposed project, please contact David Gossett at 946-6481. When appropriate, in-depth comments with supporting data is requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed / i Date zv' /' 7 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources 4 • • Division of Coastal Management p James B. Hunt, Jr., Governor � E Fl N R Jonathan B. Howes, Secretary Roger N. Schecter, Director June 19, 1997 RECEIVED MEMORANDUM JUN 2 6 1997 COASTAL MANAGEMENT TO: Mr. Larry R. Goode, Phd., P.E. Highway Administrator Division of Highways FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: On NC99 at Bridge #70 over Smith Creek, Beaufort Co. PROPOSED PROJECT: To replace an existing bridge with a new 82' long bridge. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 11, 1997. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY t7 This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agenc objec to a project for reasons described in the attached comments. Signed Date C r -1 !tJ P.O.Box 27687, FAX FAX 919-733-1495 Raleigh,North Carolina 27611-7687 FU An Equal Opportunity/Affirmative Action Employer Voice 919-733-2293 Reduce Reuse Recycle 50%recycled/10%post-consumer paper • State of North Carolinalc Department of Environment, Health and Natural Resources 1 • • Division of Coastal Management James B. Hunt, Jr., Governor p E H N R Jonathan B. Howes, Secretary Roger N. Schecter, Director June 19, 1997 RECEIVED MEMORANDUM JUL 0 7 1997 TO: Ms. Renee Gledhill-Early COASTAL MANAGEMENT Environmental Review Coordinator Division of Archives and History FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMAJDREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: On NC99 at Bridge#70 over Smith Creek, Beaufort Co. PROPOSED PROJECT: To replace an existing bridge with a new 82' long bridge. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 11, 1997. If you have any questions regarding the proposed project, please contact John Parker at 733-2293 when appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SignedL „G��LJ Date 7 y 2� P.O. Box 27687, ���arl FAX 919-733-1495 Raleigh,North Carolina 27611-7687 An Equal Opportunity/Affirmative Action Employer Voice 919-733-2293 Reduce Reuse Recycle 50%recycled/10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources A4 17 • • Division of Coastal Management JamesnatB. Hunt, Jrw., , Secrnor etes ED E H N R Jonathan B. Howes, Secretary Roger N. Schecter, Director RECEIVED / June 19, 1997 'N 91E, ; 1 JUL 07 1997 c' �,., s N :'),h% ).� W ,„ MEMORANDUM COASTAL MANAGEMENT sc,4c,ee ZZ LZ is‘ TO: Mr. Joseph H. Henderson, Director State Property Office Department of Administration FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: On NC99 at Bridge #70 over Smith Creek, Beaufort Co. PROPOSED PROJECT: To replace an existing bridge with a new 82' long bridge. Plesase indicate below your agency's position or viewpoint on the proposed project and return this form July 11, 1997. If you have any questions regarding the proposed project, please contact John Parker at 733-2293 when appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed ['Jr_ Date 1 3 a P.O. Box 27687, IL FAX 919-733-1495 � al Raleigh,North Carolina 27611-7687 f An Equal Opportunity/Affirmative Action Employer Voice 919-733-2293 Reduce Reuse Recycle 50%recycled/10%post-consumer paper ' State of North Carolina Ti4FrA, Department of Environment, Health and Natural Resources A 7 Division of Coastal Management p James B. Hunt, Jr., Governor Co H N F. Jonathan B. Howes, Secretary Roger N. Schecter, Director June 19, 1997re:Ircr-g MEMORANDUM JUN 20 1997 TO: Mr. John Sutherland, Chief ChisloN HATER Resotacee Water Planning Section Division of Water Resources RECEIVED FROM: John Parker, Jr. JUL 0 2 1997 Major Permits Processing Coordinator COASTAL MANAGEMENT SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: On NC99 at Bridge #70 over Smith Creek, Beaufort Co. PROPOSED PROJECT: To replace an existing bridge with a new 82' long bridge. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 11, 1997. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date 7/0 7 P.O. Box 27687, .O FAX 919-733-1495 Raleigh,North Carolina 27611-7687 f An Equal Opportunity/Affirmative Action Employer Voice 919-733-2293 Reduce Reuse Recycle 50%recycled/10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources � • 14• Division of Coastal Management JamesnahaB. Hunt, Jrw„ , Secrnor etary p E H N Jonathan B. Howes, Secretary Roger N. Schecter, Director 12 June 1997 Mr. H. Franklin Vick, P.E. , Manager Planning and Environmental Branch North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611 Dear Mr. Vick: The Division of Coastal Management hereby acknowledges receipt of an application from the North Carolina Department of Transportation for State approval for development of their property located on NC 99 at Bridge No. 70 over Smith Creek in Beaufort County, North Carolina. It was received on 9 June 1997 and appears to be adequate for processing at this time. The projected deadline for making a decision is 23 August 1997. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will also serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Should there be any questions on this procedural change, do not hesitate to contact me. N.C.G.S. 113A-119(b) requires that notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, David L. Gossett Field Representative DLG/pdp ENCLOSURE 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer . 50%recycled/10%post-consumer paper p-11 be '459 519 951 P 459 519 952 US Postal Service us Postal service, ;.c"ifiec'� Mail Receiptfor Certified Mail � Re�i=. ;�, ,or Ce<< No Insurance Coverage Provided. �o,::..:=,...nc_Coverage Provided. fe-Intarnatioral Mali See reverse • Do not use for Erie r naf:onai?,flail See rnv:r: IC �—� L. .0. r 31V Oft- i Ie.r.VP Cod Sfi� -- ! ,: _ 1 — [`t t 2—, 1�� IQrl I Postage 1 ; -- _, - Certified Fee f — I "- Special Delivery Fee i _ __ — in Restricted Delivery Fee - •a'I Reim _l _ PShowing:o "�y :_ Whom 3 Date Delivered -- QflC,:m fieCelpf Showily to: .:en. ' � 1 r _ { Date.B Addressee's Ail,vs 4� c - . O TOTAL Pos' c ;$ --"- .. .., O .ae& ce;; Postmark or C. ,: 0 2 � �;2 a • • . S ram I : State of North CarolinaV: A Department of Environment, Health and Natural Resources A • • Division of Coastal Management James B. Hunt, Jr.,Governor Jonathan B. Howes, Secretary ED E H N F =1 Roger N. Schecter, Director MEMORANDUM TO: Jim Mulligan Deborah Sawyer FROM: David Gossett" DATE: 12 June 1997 SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit North Carolina Department of Transportation Bridge No. 70 over Smith Creek Beaufort County, North Carolina Attached is an application for a CAMA Major and/or a Dredge & Fill permit which was received by me on 9 June 1997. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me. 1424 Carolina Avenue,Washington,North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper