Loading...
HomeMy WebLinkAboutNCDOT 4-96 Bridge #6-SR 1318 (Pollock Swamp) s \ \ \ \ \ \ , Permit Class Permit Number , ' NEW 4-96 , ' STATE OF NORTH CAROLINA ' / Department of Environment,Health&Natural Resources ' ' and , / Coastal Resources Commission ' a Ipiit trinit ,N, 4. rt wn\if.0 -vh. ..., , for JAN 3 ►v, X Major Develop t an Area of Environmental MI em uu - DNS pursuant 13A-118 otit'„ s � ► W , _ Excavati d/or filling tsuant to NCGS 113-229 . � Issued to NC Dept. of Transportation, v,:o1. i ways, P.O. Box 25201, - _ 27611 Chowan `� �—. ollock Swam SR1318 bridge crossing (Br. 6) , ' authorizing development in \,-'County at. s P� 10/3/95 includingattached workplan , as requested in the prittee's aP ication dated drawings, sheets 1-5 of 5 dated 9/20/95. \------ ' , This permit, issued on / 06. ,4 s ct compliance with the application(where consistent with the permit), all applica le regulations, special condition notes set forth below. Any violation of these terms may be subject to a fine,imprisonment or civil action; or may cause the permit to be null and void. In-Water Moratorium 1) In order to protect spawning and juvenile anadromous fish and other species using this functioning nursery area, no work may take place below normal water level from February 15 - , June 30 of any year without prior approval of the Division of Coastal Management in , consultation with the Wildlife Resources Commission and the Division of Marine Fisheries. , , Erosion Control 2) Appropriate erosion and sedimentation control devices, measures, or structures must be used to , prevent sediment from entering the adjacent wetlands/watercourses/property (e.g., silt fence, , diversion swales/berms, sand fence, etc.). , (See attached sheet for Additional Conditions) ' This permiCaction may be appealed by the permittee or Signed by the authority of the Secretary of DEHNR and the ' ' other qualified persons within twenty (20) days of the Chairman of the Coastal Resources Commission. ' issuing date. An appeal requires resolution prior to work ' initiation or continuance,as the case may be. / This permit must be accessible on-site to Department Ze_aie- -, 4'��• personnel when the project is inspected for compliance. + / �.^ ger N. Schecter,Director ' • Any maintenance work or project modification not Division of Coastal Management ' • covered hereunder requires further Departmental approval. / / All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 1999 , In issuing this permit,the State of North Carolina agreestj , that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee / NC Dept. of Transportation Permit #4-96 Page 2 of 2 / / ADDITIONAL CONDITIONS 3) A ground cover sufficien strain erosion must be provided within 30 working days of completion of any phase o rading on cut or filled slopes. , 4) Activities will be conducted n Lh anner as to prevent significant increase in turbidity / / outside the construction area. / / ( iIIMa €ria1 5) All fill material will be obtained from ancd source and will be clean and free of any / pollutants, except in trace quantities / / 6) All fill, construction materials and construction equipment shall be contained within the approved ' / construction site. / NOTE: The Division of Environmental Management approved this project on November 15, , 1995 under General Water Quality Certification No. 3025. / / / Form DCM-MP-1 APPLICATION 6 (To be completed by all applicants) 1. APPLICANT b. City, town. community or landmark Npprox. 2 miles north of Edenton a. Landowner: c. Street address or secondary road number Name N. C. Department of Transportation SR 1318 Address P.O. Box 25201 d. Is proposed work within city limits or planning jurisdiction? Yes X No City Raleigh State N.0 e. Name of body of water nearest project (e.g. river, Zip 27611-5201 Day Phone(919)733-3141 creek, sound,bay)Pollock Swamp Fax (919) 733-9794 b. Authorized Agent: 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT Name H. Franklin Vick,P.E.,Mgr.,P&E Branch Address P.O. Box 25201 a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. City Raleigh State N.C. Replace existing bridge with new bridge Zip 27611-5201 Day Phone(919)733-3141 Fax (919)733-9794 b. Is the proposed activity maintenance of an existing project,new work, or both? both c. Project name(if any)Replacement of Bridge #6 c. Will the project be for public, private or commercial use?Public Transportation NOTE: Permit will be issued in name of landowner(s). d. Give a brief description of purpose, use, methods of and/or project name. construction and daily operations of proposed project. If more space is needed, please attach VN additional pages. Public Transportation: Highway crossing of Pollock Swamp; Standard Construction 2. LOCATION OF PROPOSED Methodologies PROJECT a. County Chowan Form DCM-MP-1 m. Describe existing wastewater treatment facilities. 4. LAND AND WATER N/A CHARACTERISTICS a. Size of entire tract N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individual lot(s)N/A wastewater, industrial/commercial effluent, "wash down" and residential discharges.) c. Approximate elevation of tract above MHW or Surface runoff from bridge and approachways NWL+/-E13.0 ft(USGS);+/- 103 ft assumed datum d. Soil type(s)and texture(s)of tract o. Describe existing drinking water supply source. Mapped as Chowan Silt Loam; some muck N/A e. Vegetation on tract Maple, gum, ash swamp f. Man-made features now on tract Bridge 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land In addition to the completed application form, the classification of the site? (Consult the local land use following items must be submitted: plan.) • A copy of the deed (with state application only) or Conservation Transitional other instrument under which the applicant claims Developed Community title to the affected properties. If the applicant is not X Rural Other claiming to be the owner of said property, then forward a copy of the deed or other instrument under h. How is the tract zoned by local government? which the owner claims title, plus written permission Rural from the owner to carry out the project. i. Is the proposed project consistent with the • An accurate, dated work plat (including plan view applicable zoning? X Yes No and cross-sectional drawings) drawn to scale in black (Attach zoning compliance certificate, if applicable) ink on an 8 1/2"by 11"white paper. (Refer to Coastal j. Has a professional archaeological assessment been Resources Commission Rule 7J.0203 for a detailed done for the tract? Yes X No description.) If yes,by whom? Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line k. Is the project located in a National Registered prints or other larger plats are acceptable only if an Historic District or does it involve a National Register listed or eligible property? adequate number of quality copies are provided by Yes X No applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat 1. Are there wetlands on the site? X Yes _No requirements and it must be sufficiently detailed to Coastal(marsh) Other X guideagency personnel unfamiliar with the area to the If yes,has a delineation been conducted? Yes (Attach documentation, if available) Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION IA Stormwater Certification, if one is necessary. TO ENTER ON LAND IA list of the names and complete addresses of the I understand that any permit issued in response to this adjacent waterfront (riparian) landowners and application will allow only the development described in signed return receipts as proof that such owners the application. The project will be subject to have received a copy of the application and plats conditions and restrictions contained in the permit. by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal I certify that to the best of my knowledge, the proposed Management. Upon signing this form, the applicant activity complies with the State of North Carolina's further certifies that such notice has been provided. approved Coastal Management Program and will be conducted in a manner consistent with such program. Name Yates Parrish, Jr. Address 381 Old Hertford Road I certify that I am authorized to grant, and do in fact, Edenton,N.C. 27932 grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in Name Adrien J. Smith, Jr. & Sons, Inc. connection with evaluating information related to this Address Rt. 2,Box 382 permit application and follow-up monitoring of the Edenton,N.C. 27932 project. Name John L. Armstead I further certify that the information provided in this Address 67 N. Warren Avenue application is truthful to the best of my knowledge. Brockton,Mass. 02401 Name Betty B. Ward This is the 3 day of , 19 9s Address P.O. Box 4 Edenton,N.C. 27932 Print Name H. Fr• A list of previous state or federal permits issued for work on the project tract. Include permit Signature7ick,& � numbers,permittee, and issuing dates.None Lan owner or Authorized Agent • A check for$250 made payable to the Department of Environment, Health, and Natural Resources Please indicate attachments pertaining to your proposed (DEHNR) to cover the costs of processing the project. application. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development • A signed AEC hazard notice for projects in DCM MP-4 Structures Information oceanfront and inlet areas. X DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to NOTE: Please sign and date each attachment in the 10) If the project involves the expenditure of public space provided at the bottom of each form. funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this (4) Will all, or a part of, the existing culvert be proposed project. removed?(Explain) 1. BRIDGES g. Length of proposed bridge 3 spans @ 35 ft= 105 ft h. Width of proposed bridge 24 ft CW,+/-27 ft R-R* a. Public X Private i. Height of proposed bridge above wetlands b. Type of bridge (construction material) +/-4.0 ft Concrete-Prestressed cored slab *R-R denotes rail-to-rail j. Will the proposed bridge affect existing water flow? Yes X No c. Water body to be crossed by bridge If yes, explain Pollock Creek d. Water depth at the proposed crossing at MLW or NWL +/-6 ft. k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? +/-4.0 ft X Yes No 1. Will the proposed bridge affect navigation by If yes, reducing or increasing the existing navigable (1) Length of existing bridge 69 ft. opening? X Yes No (2) Width of existing bridge 19.2 ft CR* If yes, explain Existing bridge has 4 spans @ 17 ft; (3) Navigation clearance underneath existing proposed bridge will be 3 spans @ 35 ft;therefore, bridge +/-4.5 ft navigational width is increased. Vertical clearance (4) Will all, or a part of, the existing bridge be will be+/-0.5 ft lower due to added deck thickness removed?(Explain) Entire existing bridge will be removed m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No *CR denotes clear roadway If yes, explain f. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert n. Have you contacted the U.S. Coast Guard (3) Height of the top of the existing culvert above concerning their approval? the MHW or NWL _ Yes X No If yes, please provide record of their action. Form DCM-MP-5 j. Will the proposed culvert affect existing navigation 2. CULVERTS potential? Yes No N/A If yes, explain a. Water body in which culvert is to be placed N/A b. Number of culverts proposed N/A 3. EXCAVATION AND FILL c. Type of culvert(construction material, style) a. Will the placement of the proposed bridge or culvert N/A require any excavation below the MHW or NWL? Yes X No If yes, d. Will proposed culvert replace an existing bridge? (1) Length of area to be excavated Yes No N/A (2) Width of area to be excavated If yes, (3) Depth of area to be excavated (1) Length of existing bridge (4) Amount of material to be excavated in cubic (2) Width of existing bridge yards (3) Navigation clearance underneath existing bridge b. Will the placement of the proposed bridge or culvert (4) Will all, or a part of, the existing bridge be require any excavation within: No removed?(Explain) _Coastal Wetlands SAVs Other Wetlands If yes, — — (1) Length of area to be excavated (2) Width of area to be excavated e. Will proposed culvert replace an existing culvert? (3) Amount of material to be excavated in cubic Yes No N/A yards If yes, (1) Length of existing culvert c. Will the placement of the proposed bridge or culvert (2) Width of existing culvert require any highground excavation? (3) Height of the top of the existing culvert above X Yes No the MHW or NWL If yes, (4) Will all, or a part of, the existing culvert be (1) Length of area to be excavated +/-20 ft removed? (Explain) (2) Width of area to be excavated +/-40 ft (3) Amount of material to be excavated in cubic yards +/- 135 cu yds f. Length of proposed culvert N/A d. If the placement of the bridge or culvert involves any excavation,please complete the following: g. Width of proposed culvert N/A (1) Location of the spoil disposal area Upland site to be determined h. Height of the top of the proposed culvert above the (2) Dimensions of spoil disposal area MHW or NWL N/A see d. (1) i. Will the proposed culvert affect existing water flow? (3) Do you claim title to the disposal area? Yes No N/A Yes No see d. (1) If yes, explain If no, attach a letter granting permission from the owner. Form DCM-MP-5 (4) Will the disposal area be available for future b. Will the proposed project require the relocation of maintenance? Yes No see d.(1) any existing utility lines? Yes X No (5) Does the disposal area include any coastal If yes, explain in detail None anticipated wetlands(marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. see d. (1) c. Will the proposed project require the construction (6) Does the disposal area include any area below of any temporary detour structures? the MEW or NWL? Yes X No Yes X No If yes, give dimension if different from No. 2 If yes, explain in detail None anticipated above. see d. (1) e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X No MEW or NWL? Yes X No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled e. How will excavated or fill material be kept on site (2) Width of area to be filled and erosion controlled? Stringent application of (3) Purpose of fill NCDOT's BMPs for the Protection of Surface Waters f. Will the placement of the proposed bridge or culvert f. What type of construction equipment will be used result in any fill (other than excavated material (for example, dragline, backhoe or hydraulic described in Item d. above)to be placed within: dredge)? Backhoe,trucks, etc. _Coastal Wetlands SAVs_Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled g. Will wetlands be crossed in transporting equipment (3) Purpose of fill to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No h. Will the placement of the proposed bridge or culvert If yes, require any shoreline stabilization? (1) Length of area to be filled +/-300 ft Yes X No (2) Width of area to be filled +1-36 ft If yes, explain in detail (3) Purpose of fill Improve vertical alignment of bridge and roadway in vicinity of bridge 4. GENERAL NCDOT- .''. rankli Ali ,I P.E. / Ap c- t . ' oJect N.y''� ' Lad a. Will the proposed project involve any mitigation? '� n•tu e Yes X No / 3 ps If yes, explain in detail Date /,„ 7(,-it ® Chowan County „]o., ,177]17! 172 :o Isu \.7 c:1 la '.J!6 '.1 )ua�_ �a 1777_ ,.1 i ,717 i7O_ �: • Cifco J I 1111 61. . 17U 1216 Se • t 'm.3 ,ate Z�. fr- 'D 1)1v Mwolon WIW♦ I • ,7t! 1777 .v MOYvlen,• Y� J 1 7 O _ Lending 6 �17]7 k '7J "171i� .s 1717 RacYyhacY Ch. (,rN ‘` __ .:v 11ls_ 700 !1 1'` ,.H]1RN577' 4,303 " \ .1317 A I• '"•POND 1111 V `O� 171a ro �Q N 171, ,]I] 1�1! y' u E.,- -, ., 17m 1?7 ♦ I taCedon,a • 6 n Hancock Harris` , .S .a .5 1210 N Landing 1 1710 'J ) C .. 1777 1.6 ` . ; '1 0 •/0v 41. )6 • Valhalla.131E 1 �.i 1711 WJ ��— 1 I 7 ��� 1_71 � /L 16 • ti tr ./ 1 1707� I 17p� r 1. 1 1 ? 1t\ L ilin ♦♦♦°' Ea G .. P \T, f }/ 1706,n 4)....Honcoilt ,x / y �47. Sav \�P .73 1 4 �\ �\ 170s ✓ 17�1 '..\ < Fa'-1a70 1 1 0 t .,, 372 �" �\ ` .d �101 d1, • r '� • ,7a. as. ., ,W;:..::. .. i \ Yeppinl C i 170%�I =_qa Ito3i ��,. Ki�1 ��� �. �1Q R1 "�>11 EDEMOL1 �. 11,7 .. ,\ M•k0 .t 70 \ r Ed♦n,an t Trig \ ta \`., \b 11/�• • a :i: _ .e► •�/ .6 V' ii 7 / 1 f......... ....a. e1 1.7 11�6 "�1116� t0 \\ , 1,30 1�3o I.1 SR, LI07, f \ 1 o _.R"ndv 1'�;nr �y \ �111 North Carolina Department ofTrensportation Division of Highways County: Chowan Quad:Edenhouse • Basin: Chowan 1,4111.11111101111111.011.-W° P ecll: R lace Bridge#6 on p ~�ti• SR 1318 Over Pollock Swam ir��V'I'Iy1i►fTiui�"h�jr�� Date:09/ZO/95 . >•r1Ti��e"---. Vicinity Map 110/7 Sheet i of 5 e 1 1 I r �r�s �,ze‘sN , SQ. E� t10 Ezisr lN; Eo4r 3st c..p Hc2iFcea RD. ca.. - - - - — — Redo EOsk-roa, Nc_. 7.113Z •zr € St i- z 1 WOODS A �� �1 PaEsrRE5S D C cD SLAP r<=r;r `I , q0° .3 ,'C I,J A s-',:. ?. Sr-e ir.+ 3R.t SovS StiG, R,,tK r. Ta� All- op rzr.Z, F3 o,c 3 p,z Fit 1 . -->Q PP.01. ,o- CDE�-)Tc�.t , NC. i J TA '" S�FI NIP Z T13Z- Eocr of wETu._s l,� 1 �N — — _L - EOca� of N V:.CVOS _1�-IX1317 I CR 1-{10 rt ' � 1 t t'17=c?(—, _ _" — - -- - - -- - - -- )0SR1310 - -- - �-- �7 —1_ .1— ` - - - 1(' DTRZT D �, Ev�4: of w'STU•+:5 - - - •• - - - - - - - - �— - - - -- - - - .411 - _Av.._ _ ___., '17 Nfr r ' a="Ty B. waeo * 1�0. 13oY �- 8 CidffiLuit..,�1C Ec)GiG O PiVE.71.4x.JDS EDErv1-0`1, NG i'1� • Tub •F FILL 10�,J L. Q2rt Srl:e� Z743Z C.-7 ?J. Wart2e..+-a AJC • st,Pr\P ' -7vt) U WO o 03 e2Zoc.kTo1,-1, Hass. _ (`� o o zoo l NIR,\\\�\�\J ,0E,/,7SS Pict- i,v wzrZiPdo s y O ro p el v LCif 7x,4,i 0.0Sacly C O C o o. ws�.g ,OrM,T' /// H q/'�v.�o L• rc,+%A?'�A/ ,...,-- C7 Icn o co o a. C7 I a 3-too 4+0o 5± 00 E 50 Mo g Sc�LE / - Iz` z, �- - - -. _xc7 10 cc — ham — _ _ _ — NS /T� NG '. REr,.o`1 I MA i L 6r2::,,,ahlo I EX r5TrNG AREA% 354 Svc-IL - PRoPoSE.0 ARcA ;387j9, 4 , C S ',4 . ? ='12.0C J,-- c • V IZJfSi 110 rjrLr� fE':.:+-a`._:c CC;:.' 5=r 'YE/'_`y _ gG�FC r 1C)I� -_ - --- _ —_ NGRT—J — - `1C �) . \ \ - -. - -i- - rk 1p \ E I - \ - - I I -� " 1, - - l F; �f(Sr-L, 91. �'� I ii-,3-ti f'i/).(, r,,,A.-r+L vwS) / C.) o ;c o EX1Sr1rr(c J i G2,4o-1 Q r 6 .° a � S = kp Rio Ic. 'T = a R R7,. E DE,v./i iS /i 4g “aw.ii F.tcr+vArlot/ V fi. co fa. .ti CA E D i m I . x �o � a ) t00, r/- , Z+00 3100 yYOC7 A O 7 w 5c,�L • 1 —5O NoRrz. b I,, _ 10 1 YEPT. LEGr KD (DAN Pi E l Ev rS A scu:-A,2D) C. , f�� I �f,-;� - 110 1-, - O I/O - - - - - - NG LT — N; p-r F,�'aO)sE,c c G,f42 ,� - - . -- - JOG — Ex's T/f/�C - ��— `2 /G� r - - --- - -- -- - � GCl=1� `- - -� -- - - - F1 2 L t� �! 90 U1 ~i Ai 1 1 11 J7CO 6 CO 7-too VT�O i_, c r;D : � --_- --�p,�T u r� E �E11. Is f?s;.r,;r.E0JJ=H. _ --f/-�------' - r:sRT, I '' - /Q ' Vr ,c.-' I iio , 0 /10 CD ^� A a ., y C �4. 0 3 Z no X " ,+ o W w g o o 7,: es o /00 1.i r e t1, co D 4 9,2,n 9y �► I o 1 90 /&-o0 g - 5c,4 t E I /0 ' f-fcK-Z , ( DAIuc'\ IS RSS'AMED ELEV.) i "= id ViRT , 100 /0G $Ecrow A -A . � � I I I I 1 I I I I 9o1 0LI, 30 LT 20 I0 LT. 0 10RT 20RT,, 30 RI: 110pr. , Pp.cfc= G.t L E 31'25 I ������� ��,�T v. you 7. _ 3o LT, 20 LT. I a LY, O !0 17i, 20 �T 30 Ai. Ir'0 k' env - � co 1 r , r a = a I=, a to n a LEGEND SET/ / Q -6 W, e 0 .j 0 c) F D � w sa Y= STZN : GRF D _ I wo • �'� 00 sDATU Ts. ASStJi\ P ELEV,) i I. bug o SCALE : / = /4 ; 7—, c � a4. II _— , i o 0 (' I0 VP;e, , 'Is : i DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NC DOT Bridge # 6, SR 1318, Chowan County 2. LOCATION OF PROJECT SITE: SR 1318, and Pollock Swamp, 2 mi. north of Edenton Photo Index - 1989: not available 1984: not available State Plane Coordinates - X: 2,714,000 Y: 869,700 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/17/95 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 10/6/95 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Chowan County Land Classification From LUP - Rural without Services (B) AEC(s) Involved: Public Trust Waters (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - NA Planned - NA (F) Type of Structures: Existing - 69' X 19.2', 4.5' clearance over PTW Planned - 105' X 24', 4.0' clearance over PTW (G) Estimated Annual Rate of Erosion: NA Source - NA 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED SHADING (A) Vegetated Wetlands 45 sf. (B) Public Trust Waters 600 sf. 960 sf. (C) Other (D) Total Area Disturbed: 1605 sf. (0.037 A.) (E) Primary Nursery Area: No (F) Water Classification: CSW Open: No 8. PROJECT SUMMARY: NC DOT proposes to replace Bridge #6 at the crossing of SR 1318 and Pollock Swamp north of the Town of Edenton in Chowan County. The existing 19 ft. wide X 69 ft. long wooden bridge would be replaced with a 24 ft. wide X 105 ft. long concrete span. Vertical clearance is proposed to be reduced by 0.5 ft. NC DOT BRIDGE NO. 6, CHOWAN COUNTY BIO REPORT Page Two SITE DESCRIPTION The NC DOT owns and maintains Bridge # 6 at the crossing of SR 1318 and Pollock Swamp , approximately 2 miles north of the Town of Edenton, Chowan County. Pollock Swamp in the vicinity of the SR 1318 bridge is approximately 1200 ft. wide and is forested with mostly Taxodium distichum (bald cypress), Nyssa aquatica (black gum), Acer rubrum (red maple) and Magnolia virginiana (sweetbay magnolia). The shoreline adjacent to the existing bridge is predominately vegetated with the same overstory canopy. The waters of Pollock Swamp are classified by the Wildlife Resources Commission and the Division of Marine Fisheries as Inland Waters. These waters are classified by the Division of Environmental Management as CSW. The waters of Pollock Swamp are classified as Public Trust Waters by the Division of Coastal Management and is a part of the Estuarine System Area of Environmental Concern. Flow data are not readily available on Pollock Swamp although a very slow flow was observed on October 17, 1995. The existing channel of Pollock Swamp is often choked with Limna spp. (duckweed). No submerged aquatic vegetation were noted during this investigation although emergents such as Saururus cernuus (lizards tail) and Polygonum amphibium (water smart weed) were present adjacent to the channel area and as groundcover in the adjacent swamp. The submitted plat work on NC DOT Bridge # 6 indicates the existing bridge is 19.2 ft. in width and 69 ft. in length, a mid-point water depth of - 6.0 ft. and a vertical clearance over Public Trust Waters of 4.5 ft. at normal water level conditions. During a field investigation on October 17, 1995 the channel water depth and vertical bridge clearance at the mid-point location of the bridge was 5 ft. 2 in. and 4 ft. respectively. The bridge is constructed of asphalt-covered wood planking supported by nine wood/concrete piles. The adjacent shorelines are stabilized with natural vegetation. PROPOSED WORK The DCM received an application on October 6, 1995 from the NC DOT requesting authorization to replace the existing bridge No. 6. NC DOT proposes to remove and replace the wooden bridge at Pollock Swamp with a 24 ft. wide reinforced concrete structure. The proposed 105 ft. long bridge structure consist of three 35 ft. long prestressed concrete spans supported on two 15 inch diameter bent piles. The proposed structure would provide a clearance over Public Trust Waters of about 4.0 ft. at normal water level conditions. Both existing approaches to Bridge # 6 would be widened to 36 ft. in width for a distance of 40 ft. from the proposed bridge structure. SR 1318 will be closed for the duration of the project. No temporary bridge bidge access will be needed. NC DOT BRIDGE NO. 6, CHOWAN COUNTY BIO REPORT Page Three ANTICIPATED IMPACTS NC DOT Bridge #6 has no known historical significance. The proposed project would require the placement of piles and fill which will directly impact and freshwater wetlands and Public Trust Waters. The new bridge structure would result in the filling of 600 sf. and the shading of 960 sf. of Public Trust Waters as well as the filling of 45 sf. of freshwater wetlands. Access to Public Trust Waters would be impacted by the proposed one-half ft. reduction in vertical clearance. Construction of the proposed project would temporarily increase turbidity within the stream channel and downstream. The NC DOT has not offered any compensation for the projected wetland or Public Trust losses or impacts. CAMA REVIEW The proposed development falls within the purview of the Chowan County Land-Use Plan. In its plan, the County expresses support for various state and federal programs, especially NC DOT road improvements. The County relies on existing regulations when dealing with impacts to the AEC's that can be permitted by regulatory agencies. If these permitting agencies issue a permit for the proposed work, it would be consistent with the Chowan County Land-Use Plan. Submitted by D. W. Hawthorn October 26, 1995 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL/PROCESSING RECORD A) APPLICANT: NC DOT - Bridge #6 COUNTY: Chowan q-K ' LOCATION OF PROJECT: SR 1318 & Pollock Swamp, north of Edenton, Chowan County DATE APPLICATION RECEIVED COMPLETE BY FIELD: October 6, 1995 FIELD RECOMMENDATION: Attached - N To Be Forwarded - Y 9 101 44 '•CONSISTENCY DETERMINATION: Attached - Y To Be Forwarded - N Rfc�vED UCT 3o ,995 COWAL FIELD REPRESENTATIVE: Hawthorn DISTRICT OFFICE: Elizabeth City�� MAN NEE r DISTRICT MANAGER REVIEW: l a" B) DATE APPLICATION RECEIVED IN RALEIGH: - 3 D- 9 S FEE REC'D: $J[9 PUBLIC NOTICE REC'D: � END OF NOTICE DATE: I i -z2 _ gs ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: � � ON: \"— \ ‘- C) 75 DAY DEADLINE: ��- D - Ts- 150 DAY DEADLINE: MAIL OUT DATE: !i - 4 - Sr STATE DUE DATE: _P- , 7- 9 c J FEDERAL DUE DAT • FED. COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS OBJECTIONS NOTES RETURNED YES NO Coastal Management Dist. Office / q __ c( / Div. of Community Assistance ( �, Land Quality Section 5 c / GG J VVV Div. of Env. Management /I_ State Property Office Div. of Archives & History / IP l __ 61 r 1_I Div. of Env. Health �— 0 - 9 S Div. of Highways 1 ( ` _ r L///` Wildlife Resources Commission a_i , -1 c Div. of Water Resources ! Div. of Marine Fisheries �. 4 \\-t%.1 esctx- CA) MEMORANDUM , TO: John Parker 9 5 FROM: Dennis W. Hawthorn SUBJECT: Recommendations NCDOT Bridge No. 6, SR 1318 New Road, Chowan County DATE: November 8, 1995 The new bridge structure will be the same alignment as the existing bridge. The proposed structure will reduce the current clearance by 0. 5 ft, NWL. The proposed project, through filling, will directly impact 45 sf. of freshwater wetlands and 600 sf. of Public Trust Waters. The new bridge would shade a total of 960 sf. of Public Trust Waters. I recommend approval of this proposed project with the following conditions. 1) This project will require a site erosion plan ; 2) All fill material will be obtained from an upland source and will be clean and free of any pollutants, except in trace quantities ; 3) All fill, construction materials and construction equipment shall be contained within the approved construction site ; 4) Appropriate erosion and sedimentation control devices, measures or structures shall be used to prevent sediment from entering the adjacent marsh and estuarine waters ; 5) Ground cover sufficient to restrain erosion shall be provided within 30 working days of completion of any phase of grading on cut or filled slopes ; 4 6) Activities will be conducted in such a manner as to prevent significant increase in turbidity outside the construction area ; NC DOT Bridge No. 6 Recommendations Page Two 7) In order to protect juvenile finfish populations, no excavation or filling will be permitted between t February 15 and September 30 of any year without prior approval of the Division of Coastal Management in consultation with the Division of Marine Fisheries ; 8) In the event that significant archaeological resources are found present within the boundaries of this proposed permit area, the permittee shall notify the Division of Coastal Management and develop a cultural resources management plan in consultation with the Division of Archives and History for the effective long-term management of such resources. Y, 'State of North Carolina Department of Environment, Health and Natural Resources ` • • Division of Coastal Management 4647v JameswItir nahaB. Hunt, Jr., , Secrnor etary E II F Jonathan B. Howes, Secretary C Roger N. Schecter, Director • November 3, 1995 MEMORANDUM TO: Mr. Charles R. Fullwood, Jr., Director Wildlife Resources Commission Attn: Habitat Conservation Program FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: SR 1318 & Pollock Swamp, Bridge #6, Chowan Co. ROPOSED PROJECT: To replace wooden bridge with concrete span. Please indicate below your agency's position or viewpoint on the proposed and return this form by November 24, 1995. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. �^ ✓ This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attache co ents. — Signed `�l�,t-�-�� Q Date r,?a /-"X�0 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper 4' war. Nh d North Carolina Wildlife Resources Commission 0 512 N.Salisbury Street,Raleigh,North Carolina 27604-1188,919-733-3391 Charles R.Fullwood,Executive Director MEMORANDUM TO: John R. Parker, Jr. Major Permits Processing Coordinator Division of Coastal Management FROM: Franklin T. McBride, Manager Habitat Conservation Program ram g DATE: November 22, 1995 SUBJECT: CAMA/Dredge and Fill Permit Application for NCDOT bridge project on SR 1318 over Pollock Swamp, Chowan County. Staff biologists with the Wildlife Resources Commission have reviewed this permit application and are familiar with habitat values in the project area. Our comments are provided in accordance with provisions of the Coastal Area Management Act(G.S. 113A-100 through 113A-128), and the Fish and Wildlife Coordination Act(48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). NCDOT proposes to replace wooden bridge# 6 on SR 1318 with a concrete span bridge. The project as proposed will fill 45 square feet of vegetated wetlands, 600 square feet of public trust waters (PTW), and shade 960 square feet of PTW. Additionally, the project will reduce the vertical bridge clearance by 0.5 feet. The project as proposed has the potential to adversely effect fish and wildlife habitat in Pollock Swamp. Wetlands such as those found on this site provide functions which benefit the public as well as fish and wildlife. Wetlands act as a stormwater runoff purification zone between upland areas and surface waters. Wetlands store and convey flood waters and provide shoreline erosion protection through attenuation of wave energy. Wetlands also serve as a physical habitat for numerous species of amphibians, reptiles ,birds, and mammals. In some instances, wetlands serve as spawning areas for anadromous fish. Through deposition of detritus into adjacent waters, wetlands contribute large quantities of organic carbon, forming the food chain base and the resulting biological productivity for many aquatic ecosystems. • 4. The shallow water habitat in Pollock Swamp is used by numerous species of anadromous • freshwater fish(specifically herring)as spawning, rearing, feeding, and escape areas. Because of the project's potential to adversely impact fish and wildlife in Pollock Swamp,we request that no in-water work be performed form March 1 to September 30. Impacts to fishery resources will be minimized if work is not undertaken during this critical spawning and rearing period. We appreciate the opportunity to review this permit application. If we can be of further assistance please contact David Cox,Highway Project Coordinator, at(919) 528-9886. FM/ct ... State of North Carolina I Q S I 1 Department of Environment, Health and Natural Resources • • Division of Coastal Management James B. Hunt,Jr., Governor E H N Jonathan B. Howes, Secretary Roger N. Schecter, Director RECEIVED October 27, 1995 WASHINGTON OFFICE NOV 0 2 1995 MEMORANDUM D. E TO: Mr. A. Preston Howard, Director Division of Environmental Management di FROM: John R. Parker, Jr. D S 0 W q _s Major Permits Processing Coordinator �_._.m SUBJECT: CAMA/DREDGE & FILL Permit Application Review , / - 6 1995 Applicant: NC DOT - Bridge #6 LANDS Project Location: SR 1318 & Pollock Swamp north of Edenton, ChowanQUACl TY Proposed Project: Replace Bridge #6 an existing 19' x 69' wooden bridge with a 24' x 105' concrete span and reducing the vertical clearance by 0.5' . Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 17, 1995. If you have any questions regarding the proposed project, please contact Dennis W. Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date 11111f �J 1367 U.S. 17 South.Elizabeth City,North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources � • • Division of Environmental Management JamesnahaB. Hunt, Jrw„ , Secrnor etary p E H N F Jonathan B. Howes, Secretary A. Preston Howard, Jr„ P.E., Director November 15, 1995 owan County DE roject # 951176 APPROVAL of 401 Water Quality Certification - NO L is, '5 Mr. Franklin Vick NOV 20 1995 N.C. Dept. of Transportation CO CO4SiAL Planning and Environmental Branch MANAGEMENT P.O. Box 25201 V" Raleigh, N.C. 27611 - -. Dear Mr. Vick: You have our approval to place fill material in 45 square feet of wetlands and 600 square feet of waters for the purpose of replacing Bridge #6 on SR1318 at Pollock Swamp, as you described in your application dated 2 November 1995. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification N ber 302 . This approval is only valid for the purpose and • t you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. Sine rel , '71 if`-'1 / ton Howard, Jr .E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DEM Regional Office Mr. John Domey Central Files John Parker, DCM Stephanie Briggs; N.C. DOT 951176.1tr P.O. Box 29535,Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper • 00 cflaooy9 _ ,. • �1 ��o� FD 9C�1��R 99`S 3 S Fyl DEPARTMENT OF ENVIRONMENt 4.11310 HEALTH.AND NATURAL RESOURCES MEMORANDUM TO: JOHN R. PARKER, JR. FROM: SARA WINSLOW DATE: 7 NOVEMBEI. 1995 SUBJECT: NCDOT BRIDGE #6 CHOWAN Applicant County Attached is the response to the above application. If I can be of further assistance, please let me know. gm /attachment(s) State of North Carolina Department of Environment, Health and Natural Resources A 41,1 Division of Marine Fisheries • James B. Hunt, Jr., Governor p E H N R Jonathan B. Howes, Secretary Bruce L. Freeman, Director • MEMORANDUM: TO: John R. Parker, Jr., DCM Major Permits Processing Coordinator THROUGH: Maury Wolff, Permit Coordinator FROM: Sara E. Winslow, Biologist Supervisor Mti) SUBJECT: NCDOT - Bridge #6, SR 1318 Pollock Swamp DATE: October 30, 1995 The following comments by the North Carolina Division of Marine Fisheries are provided pursuant to General Statute 113-131. Pollock Swamp functions as_ a spawning and nursery area for blueback herring and alewife. The utilization by these species have been documented by the Division in various federal aid reports. Other commercially and recreationally important species also utilize the area. This agency requests a moratorium associated with the removal and replacement of the bridge. The requested time period is 15 February through 30 June. This will ensure the environmental integrity of the area is protected during et—altieal time of usage by the previously mentioned species. P.O. Box 769, Morehead City, North Carolina 28557-0769 Telephone 919-726-7021 FAX 919-726-0254 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources • • Division of Coastal Management AT'W James B. Hunt,Jr., Governor EHNIR Jonathan B. Howes,Secretary rD Roger N. Schecter, Director October 27, 1995 MEMORANDUM TO: Mr. Bruce L. Freeman, Director Division of Marine Fisheries FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC DOT Bridge #6 Project Location: SR 1318 & Pollock Swamp north of Edenton, Chowan County Proposed Project: Replace Bridge #6 an existing 19' x 69' wooden bridge with a 24' x 105' concrete span and reducing the vertical clearance by 0.5' . Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 17, 1995. If you have any questions regarding the proposed project, please contact Dennis W. Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. -J This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Sign Date /C2- 30 1367 U.S. 17 South,Elizabeth Ctty,North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper . State of North Carolina Department of Environment, Health and Natural Resources !TT& ' Division of Coastal Management James B. Hunt,Jr., Governor CO E HIVIR Jonathan B. Howes, Secretary Roger N. Schecter, Director 9 10 INNo V 8�9 41A,b� 95 October 27, 1995 Fir �l H / 0, MEMORANDUM �� TO: Mr. Charles Gardner, Director Division of Land Resources FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/D GE & FILL Permit Application Review Applicant: NC DO - Bridge #6 Project Location: SR 131 Pollock Swamp north of Edenton, Chowan County Proposed Project: Replace Bridge #6 an existing 19' x 69' wooden bridge with a 24' x 105' concrete span and reducing the vertical clearance by 0.5' . Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 17, 1995. If you have any questions regarding the proposed project, please contact Dennis W. Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached/ lilts C. Signed -Ave— Date /cS 1367 U.S. 17 South,Elizabeth Cfty, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper DIVISION OF LAND RESOURCES LAIN UALITY/SECTION MEMORANDUM TO: John R. Parker, Jr. /Stephen Benton Major Permits Processing Section Division of Coastal Management FROM: Patrick H. McClain Assistant Land Quality Regional Engineer Washington Regional Office SUBJECT: 1)4-- ge This office will require that: 1. The area be properly graded. 2. A permanent ground cover sufficient to restrain erosion be provided on all exposed areas within the shorter of 30 working or 120 calendar days after project comple- tion. 3 . The exterior slopes of the disposal area dikes be at an angle no steeper than 1 1/2 H: 1 V. 4 . Appropriate erosion and sedimentation control devices, measures , or structures be used to prevent sediment from entering the adjacent wetlands/watercourses/ property (e.g. , silt fence, diversion swales/berms , sand fence, etc. ) . V 5 . A ground cover sufficient to restrain erosion be provided within 30 working days of completion of any phase of grading on cut or filled slopes. 6. An erosion and sedimentation control plan be submitted at least 30 days prior to initiation of land-disturbing activities. 7. Additional information concerning the area of the land- ward disturbance be submitted to determine if an erosion control plan is required. 8. Other: State of North Carolina Department of Environment, Health and Natural Resources � • � • Division of Coastal Management James B. Hunt,Jr., Governor ClE HNJR Jonathan B. Howes, Secretary Roger N. Schecter, Director October 27, 1995 MEMORANDUM TO: Mr. Robert E. Chandler, Director Division of Community Assistance FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC DOT - Bridge #6 Project Location: SR 1318 Pollock Swamp north of Edenton, Chowan County Proposed Project: Replace Bridge #6 an existing 19' x 69' wooden bridge with a 24' x 105' concrete span and reducing the vertical clearance by 0.5' . Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 17, 1995. If you have any questions regarding the proposed project, please contact Dennis W. Hawthorn at (919) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. is a•en y objects to the project for reasons described in the attach=d ► ments. 4PiL Signed `%kf ,����, Date It7 5 r N 1367 U.S. 17 South,Elizabeth City,North Carolina 27909 Telephone 919-264-3901 FAX 919-264-3723 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources 617 4i1111 Division of Coastal Management James B. Hunt,Jr., Governor p E H N F Jonathan B. Howes, Secretary Roger N. Schecter, Director November 3, 1995 MEMORANDUM TO: Mr. Larry R. Goode, Phd., P.E. Highway Administrator Division of Highways 11 FROM: John Parker, Jr. P\E# fn Major Permits Processing Coordinator c, 20 1995 PA- SUBJECT: CAMA/DREDGE & FILL Permit Application Review MANaG APPLICANT: NC DOT 9 114 PROJECT LOCATION: SR1318 & Pollock Swamp, Bridge 4, Chowan Co. PROPOSED PROJECT: To replace wooden bridge with concrete span. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 24, 1995. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY V This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the atta ed o ts. Signed Date // l 9 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper 114'3 State of North Ca ' li a .,-, Department of En it nment, ./.;,' Health and Natur sources ATI:A a t�f /0 Division of Coastal Man, ment (� 11 ames B. Hunt, Jr., Governor r li I Jonathan B. Howes Director ED C H N F� (�• ry E pc) Roger N. Schecter, Director kC.a Lf gym"c'' V E November 3, 1995 NOV :. 1995 MEMORANDUM - G;. , I_Tll TO: Ms. Linda Sewall Director , w,_ 1 r ;-_ Division of Environmental Health • L. I ,:. FROM: John Parker, Jr. Major Permits Processing Coordinator Dior'. OF ENVIRONMENTAL HEA!TH SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT _ PROJECT LOCATION: SR1318 & llock Swamp, Bridge #6, Chowan Co. PROPOSED PROJECT: To replace wooden bridge with concrete span. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 24, 1995"%1 If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. • Signed aba / 6;1d6irdOWDate i���' /7 5 ?.S ,gyp / � `� / _i-c,-�,.C� //lL o Ara P.O. Box 27687,Raleigh,North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources A7;1•117A Division of Coastal Management Jameswit" • • nahaB. Hunt, Jr., , Secretr ary � F1 NJ F Jonathan B. Howes, Secreta C Roger N. Schecter, Director 4) � f November 3, 1995 RE30��19 5 VP.311k ,�OV O MANAGEMENT MEMORANDUM cu TO: Ms. Renee Gledhill-Early 9 5 �, Environmental Review Coordinator Division of Archives and History . FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: SR1�18 & Pollock Swamp, Bridge #6, Chowan Co. PROPOSED PROJECT: To replace wooden bridge with concrete span. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 24, 1995. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed( Date P.O. Box 27687, Raleigh,North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper III State of North Carolina I i r x Department of Environment, Health and Natural Resources 4 mr.1 A Division of Coastal Management JamesnahaB. Hunt, Jr., , Secrnor etary p E H N' Jonathan B. Howes, Secretary Roger N. Schecter, Director November 3, 1995 Q.%i.M+r YVi ri, MEMORANDUM NOV 9 i995 TO: Mr. John Sutherland, Chief DMSIQN OF WA' R RESaIRcE Water Planning Section Division of Water Resources ,I,Ct, _112j, FROM: John Parker, Jr. s 411:t a �,F\\ -�9y Major Permits Processing Coordinator a.-- f6 ‘, -- Ot , ac\‘‘t SUBJECT: CAMA/DREDGE & FILL Permit Application Re ew $‘'- , APPLICANT: NC DOT -'y __ _ , �� J'9 10 PROJECT LOCATION: SR1318'Pollock Swamp, Bridge #6, Chowan Co. PROPOSED PROJECT: To replace wooden bridge with concrete span. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 24, 1995. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed ;' , Date /1-3/4/f,r - P.O. Box 27687,Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper MIL State of North Carolina Department of Environment, Health and Natural Resources / "v. A Division of Coastal Management James B. Hunt,Jr., r C Jonathan B. Howes,, Secretary 1:3 C Roger N. Schecter, Director November 3, 1995 MEMORANDUM TO: Mr. Joe Henderson, Acting Director State Property Office Department of Administration FROM: John Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review APPLICANT: NC DOT PROJECT LOCATION: SR1318 & Pock Swamp, Bridge #6, Chowan Co. PROPOSED PROJECT: To replace wooden bridge with concrete span. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 24, 1995. If you have any questions regarding the proposed project, please contact John Parker at 733-2293. When appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. J This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed C �� Date la 1 1 S P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper State of North Carolina 46, ; Department of Environment, Health and Natural Resources 77 A Division of Coastal Management • wit,' James B. Hunt, Jr., r ry p E H N Fl Jonathan B. Howes,, Secretary Roger N. Schecter, Director January 9, 1996 Mr. Barney O'Quinn NC Dept. of Transportation Planning & Environmental Branch P. O. Box 25201 Raleigh, NC 27611 Dear Sir: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff- colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the fmal decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, John R. Parker, Jr. Major Permits Processing Coordinator JRP:j r/amw Enclosure P.O. Box 27687,Raleigh,North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper 1 � State of North Carolina pc FA Department of Environment, Health and Natural Resources / . • Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes,Secretary Roger N. Schecter, Director October 27, 1995 Mr. H. Franklin Vick, P.E. Planning and Environmental Branch NC Dept. of Transportation P. O. Box 25201 Raleigh, NC 2001 Dear Mr. Vick: The Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of property located at SR 1318 and Pollock Swamp, north of Edenton, Chowan County. It was received on October 6, 1995, and appears to be adequate for processing at this time. The projected deadline for making a decision is December 20, 1995. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any 1367 U.S. 17 South,Elizabeth City, North Carolina 27909 Telephone 919-264-3901 FAX 919-264-372:4 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper October 27, 1995 Page #2 questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, De s W. Hawthorn Field Representative I DWH/dc Enclosure cc: John Parker Richard L. Watts STATE o r-- ) STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETr JR. GOVERNOR SECRETARY P.O. Box 1405 Elizabeth City,N.C. 27906-1405 Phone:(919)331-4737 September 29, 1995 Mr. John L. Armstead 67 N. Warren Avenue Brockton, Mass 02401 Dear Sir: The North Carolina Department of Transportation (NCDOT) is proposing to replace the existing bridge over the Pollock Swamp on SR 1318 in Chowan County. The existing bridge is functionally deficient and is scheduled to be replaced by a reinforced concrete structure. The attached form is submitted to insure that adjacent, riparian landowners have an opportunity to review and comment on the proposal. I have also included a copy of the CAMA Major Development Permit and engineering drawings which depict the project in plan view (overhead view). Please review this material at your convenience and, if you have no objections to the project, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. John Parker Division of Coastal Management N.C. Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, N.C. 27611-7687 Thank you for your cooperation. Sincerely, ( •4-kidert/P M. Randall Turner, Division Environmental Officer Planning & Environmental Branch Attachments cc: John Parker, Division of Coastal Management, Raleigh H. Franklin Vick, P.E., NCDOT, Raleigh f, STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. GOVERNOR SECRETARY P.O. Box 1405 Elizabeth City,N.C.27906-1405 Phone:(919)331-4737 September 29, 1995 Mr. Adrien J. Smith, Jr. & Sons, Inc. Rt. 2, Box 382 Edenton, N.C. 27932 Dear Sir: The North Carolina Department of Transportation (NCDOT) is proposing to replace the existing bridge over the Pollock Swamp on SR 1318 in Chowan County. The existing bridge is functionally deficient and is scheduled to be replaced by a reinforced concrete structure. The attached form is submitted to insure that adjacent, riparian landowners have an opportunity to review and comment on the proposal. I have also included a copy of the CAMA Major Development Permit and engineering drawings which depict the project in plan view (overhead view). Please review this material at your convenience and, if you have no objections to the project, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. John Parker Division of Coastal Management N.C. Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, N.C. 27611-7687 Thank you for your cooperation. Sincere l , U/✓' M. Randall Turner, Division Environmental Officer Planning & Environmental Branch Attachments cc: John Parker, Division of Coastal Management, Raleigh H. Franklin Vick, P.E., NCDOT, Raleigh s o.STATF o � ' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. GOVERNOR SECRETARY P.O. Box 1405 Elizabeth City,N.C.27906-1405 Phone:(919)331-4737 September 29, 1995 Mr. Yates Parrish, Jr. 381 Old Hertford Road Edenton, N.C. 27932 Dear Sir: The North Carolina Department of Transportation (NCDOT) is proposing to replace the existing bridge over the Pollock Swamp on SR 1318 in Chowan County. The existing bridge is functionally deficient and is scheduled to be replaced by a reinforced concrete structure. The attached form is submitted to insure that adjacent, riparian landowners have an opportunity to review and comment on the proposal. I have also included a copy of the CAMA Major Development Permit and engineering drawings which depict the project in plan view (overhead view). Please review this material at your convenience and, if you have no objections to the project, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. John Parker Division of Coastal Management N.C. Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, N.C. 27611-7687 Thank you for your cooperation. Sincere) /12'4114/ M. Randall Turner, Division Envirohmental Officer Planning & Environmental Branch Attachments cc: John Parker, Division of Coastal Management, Raleigh H. Franklin Vick, P.E., NCDOT, Raleigh Ur STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. GOVERNOR SECRETARY P.O. Box 1405 Elizabeth City,N.C.27906-1405 Phone:(919)331-4737 September 29, 1995 Ms. Betty B. Ward P.O. Box 4 Edenton, N.C. 27932 Dear Ms. Ward: The North Carolina Department of Transportation (NCDOT) is proposing to replace the existing bridge over the Pollock Swamp on SR 1318 in Chowan County. The existing bridge is functionally deficient and is scheduled to be replaced by a reinforced concrete structure. The attached form is submitted to insure that adjacent, riparian landowners have an opportunity to review and comment on the proposal. I have also included a copy of the CAMA Major Development Permit and engineering drawings which depict the project in plan view (overhead view). Please review this material at your convenience and, if you have no objections to the project, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. John Parker Division of Coastal Management N.C. Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, N.C. 27611-7687 Thank you for your cooperation. Sincerely Matieieraai/ M. Randall Turner, Division Environmental Officer Planning & Environmental Branch Attachments cc: John Parker, Division of Coastal Management, Raleigh H. Franklin Vick, P.E., NCDOT, Raleigh 0 P 013 217 953 P 013 21r'? 954 P 01r3 21,7 955 ,.. Receipt for Receipt for Receipt for - ..` Certified Mail Certified Mail Certified Mail w" No Insurance Coverage Provided No Insurance Coverage Provided No Insurance Coverage Provided 1 r—raaw s r. u.,eerr�r[: Do not use for International Mail ��„ Do not use for International Mail - POSTAL u,"r PO-,usz.�EDo not use for International Mail I l.II (See Reverse) (See Reverse) (See Reverse) cn S „ tol,F 16 �irw �.(fi _4r- oien Smiih 3v. f JD Tr S o S ret and No. r and o. P S to an ZIP Code P O. S to and Z P Code _ l r n, �G a 3� ��i ►�A.: • . . - f,jG a�" Postage Postage 1 _ Postage $ Certified Fee $ Certified Fee $ Certified Fee Special Delivery Fee " Special Delivery Fee Special Delivery Fee Restricted Delivery Fee Restricted Delivery Fee Restricted Delivery Fee T Return Receipt Showing r- Return Receipt Showing Return Receipt Showing 01 cg to Whom&Date Delivered p) to Whom&Date Delivered co to Whom&Date Delivered Return Receipt Showing to Whom, m Return Receipt Showing to Whom, - m Return Receipt Showing to Whom, cc Date,and Addressee's Address a Date,and Addressee's Address C Date,and Addressee's Address 7 R 7 7 • TOTAL Postage 1� n & TALL Postage —1 TOTAL Postage A • &Fees t� Oyfi a &Fees Postmark or Date Postmark or Date - 0 Po tmark or Date 03 CO C,V)n)can C� or3E Cowan Co . o ran G) • . (.0 it to 1_— — — • • • "V•m d Q p il /` ..'.' . •' i r .T'.' ., • • fll 4" o y L • .•. tzt, a >M ; C mC c.m 4:3) 1 IA = sN ) � • o v O at Q O y C' ¢ J N �;,t w: F rn m O x m v c i c: v 11 b. x 0 p o -) o cc ce 3 ri o" :a s in ��a a u cn L 661 gunk'008E woo j Sd r I� 11 95 �X.' 1 �$`91h 331 4739 : CllOT LC DIST 1 __ 001 z JFj -‘11-ATE OF NOR,IH CAROLINA DEPARTMENT OF TRANSPOKIATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GAftru;r JR, GOVERNOR P O Box 1405 � SiCRk fARy Elizabeth City, NC 27906' (919) 331-4737 • FAX -COVER SHEET TO: )/241 ci:72)47/X)/24 COMPANY: FROM: - (L1J4 DATE l )- -,1 (r - 7 i!. 11. IINUMBER OF PAGES: (including c 3ver sheet) If you have any problems receiving this FAX, please call (919) 331-4737 Sender's FAX Number: ,919) 331-4739 SPECIAL INSTRUCTIONS. V e('( IC("cv-ble.A.-ti; j L /4 k" A`C r:'1 1 r`! I )- zt'Ll&J •- -- '` • Afebe.',/467L'e.:24.2.5- iy. c/27,-/z)/AAJ C-,-,-eix2- '' ,r«4' ?76 Original will fellow Ongina' w;11 -ic•; fellow 1 er yurrx'vK• 1,-eIso -W lsh tJ !r PIPS• "rfa i •�-,vf: r�,r r G+mp1eM Iitems8.and Aa i b......,,,n rrem- r ,. .. ..rsi, t0 r�ce:i✓�t[Rd • Prior your name,a•d ( IUllowbty rrJr- f,., , •address on the reverse of this torn s0 trat w o can itt a tattoo this•.Sri to you. , feel: O.V''h >'r✓,.•,.. �,! 8❑ ext'e 4' =! • Attach Ctrs form+p ,_ - t., 4', , ci..,- :ql •r RopuestOf t(Atha tha r, J ~ `I^ ., fo m,o t. .., fie r_r•. . the r rail for does not pe•rt.lt P .c.a;on u,�bar* f soace _tt. •sot y t • p r, "`Ec '▪' ..- i des fu, t r••n: nt the mJ,^ cam,a nn ..a,.k:f ct,ace ' ^,rtc� d • 1 t 1? n • • A.ir,s r • The+t ••ce below V IC artrt,.r number.) 4" t r.o•mit wiil show to wham the a e was de iv:red ."the dafo 2' Restricted Delivery r a r i v✓nta 'Return Poceipt Revr:o•aeJ' on t,,meitptece below the nrticta n.anbre•; N • �p daliverrdL R ^C.rld Dtati'vrrt,.+ ' ,, i;" • r he Nn;r•te fieenipt wilt sfrow to M';h7 the erticte was dr•r,ared and Uw detu •Q 3• :rticle n,tidressod to: -"" -- -- -j Co-. ult postmaster for fee. m 5 do l.!...rl. =a. Article Number " li --- Consult po.,ru-,aster fe. fu^ Qi F. �, 3. Article Addressed u: -j +Ia. !tittle Nurnue,r r --PO Bar/_(75,3_ F. + n.eti -- - - .� 1 j 4b. Service Type -_-_ � � o�� ,t q MS . Betty B. Ward I . egistered U Insured E e Type Mr. 4h. Service T' e cc P. O. Box 4 I Certified rn v r• Yates Parrish, Jr + egistered l.0 lnt:ured Edenton NC 27932 ❑ Exprc 'Dt ' • �t �81 Old Hertford Road certified EJ c c t s s�vlr 4 ;t for F,' 1 -. f +� f,d , pC n NC 2 7 32 U Express Mdi, r.) Return Receipt for X 7 pate of D • k N __- --.2 , n: 0�0 MerchanC;sc l� l�/, w 6 C1 7, Date of Delivery 5. Signa'.0 (d Addressee) -- `-- a ' `� _ ! //`` B. Addressee' A es to .;tr x i Z (1 ' � __ o _ ~ -~ _ �1>gf-7 � 5. Sirnature f ddrt.ss -- a- ca --- __ _ - anc+ ter is p } �z 8. Atidrrasee's Address tOniy ii teque��Ad.Y ::'Gnat;-a iAtent) - -- -_ (JS c l �{/(ifJ�' and fee is pa,a1 c f'" ' ; E, azure (Agent; r ^'S Fo• 3311, December 1991 sits GPo:fso. s?-7t4 DOMESTIC RETURN RECEIPT o N PS Form 3811. December t y9 t eu s Gr o iee3-saata DOMESTIC RETURN RFC IP';' - t SENpERtte, • -iENrJYr' _ ^ - - rCl�an`41 r�p • �'' r• r,m a enrtror 2!or additional services. + I also wish to receive 'the i 4 r �-_-`Com',Ir r tam and 4a 6 nN • is /and/or`.?Ibr eddHionel scrr,crs. i afsU wish to reCerVe the Print yc.rr name and uddreas 0n the,oversr,of ttnG tans so ih;d we can follow+ng services (for an e'!tra di a, • Complete items ;t,atid4e O.!,i` -. following services lion an a extra c1lii eturn V s card to you. fee): ? .q • Pram your name and a�cfrc,a rn the revery of this form so rho we can C" Attac this torn,to the front of the ma:r+„Y;.r•or on the bock if space CID rercnn this card to you.. • .' '' fee,): j„�,no f r 1 1. ❑Addresst:'rr's Addresd t� r • Attach this•form to the lrohtrtt the;rrfttllniece,01 on the back If space m • _ tlucs skit permit. Li Adrire y v'''r n .r theReceiptRequested"' thectr number. • The F u n,. ,I,t will show r0 whom the article was dnu2. U Restricted Delivery a • Write'Retn,• Rncei p yr c ed on pc mailpieca blow the u tictn number. p e'ivr,red vered end the date •� • 'rho Return Receipt 1 t,bcw ice whun,the article we..delivered end the date 2. '-� RfStnCted{JeIlVery Consult,postmaster for fee, o o delivered._ - 3. Article Addresrd to: - j Y- ---"---- ----__ m o ---.--__-_- _ 1 u 14a. :"e Number ¢ (onsJ.t postmaster for ter, �, 3. Article Addressaf. �i• i-` - _--I qa. ..A -le Number - -- --- m j._• E. 1 } a r�n� A7r. John L, I nta. seniceType a �.: .. af% ai 1 ` "i55 _ g CC E Mr. Adriel 1J. Smith, Jr. !' I U Se!vicrrType ----Armstead F,.i,�/�epistered Insured o r�p gistered ? insured a r 67 N. Warren Avenue ! !Jr Certified ❑ COD ° & Sons Irr(y. IY f �, , LL'•,,t Brockton, MA �24 r In Route f NYCertified El COD c Q I i Express Mail ( Return Receipt for a Lu 2, hUX;;: $� Merchandise eC' .27932 i U Express Mail D Return Receipt for• r.'// Edenton f.f I C rf c?af dt,h'1 1. Date et Delivery - ° n� NC 2 7 9 3 �- _-Merchandise �{ = GI r. ate o Geiiv ry „.. 5 ana:.)ro (Addressee) I �----.� - - -- i ' .1 , 'C: ems --ate/ r• • )- o 8. Addressee's Address lOn1y if requested Y "5�5 nature (Addressee) ,, and fee is paid) = �'` 8. Addressee's Address (Only if requested•e _ __ - m F and fee is paid) a Signal Jre iAgenti - - - - .c .t _ -- i_�.__.▪_.— - - - { 1'- cc 6. Signature (Agent)' • r' ri Form 3$11, CJecembc• 1991 ¢uv.G?o:taaaas2ata ° I _ DOMESTIC RETURN RECEIPT y PS Folio 381'I• December 199 i ou.s.GPQ.tear <ai» DOMESTIC RETURN RECEIPT 1-