Loading...
HomeMy WebLinkAboutNCDOT 106-12 B-2500 Phase I Minor Mod 9 • - Permit Class Permit Number MODIFICATION/MINOR 106-12 STATE OF NORTH CAROLINA Iepartment of Environmental Quality and Coastal Resources Commission ernitt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N.C. Department of Transportation, 113 Airport Drive,Edenton,NC 27932 Authorizing development in Dare County at Oregon Inlet and Pamlico Sound,Herbert C. Bonner Rridu on NC Highway 12 , as requested in the permittee's application letters dated R/13/19 and 7/10/19_ including the attached workplan drawings(10)as referenced in Condition No. 1 of this permit,&AEC Hazard Notice dated 1/17/19. This permit, issued on 8/29/19 , is subject to compliance with the application (where consistent with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) Unless specifically altered herein, all work authorized by this Minor Modification shall be carried out in accordance with the following attached workplan drawings (10): 2 dated 8/12/19, 1 dated 8/5/19, I dated 7/11/19, and 6 dated 7/10/19, except as modified herein. 2) Unless specifically altered herein, this Minor Modification authorizes the following additional activities associated with demolition of the existing Herbert C. Bonner Bridge over Oregon Inlet: expansion of the south loading dock by approximately 2,000 square feet, an additional bridge demolition trestle, and 48 additional breasting piles, all as depicted on the attached workplan drawings. NOTE: The specific development being permitted does not preclude the remainder of the B-2500 project being built in the Pamlico Sound provided that future development will be constructed in a way that avoids and minimizes impacts to AECs. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the Chair other qualified persons within twenty(20)days of the issuing of the Coastal Resources Commission. date. This permit must be accessible on-site to Department O personnel when the project is inspected for compliance. Braxton C. Davis, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its co 'tions are hereby acpepted. No expiration date, pursuant to GS 136-44.7B In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee • • -....-- -n-Ill w+w N.C. Department of Transportation Permit#106-12 Page 2 of 3 ADDITIONAL CONDITIONS NOTE: The proposed project will increase temporary impacts to surface waters by approximately 0.03 acres. 3) Nothing in this permit authorizes any activity that has not received approval from the National Park Service and/or the U.S. Fish and Wildlife Service, if required, for work within the Cape Hatteras National Seashore and/or the Pea Island National Wildlife Refuge. The proposed work shall not commence until the permittee has been issued a Special Use Permit from the NPS and/or the USFWS, if required, and a copy of the Special Use Permit(s) is received by DCM. 4) The authorized activities shall not result in any additional permanent or temporary impacts to vegetated wetlands or areas with submerged aquatic vegetation, without permit modification. 5) The installation and removal of the piles shall be accomplished by pile driving and/or the use of a vibratory hammer. Should the permittee and/or its contractor propose to utilize another type of pile installation, such as jetting, additional authorization from DCM shall be required. In the event that a piling breaks during removal and cannot be removed in its entirety, it may be cut off flush with the bed of the water body, and DCM shall be notified of each occurrence within one working day. 6) No dredging or excavation shall occur within waters of the State, either by conventional methods or by prop wash"kicking"with boat propellers, without permit modification. 7) No sewage, whether treated or untreated, shall be discharged at any time from any vessels using the authorized facilities. Any sewage discharge at the authorized facilities shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 8) The temporary placement and double handling of any excavated or fill material within waters or vegetated wetlands is not authorized. This condition also applies to the materials stored on work platforms and removal of the existing bridge, roadway asphalt, and associated materials. 9) The structures authorized by this Minor Modification shall be removed in their entirety immediately 1 after they are no longer needed, or within 30 days of written notification from DCM, whichever comes first,and disposed of at an approved high ground location. 10) Any significant depressions in the Sound bottom that are created by temporary hollow steel piles and that persist following removal of the piles shall be filled with native substrate material to approximate their pre-project contours and elevations as soon as practicable. 11) If it is determined that additional permanent and/or temporary impacts are necessary that are not shown on the attached workplan drawings or described in the authorized permit application, a permit modification and/or additional authorization from DCM may be required. In addition, any changes in the approved plan may also require a permit modification and/or additional authorization from DCM. The permittee shall contact a representative of DCM prior to commencement of any such activity for this determination and any permit modification. I nA. N.C. Department of Transportation Permit#106-12 Page 3 of 3 ADDITIONAL CONDITIONS 12) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work following completion of construction and demolition activities. 13) The permittee shall install and maintain at its expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. 14) The permittee and/or its contractor shall contact the DCM Transportation Project Field Representative in Elizabeth City to request a preconstruction conference prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. This includes approval, if required, from the N.C. Division of Water Resources and/or the U.S. Army Corps of Engineers. 15) Development authorized by this permit shall only be conducted on lands owned by NCDOT and/or its right-of-ways and/or easements. 16) This Minor Modification shall be attached to the original of Permit No. 106-12, which was issued on 9/19/12, as well as all subsequent modifications, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 17) All conditions and stipulations of the active permit remain in force under this Minor Modification unless altered herein. NOTE: A minor modification application processing fee of$100 was received by DCM for this project. I I ..-•-.....,.. ,....�. ........... - -,a... ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary BRAXTON C.DAVIS Director August 29,2019 N.C.Department of Transportation 113 Airport Drive Edenton,NC 27932 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act,and where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal.The original(buff-colored form)is retained by you and it must be available on site when the project is inspected for compliance.Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714,(919)733-2698 within twenty(20)days of this decision on your permit.You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty(20)days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application.Modifications,time extensions,and future maintenance requires additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved. If you are having the work done by a contractor,it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, (A- d H,i - Douglas V. Huggett Major Permits Manager N.C.Division of Coastal Management Enclosure NoD_EQ� Department of Environmental pWgi `/ North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1400 Commerce Avenue I Morehead City,North Carolina 28557 252.808.2808 N i -r.T STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H.TROGDON,III GOVERNOR SECRETARY August 13,2019 U.S.Army Corps of Engineers N.C.Division of Coastal Management Regulatory Field Office 401 S. Griffin St., Suite 300 2407 West Fifth St. Elizabeth City,NC 27909 Washington,NC 27889 ATTN: Greg Daisey ATTN: Kyle W. Barnes NCDOT Coordinator NCDOT Coordinator N.C.Division of Water Resources Washington Regional Office 9453 Washington Square Mall Washington,NC 27889 ATTN: Garcy Ward NCDOT Coordinator Subject: Request for Modification of the Individual Section 404 Permit,Section 10, Individual Water Quality Certification,and CAMA Major Development Permit for the Proposed Replacement of Bridge No. 11 over Oregon Inlet on NC 12 in Dare County,North Carolina;TIP Project B-2500(Phase I);Federal Aid Projects BRNHF-0012(48)and BRNHF-0012(36);Debit$570 from WBS Element: 32635.1.4 References: Section 404 Individual Permit,U.S.Army Corps of Engineers Action ID SAW- 1993-03077,issued August 14,2013,modified October 30,2015,NW 33 Permit Action ID SAW-1993-03077 issued February 24,2016,modified January 10, 2017 and last modified December 11,2018. Section 401 Individual Water Quality Certification,NCDWR Project No. 20120629,issued September 7,2012, modified November 6,2015,in-field modification September,2016#20160186 v4,NCDWR corresponding NW 33 WQC 3893,#20160186,modified February 3,2017,and last modified November 21,2018 with NCDWR corresponding WQC 3939.CAMA Major Development Permit,NCDCM Permit No. 106-12, issued September 19,2012,modified September 26,2016,modified February 6, 2017,and last modified December 10,2018. In addition to the letter sent on July 10,2019,the North Carolina Department of Transportation (NCDOT)is providing further information concerning the above referenced permits to authorize an additional south dock loading span to complete the marine demolition of the existing bridge. This additional modification information is being submitted after further geotechnical investigation determined an extra span on the south dock loading trestle is needed for splicing Mailing Address: Telephone:(252)482-1850 Location: NC DEPARTMENT OF TRANSPORTATION Fax:(252)482-8722 113 AIRPORT DRIVE,SUITE 100 HIGHWAY DIVISION 1 Customer Service: 1-877-368-4968 EDENTON,NC 27932 113 AIRPORT DRIVE,SUITE 100 EDENTON,NC 27932 Website:www.ncdot.gov 180 foot steel pipe piles. The Design-Build Team is continuing to look for ways to minimize impacts through their means and methods of demolition of the old bridge. Bridge Demolition Additional South Dock Loading Span The Design-Build Team has determined a need for an additional temporary bridge loading dock span that would accommodate the splicing of 180-foot steel pipe piles that are used to build the temporary bridge demolition trestle.The additional south dock loading span will be abutting and located north of the current south dock layout.The dimensions represent a—2,002 square foot area(46.25 x 43.3'),and will be 10 feet above the water surface(mean lower low water)at the same elevation as the current south dock.The additional south dock loading span will be supported by a total of 8 temporary hollow steel trestle piles(36-inch diameter pipe piles)totaling approximately 57 square feet. One pile will be located at each of the four corners of the additional loading span,and 4 additional piles will be placed 2/3 of the length of the additional span west of the current south dock. Table 1 states the spatial location of the additional south dock loading span piles. The included revised permit drawings show the additional bridge demolition trestle and proposed breasting pile locations(sheets 8,9 and 10)addressed in the July 10,2019 modification request, and expansion of the south loading dock(sheet 5A)included in this modification request. Table 1.Additional South Dock Loading Span Pile Locations Corner/Mid-length Pile Locations Latitude/Longitude(DD) South Corner(P1) 35.766067;-75.525888 Mid-length(P2) 35.7659790;-75.5259889 Mid-length(P3) 35.7659860;-75.5259993 West Corner(P4) 35.7660059;-75.5260287 North Corner(P5) 35.7660183;-75.5258352 Mid-length(P6) 35.7660638;-75.5259027 Mid-length(P7) 35.7660708;-75.5259131 East Corner(P8) 35.7660908;-75.5259425 Breasting Lines/Temporary Trestle Clarification There will be 49 bents supported by three piles at each bent,and 48 associated breasting piles located mid-span along the length of the west side of the trestle.The July 10,2019 modification letter previously stated 48 bents,and 47 breasting piles. Use of the 48 breasting piles will be installed and used throughout the bridge demolition process.It was previously stated in the July 10,2019 letter that approximately 10 breasting piles would be used at one time,and would be moved along the length of the trestle as demolition work progressed. Summary Tables of Impacts For comparison,Table 2 is an abbreviated version of the surface water impacts and the changes in impacts due to adding the bridge demolition temporary trestle,associated breasting piles and, expansion of the south loading dock.To clarify,Table 2 incorporates the modifications including in the July 10,and current request as compared to the previously permitted(December 2018) impacts. Table 2. Surface Water Impact Changes December 2018 Revised August Water Temporary SW 2019 Temporary Permit Drawing Site Number body Mitigable Impacts SW Impacts (ac.) (ac.) Site 3 Oregon (Work Trestle/Dock and Additional Inlet No <0.01 <0.01 South Dock Loading Span) Site 6(Existing Bridge Demo, Oregon Bridge Removal Trestle,Breasting Inlet No 2.46 2.49 Lines) Regulatory Approvals Section 404 Permit:NCDOT requests that the U.S.Army Corps of Engineers(USACE)review this permit modification request and issue a modification for the Individual Section 404 Permit issued August 14,2013,January, 10 2017,and last modified December 11,2018. 401 Certification:NCDOT requests that the N.C. Division of Water Resources review this permit modification request and issue a modification for the 401 Water Quality Certification issued September 7,2012,February 3,2017,and last modified November 21,2018. CAMA Permit:NCDOT requests that the N.C. Division of Coastal Management review this permit modification request and issue a modification for the CAMA Major Development Permit issued September 19,2012,February 6,2017,and last modified December 10,2018. If you should have any questions regarding this request,please contact Paul Williams at(252) 482-1861 or pcwilliams2@u,ncdot.gov. Sincerely, Jerry Jennings,P.E.,Division Engineer NCDOT Division 1 DocuSigned byozdz. 7C79B0D2941 F47E... Paul Williams,Environmental Specialist NCDOT Division 1 Cc: NCDOT Permit Application Standard Distribution List Art Beyer, US Fish and Wildlife Service Mark Dowdle,National Park Service Derek Burrill,U.S.Coast Guard Sector North Carolina Hal R.Pitts,U.S.Coast Guard, District 5 Bridge Branch t 4 ' 0 : kmz) N.e STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H.TROGDON,III GOVERNOR SECRETARY July 10,2019 U.S.Army Corps of Engineers N.C.Division of Coastal Management Regulatory Field Office 401 S.Griffin St., Suite 300 2407 West Fifth St. Elizabeth City,NC 27909 Washington,NC 27889 ATTN: Greg Daisey ATTN: Kyle W.Barnes NCDOT Coordinator NCDOT Coordinator N.C.Division of Water Resources Washington Regional Office 9453 Washington Square Mall Washington,NC 27889 ATTN: Garcy Ward NCDOT Coordinator Subject: Request for Modification of the Individual Section 404 Permit,Section 10, Individual Water Quality Certification,and CAMA Major Development Permit for the Proposed Replacement of Bridge No. 11 over Oregon Inlet on NC 12 in Dare County,North Carolina;TIP Project B-2500(Phase I); Federal Aid Projects BRNHF-0012(48)and BRNHF-0012(36); Debit$570 from WBS Element: 32635.1.4 References: Section 404 Individual Permit,U.S.Army Corps of Engineers Action ID SAW- 1993-03077,issued August 14,2013,modified October 30,2015,NW 33 Permit Action ID SAW-1993-03077 issued February 24,2016,modified January 10, 2017 and last modified December 11,2018. Section 401 Individual Water Quality Certification,NCDWR Project No.20120629, issued September 7, 2012,modified November 6,2015, in-field modification September,2016 #20160186 v4,NCDWR corresponding NW 33 WQC 3893,#20160186, modified February 3,2017,and last modified November 21,2018 with NCDWR corresponding WQC 3939. CAMA Major Development Permit,NCDCM Permit No. 106-12, issued September 19,2012,modified September 26,2016,modified February 6,2017,and last modified December 10,2018. The North Carolina Department of Transportation(NCDOT)requests a modification of the above referenced permits to authorize additional work trestle and multiple breasting piles necessary to complete the marine demolition of the existing bridge. This modification is required due to shoaling that has occurred likely from lack of maintenance dredging. The Design-Build Team is continuing to look for ways to minimize impacts through their means and methods of Mailing Address: Telephone:(252)482-1850 Location: NC DEPARTMENT OF TRANSPORTATION Fax:(252)482-8722 113 AIRPORT DRIVE,SUITE 100 HIGHWAY DMSION 1 Customer Service: 1-877-368-4968 EDENTON,NC 27932 113 AIRPORT DRIVE,SUITE 100 EDENTON,NC 27932 Websire:www.ncdot.gov i demolition of the existing bridge.On site conditions have changed and this modification request represents a change from the amount of trestle originally anticipated during pre-construction demolition planning. Bridge Demolition Temporary Trestle and Associated Breasting Piles The Design-Build Team has determined a need for additional temporary bridge demolition trestle and associated breasting piles. The additional bridge demolition temporary trestle will be located east of the new bridge and west of the existing bridge between the old bridge bents#129 and 155. The trestle will include a total of 48 bents supported by three piles at each bent. This trestle extension would serve as a transfer platform for the old bridge superstructure,substructure and pile pieces before they are transferred down the length of the platform to barges.The trestle dimensions represent an—92,688 square foot area(1931' x 48')and will be 14 feet above the water surface, supported by an estimated 147 temporary hollow steel trestle piles(36"inch diameter piles)totaling approximately 1,039 square feet. The first three bents(bent#1-3)of the additional bridge demolition temporary trestle will be built from barge-mounted cranes,and the remaining 45 bents(bent#4-48)will be built from cranes-on the bridge demolition temporary trestle. Both construction methods will thereby minimize temporary surface water disturbance. Table 1 states the location of the bridge demolition temporary trestle corner piles. Table 1.Trestle Corner Pile Locations Trestle Corner Pile Location Latitude/Longitude(DD) Bent 1 west 35.770727;-075.535517 Bent 1 east 35.770798;-075.535423 Bent 49 west 35.774601;-075.539962 Bent 49 east 35.774672;-075.539869 Breasting Lines Forty seven(47)associated breasting piles are located mid-span along the length of the west side of the trestle. These 36"temporary breasting piles will range from 80 to 100 linear feet in length. Approximately 10 breasting piles will be used at one time,and they will be moved along the length of the trestle as demolition work progresses. These breasting piles are needed to tie barges off to help maintain their position while loading of the existing bridge demolition pieces,and prevent damage to the newly constructed bridge. The included revised permit drawings show the additional bridge demolition trestle and proposed breasting pile locations on permit sheets 8,9 and 10. Summary Tables of Impacts For comparison,Table 2 is an abbreviated version of the surface water impacts and the changes in impacts due to adding the bridge demolition temporary trestle,and associated breasting piles. Table 2. Surface Water Impact Changes December Revised July Permit Drawing 2018 2019 Site Number Waterbody Mitigable Temporary Temporary SW Impacts SW Impacts (ac.) (ac.) Site 6 (Existing Bridge Demo,Bridge Oregon Inlet No 2.46 2.49 Removal Trestle, Breasting Lines) Regulatory Approvals Section 404 Permit:NCDOT requests that the U.S.Army Corps of Engineers(USACE)review this permit modification request and issue a modification for the Individual Section 404 Permit issued August 14,2013,January, 10 2017,and last modified December 11,2018. 401 Certification:NCDOT requests that the N.C.Division of Water Resources review this permit modification request and issue a modification for the 401 Water Quality Certification issued September 7,2012,February 3,2017,and last modified November 21,2018. CAMA Permit:NCDOT requests that the N.C.Division of Coastal Management review this permit modification request and issue a modification for the CAMA Major Development Permit issued September 19,2012, February 6,2017,and last modified December 10,2018. If you should have any questions regarding this request,please contact Paul Williams at(252) 482-1861 or pcwilliams2na,ncdot.gov. Sincerely, Jerry Jennings,P.E.,Division Engineer NCDOT Division 1 DxuSgned by: 7C7980D2941 F47E... Paul Williams,Environmental Specialist NCDOT Division 1 Cc: NCDOT Permit Application Standard Distribution List Art Beyer, US Fish and Wildlife Service Mark Dowdle,National Park Service Derek Burrill,U.S.Coast Guard Sector North Carolina Hal R.Pitts,U.S.Coast Guard,District 5 Bridge Branch / \ See Sheet 1-A For Index of Sheets STATE OF NOI'1 Y H CAROLINA STATE RATE MOSIER'I' ' ESIERBEICE MX No ,„EST Dffi r DIVISION OF HIGHWAYS N.C. B-2500 (PHASE I) Island (,,_,0 awn PROEM r..waw E�CEII roll k:Iodie Light HOUSE-, , A 32635.1.4 BRNHF-0012(48) CONSTRUCTION L414 `,0 321535.3.GV3 BRNHF-0012(36) CONSTRUCTION �,: ` l� END + ]� � i PROJECT DARE COUNTY zow o c , 1256 Duck Island\� ���,,...ff c. LOCATION: NC 12 — REPLACEMENT OF HERBERT C. BONNER BRIDGE ACROSS Oregon Inlet Coast Guard Station / Oregon Inlet �.c OREGON INLET FROM HATTERAS ISLAND TO BODIE ISLAND s PCL Civil Constructors, Inc. O C D 0 O TYPE OF WORK: DESIGN—BUILD AS SPECIFIED IN THE SCOPE OF WORK PCL 801 Corporate Center Drive,Suite 130 N _ 1257 CONTAINED IN THE REQUEST FOR PROPOSALS Raleigh,NC 27607 V/ p z Engineering,Inc.of the Carolinas BEGIN 1, IZ WETLAND AND STREAM IMPACTS FN HDR FayettevilleSt,Suitenc. Raleigh,N.C.Carolinas PROJECT N.C.B.E.L.S. License Number:F-0116 a • • „( 4,..i, SITE MAP Pamlico Sound Pea Island NationalaAS 8� o r ` Wildlife Refuge b I= ?O v I , D) VI(NOT O SCALE)TY MAP 1� ` END STATE PROJECT B-2500 PHASE END F.A. PROJECT BRNHF-0012(36) Q �= SITE 5 ( ) AND BRNHF-0012(48) South Dock -L- POC 28+68.00 �IS -L- STA. 206 + 96.51 al Revision BRIDGE - 08.07.2019 SITE 3 �� 10 II�'�111111a D 13111111111111010 Pamlico Sound a - ��. - am t Sou , rlIP ITE 4 .:\ 140611011 SITE 1 --- 1111''''* Ornlnlet 5A �� o. Bodie ® Manna Hatteras _ LP' Island „; ® a Q Island it O .N� ►. A � .� Oregon o SITE 6 TO ��t� Inlet 19 .. ii _ • RODANTHE ��� `i'� SITE 6 �' '^ ' NC -12.�' '� o ZI g U41140,404k M c J �1 Site 6 Bridge Demo -L- POC 176+67.51 a, co 3Z 00 — SITE 2 i Revised 07-10-2019 END BRIDGE o ® ct N BEGIN CONSTRUCTION n- • v�* TO NAGS Z � 0 0 -L- STA. 18+39.00 BEGIN STATE PROJECT B-2500 (PHASE I) D NC HEAD L., , ` •N BEGIN F.A. PROJECT BRNHF-0012(36) PERMIT DRAWINGS 12 Atlantic Ocean SHEET_ OF Atlantic Ocean V AND BRNHF-0012(48) I a SITE a -L- STA. 19 +SO.00 DOCUMENT NOT CONSIDERED FINAL m a' • • UNLESS ALL SIGNATURES COMPLETED 0 cc o cc HYDRAULICS ENGINEER DIVISION OF HIGHWAYS a a a fJ GRAPHIC SCALES DESIGN DATA PROJECT LENGTH DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA C ADT 2011 = 7,060 1000 Birch Ridge Dr.,Raicagh NC,276/0 o 50 25 0 50 100 ADT 2035 = 11,420 LENGTH ROADWAY = 0 747 MILES .N0 C _ DHV = 10 % TIP PROJECT B-2500 (PHASE I) 2006 STANDARD SPECIFICATIONSU Lc' r, �o o -- PLANS D = 50 % RIGHT OF WAY DATE: P.E T,will 7 Eiiiii LENGTH STRUCTURE _ SIG aTURF. 2.803 MILES �- so 25 0 50 100 T = 6 % TIP PROJECT B-2500 (PHASE I) DECEMBER 7,2011 DOMENIC A. I,PE ROADWAY DESIGN ENGINE Eg o _+� V = 60 MPH PROJECT ENGINEER V. /N W�\ 4 o Z 0 PROFILE (HORIZONTAL) TOTAL LENGTH = 3.550 MILES LETTING DATE: ;/ '•••i••. 'r TOO .�;.occss a•.• cF LO ^ O TIP PROJECT B-2500 (PHASE I) DULY 19,2011 DOMINIC M.WAINWRIGHT,PE I , SEAL 1 a _,' 10 5 0 10 20 FUNC N C CLASS — PROJECT DESIGN ENGINEER ! 026441 ; a r , MAJOR COLLECTOR t' '' v 1 �' NCDOT CONTACT: DAVID T. HERING,LG,PE P.E. U31 C2 " PROFILE (VERTICAL) STATEWIDE TIER PE S \ DESIGN-BUILDr .SIGNATURE \I4TL H/GHII.II DES/GA ENGINEER —/ a u PROJECT REFERENCE NO. SHEET NO. B-2500 (PHASE I) i 5A RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ZENGINEER ENGINEER e �� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 77":-\-3, PCL Civil Constructors,Inc. '801 Corporote Center Drive,Suite 130 v• ' _ ,Roleigh,NC Y7607 �) „ F♦ ` HDR Engineering Inc.01the Carolinas O J J` .C.27001 N.C.B.HE EL Serile SI Suite POO Raleigh,Liense Number F-0116 O 25 0 25 50 PLANS Existing 245' Long i1111' „ Breasting Line SITE 3 II c0. EXISTING O p SOUTH DOCK \ O O 0 1 �' r un O \ N V 1 m S) O L o. T O O O O , \ \ K \ O O SURVEYED SHORELINE \ a \ (March 2011) 4 IlIA South Dock Additiona Platform = 2,002 SF and is i AL constructed with 8 - 36inW m , ± ± - - --- - - �— 40, ����-� piles E -.., ...... — j ‘ i SOUTH DOCK ADDITIONAL SPAN SURVEYED SHORELINE / / \ ± / 6 ,a `m / d d /e� — �0� A.LINCIA SIHl �I a3MOd 80J ,_ eEN 4/ 0�� 3�8 �Ivnv Oltdw N i /� ," E— _ - a rnln ON z. V Lel PERMIT DRAWINGS alb ¢ / N - -- —� T� — - _— _ o• va SHEET OF .r .. _ � - 1 PROJECT REFERENCE NO. SHEET NO. B-2500 (PHASE I) SA . - RAN SHEET NO. ROADWAY DESIGN HYDRAUUCS ZENGINEER ENGINEER :1 ' v ,� DOCUMENT NOT CONSIDERED FINAL )1L11712"k UNLESS ALL SIGNATURES COMPLETED � PCL Civil Constructors,Inc.801 Corporofe Confer Drive,Suke 130 Raleigh,NC 27607 ♦)1( HDR Engineering,Inc.of the Carolinas 555 Fr ` .C.27601 N.CB EL.kSsl.Suite licena Numbc F-06 25 0 25 50 PLANS • Existing 245' Long „ Breasting Line SITE 3 R. - a O EXISTING O O SOUTH DOCK \ \ O • 1/1 (D O L 5- \ . i T O 3 O O __ O O O ra ,• SURVEYED SHORELINE Tz m (Much 201E - \ \ . 'fr......* . � t+���s South Dock Additional \ A�,.41, -mu,, � - Platform = 2.002 SF and is 2 a z `-.- —WLB— — — — — — - ��� � constructed with 8 - 36in • — — — �" piles _ m\ \ n_ E • SOUTH DOCK / ADDITIONAL SPAN \ o+ n SURVEYED SHORELINE / • N e (June 2017) N m /O / ± �\ o w ' (h / r P g glii T / / 6� / '� d� �0�" :I.__ 1INIOIA SIHl:01 a3MOd a0� E� -I• 0 0 00 r 1 r 3l8 �IbAV11VWS �10 I�Il(1 ON N E E-- _ — �� — a o E // / "� — X X w •N PERMIT DRAWINGS _.�_ _ ±7. ' SHEET OF - - - - N Q � V_ r r PROJECT REFERENCE NO SHEET NO B-2500 (PHASE I) 8 / / RW SHEET NO. //i////',t DENOTES TEMPORARY - ROADWAY DESIGN HYDRAULICS ?//�JZ IMPACTS IN SURFACE WATER ` ENGINEER ENGINEER �o W/7//7„ DENOTES IMPACTS IN s�SURFACE WATER s ',s �o o� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 80L Civil Constructors,Inc. SOl C ivil ote CenterConstructors, Drive.Suite 130 VOID Raleigh,NC 27607 11 HDR Engineering,Inc.of the Carolinas 0 0 0 �J! 555 Fayettevile St.Stile 90C Raleigh,N.C.27601 * 6 O ` N.C.B.E.L.S. License Number:F-0116 0 in 0 o -L- PT Sto.70+69.43 6"DECK DRAINS(a +,c 14'O.C. FROM 57 20 TO 175(51k -,F j_ GC1ERNArEr:- oa SITE 5 z z I— LU LII w .. 5KNi 2c w I - 2 r/y x_' In LLJ --7;F.96 75'00 76-00 7�G0 T8'DC 79'00 80-00 - 81'00 82 I • `.J -L- I I H 45 Q4'� �..I t J I N o �' cllb a Z �as - BREASTING PILES (36"PIPE PILES N .Q BREASTING PILES (36"PIPE PILES 00 O LOCATED BETWEEN BENTS) rn Q TEMPORARY WORK LOCATED BETWEEN BENTS) o n TRESTLE FOR N AZ m o a .v n 7 o F- a BRIDGE REMOVAL .- - - sLn If) 136"WITS: m • m • m m m M N N 3 PILES C • • • • • • • • • EACH BENT ao J < EST 147 PILES) �I J CCI'- Pay'.r�T i•Y-••,-r= e .ri=�. ..14 '� . �t•M A� Eii► -�l� . `— 4. '� ' .. -4� -fir. ___ !I± I2" o _ z. 0 '45 III E in io io Z.5. t. tr. , : : : _ c c 9 w ti ti 5 i. i, i i i 'Zi, Z W W W W W W 'ell W W W W W W W W W, W I W Wj, a o m m CO m m Co � m m ID m m m CO m� m Co m Co o m o \ . .. ui i H 0 LE -,c :( p t EXISTING AJACK LOCATION SITE 6 a SCOUR PROTECTION s g Site 6 Bridge Demo a Revised 07-10-2019 CV ro v o m V. o .. m o 0 d d ° o SAV LEGEND m o HOMOGENOUS Uniform in coverage. some anomalies. O o a Diverse coverage running from almost ~o c PATCHY homogenous to almost sparse, o u N SPARSE Limited growth won more voidel P E RM I T DRAWINGS N area then growth area. �J H E ET OF — C ''-' i c SEE SHEET NO.23 FOR -L- PROFILE. 2 a VOID Open leaser noy es. o Boundary defined by edges of other polygons. .- 0 0i o w a g w• • PROJECT REFERENCE NO SHEET NO B-2500 (PHASE I) 8 '///i!i��' DENOTES TEMPORARY RW SHEET NO IMPACTS I N SURFACE WATER � ROADWAY DESIGN HYDRAULICS ww` ENGINEER ENGINEER Y9 DENOTES IMPACTS IN w/ SURFACE WATER �.1.-ss .--10 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PCL Civil Constructors,Inc. .801 Corporate Center Drive.Suite 130 VOID Raleigh.NC 27607 ♦]1( HDR Engineering,Inc.of the Carolinas 8 8 `�r ` HE Fayetteville St.Suite 90C Raleigh,N.C.27601 + N.C.B.E.L.S. License Number:F-0116 0 q co -L- PT Sto.701-69.43 6'DECK DRAINS C +f-14'O.C. FROM 57.20 TO 175 1 51-L- -- DE TO PC tcb o SITE 5 0 Z Z I- W W WLIJ T • E+LP"BENT 24• W C, �� W LLI I ) ". 7 L I - "" WTB+� ill 00 72 00 ?3'ee 4 B .I ^ . . N 4 4 'I --- I N 0 _ A P 0 . . o /� a Z J J BREASTING PILES (36"PIPE PILES BREASTING PILES(36'PIPE PILES 03 O LOCATED BETWEEN BENTS) 0 LOCATED BETWEEN o Q TEMPORARYLEFOR - - - Q o I'"- al - n - .- .- .1.. - _ I— N .o BRIDGE REMOVAL m 13 3 PIPE PILES: s • m • m • i • m Itl m ltl . ; ; IA 3 PILES(. • • • • • • • • / FO — ES• ETA 147 PILES) P li — — N I�-�-- - - --N - - II-- W a J : Z _ ir f i i / ,dry f' IF. AtV Ir it ---f ` •P�DGE •�I.. r. SIDCEf � It ,�— /�/ / /// --- - 7I , / — y — , m � � � ► i� i� � Wit►. _ Al'. H :' ko, L°. '..1 Z, 7:7\ i i� i i i i, i i i i ill i' it it ij i i' i p a W W W W W W W W W W W W W W W W W W, Lt. W W Oo C m� CO CO a) m CO 0 m 0 m, CO m CO m� CO m m m m Q 2 ..u1 Z al O m 1.7, O Q .. l0 Z j GE 79 FC o E E EXISTING AJACK LOCATION SITE 6 rn 2 SCOUR PROTECTION Site 6 Bridge Demo Revised 07-10-2019 + \ L_ p o .. sl o � V o d SAV LEGEND m O 0 ▪ 0 HOMOGENOUS Uniform in coverage. " some anomaues. ` Diverse coverage running horn almost o c PATCHY homogenous to almost sparse. o c, . it N `? SPARSE area owth PERMIT DRAWING S CY SHEET OF , n_ VOID Boundary defined by edges of other polygons. SEE SHEET NO.23 FOR —L— PROFILE. o - ¢ r: o u a � � a vi - PROJECT REFERENCE NO. SHEET NO. B-2500 (PHASE I) 9 DENOTES IMPACTS IN PAY SHEET NO SURFACE WATER ROADWAY DESIGN HYDRAULICS ,�� ENGINEER ENGINEER 4. �j//� IMPACTS INESURFACE WATER sp s �o VDID VOID UDIL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CPCL Civil Constructors,Inc. s.R01 Corporate Center Drive,Suite 130 Raleigh,NC 27607 F J HDR Engineering,Inc.of the Carolinas 555 Faeeltevile SI.Suite 000 Raleigh N.C.27601 N.C.B.E.L.S. License Number:F-0116 in c1 • 3 6'DECK DRAINS @ +t-14'O.C. on 79 :r ScF o i FROM 57+20 TO 175,51-1.- GCVERNVE.7 z,z SITE 5 o xZ o Z F;n Z H z N , W s W ^F m W - :6 y;r c_VENT 20 BENT W -r W 2 W 00 03 00 11'00. -i.A5-00 eS-eQ 67-00 86+A9 84-e6 ✓�' ' - . '~ • •- • W N -/:// I I N 45'04'445"Al I.. G/) O �l // / b, e� �_ p a ID • • . Aft\ AillkillkIllikAl& Al& ark • .: / / �� NI Lf) a ZCO BREASTING PILES r 0 BREASTING PILES(36"PIPE PILES (36"PIPE PILES BREASTING PILES (36"PIPE PILES ¢ 1 Q LOCATED BETWEEN BENTS) LOCATED BETWEEN BENTS) LOCATED BETWEEN BENTS) - - ry ' r ^ • 8 rv?D' • R • R • St r A lA R • A 3 Q o I- 0 N S S S r R m m m m N m • II • o • m i m • • 0 • i • i • ; • y • m m Itl • i m U N• i ►i►1, ipi♦i♦O.♦i�;►D00.5.-.-cl►�►+.-.-*.-��6- ♦r'.-v- I , I i Z 0o 14, , � I II I ,� ____�_a_ r,V�} �'v�—BRIDGa•,MA BRIDGE, ' _ ' __--- .___ v.____ /, __ ___Ir ____ ____ v' ____ _ J oP . o z. ,_ ��' r • J I /1 -/ , �— I t_ i _ - m xj x', x x x x x x x ii x i xl x x O a W W W W W W W lWy W lWy W. W W W W a p m m m, 0 mi m m m m m'; m� 2 MI mi m i co Z TEMPORARY WORK w N = TRESTLE FOR m P O BRIDGE REMOVAL ro (36"PIPE PILES: iMc 3 PILES M EACH BE na EST 147 PILES) - -- SITE 6 T l EXISTING AJACK LOCATION o rr SCOUR PROTECTION (Site 6 Bridge Demo L Revised 07-10-2019 a a, d a o SAV LEGEND m 0 o N HOMOGENOUS Uniform in coverage. r; rV some anomalies. o °. m PATCHY Diverse coverage running from almost homogenous to almost sparse. o . in u PERMIT DRAWINGS O _ SPARSE Limited growth with more void- area then growth area. ,x " U SHEET OF 2 4 a Open with little defined no growth. a VOID Boundary defined by edges of other polygons. SEE SHEET NO 2c FOR -L- PROFILE o w a � N L:._ • PROJECT REFERENCE NO SHEET NO DENOTES8 2500 (PHASE I) 9 IMPACTS IN /W.7, Raw SHEET NO. SURFACE WATER ROADWAY DESIGN HYDRAULICS �� i ENGINEER ENGINEER tiy� II 7 //i: �/. IMPACTSO IN SURFACEWATER e� 's\ �` VOID O, DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PCL Civil Constructors,Inc. ' • 801 Corporote Center Drive,Suite 130 Raleigh,NC 27607 ♦1 HDR Engineering,Inc.of the Carolinas o �J J 555 Fayetteville SI.Site 9W Raleigh.N.C.27601 ` N.C.B.E.L.S. License Number:F-0116 ul m 8 rn DP 19 nC 59E 6"DECK DRAINS C +f 14'O.C. JS JO VEpNMEr•' FROM 57+20 TO 175+51-L- co SITE 5 0 Z Z I— _ ,w w = w - -- C BENT 26 vi. BENI c_ w N - 2 w : w 00 83 00 t61.00. =6R ee 436.GA 8-786 r -88+86 86-68 96'00 -- / '- 92 06 ' , 9a'00 Of., w V) I 1 I 1 I , N 45 04'445'W , I I N ,A Co , Q BREASTING PILES (36"PIPE PILES BREASTING PILES (36"PIPE PILES — BREASTING PILES (36"PIPE PILES `0`/ ¢ LOCATED BETWEEN BENTS) LOCATED BETWEEN BENTS) / LOCATED BETWEEN BENTS) tc. ;Ft N 6 m co1 •m in m m w h 85_ phi •m m F ht m w S m V) • • • • • r' • • • • • �%� • • • • W • • • • • • • • w • • • • • • • • • ^ W I. W • W W ♦' ♦ 'I �'♦♦�►'►♦♦ �► I �� 1� �; ♦ ♦ o♦♦�♦P r♦ i Ir♦ ♦ I. . r:rI f?P ''. : ♦O�il�i♦♦i♦i♦i'►♦i♦i♦♦�i�ii►♦�i♦i'; I: ri♦i♦.! lei y♦%♦♦���p�♦ ii;i�♦♦♦i♦i♦i�� li♦ o► ir�i♦ii�♦�i r' I I I t� ♦ t►♦♦i♦♦I♦ ♦♦►♦♦♦♦qi♦♦♦ I ♦♦�♦ ♦♦•i♦♦►�i♦♦���♦♦♦•♦1I♦♦�♦♦r♦♦♦♦♦ir♦, �r♦♦♦♦i�u♦♦ I J Ile. . i� �M►♦���.♦♦!�4i �����.n��• �♦t�♦!♦a* :►���•e�♦.♦w._� ♦♦�•►••s♦I��♦e�a_♦!♦�♦!♦.►♦��e.�♦• I • 8 ► IaP< �41" i-���'�'i��Pi �`i3`� ► ♦4II����♦i'►-��♦i!;KV♦oi,.*psi.,����sii; oilI�♦s��i;"♦°♦';9•9 •. i. I : : .ii • • � ' ♦♦.♦♦♦♦♦p♦♦♦♦�►♦♦♦i♦♦i;♦♦ir♦♦♦yih♦�iii '� O♦�•♦♦♦♦♦�i♦♦♦♦�;►♦♦♦♦�Ni.►♦♦�1►♦�►♦i♦i♦il�i♦i♦♦�♦♦�♦♦�,♦♦♦♦♦Ir♦♦♦i, . . I LLI ° — r, i.»1 . �/, Cr/ __ %/ i��. _ M. ---!CJi :d1JL!LLfJ&.&,.. ri un 9*, 001A 1 cv 00. _, . 4, 1 -0 . o \ J • 'pro E N N• L W i N' TIT p o . Ikr, ULL ' , a � • ` 'I • �I �l 1I ti �I :, o m 2 WW m m co i co • m'I m l co m Z N Z L TEMPORARY WORK W NO TRESTLE FOR enp BRIDGE REMOVAL 136"PIPE PILES: 2 0 3 PILES Z i EACH BENT • • Lu EST U7 PILES; SITE 6 E a „ EXISTING AJACK LOCATION Site 6 Bridge Demo o g SCOUR PROTECTION 9 p a Revised 07-10-2019 + \ O 0 • L.1' m C." a c SAV LEGEND m o m 0 0 D .on HOMOGENOUS Uniform In coverage nv some anomalies. • m o w PATCHY Diverse coverage running from almost homogenous to almost sparse. o c o u PERMIT DRAWINGS _ SPARSE • Limited growth with more void ,. ,,, u area then growth area. N SHEET OF Open with little or no growth. 0 0_ VOID Boundary defined by edges of otherpoygons. SEE SHEET NO.24 FOR -L- PROFILE. I- Iz Li o ,6,", a o ,: PROJECT REFERENCE NO SHEET NO 10 //ir// DENOTES IMPACTS I N 8 2500 (PHASE I)RW SHEET NO UC SURFACE WATER ROADWAY DESIGN HYDRAULICS "Y` ENGINEER ENGINEER �o %,A, DENOTES TEMPORARY �� IMPACTS IN SURFACE WATER ,Ps \ s-10 o� \ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Civil n strto ,Inc i �,B01PCL CorporatCoe Cen+ucer rsDrrve.Suite 130 Raleigh,NC 27607 8 �RE�1)l HDR Engineering,Inc.of the Carolinas 8 ` 01 E N.C. 6 N.C.BLS. Licen SI.Suite se Numbhe F-0116 i.ri CT V... rn -L- PC Ste.102+46.84 6"DECK DRAINS @ +/-14'O.C. FROM 57+20 TO 175+51-L- BREASTING UNE "C" (36"PIPE PILES Cr, @ 40'SPACING r-- SITE 5 EST 5 PILESI BREASTING LINE"B" rr— (36"PIPE PILES O O @ 40'SPACING BREASTING LINE"D"—n Z EST 4 PILES) (36"PIPE PILES Z 40'SPACING ,. EST 7 PILES) - BENT 36 W LL • - - _.. BENT 3� R 6100' W LL N _-. --- - - -_ _ C _ I _- �- o-_. _.-& () W ,00 +y,.^70 -L- • *RANII - -- - W LL 97-00 D0 N 45'04'445'W I U) L.ri Cl) oI ♦i♦i♦i♦i♦i'♦1i ♦i V. '.•.•.♦♦♦Apes♦�.1 + + \ �b • >00/--- BREASTING LINE'A" �♦♦♦♦♦♦♦♦♦1♦i♦i♦♦♦♦♦� R 6000 � a, Z (36"PIPE PILES ♦♦♦♦♦♦♦♦♦♦•b 0 O BREASTINGOC PILES WE PIPE PILES @ I ♦♦♦♦♦♦♦1♦♦/ o LOCATED BETWEEN BENTS) ,♦♦♦♦♦♦♦♦♦♦ o: Q ro 40'SPACING ►♦•••♦♦♦♦♦♦♦♦♦♦♦♦♦i EST 4 PILES( ♦♦♦♦♦♦♦♦♦♦/ p r + TEMPORARY WORK v '1♦♦♦♦♦♦♦♦♦ Q 1 :::::::::::1 TRESTLE FOR BRIDGE REMOVAL TEMPORARY PLATFORM ►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦4 (/) 0 • 133 PIPE PILES- FOR BRIDGE REMOVAL �♦♦♦♦♦♦♦♦♦♦ p I 3 PILES C�+ �♦♦♦ ♦♦�♦♦ I s (36"PIPE PILES ►♦♦/♦♦♦ :40:4 ♦///♦/ it 3♦2:::Z:::: : :::EACH BENT — ♦ ♦ ♦♦♦♦♦ EST 147%1F51 _ ♦♦♦♦♦♦♦i -4.4gRN...♦. a J N T 28 PILESI ►♦/♦♦♦♦♦♦♦♦1♦♦♦♦♦♦♦♦14 I i, —_._ —J O LLJ / 0, o /i ^ 7 ¢ Z -_ — — /^I BRICGE nrBOtNaER BRID ^ T TS^ TS^ TS TS^ ^TS Z+ LTJ/T /J/� o J ^--' /' -JS"i— �l T--// TS TS TSr r ^ o = //' TyX Iy / r/��' !//S�/ / i ^ y JAI J TS J N ���/ C. C BRIDGE DECK a=ea„w.. m -' 4-e �/ �i Ws vim Ail Alr�,mrii�ii , .r..�.�me- ... V ` 1-- z S m t_ N o P col _� h R h' t`� `I OI e: it O W' Q U' m Q W W =' W W ..1...i. 2 2 m n F' 21 2 2 2 2 WI W W W co W m. col CO CO col m m m m Fe ,_ °' m col cO m WN col m ro col CO u � Z 2 sri w o o co •• o Z , Site 6 Bridge Demo SITE 6 , I— a Revised 07-10-2019 — E m p CCVL-NMEV' ." r �-new_-0'0 at �� N P l �/ \i--� / _ea� r O •. P. I O w O p / — d m° : :7 ( HOMOGENOUS Uniform in coverage. +-a,.�___----•f--- -we -- — -�-- some anomalies. v o PATCHY Diverse coverage running from almost • o o u homogenous to almost sparse i u 1. PERMIT DRAWINGS , ¢ > SPARSE umi[ed growth with more void E m u area then growth area. SHEET OF m 4 e_ VOID Open with lime or no growth. SEE SHEET NO.25 FOR —L— PROFILE. o Boundary defined by edges of other polygons. J o o w w w N a m w PROTECT REFERENCE NO SHEET NO. DENOTES IMPACTS IN B-2500 (PHASE I� 10 W/ RW SHEET NO. / SURFACE WATER ROADWAY DESIGN HYDRAUUCS R ENGINEER ENGINEER �9` /' DENOTES TEMPORARY s�"4\ /////i� l/, IMPACTS IN SURFACE WATER sus \. • \\ DOCUMENT NOT CONSIDERED FINAL \ UNLESS ALL SIGNATURES COMPLETED \ PCL Civil Constructors,Inc. VC1 �� 801 Corporate Center Drive,Suite 130 Raleigh.NC 27607 8 \ F)1 HDR Engineering,Inc.of the Carolinas o `cc Fayetteville SL Suite 90C Raleigh,N.C.27E01 O N.C.B.E.L.S. License Number:F-0116 ui o) VC[C -L- PC S/a.l02+4684 • 6"DECK DRAINS 6e +/-IA'O.C. FROM 57+20 TO 175+51-L- BREASTING UNE"C' (36"PIPE PILES @ 40'SPACING \ P- SITE 5 EST 5 PILES)BREASTING LINE "B" O (36"PIPE PILES O Z @ 40'SPACING BREASTING UNE"D" EST 4 PILES) (36'PIPE PILES ` \ Z I— @ 40'SPACING EST 7 PILES) W Lw _ . _:',' C FEY' 34 - _ __ '�BENT 36 _ _ __ LJJ R 6100' C _ FO2'00 ,- 1O3-B0 L9M.84- Epp•pp I - " A.. W W00 9',00 97-00 A, 45'04'44S' �I L- , _'_ll 1 CD ♦ ♦ o + N Ln BREASTING LINE "A" C♦::::44444:1 R 6000 03 a Z ( ► ♦♦♦♦i♦i�♦ BREASTING PILES (36"PIPE PILES 36"PIPE PILES I I��::::::::� 0 O @ 40'SPACING ►♦♦♦♦♦♦♦♦♦♦ o LOCATED BETWEEN BENTS)< z, . if, EST 4 PILES ►♦♦♦♦♦♦♦♦•♦ p I— - . TEMPORARY WORKI tit::.:*,::.::.::,::.::: �♦::�♦♦♦: 1 • TRESTLE FOR n '►♦♦♦♦♦♦♦♦♦♦ 666 N BRIDGE REMOVAL TEMPORARY PLATFORM ♦♦♦♦♦♦♦♦♦♦4 • FOR BRIDGE REMOVAL ►♦♦♦♦♦♦♦♦♦♦ I N 133 PIPE PILES:PILES r.i ♦♦♦♦♦♦♦♦♦♦� s 36"PIPE PILES ►��������♦-♦♦♦♦♦♦♦♦♦♦♦� J EACH BENT - _- - g n SPILE5) "♦♦�►��♦�����♦����♦♦�♦� J I o FAT 28 PILE51 N♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦►/ EST U7 PILES) _ --"- T ♦♦♦♦♦���♦♦♦♦���♦����♦, J -- - - - 411 -- / /- -/ --r TS� BRIDGE till IBONNER BRIO T9� - '-T� T ---- ---TS i5± TS / pT5 TS/- Z c 04C BRNNE OECR -e d. m ` U i T Q o ] I, - -- - } - ' I N ;' Ni c _ `°, ....' N E N o • m �' co W o c, ca. a �I �I it ? i i i i W IW� 2 2I 2•I W2W W W W 4. U m m m 0 o• a mi 0 W m ml m m1 03 mi mi m 0] o] o o0 0 IZ z ` z u . w Site 6 Bridge Demo z = SITE 6 m Revised 07-10-2019 -- E U CE �G E4E / o, v _ GCVEPtvM.EN1 / */ -rK%--__- m I o ui J fa _�..a'4� * * * t / �-/ d At o SAV LEGEND 4-`- / •• - \�_�. -� m •� ^* 0 Uniform in alien. a <-.•_-P1..�- ----..r----w---- �"-- � HOMOGENOUS some anomalies. m o yt PATCHY Diverse coverage running from almost o ° homogenous to almost spare PERMIT DRAWINGS ¢ > SPARSE Limited growth with more void N area then growth area. SHEET 0 F >Ku V a ? a Open with little or no growth. SEE SHEET NO.25 FOR -L- PROFILE. o VOID • Boundary defined by edges of other polygons. - w o w aN � w WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Wetland Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Restoration Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 19+96 TO 21+66 LT Roadway 0.01 • 2 -Y01- 12+49 TO 21+80 RT Roadway 0.32 0.01 0.12 3 -L-41+86 TO 44+32 LT Work Trestle/Dock *** *** -BW- 10+58 TO 10+85 Boardwalk *** 0.01 ****4 -L-39+61 TO 40+57 LT Utility Relocation 0.01 0.05 0.22 *5 -L-38+36 TO 176+68 Prop. Bridge *** 0.65 0.09 *** 0.93 Work Trestle *** *** Temp. Platform *** **6 -L-56+40 TO 172+10 RT Exist. Bridge Demo *** *** Bridge Removal Trestle/Breasting Lines *** _ 7 -L- 191+20 TO 197+80 Roadway 0.06 0.01 0.13 - . Site 3 South Dock Rev. 08.07.2019 Site 6 Bridge Demo Rev. 07.10.2019 TOTALS: 0.39 0.70 0.02 0.09 0.49 0.00 0.93 0 0 0 *Permanent surface water and permanent fill in wetland impacts were calculated based on the type of foundation. If the foundation has a pile cap then the cap would be in the water- 1.0'based on the mean high water elevation, so the cap dimensions were used instead of the individual pile sizes(giving us a larger footprint). If the foundation has 54"circular piles with no pile cap then the pile surface area was used to calculate the impact, plus a small area immediately around the pile. **The impacts for the removal of the existing bridge were calculated using the pile window(the extent that the piles project into the water)and not individual pile sizes. The demolition/pile removal in wetlands was considered "Temporary Fill"because"Temporary Excavation"is not a category. NC DEPARTMENT OF TRANSPORTATION *** Impacts for the temporary work trestle,work bridge, and work platform were calculated as pile impacts. The piles being proposed are 36"circular piles The work trestle. platforms, and bridge all require two piles per span and spans will be spaced every 40 feet apart. The boardwalk impacts are calculated as the entire footprint of the 10'wide boardwalk. Impacts for the trestle and breasting lines installed to remove the existing bridge were calculated as 36"pipe piles with the number of piles needed called out on the plan sheet. The impact has been added to the total shown under the existing bridge demo category. DIVISION OF HIGHWAYS **"* The underground utlility relocation going to be installed by bore and jack and the temporary weland impacts are for the bore pit needed to install the utility lines and the footprint of the temporary riser poles. The permanent fill in wetland hatching represents the permanent riser pole structure footprint. CAMA vs 404 Wetland Impacts DARE COUNTY Mech.Clearing in CAMA Wetlands=0.01 AC. *** Bent Impacts WBS-32635.1.4 and 32635.3.GV3 Mech.Clearing in 404 Wetlands=0.08 AC. Boardwalk ork Tr.-tle/Do Proposed Bridge Work Trestle/Platform c B-2500(Phase I) Perm. Fill in CAMA Wetlands=0.01 AC Perm.Fit in 404 Wetlands= 01 Ao Temp.SW Impacts=<0.01 AC Perm ill in CAMA Wetlands=0.01 AC Temp. Fit in CAMA Wetlands=0.0 •C Te p. Fill in t,MA Wetl. ds=0.3 AC Replacement of Herbert C. Banner Bridge Across Perm. Fill in 404 Wetlands=0.38 AC Tern..Wetland=<0.01 AC . -rm.SW Impacts= 1.00 AC Temp.SW Impacts=0.07 AC Temp.SW Impacts=2.49 AC Oregon Inlet from Hatteras Island to Bodie Island Perm. Excavation in 404 Wetlands=0.02 AC SHEET OF TYPICAL TRESTLE SECTION (LOOKING UPSTATION) EL. 14.000 CRANE MATS TRUCK / TRACK GIRDERS • : : : : : : HEADER BEAM i- PILE BONNET Y_ j 36"0 PILE p MLW -0.500 PILE A — PILE B c. PILE C APPROX. MUDLINE ELEV (VARIES) FOR REVIEW 07/11/19 --- TAM FOR REVIEW REV DALE DESIGN DRAWN REMARKS DARE CO TiY NC BONNER BRIDGE REPCEAENT PROJECT DEMOLITION TRESTLE TYPICAL CROSS SECTION PCL CIVIL CONSTRUCTORS BONNER BRIDGE REPLACEMENT 1566 NC-345, WANCHESE, NC 27981 Phone: (252) 423-3093 SCALE Drawing CROSS SECTION Approves AS NOTED Number TYPICAL TRESTLE PLATFORM TRESTLE ELEV. +10.0 1 1 I 1 1 1 1 1 1 I 1 1 ( I 1 1 1 1 1 1 I i I 1 I I I I I i Ill 1 1 1 1 1 1 C [ L L [ MLLW ELEV. -0.5i MUDLINE ELEV. R+ -2.0 N O 'O I 70 0 O X TYPICAL 36"x130' or 180' STEEL PIPE PILE FOR MUDLINE ELEV. TRESTLE PLATFORM kl -20.0 O O I b a 40'-C" TYPICAL / 08/05/19 TAM TAM REV C REV I DATE DESIGN I DRAWNI REMARKS N. CAROLINA DEPARTMENT OF TRANSPORTATION DARE COUNTY, NC • BONNER BRIDGE REPLACEMENT PROJECT SOUTH DOCK TRESTLE ELEVATION SOUTH DOCK TRESTLE PLATFORM ELEVATION VIEW • PCL CIVIL CONSTRUCTORS BONNER BRIDGE REPLACEMENT 1566 NC-345, WANCHESE, NC 27981 Phone: (252) 423-3093 -- SCALE Drawing SOUTH DOCK EXT. /WProwd AS NOTED Number r DocuSign Envelope ID:B91667F3-BB3D-4542-A6B9-A5D9DAD021E5 4 ) ,4..-, -,7,4.-- ,, * . fn,* :. anw� ROY COOPER Governor NORTH CAROLINA MICHAEL S. REGAN Environmental Quality Secretary LINDA CULPEPPER Director September 19,2019 Mr. Paul Williams NCDOT,Division One 113 Airport Drive,Suite 100 Edenton,NC 27932 Subject: Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for Proposed Replacement of the Herbert C.Bonner Bridge over Oregon Inlet on NC 12 in Dare County,Federal Aid Project No.No.BRNHF-0012(48),TIP B-2500 (Phase I). NCDWR Project No. 20120629 v.7 Dear Mr.Williams: Attached hereto is a modification of Certification No.003939 issued to The North Carolina Department of Transportation(NCDOT)dated September 7,2012 and modifications dated November 6,2015,February 25,2016, September 30,2016,February 3,2017,and November 21,2018. If we can be of further assistance,do not hesitate to contact us. Sincerely, ,-DocuSigned by: oo-NSA. C..V.apY11.Q , tindS9VErVERP6f,Director Division of Water Resources Attachments Electronic copy only distribution: Kyle Barnes,US Army Corps of Engineers,Washington Field Office Colin Mellor,NC Department of Transportation Chris Rivenbark,NC Department of Transportation Greg Daisey,NC Division of Coastal Management Cathy Brittingham,NC Division of Coastal Management Garcy Ward,NC Division of Water Resources,Washington Regional Office File Copy I .�T North Carolina Department of Environmental Quality I Division of Water Resources ,_`�,,,,t-�k P 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 °� '�"�f 919.707.9000 r' DocuSign Envelope ID:B91667F3-BB3D-4542-A6B9-A5D9DAD021E5 Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Resources(NCDWR)Regulations in 15 NCAC 2H.0500 and 15A NCAC 2B.This certification authorizes the NCDOT to impact an additional 0.03 acres of open waters in Dare County. The project shall be constructed pursuant to the modification dated received July 10,2019 and additional information received August 20,2019. The authorized impacts are as described below: Open Water Impacts in the Pasquotank River Basin Site Permanent Fill in Temporary Fill in Open Waters (ac) Open Waters (ac) Previously approved impacts at Site 6 -- 2.46 New additional impacts with this approval at Site 6 -- 0.03 New additional impacts with this approval at Site 3 --- <0.01 Total 2.49 Total Open Water Impact for Sites 3 and 6: 2.49 acres. The application provides adequate assurance that the discharge of fill material into the waters of the Pasquotank River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore,the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,302,303,306,307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your modified application dated received July 10,2019 and additional information received August 20,2019. All the authorized activities and conditions of certification associated with the original Water Quality Certification dated September 7,2012 and modifications dated November 6,2015,February 25,2016,September 30,2016,February 3,2017,and November 21,2018 still apply except where superseded by this certification. Should your project change,you are required to notify the NCDWR and submit a new application. If the property is sold,the new owner must be given a copy of this Certification and approval letter,and is thereby responsible for complying with all the conditions. If any additional wetland impacts,or stream impacts,for this project(now or in the future)exceed one acre or 150 linear feet,respectively,additional compensatory mitigation may be required as described in 15A NCAC 2H.0506(h)(6) and(7). For this approval to remain valid,you are required to comply with all the conditions listed below. In addition,you should obtain all other federal,state or local permits before proceeding with your project including (but not limited to)Sediment and Erosion control,Coastal Stormwater,Non-discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition(s)of Certification: 1. This modification is applicable only to the additional proposed activities at Site 6. All of the authorized activities and conditions of certification associated with the original Water Quality Certification dated September 7,2012 and subsequent modifications dated November 6,2015,February 25,2016,September 30,2016,February 3,2017,and November 21,2018 still apply except where superseded by this certification. DocuSign Envelope ID: B91667F3-BB3D-4542-A6B9-A5D9DAD021E5 2. The temporary piles associated with the proposed work trestle and breasting lines must be removed in their entirety upon completion of the project. Exceptions to this condition require prior approval from NCDWR. 3. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition,the Water Quality Certification and all subsequent modifications,if any,shall be maintained with the Division Engineer and the on-site project manager. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm,except for official state holidays. The original and one(1)copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five(5)business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh,NC 27699-6714 Telephone:(919)431-3000,Facsimile:(919)431-3100 A copy of the petition must also be served on DEQ as follows: Mr.Bill F.Lane,General Counsel Department of Environmental Quality 1601 Mail Service Center This the 19th day of September 2019 DIVISION OF WATER RESOURCES DoouSignmd by: a"? Cimpiweak, Linda Lulpepperr,'Liirector WQC No.003939 r /w T��F do DEPARTMENT OF THE ARMY 7k,,„W 7V\ WILMINGTON DISTRICT,CORPS OF ENGINEERS a/ ��� ��/ \x 69 DARLINGTON AVENUE A� " I� WILMINGTON,NORTH CAROLINA 28403-1343 _ _ % 4S✓,lCCS UIh September 3, 2019 Regulatory Division/1200A Action ID No. SAW-1993-03077 Mr. Paul Williams North Carolina Department of Transportation Division of Highways/Division 1 113 Airport Drive Edenton,North Carolina 27932 Dear Mr. Williams: Reference the Department of the Army (DA) permit dated August 14, 2013, to Mr. Clay Willis, of the North Carolina Department of Transportation(NCDOT) for impacts associated with the replacement of the Herbert Bonner Bridge (Bridge No. 11) on NC 12 Highway over Oregon Inlet, TIP Project B-2500 (Phase I). The 3.55 mile project includes the construction of a new bridge and 0.49 acres of fill in jurisdictional wetlands for bridge approaches. The project area contains the Pamlico Sound, Oregon Inlet, and Motts Creek and adjacent wetlands in the Pasquotank River Basin(8-Digit Cataloging Unit 03010205). Also reference your permit modification request letter and attachments received via email dated July 10, 2019 and August 16,2018,proposing the following: Bridge Demolition Additional South Dock Loading Span The Design-Build Team has determined a need for an additional temporary bridge loading dock span that would accommodate the splicing of 180-foot steel pipe piles that are used to build the temporary bridge demolition trestle. The additional south dock loading span will be abutting and located north of the current south dock layout. The dimensions represent a—2,002 square foot area(46.25 x 43.3'), and will be 10 feet above the water surface (mean lower low water) at the same elevation as the current south dock. The additional south dock loading span will be supported by a total of 8 temporary hollow steel trestle piles (36-inch diameter pipe piles)totaling approximately 57 square feet. One pile will be located at each of the four corners of the additional loading span,and 4 additional piles will be placed 2/3 of the length of the additional span west of the current south dock. Table 1 states the spatial location of the additional south dock loading span piles. 1 1 -2- The included revised permit drawings show the additional bridge demolition trestle and proposed breasting pile locations (sheets 8, 9 and 10)addressed in the July 10,2019 modification request, and expansion of the south loading dock(sheet 5A) included in this modification request. Table 1.Additional South Dock Loading Span Pile Locations Corner/Mid-length Pile Locations Latitude/Longitude(DD) South Corner(P1) 35.766067; 75.525888 Mid-length(P2) 35.7659790; -75.5259889 Mid-length (P3) 35.7659860; -75.5259993 West Corner(P4) 35.7660059; -75.5260287 North Corner(P5) 35.7660183; -75.5258352 Mid-length (P6) 35.7660638; -75.5259027 Mid-length(P7) 35.7660708; -75.5259131 East Corner(P8) 35.7660908; -75.5259425 Breasting Lines/Temporary Trestle Clarification There will be 49 bents supported by three piles at each bent, and 48 associated breasting piles located mid-span along the length of the west side of the trestle. The July 10, 2019 modification letter previously stated 48 bents, and 47 breasting piles. Use of the 48 breasting piles will be installed and used throughout the bridge demolition process. It was previously stated in the July 10, 2019 letter that approximately 10 breasting piles would be used at one time, and would be moved along the length of the trestle as demolition work progressed. Summary Tables of Impacts For comparison, Table 2 is an abbreviated version of the surface water impacts and the changes in impacts due to adding the bridge demolition temporary trestle, associated breasting piles and, expansion of the south loading dock. To clarify, Table 2 incorporates the modifications including in the July 10, and current request as compared to the previously permitted (December 2018) impacts. -3- Table 2. Surface Water Impact Changes Permit Drawing Site Number Water Mitigable December 2018 Revised August body Temporary SW 2019 Temporary Impacts SW Impacts (ac.) (ac.) Site 3 Orego (Work Trestle/Dock and n No <0.01 <0.01 Additional Inlet South Dock Loading Span) Site 6(Existing Bridge Demo, Orego Bridge Removal Trestle, n No 2.46 2.49 Breasting Inlet Lines) Following evaluation of the information submitted in your modification request,the U.S. Army Corps of Engineers, Wilmington District (Corps) has determined that it is appropriate and reasonable, is not contrary to the public interest,and no public notice is required for this modification. Should you have questions,please contact Mr. Kyle Barnes, Washington Regulatory Field Office at telephone (910) 251-4584, or at kyle.w.barnes(&,,usace.army.mil. FOR THE COMMANDER Monte Matthews Lead Project Manager Wilmington District Enclosures Copies Furnished without Enclosures: Mr. Gary Jordan U.S. Fish and Wildlife Services Fish and Wildlife Enhancement Post Office Box 33726 Raleigh,North Carolina 28516 N -4- Ms. Amanetta Somerville U.S. Environmental Protection Agency Region 4 NEPA Program Office 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Travis Wilson North Carolina Wildlife Resources Commission 1718 Hwy 56 West Creedmoor,North Carolina 27522 Ms. Cathy Brittingham Transportation Project Coordinator North Carolina Division of Coastal Management 1617 Mail Service Center Raleigh,North Carolina 27699-1617 Mr. Greg Daisy North Carolina Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City,North Carolina 27909 Mr. Garcy Ward North Carolina Division of Water Resources 943 Washington Square Mall Washington,North Carolina 27889 \g -5 rep ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary BRAXTON C.DAVIS Director TO: Doug Huggett, Major Permit Coordinator, DCM THROUGH: Cathy Brittingham,Transportation Project Coordinator, DCM FROM: Greg Daisey, Transportation Project Field Representative, DCM SUBJECT: Comments & Recommendations —Modification to CAMA Major Permit 106-12, Proposed Replacement of Bridge No. 11 over Oregon Inlet on NC Highway 12 in Dare County. DATE: August 27, 2019 The following are my comments and recommendations regarding the above-mentioned proposal. The request for permit modification is to authorize construction of one (1) temporary bridge demolition work trestle, forty-eight(48)temporary breasting lines,and an additional loading span at the south dock loading platform related to the replacement of Bridge No. 11 over Oregon Inlet on NC Highway 12 in Dare County.Th applicant states that the proposed modification is necessary to complete demolition of the existing bridge in a response to shoaling. The additional bridge demolition temporary trestle will be located east of the new bridge and west of the existing bridge. The temporary trestle will be approximately 1,931' by 48', supported by 147 hollow steel piles (36"diameter piles),and will be approximately 14' above Normal Water Level(NWL).The trestle will consist of forty-nine(49)bents supported by three piles at each bent. The associated breasting lines will be located mid-span along the length of the west side of the temporary trestle. All breasting piles (36" in diameter) will be installed and utilized throughout the process of bridge demolition. The additional south dock loading span will abut the existing loading span on the northern side of the current configuration. The loading span will be approximately 46' by 43', supported by eight (8)temporary hollow steel piles (36"in diameter), and will match the existing platform height at approximately 10' above NWL. Based upon my review I have no objection to the issuance of this modification for the proposed activities,but offer the following conditions: 1 The permittee shall exercise all available precautions in the day-to-day operations of the facility to prevent waste from entering the adjacent waters and wetlands. NORTH CAROLINAD E Q!' Department at Environmental UuegryD North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1401 South Griffin Street,Suite 301 I Elizabeth City.North Carolina 27909 252.264.3901 Modification to Major Permit No. 106-12 North Carolina Department of Transportation August 27, 2019 2 The installation and removal of the piles for the new temporary work trestles and temporary breasting lines,shall be accomplished by pile driving and/or the use of a vibratory hammer. Should the permittee and/or its contractor desire to utilize another type of pile installation additional authorization from the DCM shall be required. 3 All construction access shall be through the use of the existing bridge, authorized temporary work trestle, existing high ground areas, and barges. 4 Barges used for construction and demolition access shall be removed immediately when they are no longer needed. 5 Dredging in any manner, including"kicking"with boat propellers, is not authorized without permit modification. 6 The temporary placement and double handling of any excavated or fill material within waters or vegetated wetlands is not authorized. This condition also applies to the materials stored on work platforms and removal of the existing bridge, roadway asphalt, and associated materials. 7 In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 8 If it is determined that additional permanent and/or temporary impacts are necessary that are not shown on the attached workplan drawings or described in the authorized permit application, a permit modification and/or additional authorization from DCM shall be required. In addition, any changes in the approved plan may also require a permit modification and/or additional authorization from DCM. The permittee shall contact a representative of DCM prior to commencement of any such activity for this determination and any permit modification. 9 No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work following completion of construction and demolition activities. 10 The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. 11 Pilings in open water from the temporary work trestle and breasting lines shall be removed in their entirety, except that in the event that a piling breaks during removal and cannot be removed in its entirety,DCM shall be notified to determine an appropriate course of action. Existing bridge pilings in SAV areas and wetlands shall be cut off at the mudline. 2 Modification to Major Permit No. 106-12 North Carolina Department of Transportation August 27, 2019 12 The temporary work trestle and breasting lines shall be removed in its entirety within 90 days after it is no longer needed and disposed of at an approved high ground location. 13 This permit authorizes only the structures that are expressly and specifically set forth in the permit application and shown on the attached workplan drawings. No other structures,whether floating or stationary,may become a permanent part of this project without additional authorization from the DCM. No non-water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 14 Unless specifically altered herein, any mitigative measures or environmental commitments specifically made by the permittee in the original CAMA permit application,the NEPA/404 Merger Process, and/or the Record of Decision document dated December 20,2010 shall be implemented,regardless of whether or not such commitments are addressed by individual conditions of this permit modification. 15 Nothing in this permit authorizes any activity that has not received approval from the National Park Service (NPS) and the U.S. Fish and Wildlife Service (USFWS) for work within the Cape Hatteras National Seashore and Pea Island National Wildlife Refuge. The proposed work shall not commence until the permittee has been issued Special Use Permits from the NPS and the USFWS, and a copy of the Special Use Permits are received by DCM. 16 The permittee and/or his contractor is encouraged to contact the DCM Transportation Project Field Representative in Elizabeth City at(252) 264-3901 to request a pre- construction conference prior to project initiation. NOTE: This project will temporarily impact approximately 108,464 sq. ft. (2.49 acres) of surface waters. NOTE: In accordance with the commitments made by the permittee, the permittee shall coordinate with NCDMF to barge suitable bridge demolition material to four existing artificial reef sites in the Atlantic Ocean for disposal, as described in the letter of application. The composition of the disposal material shall conform to all state and federal requirements. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any necessary for the disposal of suitable material on artificial reefs. 3 OF ae�T o�.c+ DEPARTMENT CO THE ARMY � 777 M WILMINGTON6 DARL DISTRICT, INGTON AVENUE ENGINEERSRPS OF // m WILMINGTON, NORTH CAROLINA 28403-1343 Q 'ql II'r t+J iTFO STATES September 3,2019 Regulatory Division/1200A Action ID No. SAW-1993-03077 Mr. Paul Williams North Carolina Department of Transportation Division of Highways/Division 1 113 Airport Drive Edenton,North Carolina 27932 Dear Mr. Williams: Reference the Department of the Army(DA)permit dated August 14, 2013,to Mr. Clay Willis, of the North Carolina Department of Transportation(NCDOT) for impacts associated with the replacement of the Herbert Bonner Bridge (Bridge No. 11) on NC 12 Highway over Oregon Inlet, TIP Project B-2500 (Phase I). The 3.55 mile project includes the construction of a new bridge and 0.49 acres of fill in jurisdictional wetlands for bridge approaches. The project area contains the Pamlico Sound, Oregon Inlet, and Motts Creek and adjacent wetlands,in the Pasquotank River Basin(8-Digit Cataloging Unit 03010205). Also reference your permit modification request letter and attachments received via email dated July 10, 2019 and August 16,2018,proposing the following: Bridge Demolition Additional South Dock Loading Span The Design-Build Team has determined a need for an additional temporary bridge loading dock span that would accommodate the splicing of 180-foot steel pipe piles that are used to build the temporary bridge demolition trestle. The additional south dock loading span will be abutting and located north of the current south dock layout. The dimensions represent a—2,002 square foot area(46.25 x 43.3'), and will be 10 feet above the water surface (mean lower low water) at the same elevation as the current south dock. The additional south dock loading span will be supported by a total of 8 temporary hollow steel trestle piles (36-inch diameter pipe piles)totaling approximately 57 square feet. One pile will be located at each of the four corners of the additional loading span, and 4 additional piles will be placed 2/3 of the length of the additional span west of the current south dock. Table 1 states the spatial location of the additional south dock loading span piles. -2- The included revised permit drawings show the additional bridge demolition trestle and proposed breasting pile locations (sheets 8, 9 and 10) addressed in the July 10,2019 modification request, and expansion of the south loading dock(sheet 5A) included in this modification request. Table 1.Additional South Dock Loading Span Pile Locations Corner/Mid-length Pile Locations Latitude/Longitude(DD) South Corner(P1) 35.766067; • -75.525888 Mid-length(P2) 35.7659790; -75.5259889 Mid-length(P3) 35.7659860;-75.5259993 West Corner(P4) 35.7660059;-75.5260287 North Corner(P5) 35.7660183; -75.5258352 Mid-length(P6) . 35.7660638;-75.5259027 Mid-length(P7) 35.7660708;-75.5259131 East Corner(P8) 35.7660908; -75.5259425 Breasting Lines/Temporary Trestle Clarification There will be 49 bents supported by three piles at each bent, and 48 associated breasting piles located mid-span along the length of the west side of the trestle. The July 10, 2019 modification letter previously stated 48 bents,and 47 breasting piles. Use of the 48 breasting piles will be installed and used throughout the bridge demolition process. It was previously • stated in the July 10, 2019 letter that approximately 10 breasting piles would be used at one time, and would be moved along the length of the trestle as demolition work progressed. Summary Tables of Impacts For comparison, Table 2 is an abbreviated version of the surface water impacts and the changes in impacts due to adding the bridge demolition temporary trestle, associated breasting piles and, expansion of the south loading dock. To clarify, Table 2 incorporates the modifications including in the July 10,and current request as compared to the previously permitted(December 2018)impacts. • -3- • Table 2.Surface Water Impact Changes Permit Drawing Site Number Water Mitigable December 2018 Revised August body Temporary SW 2019 Temporary Impacts SW Impacts (ac.) (ac.) Site 3 Orego (Work Trestle/Dock and n No <0.01 <0.01 Additional Inlet South Dock Loading Span) Site 6(Existing Bridge Demo, Orego Bridge Removal Trestle, n No 2.46 2.49 Breasting Inlet Lines) Following evaluation of the information submitted in your modification request,the U.S. Army Corps of Engineers, Wilmington District(Corps)has determined that it is appropriate and reasonable,is not contrary to the public interest, and no public notice is required for this modification. Should you have questions,please contact Mr. Kyle Barnes, Washington Regulatory Field Office at telephone(910)251-4584, or at kyle.w.barnes@,usace.armv.mil. FOR THE COMMANDER Monte Matthews Lead Project Manager Wilmington District Enclosures Copies Furnished without Enclosures: Mr. Gary Jordan U.S. Fish and Wildlife Services Fish and Wildlife Enhancement Post Office Box 33726 Raleigh,North Carolina 28516 -4- Ms. Amanetta Somerville U.S. Environmental Protection Agency Region 4 NEPA Program Office 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Travis Wilson North Carolina Wildlife Resources Commission 1718 Hwy 56 West Creedmoor,North Carolina 27522 Ms. Cathy Brittingham Transportation Project Coordinator North Carolina Division of Coastal Management 1617 Mail Service Center Raleigh,North Carolina 27699-1617 Mr. Greg Daisy North Carolina Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City,North Carolina 27909 Mr. Garcy Ward North Carolina Division of Water Resources 943 Washington Square Mall Washington,North Carolina 27889 Brittingham, Cathy From: Brittingham, Cathy Sent: Thursday, August 29, 2019 11:48 AM To: Melissa Sebastian Cc: Greg Daisey Subject: Debit memo, Bonner Bridge demolition, Minor Modification Attachments: DOT PERMIT FEE BILLING REQUEST.doc Hi Melissa, Please see attached. Sincerely, Cathy Cathy Brittingham,Transportation Project Coordinator N.C. Division of Coastal Management (919)707-9149 phone cathy.brittingham@ncdenr.gov Mailing Address: • c/o DWR Transportation Permitting Unit 1617 Mail Service Center Raleigh,NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building 12th Floor, Room 1204C Raleigh,NC 27604 Please visit https://dea.nc.gov/about/divisions/coastal-management/for more information about the N.C.Division of Coastal Management. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 1 DOT PERMIT FEE BILLING REQUEST Date 8/29/19 To: Melissa Sebastian CC: Greg Daisey From: Cathy Brittingham Transfer Amount: $100 Project Description: The following additional activities associated with demolition of the existing Herbert C. Bonner Bridge over Oregon Inlet: expansion of the south loading dock by approximately 2,000 square feet, an additional bridge demolition trestle, and 48 additional breasting piles. Project Location: Dare County DCM Permit Type and Number: Minor Modification, 106-12 Fee Division if Applicable: (record amounts to be split with DWR, if applicable) DCM: 100% DWR: 0% WBS Element Number: 32635.1.4 Brittingham, Cathy From: Williams, Paul C Sent: Friday, August 16, 2019 2:08 PM To: Barnes, Kyle W SAW;Ward, Garcy; Daisey, Greg Cc: Brittingham, Cathy; Beyer, Arthur (arthur_beyer@fws.gov); 'Mark Dowdle'; Pitts, Hal R CIV; Hernandez, Pablo A; Robert Gianna; Coletti, Domenic; Tisdale, Jessica (Jessica.Tisdale@hdrinc.com); Carpenter,Kristi Subject: RE: Permit Modification Request for B-2500 (Bonner Bridge Replacement) Project Attachments: NCDOT_Bonner_Permit_Mod_Package_08132019_signed.pdf Kyle, Garcy, and Greg, In addition to the previous permit modification request submitted on 7/10/2019, NCDOT is requesting modification of the B- 2500 permits to authorize an additional south dock loading span and additional breasting piles to complete the marine demolition of the existing bridge. Please see the attached file. Greg, I will deliver a hard copy of this additional request to the Elizabeth City District DCM Office on Monday. Garcy and Kyle, This additional request be will submitted into Laserfiche today. Thanks, and let me know if you have any questions. Paul C. Williams,Jr. Division Environmental Officer Division One NC Department of Transportation (252)482-1861 office (252) 333-9812 mobile (252)482-8722 fax 1 pcwilliams2@ncdot.gov<mailto:pcwilliams2@ncdot.gov> 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Williams, Paul C Sent: Wednesday,July 10, 2019 2:54 PM To: Barnes, Kyle W SAW<Kyle.W.Barnes@usace.army.mil>; Ward, Garcy<garcy.ward@ncdenr.gov>; Daisey, Greg <Greg.Daisey@ncdenr.gov> Cc: Brittingham,Cathy<cathy.brittingham@ncdenr.gov>; Beyer, Arthur (arthur_beyer@fws.gov) <arthur_beyer@fws.gov>; 'Mark Dowdle' <mark_dowdle@nps.gov>; Pitts, Hal R CIV<Hal.R.Pitts@uscg.mil>; Hernandez, Pablo A <phernandez@ncdot.gov>; Robert Gianna<RGianna@pcl.com>; Coletti, Domenic<Domenic.Coletti@hdrinc.com>;Tisdale, Jessica (Jessica.Tisdale@hdrinc.com) <Jessica.Tisdale@hdrinc.com>; Carpenter,Kristi<kristilynn.carpenter@ncdenr.gov> Subject: Permit Modification Request for B-2500 (Bonner Bridge Replacement) Project Kyle, Garcy, and Greg, As we have discussed, NCDOT is requesting modification of the B-2500 permits to authorize the construction of additional work trestle and breasting piles to complete the demolition of the Bonner Bridge. Please see the attached files. 2 s Greg, We have delivered a hard copy of this request to the Elizabeth City District DCM Office today. Garcy and Kyle, This request has been submitted into Laserfiche,and a copy of that submittal is attached. Thanks, and let me know if you have any questions. Paul C. Williams,Jr. Division Environmental Officer Division One NC Department of Transportation (252)482-1861 office (252) 333-9812 mobile (252)482-8722 fax pcwilliams2@ncdot.gov<mailto:pcwilliams2@ncdot.gov> 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3