HomeMy WebLinkAboutNCDOT 106-12 B-2500 Phase I Minor Mod 3 Permit Class Permit Number
MODIFICATION/MINOR 106-12
STATE OF NORTH CAROLINA
40' Department of Environmental Quali � �
and
Coastal Resources Commissicn V
� 3
•
O • crmitDiv SUN30?0
It
for _ °F cogsr' 16
R I
M �Ei H1Nq G ME
X Major Development in an Area of Environmental.Con cernq NT
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to N.C. Department of Transportation, 113 Airport Drive, Suite 100, Edenton, NC 27932
Authorizing development in Dare County at Oregon Inlet, Herbert C. Bonner Bridge on
NC Highway 12, as requested in the permittee's application letter dated 6/6/16, including the
attached workplan drawings (5): 3 dated 6/1/16, and 2 dated as received 6/6/16.
This permit, issued on 6/17/16 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) Unless specifically altered herein, this Minor Modification authorizes the placement of a 36" hollow
steel pile in Motts Creek to create a protected jetting water intake point as a means and method for
construction during replacement of the Herbert C. Bonner Bridge over Oregon Inlet, as depicted on
the attached workplan drawings.
•
2) In accordance with commitments made by the permittee, a—1/2 inch metal "bottle cap" type screen
shall be placed over the top of the authorized 36" pile, and a screen shall also be placed on the intake
line.
• NOTE: The specific development being permitted does not preclude the remainder of the B-2500
project being built in the Pamlico Sound provided that future development will be constructed
in a way that avoids and minimizes impacts to AECs. •
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance. . � �` �y /
Any maintenance work or project modification not covered Braxton C. Davis, Director
hereunder requires further Division approval.
Division of Coastal Management
All work must cease when the permit expires on
This permit and its conditions are hereby accepted. •
No expiration date, pursuant to GS 136-44.7B •
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal iii_o_
�t/�Management Program. a
Signature of Permittee
N.C. Department of Transportation Permit No. 106-12
Page 2 of 2
ADDITIONAL CONDITIONS
3) The permittee shall exercise all available precautions to ensure that the authorized jetting water intake
structure and associated equipment does not pose a hazard to navigation.
4) In accordance with commitments made by the permittee, the permittee shall replace the substrate that is
removed from within the authorized 36" hollow steel pile during installation with suitable material prior
to extracting the pile.
NOTE: The permittee shall request approval from the N.C. Division of Coastal Management (DCM) if
any additional jetting water intakes are desired.
5) If it is determined that additional permanent and/or temporary impacts are necessary that are not shown
on the attached workplan drawings or described in the authorization request, a permit modification
and/or additional authorization from DCM may be required. In addition, any changes in the approved
plan may also require a permit modification and/or additional authorization from DCM. The permittee
shall contact a representative of DCM prior to commencement of any such activity for this
determination and any permit modification.
6) Nothing in this Minor Modification authorizes any activity that has not received approval from the
National Park Service (NPS) and/or the United States Fish and Wildlife Service (USFWS) for work
within the Cape Hatteras National Seashore and/or the Pea Island National Wildlife Refuge. The
proposed work shall not commence until the permittee has been issued Special Use Permit(s) from the
NPS and/or the USFWS, if required, and a copy of the Special Use Permit(s) are received by DCM.
NOTE: This Minor Modification does not eliminate the need to obtain any additional state, federal or
local permits, approvals or authorizations that may be required.
NOTE: The permittee is strongly encouraged to contact the DCM Transportation Project Coordinator in
Elizabeth City to request a preconstruction conference prior to project initiation.
7) This Minor Modification shall be attached to the original of Permit No. 106-12, which was issued on
9/19/12, as well as all subsequent modifications, and copies of all documents shall be readily available
on site when a Division representative inspects the project for compliance.
8) All conditions and stipulations of the active permit remain in force under this Minor Modification unless
specifically altered herein.
NOTE: An application processing fee of$100 was received by DCM for this project.
•
1367 US Hwy 17 South
Elizabeth City, NC 27909
Nothing Compares,.,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Willis,Thomas C
Sent: Monday,June 06, 2016 9:27 AM
To: Daisey, Greg<Greg.Daisey@ncdenr.gov>;tracey.l.wheeler@usace.army.m_il;Ward, Garcy<garcv.ward@ncdenr.gov>
Cc: Hernandez, Pablo A<phernandezt ncdot.gov>;john.jamison@hdrinc.com
Subject: B-2500 water intake for the jetting operation
Agencies,
I wanted to make you all aware of PCL's intention for their water intake system at Mott's Creek.They are proposing to
place a 36" hollow steel pile in the creek bed to create a protected intake point,which will increase their ability to draw
water effectively,with added screening ability.The pile will be inserted to a depth of 6 feet below the mud line. Material
inside the 36 inch pile will be removed by suction line to -3 ft. below the creek bed.That material (" 1 cubic yard)will be
carried up through the pump system and discarded in an upland location. This intake point will be maintained
throughout the project for a water intake point and will be utilized during pile jetting operations for water supply.
Following the pile installation along the section of the bridge, PCL will replace the removed substrate with suitable
material and extract the pile.
The water intake point in Motts Creek was included in the permitting language and is located within the cross hatched
footprint of the temporary work trestle on the permit drawings. I double checked with HDR engineering on the
temporary pile impact calculations included in the permit and they informed me that the Impact summary table ***Bent
Impacts for temporary trestle pile impact of 0.066 acres SW, allows for the Motts Creek Channel intake. At the time of
permitting a particular design for the intake point wasn't available, it has since been designed, so I wanted to make you
all aware of their set-up. Please, let me know if you all have any questions or need any clarification on the water-intake
point in Motts Creek.
Thanks,
Clay Willis
NCDOT—Division One
Environmental Supervisor
Office—252-482-1876
Cell—252-312-3692
tcwillis@ncdot.gov
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
2
Brittingham, Cathy
From: Willis, Thomas C
Sent: Wednesday,June 08, 2016 12:10 PM
To: Daisey, Greg
Cc: Brittingham, Cathy
Subject: RE: B-2500 water intake for the jetting operation
Attachments: B2500_Minor_Permit_Modification_trestle02022016.pdf
Greg,
Page 2, second paragraph of the permit modification request from February 2, 2016 includes language about Motts
Creek intake point and 36 inch pile impacts.
By having the 36"sump pile, it provides another opportunity to put a —1/2 inch metal "bottle cap" type screen over the
top of the 36" pile, as well as a screen on the intake line itself.
Let me know if this answers your questions or if you need anything else from us.
Thanks,
Clay
From: Daisey, Greg
Sent: Wednesday, June 08, 2016 11:07 AM
To: Willis, Thomas C
Cc: Brittingham, Cathy
Subject: RE: B-2500 water intake for the jetting operation
Clay—
DCM has reviewed the information that NCDOT has provided regarding PCL's intention for their water intake system at
Mott's Creek.After initial review,this will be processed as a Minor Modification and would like additional
information/clarification on the following points contained in the request:
• The request states"The water intake point in Motts Creek was included in the permitting language". Please
provide any documentation of this statement in the original permit/permit documents.
• The request states"They are proposing to place a 36" hollow steel pile in the creek bed to create a protected
intake point,which will increase their ability to draw water effectively,with added screening ability". Please
provide additional information/explanation on the added screening ability associated with this method of a
water intake system.
Thanks for your time and please contact me with any questions.
Greg Daisey
Transportation Projects Field Representative
Division of Coastal Management
North Carolina Department of Environmental Quality
252 264 3901, EXT. 249
Greg.Daisey(c ncdenr.gov
1
MOTTS CREEK PUMP PLATFORM AND SUMP LAYOUT
6 " PUMP
II I I I I I I I I I IHI I 1 1 I I I l ( II ® I INI I IB1 I I I I IN1 I I I IHI I ! HI�E
: f
[I
I
IL
1 (../ T _ l : g
F
i
�t /
MLW=-0.49' e
t
I
tt
M 2
9
3
�� a.. \T---, a, a. 1
3
t
a
36"Pipe Pile(Sump) 1
s
a
Revision No.&Date STATE OF NORTH CAROLINA Engineer's Seal Drawing Status Name Date PCL Civil Constructors,Inc. a
DEPARTMENT OF TRANSPORTATION Drawn ByRWM 6/01/16 3810 N(813)-2rthdale 4-95Blvd SuiteF x:2 (0,Tampa-Florida8 33624
(813)-264-9500;Fax:(813)-264-6689 3
Road No. County Financial Project ID No. 4444, Design By RWM 6/0116 Submittal PCL Project/Job No. z
WATERLINE PUMP PLATFORM BONNER/6800001
NC 12 DARE C202185 Check By --/--/16 Drawing Title Sheet No. a
CROSS SECTION 1
/// / / / /
LIVESTOCK HAND RAIL �" PUMP, .:7/ 6 PUMPI
�—' r_-
AI 1
"i. r ///) t
-IJ•-t -
6"PUMP FOOT PRINT HP 12X53(TYP)
__ PILE BONNET(TYP)
rill1��1�
1
(2)6"X4'X16'CRANE MAT '
s
36"0 x 40'PIPE PILE DRIVEN I
L!!..-_„ APPROX 22'BELOW GRADE(TYP)
�� i
pIp
- 36"SUMP PIPE i
I
s
PLAN VIEW I
4
il CDN.._...., 3
DOWN STATION VIEW RIGHT SIDE VIEW e
I
I
1
a
3
a
R
Revision No.&Date STATE OF NORTH CAROLINA Engineers Seal Drawing Status Name Date PCL Civil Constructors,Inc. R
DEPARTMENT OF TRANSPORTATION 3810 Northdale Blvd.Suite 200,Tampa Florida 33624 g
Drawn By RWM 6/01/16 (813)-264-9500;Fax:(813)-264-6689 i
Road No. County Financial Project ID No. kW Design By RWM 6/0116 Submittal PCL Project/Job No.
WATERLINE PUMP PLATFORM BONNER/6800001
NC 12 DARE C202185 Check By -- —/—/16 Drawing Title Sheet No. I
PROFILES 2
•
• 8'
/ / HP12X53(TYP)
N II
i INSTALL MAT CLIPS IN OPPOSING DIRECTIONS
2 EA REQUIRED PER MAT(TYP) 11
. u . . 0
i I_ \\ . % / \\ n
\\ \\
Co
a0 i _ fl II, _II I 'I a
// •
•
a
8
FASTEN MATS TOGETHER
W/ITH PLATE AND LAGS I (3)e'FILLET WELD EACH SIDE
3"LONG(TYPICAL FOR ALL
BEAM TO BONNET CONNECTIONS 11
3
I
d H
s
Revision No.&Date STATE OF NORTH CAROLINA Engineer's Seal Drawing Status Name Date PCL Civil Constructors,Inc. x
DEPARTMENT OF TRANSPORTATION 3810 Northdale Blvd.Suite 200,Tampa Florida 33624 6
Drawn By RWM 6/01/16 (813)-264-9500;Fax:(813)-264-6689 .
Road No. County Financial Project ID No. #### Design By RWM 6/0116 Submittal PCL Project/Job No.
WATERLINE PUMP PLATFORM BONNER/6800001
NC 12 DARE C202185 Check By --- --/--/16 Drawing Title Sheet No. '
GRILLAGE LAYOUT __.- . 3
,....
.. .
oc ,
a r----
II 111 P ,
I ,
L '
i 1
et,
CA
II '11=
• _ • .- .
. - ...3r". . I) ' ' MI
i.-
,
rt r 41'*''• .• a yi "' ',..i , lip . 1' -1
r '• 44 % • ' •
or '
,-- - I .. ., •
-. . .....
.-*
C.21
; .
;
)1'3'3AD
. .
S1101A1 .
Cl)
. .
ci. a 0..
- ..e.
.. . •
1,.
a ii a----Tgi ...„... . .4
mit.
:.=,:
-- -"L--.— P,‘
!., 1 1 ',-
...
el lielik..
•41111, .
II 1 i
krz=ibi ,th.10-4"
MI
1
. •
I 1
,„
4
1"1:''
4. e
• il !:1 ;
'
II 1 ,0, . _, - <
,d ii ,.- - , • a.,
lit• . e.Li______ ------.-----------"----- --r,...„. 1 ,,11
,,. • 1 , .-- ,i, 1 .
ffr-* * 4 ,4 7.' .Cr dr. ... .... d, ....„„ ,.. ....„ ..., . 1 ,; , - -
. - .i. . .
. 0
i OW •
aw.
Itifoltk,
$11
Mir : 4.5.''''
•
' - - ' .,..., •, .
!II _
r .J,.= -
.. .
.. .
IdSZ.Z.H
4.4i i
4._
•
.. .
, .
. 4
_
., , .,./-d „
........
4
* i . .
II .- .,,r'
—
...
,
* M a-
114
0. V liw. . '46, Oftil' 401 . .1/4.
VP -' ' l:' ...., 4. , ___, 1 ... 1,... 11
mt.toinf.. .1=1••••••..a________ I.
• ..0.
I L
f • 4
I
AS
• IN T. ' t —11.../AW
t•
REVISED 01/14/2016
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized( Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Wetland Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size/Type Restoration Wetlands Wetlands Wetlands in Wetlands'Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L-19+96 TO 21+66 LT Roadway 0.014
2 -Y01-12+49 TO 21+80 RT Roadway 0.320 0.009 0.117
3 -L-41+86 TO 44+32 LT Work Trestle/Dock ••• •••
-BW-10+58 TO 10+85 Boardwalk ••' 0.012
•
'•••4 -L-39+61 TO 40+57 LT Utility Relocation 0.010 0.050 0.220
•
•5 -L-38+36 TO 176+68 Prop.Bridge '•` 0.637 0.079 ••• 0.931
Work Trestle `•` "•
Temp.Platform •••
-L-56+40 TO 172+10 RT Exist.Bridge Demo ••• •••
7 -L-191+20 TO 197+80 Roadway 0.056 0.007 0.133
Casting-Yard Trestle
TOTALS: 0.386 0.687 0.016 0.079 0.496 0.000 0.931 0 0 0
'Permanent surface water and permanent fill in wetland impacts were calculated based on the type of foundation. lithe foundation has a pile cap then the cap would be in the water-1.0'based on the mean high water elevation,so the
cap dimensions were used instead of the individual pile sizes(giving us a larger footprint).lithe foundation has 54"circular piles with no pile cap then the pile surface area was used to calculate the impact,plus a small area immediately
around the pile.
'-The impacts for the removal of the existing bridge were calculated using the pile window(the extent that the piles project into the water)and not individual pile sizes.The demolition/pile removal in wetlands was considered'Temporary
Fill"because"Temporary Excavation"is not a category. NC DEPARTMENT OF TRANSPORTATION
Impacts for the temporary work trestle,work bridge,and work platform were calculated as pile impacts.The piles being proposed are 36"circular piles The work trestle,platforms,and bridge all require two piles per span and spans will
be spaced every 40 feet apart.The boardwalk impacts are calculated as the entire footprint of the 10'wide boardwalk. DIVISION OP HIGHWAYS
"'•The underground utlility relocation going to be installed by bore and jack and the temporary weland impacts are for the bore pH needed to install the utility lines'and the footprint of the temporary riser poles.The
permanent fill in wetland hatching represents the permanent riser pole structure footprint.
CAMA vs 404 Wetland Impacts DARE COUNTY
Mech.Clearing in CAMA Wetlands=0.004 AC. "'Bent Imps wBs-32635.1.4 and 32635.3.0v3
Mech.Clearing in 404 Wetlands=0.075 AC. Boardwalk Work Trestle/Dock Proposed Bridge Work Trestle/Platform Existing Bridge Demo B-2500(Phase II
Penn.Fill in CAMA Wetlands=0.014 AC Perm.Fill in 404 Wetlands=0.035 AC Temp.SW Impacts=0.005 AC Penn.Fit in CAMA Wetlands=0.014 A Temp.Fill in CAMA Wetlands=0.032 AC amp.Fill in CAMA Wetlands=0.343 AC Replacement of Herbert C.Bonner Bridge Across
Penn.Fill in 404 Wetlands=0.376 AC Temp.Wetland=0.001 AC Perm.SW Impacts=0.816 AC Temp.SW Impacts=0.066 AC Temp.SW Impacts=2.658 AC Oregon Inlet from Hatteras Island to Bode Island
Penn.Excavation in 404 Wetlands=0.016 AC SHEET 45 OP 45
\ Allows for pile
impact associated
with Motts Creek
water intake
' I-2500 PWhSE II u
' DENOTES IMPACTS IN M�"° N `
SURFACE WATER
• • 1,4 �J / DENOW.1 LANDL IN
ew /%7/.� MPAC NOTS INTESURFARY
CE WATER
k. BENT 71 .a«ar'�"
- void - _ -- _. stark.ix
- f Z DENOTES TEMPORARY 7/ FILL IN WETLAND `'((+�7 POI w..•akrrCrm
Nr•.•e =
111L MI
i/ I.eY
r An O / VD D j' '
/es-K1 i`ii2m • •
i ce!0Vl -- •
( /
c /-a 1 . OM it , wax TIME '• r � �D
o ,` . .` ",, , von) 4 .i ;• • -t-PC Sb./10+5].72� T CONTAINMENT
r • . , ,.rV NTAlNMENT
IN PERMITTED O
z • - r..�o.,.• axe= I ' Motts water ! • Z
•_ -1 m O.A*V•M1 SITE 5 , . • - -
_ , -�' .• _ i intake point =
W I / _ • Vi
!// / •.` Im
•
- �. ..�s ._ �:,,. SSff�,...��� ap co,
tSfiy MI fefr. - ..„ ' :i. o
-�KiF# / - Y Fly". 1+� / 44T4I/ FAO I/ ►1�i7 / ���I�r i
.i/R if �`t��s i"•':�j +:./ r��� el
8 ^ *�♦� 'IV _ Air-'e�♦ IP'�••••'''" :liter���wve• *v we"'v‘ ♦ N r7 11I4'�'
���C�i.•_•.••AA••••••• 'IPA 4'.OF�..4. .����►1.��.♦•♦•♦�♦�i.Al du.. •.w•i�i.,4_•_**4C.u.•.•yiAi��►�i�♦��-i. 4.-..— .��i. .......• ...+.�.•�.O�i�����,...•♦�' 4
♦Tt�► .lam . ♦.•�•Z!0:!J:�A'.�:rr_� ��►:•w ...•.1 �:��AA�������y_!./.o♦ ►y,�7♦r1�►♦v♦�♦�,�*.r.� .ry A�. ..IL r.••.•'
1,
velo
.,
,,.
um -,0 • - M---11,‘ \ is -. . I'1 -b --11---7—v—r;—A -.—------tC • -•.,Thic 0 yg -- us
•
S 5 �.` . r. . x a p._ ..__T •7 • F • ! • F 7 • •• f ., t ' 9 y.- V r.. U
at u
at u
Ift I,
• • •
1
i3 • >i • � .
• • •
s
go — - . ' .. .'• � --\
•• iMV IBBHIe
1111111211111411 "lb"M..^l \..
"'O" ''��`��I" PERMIT DRAWINGS •
! Win Om rime ma SHEET 29 OF 45
_ ` we 2=0, �.w•+.r.►.eo+ra.. - Mill S NO.21 FOP�.PROFILE�rrr rww.r
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
Coastal Management
ENVIRONMENTAL QUALITY BRAXTON DAVIS
Director
June 20,2016
N.C.Department of Transportation
113 Airport Drive
Edenton,NC 27932
Dear Sir or Madam:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and
where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal.The
original(buff-colored form)is retained by you and it must be available on site when the project is
inspected for compliance. Please sign both the original and the copy and return the copy to this office in
the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal
• described below.
If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS
113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter
150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714,
(919)733-2698 within twenty(20)days of this decision on your permit.You should also be aware that
another qualified party may submit an objection to the issuance of this permit within twenty(20)days.
The project plan is subject to those conditions appearing on the permit form.Otherwise,all work
must be carried out in accordance with your application.Modifications,time extensions, and future
maintenance requires additional approval.Please read your permit carefully prior to starting work and
review all project plans,as approved.If you are having the work done by a contractor, it would be to your
benefit to be sure that he fully understands all permit requirements.
From time to time,Department personnel will visit the project site.To facilitate this review,we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However,if
questions arise concerning permit conditions,environmental safeguards,or problem areas,you may
contact Department personnel at any time for assistance.By working in accordance with the permit,you
will be helping to protect our vitally important coastal resources.
Sincerely,
Douglas V.Huggett
Major Permits Manager
N.C. Division of Coastal Management
Enclosure
Nothing Compares-
State of North Carolina I Environmental Quality I Coastal Management
400 Commerce Avenue I Morehead City,NC 28557
252-808-2808 T
Brittingham, Cathy
From: Brittingham, Cathy
Sent: Friday,June 17, 2016 2:56 PM
To: Willis, Clay; Paul Williams (pcwilliams2@ncdot.gov)
Cc: Daisey, Greg;Wheeler, Tracey L SAW;Ward, Garcy (Garcy.Ward@ncdenr.gov)
Subject: B-2500 Phase I Jetting Water Intake CAMA Minor Modification
Attachments: 106-12 Minor Mod.pdf
Hello,
Attached please find a Minor Modification of CAMA Major Permit 106-12 authorizing the placement of a 36"
hollow steel pile in Motts Creek to create a protected jetting water intake point as a means and method for
construction during replacement of the Herbert C. Bonner Bridge over Oregon Inlet.
A paper copy will be sent to NCDOT in Edenton. If anyone else would like a paper copy, please let me know.
If you have any questions or concerns, please contact Greg Daisey or me.
Sincerely,
Cathy Brittingham
Cathy Brittingham,Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
cathy.brittingham@ncdenr.gov
Mailing Address:
c/o DWR Wetlands Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor, Room 1204G
Raleigh,NC 27604
Please visit www.nccoastalmanapement.net to subscribe to Coastal Management's quarterly newsletter,the CAMAgram.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
1
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
Coastal Management
ENVIRONMENTAL QUALITY BRAXTON DAVIS
Director
June 20, 2016
Mr. Derb Carter
Southern Environmental Law Center
601 W. Rosemary St., Suite 220
Chapel Hill,NC 27516-2356
RE: N.C. Department of Transportation, Minor Modification of CAMA Major Permit No. 106-
12, TIP No. B-2500 Phase I, Replacement of Herbert C. Bonner Bridge over Oregon Inlet, on
NC Highway 12, Dare County,NC.
Dear Mr. Carter:
In accordance with paragraph 4.c. of the Bonner Bridge Settlement Agreement, please find
enclosed a copy of the Minor Modification of CAMA Major Permit No. 106-12 that was issued
on June 17, 2016 regarding the above referenced project. The Minor Modification authorizes
the placement of a 36"hollow steel pile in Motts Creek to create a protected jetting water
intake point as a means and method for construction during replacement of the Herbert C.
Bonner Bridge over Oregon Inlet, on NC Highway 12, in Dare County, NC.
Please feel free to contact me if you have any questions or would like additional information,
including a copy of the modification application. I can be reached via e-mail at
cathy.brittingham@ncdenr.gov or by telephone at (919) 707-9149.
Sincerely,
Cathy Br' gham
Transportation Project oordinator
Enclosure
CC: Doug Huggett, DCM
Sarah Young, DCM
Nothing Compares
State of North Carolina I Environmental Quality I Coastal Management
do DWR Wetlands Unit 11617 Mail Service Center I Raleigh,NC 27699-1617
919-707-9149
Britting ham, Cathy
From: Brittingham, Cathy
Sent: Monday,June 20, 2016 12:07 PM
To: Young, Sarah; Huggett, Doug (Doug.Huggett@ncdenr.gov)
Cc: Walker, Michele (Michele.Walker@ncdenr.gov)
Subject: SELC notice Minor Mod
Attachments: SELC notice Minor Mod.pdf; 106-12 Minor Mod.pdf
RE: Bonner Bridge Settlement Agreement. Minor Modification issued for CAMA Major Permit No. 106-12
authorizing the placement of a 36" hollow steel pile in Motts Creek to create a protected jetting water intake
point as a means and method for construction during replacement of the Herbert C. Bonner Bridge over Oregon
Inlet, on NC Highway 12 in Dare County, NC.
Hello,
FYI, the attached letter, along with the referenced enclosure, was mailed to Derb Carter by U.S. Mail today.
Please let me know if you have any questions or concerns.
Sincerely,
Cathy Brittingham
Cathy Brittingham,Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
cathy.brittingham@ncdenr.gov
Mailing Address:
c/o DWR Wetlands Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor,Room 1204G
Raleigh,NC 27604
Please visit www.nccoastalmanagement.net to subscribe to Coastal Management's quarterly newsletter,the CAMAgram.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
1
Brittingham, Cathy
From: Willis, Thomas C
Sent: Friday, June 17, 2016 4:10 PM
To: Brittingham, Cathy;Williams, Paul C
Cc: Daisey, Greg; Wheeler, Tracey L SAW;Ward, Garcy
Subject: RE: B-2500 Phase I Jetting Water Intake CAMA Minor Modification
Thanks Cathy,
I have forwarded this along to the contractor along with the drawings.
Clay
From: Brittingham, Cathy
Sent: Friday, June 17, 2016 2:57 PM
To: Willis, Thomas C; Williams, Paul C
Cc: Daisey, Greg; Wheeler, Tracey L SAW; Ward, Garcy
Subject: B-2500 Phase I Jetting Water Intake CAMA Minor Modification
Hello,
Attached please find a Minor Modification of CAMA Major Permit 106-12 authorizing the placement of a 36"
hollow steel pile in Motts Creek to create a protected jetting water intake point as a means and method for
construction during replacement of the Herbert C. Bonner Bridge over Oregon Inlet.
A paper copy will be sent to NCDOT in Edenton. If anyone else would like a paper copy, please let me know.
If you have any questions or concerns, please contact Greg Daisey or me.
Sincerely,
Cathy Brittingham
Cathy Brittingham, Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
cathy.brittingham@ncdenr.gov
Mailing Address:
c/o DWR Wetlands Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor, Room 1204G
Raleigh,NC 27604
Please visit www.nccoastalmanagement.net to subscribe to Coastal Management's quarterly newsletter,the CAMAgram.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
1
PAT MCCRORY
Governor
N
�a
DONALD R. VAN DER VAART
Secretary
Coastal Management B R A X T O N DAVIS
ENVIRONMENTAL QUALITY
MEMORANDUM
TO: Doug Huggett
THROUGH: Cathy Brittingham
FROM: Greg Daisey
SUBJECT: Comments& Recommendations
CAMA Minor Permit Modification(CAMA Major Permit No. 106-12)
TIP B-2500 Phase I - Replacement of Bridge No. 11 on NC 12, Dare County
DATE: June 15,2016
The following are my comments and recommendations regarding the above mentioned
modification request. The request is to place a temporary 36"hollow steel pile in Motts Creek to
create a protected jetting water intake point as a means and method for construction during the
replacement of Bridge No. 11 over Oregon Inlet on NC Hwy 12, TIP No. B-2500 Phase I,in Dare
County. Based upon my review I have no objection to the issuance of this permit, but offer the
following conditions:
1 's Major Modification of Permit 106-12 authorizes the placement of a temporary 36"
hollow steel pile in Motts Creek to create a protected jetting water intake point in Motts
Creek as a means and method for construction during the replacement of Bridge No. 11
over Oregon Inlet, as depicted on the attached work plan drawings.
2 The permittee shall exercise all available precautions in the day-to-day operations of the
facility to prevent waste from entering the adjacent waters and wetlands.
111
\(\ '�U4__ cA' A\
-2 Nothing Compares--,,,,
State of North Carolina I Environmental Quality I Coastal Management
1367 US Hwy 17 South I Elizabeth City,NC 27909
252-264-3901
NCDOT—Bridge No. 11 Replacement(TIP No. B-2500AB), Dare County
Minor Modification-Comments and Recommendations
June 15, 2016
Page 2 a c ,��- \ncAuS
sue' seem li�z \ i ;ssve �s case v.rec2 dlntperSA
con,A\Irior\ fit\ - R oc;)S u\ - v 1ye 1oeCaose- coa4.- G d
3 No attempt shall be made by the permittee to prevent the full and free use by the public of
all navigable waters at or adjacent to the authorized work.
4 If it is determined that additional permanent and/or temporary impacts are necessary that
are not shown on the attached work plan drawing(s)or described in the authorized permit
application, a permit modification and/or additional authorization from the N.C. Division
of Coastal Management(DCM) shall be required. In addition,any changes in the
approved plan may also require a permit modification and/or additional authorization
from DCM. The permittee shall contact a representative of DCM prior to
commencement of any such activity for this determination and any permit modification.
X 5 In accordance with commitments made by the permittee, all conditions outlined in the
July 13, 2015 USFWS Guidelines for Avoiding Impacts to the West Indian Manatee:
Precautionary Measures for Construction Activities in North Carolina Wate s shall be
implemented. �nkS ;t1 oc�y:nab,,�e coL\d. `c�cj1' i� \
My\oc Moo., you �'ht.F strk, \s 0,A \f�c raxi re \�,_, \�ood�
s>ee�‘-.0NAr\0xe S
2 6 In order to minimize impacts to fish species,the water intakes for the jetting operation \-ve ze
shall use NCDMF recommended jetting intake creens and approach velocities.
ua) n'c' coc\s1 i C ' ,\S kb 13.e. 1-0 b fresc CNfT\V'e-
7 s permit does not eliminate the need to obtain any additional state, federal, or local
kyT-In
permits,approvals or authorizations that may be required.
8 A conditions and stipulations of the active permit remain in force under this Major
edification unless altered herein.
NOTE: permittee apdor h is strongly encouraged to contact the N.C.
k. ivision of Coastal Management Transportation Project Coordinator in Elizabeth
City to request a preconstruction conference prior to project initiation.
- 'Nothing Compares
State of North Carolina I Environmental Quality I Coastal Management
1367 US Hwy 17 South I Elizabeth City,NC 27909
252-264-3901
Brittingham, Cathy
From: Staples, Shane
Sent: Thursday, June 09, 2016 2:49 PM
To: Brittingham, Cathy
Subject: B-2500 Water intake mod
Attachments: B-2500 Phase-1 Water intake mod, Sump.pdf
Cathy,
I have no comments for the mod to create a sump using a single additional piling.Along with making water more
available it should reduce the chances of inclusion of fishes or shellfish that may be in the area of the pump and keep
potential bottom disturbance from pumping to a defined area.
Thanks
Shane
Shane F. Staples
Fisheries Resource Specialist
Division of Coastal Management
Department of Environmental Quality
252 948 3950 office
shane.staples@ncdenr.gov
943 Washington Square Mall
Washington, NC 27817
/'Nothing Compares ,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
•
PAT MCCRORY
BC RECEIVED Governor
DONALD R. VAN DER VAART
JUN b 9 Mt
Secretary
Coastal Management DCM-Fisheries
ENVIRONMENTAL QUALITY WARO BRAXTON DAVIS
Director
MEMORANDUM
TO: Shane Staples, DCM
Garcy Ward,DWR
CC: Greg Daisey,DCM
FROM: Cathy Brittingham, Transportation Project Coordinator
DATE: June 8,2016
SUBJECT: TIP No. B-2500,Phase I, Replacement of Herbert C. Bonner ,
Bridge over Oregon Inlet,Dare County,CAMA Major Permit
No. 106-12.
PROPOSED PROJECT: Install a 36"hollow steel pile in the creek bed of Motts Creek
within the footprint of the permitted temporary work trestle to
create a protected jetting water intake point,which will increase
the ability to draw water effectively,with added screening ability.
Please indicate below your agency's position or viewpoint on the proposed project and return
this form as soon as possible to Cathy Brittingham,N.C.Division of Coastal Management,
c/o DWR Wetlands Office, 1617 Mail Service Center, Raleigh,NC 27699-1617. If you have
any questions regarding the proposed project,please contact Cathy Brittingham at(919) 707-
9149 or Greg Daisey at(252)264-3901 ext. 249. When appropriate,in-depth comments with
supporting data are requested.
REPLY _This agency has no objection to the project as proposed.
V.This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
memo.
Signed s. " ' /?:,' Date ‘ f/1�`
- ' othing Compares,..
State of North Carolina I Environmental Quality I Coastal Management
clo DWR Wetlands Unit 11617 Matz Service Center I Raleigh,NC 27699-1617
919-707-9149 T
Brittingham, Cathy
From: Brittingham, Cathy
Sent: Wednesday,June 08, 2016 1:18 PM
To: Staples, Shane;Ward, Garcy(Garcy.Ward@ncdenr.gov)
Cc: Hart, Kevin; Daisey, Greg
Subject: FW: B-2500 water intake for the jetting operation at new Herbert C. Bonner Bridge
Attachments: MottsCreek_intakepoint_permitsheet.pdf; Pump Platform_water_Intake_MottsCreek.pdf;
MottsCreek_water_intake_impactsheet.pdf; Request for permit comments.doc.docx
Hello,
Please find attached in WORD a request for your comments on the information received below from NCDOT
regarding the design for the jetting water intake point in Motts Creek for the construction of the new Herbert C.
Bonner Bridge over Oregon Inlet. Please also find attached three pdf documents that are part of the NCDOT
request, along with an accompanying narrative from NCDOT in the e-mail below.
After receiving the June 6, 2016 e-mail below, the following additional detail was received from NCDOT in
response to a request from DCM for additional information:
• "Page 2, second paragraph of the permit modification request from February 2, 2016 includes
language about Motts Creek intake point and 36 inch pile impacts.
• By having the 36 " sump pile, it provides another opportunity to put a—1/2 inch metal "bottle
cap" type screen over the top of the 36"pile, as well as a screen on the intake line itself."
FYI, the specific language from the February 2, 2016 NCDOT request, which was authorized by DCM in a
Minor Modification on February 5, 2016, is as follows: "The work trestle will also be utilized for the jetting
water lines, which will access surface waters for intake withdrawal (including the Motts Creek channel near
bent 77.)"
Please let me or Greg Daisey know if you have any questions or would like additional information.
Shane and Kevin—I copied Kevin on this e-mail due to his past history working on this project when it was
originally issued in 2012.
Thanks,
Cathy Brittingham
Cathy Brittingham,Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
cathy.brittingham(a,ncdenr.gov
Mailing Address:
c/o DWR Wetlands Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
1
Brittingham, Cathy
From: Brittingham, Cathy
Sent: Thursday,June 16, 2016 3:43 PM
To: Sebastian, Melissa (Melissa.Sebastian@ncdenr.gov)
Cc: Daisey, Greg; Carver,Yvonne (Yvonne.carver@ncdenr.gov)
Subject: DOT permit fee billing request, Protected jetting water intake point
Attachments: DOT PERMIT FEE BILLING REQUEST.doc
Hi Melissa,
Please see attached.
Thanks,
Cathy
Cathy Brittingham,Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
cathy.brittingham@ncdenr.gov
Mailing Address: •
c/o DWR Wetlands Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor, Room 1204G
Raleigh,NC 27604
Please visit www.nccoastalmanagement.net to subscribe to Coastal Management's quarterly newsletter,the CAMAgram.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
1
•
DOT PERMIT FEE BILLING REQUEST
Date: 6/16/16
To: Melissa Sebastian
CC: Greg Daisey
From: Cathy Brittingham
Transfer Amount: $100.00
Project Description: Placement of a 36"hollow steel pile in Mons Creek to create a
protected jetting water intake point.
Project Location: B-2500 Phase I, Herbert C. Bonner Bridge replacement, Oregon Inlet,
Dare County.
DCM Permit Type and Number: Minor Modification, 106-12
Fee Division if Applicable: (record amounts to be split with DWR, if applicable)
DCM: 100%
DWR: 0%
WBS Element Number: 32635.3.5
Brittingham, Cathy
From: Daisey, Greg
Sent: Wednesday,June 15, 2016 11:25 AM
To: Brittingham, Cathy
Subject: FW:Water intake
fYi
From: Willis,Thomas C
Sent:Wednesday,June 15, 2016 11:24 AM
To: Daisey, Greg<Greg.Daisey@ncdenr.gov>
Subject: RE: Water intake
Wbs#32635.3.5 let me know if you have any issue.
Clay
From: Daisey, Greg
Sent: Wednesday, June 15, 2016 10:03 AM
To: Willis,Thomas C
Subject: Water intake
Clay—
Due to authorizing the water intake by Minor Mod, we need a WBS Element Number and authorization to debit
the $100.00 processing fee.
Thanks,
Greg Daisey
Transportation Projects Field Representative
Division of Coastal Management
North Carolina Department of Environmental Quality
252 264 3901, EXT. 249
Greg.Daisey c�.ncdenr.gov
1367 US Hwy 17 South
Elizabeth City, NC 27909
Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1