HomeMy WebLinkAboutNCDOT 5-20 Albemarle Sound Permit Class Permit Number
NEW 5-20
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
I� ermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to N.C. Department of Transportation Division One, 113 Airport Drive,Edenton,NC 27932
Authorizing development in Tyrrell County at Albemarle Sound and manmade drainage
canal, SR 129. (Pledger Harbor :d), as requested in the permittee's application dated 10/7/19, including the
attached workplan drawings (1) dated 8/23/19.
This permit, issued on 1/10/20 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action;or may cause the permit to be null and void.
1) The depth of excavation within the manmade drainage canal shall not exceed -1.5 feet below the
normal water level. The depth of excavation within the Albemarle Sound shall not exceed—1.8 feet
below the normal water level. In no case shall excavation exceed the depth of connecting waters.
Overdredging is specifically prohibited.
2) In accordance with commitments made by the permittee, excavation shall be accomplished using a
tracked excavator, and all excavated materials shall be placed directly into a closed body dump truck
and hauled offsite to an upland disposal site in a manner not to impact waters or wetlands.
3) Dump trucks or other vehicles that are used to transport excavated materials shall be water tight
during transport. There shall be no spillover of solids or seepage of effluent into any vegetated
wetlands or surrounding waters.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the Chair
other qualified persons within twenty (20) days of the issuing of the Coastal Resour es Commission.
date.
This permit must be accessible on-site to Department /7/6244A4164/k
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered Braxton C. Davis, Director
hereunder requires further Division approval.
Division of Coastal Management
All work must cease when the permit expires on
This permit and its conditions are hereby accepted.
December 31,2023
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
'eeoeooevoo4011K Iallicoeo
9914.PP09999..-". a•`'d••a0a4 44.11C 144441I014444410000I00-000{00-0O11 aee ecee1e0I0I II1C44~44.e144.111+1k N.C. Department of Transportation Permit#5-20
Page 2 of 4
ADDITIONAL CONDITIONS
4) No excavation or filling shall take place at any time outside of the alignment of the areas indicated on
the attached workplan drawings, without permit modification.
5) The temporary placement and/or double handling of any excavated or fill material within waters or
vegetated wetlands is not authorized.
NOTE: DCM issued CAMA General Permit No. 68746 on 12/6/17 for excavation of approximately
1,500 square feet of accumulated sediment at the project site.
6) This project shall conform to all requirements of the N.C. Sedimentation Pollution Control Act and the
N.C. Department of Transportation's (NCDOT's) Memorandum of Agreement with the N.C. Division of
Energy,Mineral and Land Resources.
7) The permittee shall employ all sedimentation and erosion control measures necessary to prevent an
increase in sedimentation or turbidity within waters outside the permit area. This shall include, but is
not limited to, the installation of silt fencing or similar appropriate devices around all areas subject to
soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas.
8) The activity shall be conducted in such a manner as to prevent a significant increase in turbidity outside
the area of construction or construction-related discharge.
9) Construction staging areas shall be located only in upland areas, and not in any protected riparian
buffers, or waters of the State.
10) All mechanized equipment shall be regularly inspected and maintained to prevent contamination of
waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a
spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the
N.C. Division of Water Resources, and provisions of the North Carolina Oil Pollution and Hazardous
Substances Control Act shall be followed.
11) Dredging in any manner, including"kicking"with boat propellers, is not authorized outside of areas
specifically depicted on the attached workplan drawings, without permit modification.
12) The placement of riprap shall be limited to the areas as indicated on the attached workplan drawings.
The riprap material shall be clean and free from loose dirt or any pollutant except in trace quantities. It
shall be of a size sufficient to prevent its movement from the approved alignment by wave or current
action. The riprap material shall consist of clean rock or masonry materials such as but not limited to
granite, marl or broken concrete without exposed rebar, or other suitable materials approved by DCM.
13) The placement of backfill is not authorized, without permit modification.
3 a044a04m40404.40Iu.I, 1211010ofo v%.ee+Waa 'aa" - -- 0v
eoeeeeeeeeoeaeoeeeeeeveeeveeoceeceeee
N.C. Department of Transportation Permit#5-20
Page 3 of 4
ADDITIONAL CONDITIONS
Maintenance Clause
14) The maintenance clause of the active permit is modified as follows: The Division of Coastal
Management (DCM) and the U.S. Army Corps of Engineers (USACE) shall be notified in writing at
least two (2)weeks in advance of any maintenance work authorized by this permit, and again upon
completion of the work. The advance notification shall include:
A. The number of the original permit.
B. A statement that no dimensional changes are proposed.
C. A copy of the previously authorized plans with cross-hatching indicating the area to be maintained,
the area to be used for spoil disposal, and the estimated amount of material to be removed. The
location, design and holding capacity of the spoil disposal site shall be approved by a representative
of the Division prior to the initiation of any maintenance dredging activities.
D. The date of map revisions and the permittee's signature shown anew on the previously authorized
plans.
jGeneral
g NOTE: The authorized project will impact approximately 1,332 square feet of surface waters due to
maintenance excavation.
15) If the permittee discovers any previously unknown historic or archaeological resources while
accomplishing the authorized work, it shall immediately stop work and notify the N.C. Department of
Cultural and Natural Resources, DCM, and the Wilmington District Engineer to initiate the required
coordination procedures.
16) No attempt shall be made by the permittee to prevent the use by the public of all navigable waters at or
adjacent to the authorized work following completion of construction.
17) If it is determined that additional permanent and/or temporary impacts are necessary that are not shown
on the attached workplan drawings or described in the authorized permit application, a permit
modification and/or additional authorization from DCM and/or the USACE shall be required. In
addition, any changes in the approved plan may also require a permit modification and/or additional
authorization from DCM and/or USACE. The permittee shall contact representatives of DCM and
USACE prior to commencement of any such activity for this determination and any permit modification.
18) The permittee and/or its contractor shall contact the DCM Transportation Project Field Representative in
Elizabeth City at(252) 207-3656 to request a pre-construction conference prior to project initiation.
19) Development shall only be conducted on lands owned by the NCDOT and/or its Right-of-Ways and/or
easements.
20) The N.C. Division of Water Resources (DWR) authorized the proposed project(DWR Project No.
20171306 V.2)under General Water Quality Certification No.4175. Any violation of the Certification
approved by DWR shall be considered a violation of this CAMA permit.
�b S
eeeeceeeeeeeeeeeeeeeeeeooeeeeeeceeeeeoeeeeeee101:44W+1 4.6.84e
N.C. Department of Transportation Permit#5-20
Page 4 of 4
ADDITIONAL CONDITIONS
NOTE: The U.S. Army Corps of Engineers (USACE) assigned the proposed project COE Action ID No.
SAW-2019-02242.
21) This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that
may be required.
NOTE: An application processing fee of$475 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
•
s.
T"
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER JAMES H.TROGDON,III
GOVERNOR SECRETARY
October 7,2019
Greg Daisy
NC Division of Coastal Management
401 S.Griffm St.,Ste.300
Elizabeth City,NC 27909
Subject:Submittal of a Major CAMA/Dredge and Fill permit application package for
maintenance excavation of a man made drainage canal Tyrrell County.
Dear Mr.Daisey,
The North Carolina Department of Transportation (NCDOT) is requesting a Major
CAMA/Dredge and Fill permit for maintenance excavation of a man made drainage canal at it's
confluence with the Albemarle Sound located at the terminus of SR 1225 Pledger Harbor Road
east of Columbia in the Community of Goat Neck, Tyrrell County, North Carolina. This
proposed maintenance activity has been identified as a potential for drainage improvement in the
Goat Neck community. The canal opening and adjacent Albemarle Sound shoreline is exposed to
northly winds that result in seasonal shoaling of the canal opening by wave action. This
maintenance activity has been authorized once in 2017 by CAMA/Dredge and Fill General permit
no. 68746-B issued on 6 December 2017. Rather than continuing to authorize future
maintenance of this project with general permits,the NCDOT is seeking authorization to maintain
this area of the Palmetto Peartree Drainage Canal through the Major CAMA/Dredge and Fill
process.
The maintenance activities would be conducted using a tracked excavator and dump truck
working from uplands at the sound shoreline and along the road shoulder of SR 1225. The area
that typically requires maintenance is f75' long x 20' wide to an average depth of minus 1.8'
below the normal water level (NWL). Maintaining the canal opening to the aforementioned
dimensions typically results in±58 cubic yards of material. Spoil material will be placed directly
into a closed body dump truck and hauled offsite to a local upland stockpile site owned by
NCDOT.
Included with this letter are the location map, permit drawings, MP-1 and MP-2 forms
and the signed adjacent landowner notification statement. If you have questions, please contact
Steve Trowell at sjtrowell@ncdot.gov or(252)482-1876. The permit fee can be charged to WBS
# 1.208911.
Sincerely,
Jerry Jennings,P.E.
Div' 'o n ngi eer
eve Trowel'
Division One Environmental Specialist II
Mailing Address: Telephone:(252)482-1850 Location:
NC DEPARTMENT OF TRANSPORTATION Fax:(252)482-8722 113 AIRPORT DRIVE,SUITE 100
DIVISION ONE Customer Service: 1-877-368-4968 EDENTON,NC 27932
113 AIRPORT DRIVE,SUITE 100
EDENTON,NC 27932 Website.•www ncdotgov
DCM MP-t
APPLICATION for
Major Development Permit11
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/Landowner Information
Business Name Project Name(if applicable)
N.C. Department Of Transportation Palmetto Peartree Drainage Canal Maintenance
Applicant 1: First Name MI Last Name
Steve J. Trowel!
Applicant 2: First Name MI Last Name
If additional applicants,please attach an additional page(s)with names listed.
Mailing Address PO Box City State
113 Airport Road Edenton NC
ZIP Country Phone No. FAX No.
27932 252-482-1876 ext. 252-482-8722
Street Address(if different from above) City State ZIP
Email
sjtrowell@ncdot.gov
2. Agent/Contractor Information
Business Name
Agent/Contractor 1: First Name MI Last Name
Agent/Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
ZIP Phone No.1 Phone No. 2
ext. - - ext.
FAX No. Contractor#
Street Address(if different from above) City State ZIP
Email
<Form continues on back>
252-608-2808 -. 1-886-4RCOAST wviovv.reccedn,tasIrnanagernen1Lrse9
Form DCM MP-1 (Page 2 of 4) APPLICATION for
Major Development Permit
3. Project Location
County(can be multiple) Street Address State Rd.#
Tyrrell Terminus of SR 1225 at the Albemarle Sound Shoreline SR 1225
Subdivision Name City State Zip
N/A Columbia NC 27925-
Phone No. Lot No.(s) (if many,attach additional page with list)
N/A- - ext. N/A,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
Pasquotank Man made drainage canal
c. Is the water body identified in(b)above,natural or manmade? d. Name the closest major water body to the proposed project site.
❑Natural ®Manmade ❑Unknown Albemarle Sound
e. Is proposed work within city limits or planning jurisdiction? f. If applicable,list the planning jurisdiction or city limit the proposed
Oyes No work falls within.
N/A
4. Site Description
a. Total length of shoreline on the tract(ft.) b. Size of entire tract(sq.ft.)
60' 6,000
c. Size of individual lot(s) d. Approximate elevation of tract above NHW(normal high water)or
N/A, NWL(normal water level)
(If many lot sizes,please attach additional page with a list) 2' ❑NHW or®NWL
e. Vegetation on tract
Common Reed-Phragmites australis along road shoulder in project area
f. Man-made features and uses now on tract
Drainage canal, SR 1225 Pledger Harbor Road
g. Identify and describe the existing land uses adjacent to the proposed project site.
North Carolina Wildlife Resource Commission Gameland
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning'?
N/A (Attach zoning compliance certificate, if applicable)
DYes ❑No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? Oyes No
k. Has a professional archaeological assessment been done for the tract? If yes,attach a copy. Oyes No DNA
If yes,by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a Dyes No DNA
National Register listed or eligible property?
<Form continues on next page>
2E: -808.28413 .. 1-88a-41t:CUAST .. www.nc.:cnastaimaraagerneilt.oet
Form DCM MP-1 (Page 3 of 4) APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? Dyes No
(ii)Are there coastal wetlands on the site? Dyes No
(lii)If yes to either(i)or(ii)above,has a delineation been conducted? Dyes ®No
(Attach documentation,if available)
n. Describe existing wastewater treatment facilities.
None
o. Describe existing drinking water supply source.
None
p. Describe existing storm water management or treatment systems.
None
5. Activities and Impacts
a. Will the project be for commercial,public,or private use? ❑Commercial ®Public/Government
❑Private/Community
b. Give a brief description of purpose,use,and daily operations of the project when complete.
Purpose of project is to excavate sand accumulation at the confluence of the drainage canal and Albemarle Sound to
improve gravity flow and drainage to the Goat Neck community.
c. Describe the proposed construction methodology,types of construction equipment to be used during construction,the number of each type
of equipment and where it is to be stored.
An excavator with adequate reach(30')will be used to excavate accumulated sand from the canal mouth and place it direct
into a closed body dump truck to be trucked to an upland stock pile owned and maintained by NCDOT.The excavator and
dump truck will operate on uplands adjacent canal.
d. List all development activities you propose
Undertake maintenance excavation of accumulated sand in a man made canal.
e. Are the proposed activities maintenance of an existing project,new work,or both? Maintenance
f. What is the approximate total disturbed land area resulting from the proposed project? 1,332 ft2 ®Sq.Ft or DAcres
g- Will the proposed project encroach on any public easement,public accessway or other area Dyes No DNA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Surface runoff
i. Will wastewater or stormwater be discharged into a wetland? Dyes No DNA
If yes,will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
I. Is there any mitigation proposed?
DYes No DNA
If yes,attach a mitigation proposal.
<Form continues on back>
252-308-213O8 4*4COAS' www.nccoastalmanagenneat.eet
Form DCM MP-1 (Page 4 of 4) APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form,(MP-1)the following items below,if applicable,must be submitted in order for the application
package to be complete. Items(a)—(I)are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative. ---
b. An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work,clearly indicate on maps,plats,drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed(with state application only)or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront(riparian)landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name State of North Carolina Property Office Phone No.
Address 1321 Mail Service Center,Raleigh,NC
Name Phone No.
Address
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers,permittee,and issuing dates.
CAMA Dredge and Fill General permit no.68746-B issued USACOE SAW-2017-02159
12/6/2017
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation,if necessary,
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner)
k. A statement of compliance with the N.C.Environmental Policy Act(N.C.G.S. 113A 1-10),if necessary. If the project involves expenditure
of public funds or use of public lands,attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant,and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certi that th inf rmation provided in this application is truthful to the best of my knowledge.
Date / [/c• eff.e.0 9/1 Print Name Ste e Trowel)
•
Signature .�VPr-- I✓r_::. ,- .
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
❑DCM MP-4 Structures Information
2522-ti6 -;t8O8 1-I118b-4RCOAS'i' s: www.rtce t w ;altriortagleinertt.riZ,x
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit,Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access _-- ---
_ _._ _____ Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL) .,, stabilization)
Length 20' 55'
Width 20' 20'
Avg. Existing 1' 0.6'
Depth NA NA
Final Project 1.8' 1.8' NA NA
Depth
1. EXCAVATION ['This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards. Sand
35.6 below NWL and 12.8 above for 58.4 total
c. (i)Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards.
(CW),submerged aquatic vegetation(SAV),shell bottom(SB), N/A
or other wetlands(WL)? If any boxes are checked,provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii)Describe the purpose of the excavation in these areas:
N/A
2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
Local NCDOT upland stockpile site 50'x 50'
c. (i)Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
®Yes ❑No DNA ®Yes ONo DNA
(ii)If no,attach a letter granting permission from the owner. (ii)If yes,where?
Local NCDOT upland stockpile site
e. (i)Does the disposal area include any coastal wetlands/marsh f. (i)Does the disposal include any area in the water?
(CW),submerged aquatic vegetation(SAV),shell bottom(SB), ❑Yes No DNA
or other wetlands(WL)? If any boxes are checked,provide the
number of square feet affected. (ii)If yes,how much water area is affected?
❑CW _ ❑SAV ❑SB
OWL ®None _-- ---
(ii)Describe the purpose of disposal in these areas:
252-808-2808 :: 1.888-RCOAST ,: maiw.nccoasttagxnanagiernent.na t revised: 12/26/0e
Form DCM MP-2 (Excavation arid Fit, Page 2' of 3)
3. SHORELINE STABILIZATION This section not applicable
(lf development is a wood groin, use MP-4—Structures)
a. Type of shoreline stabilization: ..
b- Length:
❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other:
Width:
c. Average distance waterward of NHW or NWL: d Maximum distance waterward of NHW or NWL:
e. Type of stabilization material: f (i) Has there been shoreline erosion during preceding 12
months?
— — Oyes ONo DNA
(ii)If yes,state amount of erosion and source of erosion amount
information.
g. Number of square feet of fill to be placed below water level. h. Type of fill material.
Bulkhead backfill Riprap
Breakwater/Sill Other —
i. Source of fill material.
4. OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? Oyes ❑No DNA b. (I)Will fill material be placed in coastal wetlands/marsh(CW),
If yes, submerged aquatic vegetation(SAV),shell bottom(SB),or
other wetlands(WL)? If any boxes are checked,provide the
(ii)Amount of material to be placed in the water
number of square feet affected.
(iii)Dimensions of fill area ❑CW ❑SAV ❑SB
(iv)Purpose of fill OWL ONone
(ii)Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used(e.g.,dragline,
controlled? backhoe,or hydraulic dredge)?
Excavated sand will be placed directly into a closed body dump Tracked excavator,dump truck
truck
c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project
❑Yes ®No DNA site? ❑Yes ®No DNA
(ii)If yes,explain what type and how they will be implemented. (ii)If yes,explain steps that will be taken to avoid or minimize
environmental impacts.
Gr "(--
Date Steve Trowell, Environmental Specialist II,NCDOT
Palmetto Peartree Preserve Drainage Canal Maintenance Applicant Name ry
Project Name
252-808-2808:3 1'888-4RCOAST:.www.nccvast!tmanagrrnent.net reviser!; 32/2.6/A'Sf.
--rn M P- xcavation ill, ,'"1 or
Applicant Signature
252,808-2808 1-888-4RCOAST www.ek;coestaintenagorrientunkt reviseull2/26;80
� ►t�4 �If �11 � � � 4 t om. w�f 1 I.t 1 � f �f . ► 1 !� t. 1 } 4 -(' "
1 1' t4 t1.4 1 4 1 �4 4146 44 11 1111 + t
1( 4 , tf t i 11 ' t+ tl 4 t41 Itt tf,4tf l.f t f tftrl 1- ; "
— � ' t 4 1 , i f •t \ '4�tt � 41 11t t :4.t t ft 4 t 41 $11 „
ie I t , 4 i 4
t4 14 , 4 11,: : , :
' ttit f 't'44� f11t 1 tit1
• f 4 t \1 ,t f f t 1) �'t 114 44 .414,4�.� t i t l l f 1 ' t- I t 1 1 ; : L.J
t 1 1 q y / , i 1 '
1 t 1
�? 4t . 411t4 11 ,\Iii441' ti. f tit 1: 1 .11
�� 4t411110I 1 ' 1 11444 + t
quo. i 4,4 1 } 4 i',,1 i t 1 1, 1 4 4 t 1 t 1 ' ; _ r
m x ( 41, f 1 ! i 1' t 1 l I 1 j+ 4tt• • t m
a. c.`'• t 1 (' A t { t t 1 1 t o co v (�
t i 1 4 •'. o O co
Z \ • t I. l l+ ' 1 1_�1 t t t 44,4 1' 1 1 t N h 0
1 t 1
K . p;� — _ Pledger H.. _- g1?if. iii CO ly
1 SR-1225 yam'? m
arbor
1 1 w i •t N v 1 CD
v m 01 1 • d. i f t t, ' ...•
v �. z—
X
oc°in 1 Z f t 4 �QT:tv, v O4 Sll
`v�� 01'' + f lei { 1't� Cl) v
o-o'74 t t 1 a i 4 f O r TI O O
C� ; 1 r , ff 1 ; I O Q M
°1 Zit I 1 t t i 1 1 1 `:rov
cn
-044
0 7 L4 "'I t �-T_ f T 1i .«m Q N
t� mt,t ' (_)' i 1 i co —
t:
D D t • �` i f 1 t 1 1 { ;! CO Cr!
_ _ _ 1 . 1
a-mot= t ` 1i i 11 1 f�r
c m Wb 1 e 1 1 t
O _ 1 h: r..e _ i '�RFy� 1 1 1 1 t 4•r
„, 1 t '1 I I y:
I if�tm.E 4 11 / Ni ��
aC� [C 1 t c i 1 1 .j
I w �i 1 i . � \� i 1 1 } 1 ./t
1 m - 1 ,1 \ , 1 c t } 1 /r
N 1 t _ 1 a \� t • 3 S l
1 i 1 -' t 1 1 - ti
i s i 1 i >+
1k_S1_ Z
20' 0' 20'
PALMETTO PEARTREE PRESERVE ••••••• •
• •
DRAINAGE CANAL MAINTENANCE SCALE
STATE OF NORTH CAROLINA 0-O.5
1321 MAIL SERVICE CENTER -1.8
RALIEGH,NC 27699
DB 244 PG 731
< 75'
PALMETTO PEARTREE ^^^
PRESERVE ( .
EXISTING RIP RAP
\ (TO BE REFURBISHED) '"vim
NWL \�.le°'-\ ` -.--.
CANAL _1 •• \,0.8\ \-1.8
20' ® \ \ ALBEMARLE SOUND
, I1 &
.,.,\ \ AREA TO BE
EXCAVATED
EXISTING RIP RAP
__.. -.-- (TO BE REFURBISHED)
SR 1225
(PLEDGER HARBOR RD) BEACH
ASPHALT
^^'s. ®1.8
• 4-0.5 NORMAL WATER LEVEL
•
STATE OF NORTH CAROLINA \
1321 MAIL SERVICE CENTER
RALIEGH,NC 27699 ^^'..
DB 244 PG 731
NOTE: CANAL SURFACE WATER ELEVATION 0.3 FT BELOW N 35.990188*
NWL OF ALBEMARLE SOUND 8/22/2019 W 76.069588*
ELEVATION VIEW NC DEPARTMENT OF TRANSPORTATION
COUNTY: TYRRELL
NWL V OUAD: FORT LANDING
BASIN: PASOUOTANK
PROJECT: CANAL MAINTENANCE
WBS ELEMENT: 1.208911
TOTAL VOLUME EXCAVATED =58.4 YDS DRAWN BY: B.K.BROWN
EXCAVATION BELOW WATER LINE =35.6 YDS EXCAVATE TO ELEVATION DATE: 08/23/2019
OPEN WATER IMPACT =1332.2 SO FT 1.5' 2.6' 1.8' OF 1.8' FT. BELOW NWL
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: North Carolina Department of Transportation (NCDOT)
2. LOCATION OF PROJECT SITE: Pledger Harbor Rd. (SR1225)in Goat Neck, Tyrrell
County
Latitude: 35°59' 24.77"N Longitude: 76°04' 10.54"W
3. INVESTIGATION TYPE: CAMA/Dredge & Fill
4. INVESTIGATIVE PROCEDURE: Date of Site Visits—October 7 & 23, 2019
Was Applicant Present—No
5. PROCESSING PROCEDURE: Application Received Complete: October 7, 2019
Office—Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan—Tyrrell County
Land Classification from LUP—Forest Land/Conservation
(B) AEC(s) Involved: ES, EW, PTA
(C) Water Dependent: Yes
(D) Intended Use: N/A
(E) Wastewater Treatment: Existing—N/A
Planned—N/A
(F) Type of Structures: Existing—Rip rap revetment along canal shoreline
(both sides of canal)
Planned—Maintenance/repair of existing rip rap
revetments
(G) Estimated Annual Rate of Erosion: N/A
Source—N/A
7. HABITAT DESCRIPTION: [AREA]
EXCAVATED FILLED OTHER
(A) Open Water 1,332 sq. ft.
(B) Section 404 Wetlands
(C) High Ground
(D) Total Area Disturbed: 1,332 sq. ft.
(E) Primary Nursery Area: No
(F) Water Classification: SB (Albemarle Sound) Open: No
•
FIELD INVESTIGATION REPORT:
NCDOT-TYRRELL COUNTY
PLEDGER HARBOR RD. (SR 1225)
DRAINAGE CANAL MAINTENANCE DREDGING PROJECT
PROJECT SUMMARY:
The applicant proposes maintenance dredging of a manmade drainage canal and
maintenance/repair of existing rip rap revetments at the connection with the Albemarle
Sound at the terminus of SR 1225 (Pledger Harbor Rd.) in the community Goat Neck,
Tyrrell County.
8. NARRATIVE DESCRIPTION:
Project Setting
The proposed project site is located at the connection of an unnamed manmade drainage canal
and the Albemarle Sound at the northern terminus of Pledger Harbor Rd (SR 1225) in the
community of Goat Neck in Tyrrell County. The site is approximately 11 miles to the northeast of
Columbia. Pledger Harbor Rd. is located within Palmetto-Peartree Preserve, which was created in
1999 as a mitigation bank for the endangered red-cockaded woodpecker. The 10,297 acre preserve
site is currently owned by the North Carolina Wildlife Resources Commission and is classified as a
Significant Natural Heritage Area. The project area is an estuarine forest dominated by Nyssa
sylvatica(Black Gum),Acer rubrum(Red Maple)and other vegetation typically found in an eastern
North Carolina pine/hardwood forest.Phragmites australis(Common Reed)and various grasses are
found along the drainage canal and roadway.There are no Coastal Wetlands present. Undeveloped
forest/swamp lands dominate the surrounding area,with residences located approximately 1.15 miles
to the south of the proposed project at the intersection of Pledger Harbor Rd. (SR 1225)and Goat
Neck Rd. (SR 1223).
Pledger Harbor Rd. is a state-maintained road with a travel lane of approximately 12' with
grass shoulders in the project area. Roadside canals are located on the west side the entire length of
the roadway. A floodgate within the canal system to limit wind driven sound water into the upper
reaches of the canal is located approximately 0.50 miles to the south of the proposed project area.
Approximate elevation of the project area is 0—2' above NWL.
There are no stormwater runoff controls on the roadway in the project area. Stormwater sheet
flows directly into the adjacent roadside canal and estuarine swamp forest from the road. There are
no existing utility lines within the Right-of-Way of the road.
The Environmental Management Commission has classified the Albemarle Sound as Class SB
in the proposed project area. The waters are closed to shell fishing by the Shellfish Sanitation
Section of the Division of Marine Fisheries. The unnamed canal is approximately 20' wide and
approximately 0.8' to 1.5' deep in the project area within the canal. The water depths are
approximately 1.8' deep 20' offshore within the Albemarle Sound. The Federal Emergency
Management Agency has designated the project area as a Zone AE flood hazard area. There were no
SAV's observed in the project area during the site visit.
The applicant states the canal opening and adjacent Albemarle Sound shoreline are exposed to
northerly winds that result in seasonal shoaling of the canal opening by wave action. DCM issued
General Permit No. 68746 on December 6, 2017 for the maintenance excavation of approximately
1,500 sq. ft. of accumulated sediment at the project site.
FIELD INVESTIGATION REPORT:
NCDOT-TYRRELL COUNTY
PLEDGER HARBOR RD.(SR 1225)
DRAINAGE CANAL MAINTENANCE DREDGING PROJECT
Project Proposal
NCDOT states the purpose of this project is to excavate sand accumulation at the confluence
of the drainage canal and the Albemarle sound to improve gravity flow/drainage from the
community of Goat Neck.The applicant states NCDOT is seeking to authorize maintenance/future
maintenance through a CAMA Major Permit rather than continuing to obtain CAMA General
Permits for each excavation.
NCDOT states the proposed area to be maintained is approximately 75' long by the existing
canal width(approximately 20' wide)to an average depth of 1.8'below normal water level(NWL).
According to the applicant,typical canal maintenance to these dimensions will result in the removal
of approximately 58 cubic yards of sandy material. Existing rip rap revetments on the northwest and
southeast sides of the canal will be repaired/maintained within the current alignment/footprint with
Class II and Class B stone to a height of approximately 3' (1' above NWL).
The applicant states the proposed activities and future maintenance activities would be
conducted using a tracked excavator (with 30' reach) and closed body dump truck working from
uplands at the sound/canal shoreline. Spoil Material would be placed directly into the truck and
hauled offsite to a local upland stockpile site owned by NCDOT.
Anticipated Impacts
As proposed,the maintenance activities associated with the unnamed canal at the terminus of
Pledger Harbor Rd.(SR 1225)would result in 1,332 sq. ft.of drainage canal and open water/shallow
bottom (Albemarle Sound) impacts due to excavation. The project is not expected to impact
navigability or public trust access. A localized increase in turbidity can be expected during any in-
water construction activities related to the proposed project. There are no additional impacts
anticipated due to the maintenance/repair of existing rip rap revetments due to all associated
activities remaining in the same footprint and dimensions.
Submitted by: Greg Daisey—Elizabeth City District—November 11, 2019
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
APPLICANT: N C Department of Transportation COUNTY: Tyrrell 5 go
PROJECT NAME: Maintenance Dredging—Pledger Harbor Rd
LOCATION OF PROJECT: Pledger Harbor Rd. (SR 1225) in Goat Neck
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 10-7-19
FIELD RECOMMENDATION: Attached:No To Be Forwarded: Yes
FIELD REPRESENTATIVE: Daisey DISTRICT OFFICE: ELIZABETH CITY
DISTRICT MANAGER REVIEW:
B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $475(60/40)#IV
APPLICATION ASSIGNED TO:Barn a. By\;`T\ 14\0,van
PUBLIC NOTICE REC'D: 10-16-19 END OF NOTICE DATE: 11-5-19
ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: Yes
C) 75 DAY DEADLINE: 12-21-19 150 DAY DEADLINE: Jq1O
HOLDS:
EMAIL OUT DATE: 11-15-19 STATE DUE DATE: 12-6-19
PERMIT FINAL ACTION: ISSUE 1 I'D* DENY
AGENCY DATE NOTES
COMMENTS OBJECTIONS:
RETURNED YES NO
DCM—Field Rep \a\\IP 1 \1 C
DCM—LUP Consistency Determination 11''a6I I { V C
Local Permit Officer
Corps of Engineers—Regulatory Branch I/6 fO f'v�k _o ovia C 0 • SAI4-ao)9-
DWR-401 Section I� 17 I7 WaC 1 7175- ov\ R Pc`o\ec4
DWR—Public Water Supply \\ \5 19 ✓ 1 C - 0\ 71 3 O6' V. a
DEMLR—Stormwater
DEMLR—Sediment& Erosion 100111 ✓ Ain
DOA—State Property Office g1\\\ (1 A/C—
Wildlife Resources Commission 1a)\O \LA f JVO UsOC C(\
DMF—Shellfish Section \\\15 I I Z. Ala
DMF—Habitat& Enhancement 0 )\ \ N C
DNCR—Archives&History VAVf\ NC-
DNCR—Natural Heritage Program \a\\\\C\ ✓ NO W t\Y\ C.Q
NCDOT ,`
Rural Development Division ,NC C_cnirif';C� 1216, 17 ✓ pie_
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON C. DAVISDto
ENVIRONMENTAL QUALITY
TO: Jonathan Howell, Major Permit Coordinator, DCM
THROUGH: Cathy Brittingham,Transportation Project Coordinator, DCM
FROM: Greg Daisey, Transportation Project Field Representative, DCM
SUBJECT: Comments & Recommendations - Proposed Maintenance Excavation of an
Unnamed Manmade Drainage Canal that Connects to the Albemarle Sound on SR
1225 (Pledger Harbor Rd.) in Goat Neck, Tyrrell County.
DATE: December 16, 2019
The following are my comments and recommendations regarding the above-mentioned proposal.
The request is for proposed maintenance dredging of a manmade drainage canal and
maintenance/repair of existing rip rap revetments at the connection with the Albemarle Sound at
the terminus of SR 1225 (Pledger Harbor Rd.) in the community Goat Neck, Tyrrell County.
NCDOT states the proposed area to be maintained is approximately 75' long by the existing canal
width (approximately 20' wide) to an average depth of 1.8' below normal water level (NWL).
According to the applicant, typical canal maintenance to these dimensions will result in the
removal of approximately 58 cubic yards of sandy material. Existing rip rap revetments on the
northwest and southeast sides of the canal will be repaired/maintained within the current
alignment/footprint with Class II and Class B stone to a height of approximately 3' (1' above
NWL). Based upon my review I have no objection to the issuance of this permit, but offer the
following conditions:
. 1 The permittee shall exercise all available precautions in the day-to-day operations of the
V facility to prevent waste from entering the adjacent waters and wetlands.
2 2 No excavation or filling shall take place at any time in any vegetated wetlands or
r surrounding waters, without permit modification.
1),The placement of riprap shall be limited to the areas indicated on the attached workplan
drawings. The riprap material shall be free from loose dirt or any pollutant except in trace
quantities.
/Revetment material shall be of sufficient size to prevent movement from the site by wave
V actions or currents.
4 5 Riprap revetments shall be constructed of granite,marl,concrete without exposed rebar,or
other suitable materials approved by the Division of Coastal Management.
_.--","Nothing Compares,..
State of North Carolina I Environmental Quality I Coastal Management
401 S.Griffin St.,Suite 300 I Elizabeth City,NC 27909
252-264-3901 I 252-331-2951[fax]
NCDOT—Proposed Maintenance Dredging
SR 1225(Pledger Harbor Rd.),Goat Neck,Tyrrell County.
December 23,2019
Page 2 of 2
6 The temporary placement and double handling of any excavated material within waters or
vegetated wetlands is not authorized.
The placement of any backfill is not authorized, without permit modification.
vi The depth of excavation within the manmade drainage canal shall not exceed— 1.5 feet
below the normal water level. The depth of excavation within the Albemarle Sound shall
not exceed—1.8 feet below the normal water level. In no case shall excavation exceed the
depth of connecting waters. Over dredging is specifically prohibited.
9 The Division of Coastal Management(DCM) shall be notified in writing at least two (2)
2 weeks in advance of any maintenance work authorized by this permit, and such
notification shall include:
A. The number of the original permit.
B. A statement that no dimensional changes are proposed.
C. A copy of the original permit plans indicating the area to be maintained,the
area/location to be used for spoil disposal, and the estimated amount of material to
be removed.
D. The date of plan revision and the permittee's signature shown anew on the
original plan.
1 This project shall conform to all requirements of the N.C. Sedimentation Pollution Control
Act and NCDOT's Memorandum of Agreement with the N.C.Division of Land Resources.
If it is determined that additional permanent and/or temporary impacts are necessary that
are not shown on the attached workplan drawings or described in the authorized permit
application, a permit modification and/or additional authorization from DCM shall be
required. In addition, any changes in the approved plan may also require a permit
modification and/or additional authorization from DCM. The permittee shall contact a
representative of DCM prior to commencement of any such activity for this determination
and any permit modification.
1;r No attempt shall be made by the permittee to prevent the full and free se by the public of
V all navigable waters at or adjacent to the authorized work o 'rig completion of
construction activities.
1 yThe permittee and/or( •b contractor shall contact the DCM Transportation Project Field
V Representative in Eliza eth City at(252)264-3901 to request a pre-construction
conference prior to project initiation.
TE: Activities associated with this project will impact approximately 1,332 sq. ft. of
surface water.
N TE: This permit does not eliminate the need to obtain any additional state, federal, or
local permits, approvals, or authorizations that may be required.
Brittingham, Cathy
From: Ward, Garcy
Sent: Tuesday, December 17, 2019 6:13 PM
To: Trowell, Steve J
Cc: Williams, Paul C; Barnes, Kyle W SAW (Kyle.W.Barnes@usace.army.mil); Brittingham, Cathy;
Daisey, Greg; Carpenter,Kristi
Subject: Pledger Harbor Rd canal maintenance
Steve,
I've reviewed your CAMA major application for maintenance dredging of the canal along Pledger Harbor Road (SR 1225) in Goat
Neck,Tyrrell County (DWR project#20171306 v.2). Water Quality General Certification No.4175 corresponds to The Corps
Regional General Permit 198000291 and is issued for this activity and can be found at the following link:
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=778677&page=1&cr=1
Written approval will not be required for this Certification provided all the thresholds and conditions can be met. Please pay
special attention to activity a);v) regarding the thresholds for maintenance dredging. If open water impacts are equal to or
greater than 0.5 ac or if SAV is present then written approval will be required. Let me know if you have any questions. Thanks.
Garcy Ward
Environmental Specialist
NC Divison of Water Resources
(252)948-3917
I.
ANT oE. DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
d Washington Regulatory Field Office
2407 West 51h Street
c-'41T111111:'4-:.:-
/" Washington,North Carolina 27889
- � QCT IN REPLY REFER TO
starts OF P'
January 6, 2020
Action ID No. SAW-2019-02242
Ms. Cathy Brittingham
Division of Coastal Management
North Carolina Department of Environmental Quality
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
Dear Ms. Brittingham:
Reference the application of the North Carolina Department of Transportation, (NCDOT)
for a Department of the Army permit to conduct maintenance dredging of a manmade drainage
canal and maintenance/repair of existing riprap revetments at the connection with the Albemarle
Sound adjacent to Pledger Harbor Road, (SR 1225), in Goat Neck in Tyrrell County,North
Carolina.
The Federal agencies have completed review of the proposal as presented by the
application and your field investigation report.
We recommend that the following conditions be included in the State authorization:
A.All work authorized by this permit must be performed in strict compliance with the
attached plans,which are a part of this permit. Any modification to these plans must be approved
by the US Army Corps of Engineers(USACE)prior to implementation.
B. The permittee understands and agrees that, if future operations by the United States
require the removal,relocation, or other alteration, of the structure or work herein authorized, or
if, in the opinion of the Secretary of the Army or his authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters,the
permittee will be required, upon due notice from the U.S. Army Corps of Engineers,to remove,
relocate,or alter the structural work or obstructions caused thereby,without expense to the
United States. No claim shall be made against the United States on account of any such removal,
relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE
Chief Source Data Unit N CS261, 1315 E West HWY-RM 7316, Silver Spring, MD 20910-
3282 at least two weeks prior to beginning work and upon completion of work.
C. Except as specified in the plans attached to this permit, no excavation, fill or
mechanized land-clearing activities shall take place at any time in the construction or
maintenance of this project, in such a manner as to impair normal flows and circulation patterns
within waters or wetlands or to reduce the reach of waters or wetlands.
D. Except as authorized by this permit or any USACE approved modification to this
permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in
the construction or maintenance of this project,within waters or wetlands. This permit does not
authorize temporary placement or double handling of excavated or fill material within waters or
wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project.
E. Unless otherwise authorized by this permit, all dredged material removed from this
project shall be disposed of in an upland area and in a manner not to impact waters or wetlands.
F. All mechanized equipment will be regularly inspected and maintained to prevent
contamination of waters and wetlands from fuels, lubricants,hydraulic fluids, or other toxic
materials. In the event of a spill of petroleum products or any other hazardous waste,the
permittee shall immediately report it to the N.C. Division of Water Quality at(919) 733-5083,
Ext. 526 or(800)662-7956 and provisions of the North Carolina Oil Pollution and Hazardous
Substances Control Act will be followed.
G.All excavated materials will be confined landward of the mean high water level
elevation contour and any vegetated wetlands.
H. If the permittee discovers any previously unknown historic or archeological remains
while accomplishing the authorized work, he will immediately notify the Wilmington District
Engineer who will initiate the required coordination procedures.
I. The permittee shall advise the Corps in writing at least two weeks prior to beginning the
work authorized by this permit and again upon completion of the work authorized by this permit.
J. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents associated with the construction or maintenance of this
project with a copy of this permit. A copy of this permit, including all conditions, shall be
available at the project site during construction and maintenance of this project.
K. The permittee shall employ all sedimentation and erosion control measures necessary to
prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit
area. This shall include, but is not limited to,the immediate installation of silt fencing or similar
appropriate devices around all areas subject to soil disturbance or the movement of earthen fill,
and the immediate stabilization of all disturbed areas. Additionally,the project must remain in
full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statutes Chapter 113A Article 4).
L. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction-related discharge. Increases such that
the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by
the North Carolina Division of Environmental Management(NCDEM),25 NTU's or less in all
saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not
considered significant.
M. The permittee, upon receipt of a notice of revocation of this permit or upon its
expiration before completion of the work will,without expense to the United States and in such
time and manner as the Secretary of the Army or his authorized representative may direct,restore
the water or wetland to its pre-project condition.
N. Violations of these conditions or violations of Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District
U.S.Army Corps of Engineers within 24 hours of the permittee's discovery of the violation.
Questions or comments may be addressed to Mr. Kyle Barnes, Washington Field Office,
Regulatory Division,telephone (910)251-4584.
Sincerely,
K e Barnes
Regulatory Project Manager
US Army Corps of Engineers
Copies Furnished:
Ms. Amy Chapman
North Carolina Division of Water Quality, Transportation Unit
North Carolina Department of Environmental Quality
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh,North Carolina 27636-3726
Mr. Fritz Rhode
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort,North Carolina 28516
Mr. Chris Parker
Wetlands Regulatory Section
Water Management Division
U.S. Environmental Protection Agency
61 Forsyth Street, SW
Atlanta, Georgia 30303
Mr. Garcy Ward
N.C. Division of Water Resources
North Carolina Department of Environmental Quality
948 Washing Square Mall
Washington,North Carolina 27889
Mr. Greg Daisey
Division of Coastal Management
North Carolina Department of Environmental Quality
401 South Griffin Street, Suite 300
Elizabeth City,North Carolina 27909
Brittingham, Cathy
From: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil>
Sent: Monday, January 06, 2020 12:35 PM
To: Brittingham, Cathy; Daisey, Greg;Ward, Garcy;Trowell, Steve./
Subject: [External] SAW-2019-02242 Pledger Harbor Road CAMA Major
Attachments: SAW-2019-02242 NCDOT Pledger Harbor Road.pdf
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
report.spam@nc.gov<mailto:report.spam@nc.gov>
Cathy,
Attached is the Corps response to the CAMA Major permit requested by NCDOT for maintenance dredging of the manmade
drainage canal adjacent to Pledger Harbor Road, (SR 1225), in Tyrrell County, North Carolina.The Corps approves the issuance of
the project with the recommended conditions which are attached to this correspondence. Please let me know if you have an
questions.
Kyle Barnes
Regulatory Project Manager
US Army Corps of Engineers
Wilmington District
Washington Field Office
910-251-4584
We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would
appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at:
Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
<Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0>
Thank you for taking the time to visit this site and complete the survey.
1
BHT rif• DEPARTMENT OF THE ARMY
aQe,.r WILMINGTON DISTRICT, CORPS OF ENGINEERS
c ,,_,�„� Washington Regulatory Field Office
IIIP: 2407 West 5ch Street
/ Washington, North Carolina 27889
zT y ,2,. / IN REPLY REFER TO
4
Osr.1r OF P�
January 6, 2020
Action ID No. SAW-2019-02242
Ms. Cathy Brittingham
Division of Coastal Management
North Carolina Department of Environmental Quality
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
Dear Ms. Brittingham:
Reference the application of the North Carolina Department of Transportation, (NCDOT)
for a Department of the Army permit to conduct maintenance dredging of a manmade drainage
canal and maintenance/repair of existing riprap revetments at the connection with the Albemarle
Sound adjacent to Pledger Harbor Road, (SR 1225), in Goat Neck in Tyrrell County,North
Carolina.
The Federal agencies have completed review of the proposal as presented by the
application and your field investigation report.
We recommend that the following conditions be included in the State authorization:
A.All work authorized by this permit must be performed in strict compliance with the
attached plans,which are a part of this permit. Any modification to these plans must be approved
by the US Army Corps of Engineers (USACE)prior to implementation.
B. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or
if, in the opinion of the Secretary of the Army or his authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters,the
permittee will be required,upon due notice from the U.S. Army Corps of Engineers, to remove,
relocate, or alter the structural work or obstructions caused thereby,without expense to the
United States. No claim shall be made against the United States on account of any such removal,
relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE
Chief Source Data Unit N CS261, 1315 E West HWY-RM 7316, Silver Spring,MD 20910-
3282 at least two weeks prior to beginning work and upon completion of work.
C. Except as specified in the plans attached to this permit,no excavation,fill or
mechanized land-clearing activities shall take place at any time in the construction or
maintenance of this project, in such a manner as to impair normal flows and circulation patterns
within waters or wetlands or to reduce the reach of waters or wetlands.
D.Except as authorized by this permit or any USACE approved modification to this
permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in
the construction or maintenance of this project,within waters or wetlands. This permit does not
authorize temporary placement or double handling of excavated or fill material within waters or
wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project.
E. Unless otherwise authorized by this permit, all dredged material removed from this
project shall be disposed of in an upland area and in a manner not to impact waters or wetlands.
F.All mechanized equipment will be regularly inspected and maintained to prevent
contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic
materials. In the event of a spill of petroleum products or any other hazardous waste,the
permittee shall immediately report it to the N.C. Division of Water Quality at(919)733-5083,
Ext. 526 or(800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous
Substances Control Act will be followed.
G.All excavated materials will be confined landward of the mean high water level
elevation contour and any vegetated wetlands.
H. If the permittee discovers any previously unknown historic or archeological remains
while accomplishing the authorized work,he will immediately notify the Wilmington District
Engineer who will initiate the required coordination procedures.
I. The permittee shall advise the Corps in writing at least two weeks prior to beginning the
work authorized by this permit and again upon completion of the work authorized by this permit.
J. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents associated with the construction or maintenance of this
project with a copy of this permit. A copy of this permit, including all conditions, shall be
available at the project site during construction and maintenance of this project.
K. The permittee shall employ all sedimentation and erosion control measures necessary to
prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit
area. This shall include,but is not limited to,the immediate installation of silt fencing or similar
appropriate devices around all areas subject to soil disturbance or the movement of earthen fill,
and the immediate stabilization of all disturbed areas. Additionally,the project must remain in
full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statutes Chapter 113A Article 4).
L. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction-related discharge. Increases such that
the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by
the North Carolina Division of Environmental Management(NCDEM), 25 NTU's or less in all
saltwater classes and in all lakes and reservoirs,and 10 NTU's or less in trout waters,are not
considered significant.
M. The permittee, upon receipt of a notice of revocation of this permit or upon its
expiration before completion of the work will,without expense to the United States and in such
time and manner as the Secretary of the Army or his authorized representative may direct,restore
the water or wetland.o its pre-project condition.
N.Violations of these conditions or violations of Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District
U.S.Army Corps of Engineers within 24 hours of the permittee's discovery of the violation.
Questions or comments may be addressed to Mr. Kyle Barnes, Washington Field Office,
Regulatory Division,telephone(910)251-4584.
Sincerely,
1�
K e Barnes
Regulatory Project Manager
US Army Corps of Engineers
Copies Furnished:
Ms.Amy Chapman
North Carolina Division of Water Quality,Transportation Unit
North Carolina Department of Environmental Quality
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh,North Carolina 27636-3726
Mr. Fritz Rhode
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort,North Carolina 28516
Mr. Chris Parker
Wetlands Regulatory Section
Water Management Division
U.S. Environmental Protection Agency
61 Forsyth Street, SW
Atlanta, Georgia 30303
Mr. Garcy Ward
N.C. Division of Water Resources
North Carolina Department of Environmental Quality
948 Washing Square Mall
Washington,North Carolina 27889
Mr. Greg Daisey
Division of Coastal Management
North Carolina Department of Environmental Quality
401 South Griffin Street, Suite 300
Elizabeth City,North Carolina 27909
7 .
+ T.
rl
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretory
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittingham@ncdenr.gov
SUBJECT CAMA/Dredge&Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road(SR 1225)in Goat Neck,Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above.If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919)707-9149.When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME SAM I
AGENCY
SIGNATURE —�
DATE I I/2-6 /(G/
E
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City.North Carolina 28557
252 808.2808
t3
f i I
•
of
ROY COOPER NORTH CAROLINA
Governor eivfronmenta/Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
November 15,2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00) + j
Cathy.Brittinaham ncdenr.gov
SUBJECT: CAMA!Dredge&Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road(SR 1225)in Goat Neck,Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair t j
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above. If you have any questions
regarding the proposed project,please contact Cathy Brittingham at(919) 707-9149.When appropriate,
in-depth comments with supporting data is requested.
1. I
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCI�-�1.!Gb 1=—zZ — n c6.,
SIGNATU
DATE I(-4-3.1 9 {
i1iC NW
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City.North Carolina 28557
252.8082808
5'fA� r
Irdlk
‘ i, ,o4;%eY
.tea
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C:.DANIS
Director
MEMORANDUM
TO: Cathy Brittingham, NCDOT Projects Coordinator
Division of Coast Management
FROM: Charlan Owen , ICP, NE District Planner
Division of Coastal Management
SUBJECT: Major Permit Request by the NC Department of Transportation to routinely
maintenance dredge a 20 foot wide by 75 foot long manmade canal to an average
depth of 1.8 feet below Normal Water Level (NWL) and repair and maintain two (2)
6 foot wide by 30 foot long riprap revetments to a height of 3 feet; at the northern
terminus of the Pledger Harbor Road right-of-way where the manmade canal
connects to the Albemarle Sound, in the Goats Neck community of Tyrrell County.
•
DATE: November 26, 2019
Consistency Determination: The request is consistent with/not in conflict with the Tyrrell
County/Town of Columbia Land Use Plan certified by the CRC
on March 25, 2010.
Overview: The project site consists of a 20 foot wide by 75 foot long area within the Pledger
Harbor Road right-of-way at its northern terminus along the Albemarle Sound. The right-of-way
is within the 10,297 acre Palmetto-Peartree Preserve, which is owned by the NC Wildlife
Resources Commission and classified as a Significant Natural Heritage Area. Approximate s'
elevation of the project area is 0 to 2 feet above Normal Water Level (NWL). The project area is
in an AE floodzone.
Existing improvements within the right-of-way include a 20 foot wide roadside canal that is
approximately .8 foot to 1.5 feet deep within the project area, two (2) 6 foot wide by 30 foot long
sections of rip rap revetment on the canal banks, and a 12 foot wide state-maintained travel lane
with grass shoulders. The roadside canal is located on west side of the entire 1.15 miles of
roadway that connects with Goat Neck Road to the south. Stormwater sheet flows directly into
the adjacent roadside canal and estuarine swamp forest from the road. The applicant states that
the canal opening and adjacent shoreline are exposed to northerly winds that result in seasonal
shoaling of the canal opening by wave action. DCM issued General Permit No. 68746 in
December 2017 for maintenance excavation of approximately 1,500 sq. ft. of accumulated
sediment at the project site.
1111EQ,)
tkpaAmMt ai Frcmmmnmaiiairtu\ ./'� E
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909
252.264.3901
4
North Carolina Department of Environmental Quality
MEMORANDUM
Division of Coastal Management
Page2of5
Routine maintenance dredging of the 20 foot wide by 75 foot long canal area to an average depth
of 1.8 feet below NWL and the repair and maintenance of two (2)6 foot wide by 30 foot long riprap
revetments to a height of 3 feet are proposed. The existing riprap revetments will be
repaired/maintained with Class II and Class B stone. Maintenance activities will be conducted
using a tracked excavator and closed body dump truck working from the uplands. Spoil will be
placed directly on the truck and hauled to an offsite stockpile site owned by NCDOT. NCDOT is
seeking to authorize maintenance/future maintenance through a CAMA Major Permit rather than •
continuing to obtain CAMA General Permits for each excavation.
The waters of the Albemarle Sound are classified as SB in this area and are closed to shellfishing.
There were no SAV observed in the project area during the site visit. A review of potential historic
resources or archaeological sites was not provided.
Anticipated Impacts resulting from this project are expected to include: the excavation of 1,332
sq. ft. of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC).
The project will improve gravity flow/drainage from the community of Goat Neck.
Basis for Determination:
The Tyrrell County/Town of Columbia Land Future Land Use Plan Map identifies the project site
as "Conservation", which includes land and water areas that are environmentally sensitive,
including areas of environmental concern, as indicated on Page 133.
The following LUP policy (P.) and implementation (I.) statements may be applicable to this
request:
Policies — Land Use Compatibility:
P.38, Page 104.
"All development should be designed to protect Protected Lands and Significant
Natural Heritage Areas..."
•
• •
North Carolina Department of Environmental Quality
MEMORANDUM
Division of Coastal Management •
Page 3 of 5
Implementing Actions-Conservation:
1.23, Page 105.
"Tyrrell County and the Town of Columbia will rely on the NC Department of
Environment and Natural Resources, Division of Coastal Management to
regulate development through the CAMA permitting process. Also, it will rely on
the regulations of other state and federal agencies with regulatory authority, as •
well as existing local development regulations, to mitigate threats to AECs."
Policies —Stormwater Control:
P.41, Page 106.
"Tyrrell County and the Town of Columbia support reducing soil erosion, runoff,
and sedimentation to minimize the adverse effects on surface and subsurface
water quality."
P.42, Page 106.
"Tyrrell County recognizes the value of water quality maintenance and supports
the protection of fragile areas and the provision of clean water for recreational
purposes."
P.43, Page 106.
"The county supports the enforcement of all controls and regulations, specifically
design standards, tie-down requirements, construction and installation standards,
elevation requirements, flood-proofing, CAMA regulations, and FEMA
regulations, deemed necessary by the Board of Commissioners to mitigate the
risks of lives and property caused by severe storms and hurricanes."
P.45, Page 106.
"Tyrrell County and the Town of Columbia support requiring developers to
address stormwater management to comply with NC Department of Environment
and Natural Resources Coastal Stormwater Regulations."
P.46, Page 106.
"Tyrrell County supports the development of a comprehensive long range plan to
address the issue of cleaning out the arterial canals located throughout the
county in an effort to improve stormwater drainage throughout the County."
North Carolina Department of Environmental Quality
MEMORANDUM
Division of Coastal Management
Page 4 of 5
Policies—Water Quality:
P.72, Page 116.
"Tyrrell County and the Town of Columbia support the guidelines of the Coastal
Area Management Act and the efforts and programs of the North Carolina
Department of Environment and Natural Resources, Division of Coastal
Management and the Coastal Resources Commission to protect the ... public
trust waters of Tyrrell County and the Town of Columbia..."
P.74, Page 116.
"The county and the town support commercial and recreational fishing in its
waters and will cooperate with other local governments and state and federal
agencies to control pollution of these waters to improve conditions so that
commercial and recreational fishing will increase."
P.77, Page 116.
"Tyrrell County and the Town of Columbia recognize the value of water quality
maintenance to the protection of fragile areas and to the provision of clean water
for recreational purposes and supports the control of stormwater runoff to aid in
the preservation of water quality."
P.79, Page 116.
"Tyrrell County and the Town of Columbia support the policy that all State of
North Carolina projects should be designed to limit to the extent possible
stormwater runoff into coastal waters."
P.87, Page 117.
"Tyrrell County and the Town of Columbia support and will continue to enforce
the policies of the NC Department of Environment and Natural Resources
Coastal Stormwater Rules."
Fi
Implementing Actions —Water Quality:
1.58, Page 117.
"The county will comply with CAMA and NC Division of Environmental
Management stormwater runoff regulations..."
' E
North Carolina Department of Environmental Quality
MEMORANDUM
Division of Coastal Management
Page5of5
1.59, Page 117.
"The County will enforce its subdivision regulations to aid in protecting sensitive
shoreline areas. It will rely on state and federal agencies to promote and protect
the Palmetto-Pear Tree Preserve, the Pocosin Lakes National Wildlife Refuge,
and the Pettigrew State Park, as well as other nursery areas, habitat areas, and
coastal reserves."
Policies —Cultural, Historic, and Scenic Areas:
P.89, Page 120.
"The county supports local, state, and federal efforts to protect historic properties
within its borders and to perpetuate its cultural heritage."
P.90, Page 120.
"Tyrrell County and the Town of Columbia supports protection and preservation
of all protected natural areas which have both historic and environmental
significance."
Implementing Actions— Funding Options:
1.82, Page 115.
"Tyrrell County and the Town of Columbia officials will continue to work with the
Army Corps of Engineers and any other state and federal agencies to ensure
continued dredging and maintenance of channels and rivers as needed to keep
these facilities open to navigation. These efforts shall comply with applicable
state and federal regulations. Providing borrow or spoil areas and provision of
easements for work will be determined on case-by-case basis. The county would
encourage spoil material being placed on those areas where easements for such
use already exist. Channel maintenance has major economic significance and is
worthy of state and federal funding."
F1!
Lri
Flk[
dM ST/J£y'k
Kam`
141i1P---41.-
•
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittinghamt ncdenr.gov
SUBJECT: CAMA/Dredge &Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road (SR 1225) in Goat Neck,Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above. If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919) 707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Kacee Zinn
AGENCY NCDMF�i Shellfish Sanitation
SIGNATURE 7<C for Shannon Jenkins
DATE 11/15/2019
r�EQ�
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City.North Carolina 28557
252.808.2808
Jul r`�L
ROY COOPER NORTH CAROLINA
Governor Environmental Quarry
MICHAEL S.REGAN I
Secretary
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617 .
(Courier 52-01-00) i
Cathy.Britting hamCatncdenr.gov
SUBJECT: CAMA/Dredge&Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road(SR 1225)in Goat Neck,Tyrrell County
f..
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6. 2019 at the mail/email address above.If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919)707-9149.When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed. is
**Additional comments may be attached**
V This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments, .
PRINT NAME C 1ic tiV6 ire(d
AGENCY btk 14(aYei- SLrpil1 Sec Jico •
SIGNATURE L G� Y.Z ..
DATE L 1 ` ( 7 d 0! (
rl Y
c C)7"
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City,North Carolina 28557
252.8082808
Brittingham, Cathy
From: Wilson, Travis W.
Sent: Tuesday, December 10, 2019 8:53 AM
To: Brittingham, Cathy
Subject: FW: CAMA Major - NCDOT - Pledger Harbor Rd in Tyrrell County
Attachments: CAMA MAJOR - NC DOT- TYRRELL COUNTY.pdf; Site Plan - Pledger Harbor Rd.pdf
Cathy, sorry for the delayed response on the maintenance dredging for the canal at the end of pledger Harbor road. The last
month has had me mostly out of the office, and this week is no different. Hopefully this email will suffice. WRC does not have
any addition concerns with the proposed project.
From: Godfrey, Ella M <Ella.Godfrey@ncdenr.gov>
Sent: Friday, November 15, 2019 10:15 AM
To:joies@tyrrellcounty.net; Owens, Charlan <charlan.owens@ncdenr.gov>; Kyle.W.Barnes@usace.army.mil; Padrick, Lee
<Ipadrick@nccommerce.com>; DCR- Environmental_Review<Environmental.Review@ncdcr.gov>; Whitfield, Clif
<clif.whitfield@ncdenr.gov>; Weychert, Curtis R<curt.weychert@ncdenr.gov>; Harris, David B<davidharris@ncdot.gov>;
Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon<sharon.gupton@ncdenr.gov>; Walton,Tim
<tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>;
Carpenter,Kristi<kristilynn.carpenter@ncdenr.gov>; Dumpor,Samir<samir.dumpor@ncdenr.gov>; Ward, Garcy
<garcy.ward@ncdenr.gov>; Wilson,Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A<Rodney.Butler@ncdcr.gov>
Subject: CAMA Major- NCDOT- Pledger Harbor Rd in Tyrrell County
Good morning,
Please accept this correspondence as the official distribution of a CAMA application from the NC Department of Transportation.
Attachments include: Field Investigative Report, narrative, application, comment sheet and any other documents specifically for
you.
Ella M. Godfrey
Office Assistant IV
Division of Coastal Management
NC Department of Environmental Quality
252-264-3901, ext. 231
252-331-2951 (fax)
1
4414)
•
�auw�
ROY COOPER
Goya
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52 01-00)
Cathy.Brittingharngncdernr
SUBJECT: CAMA 1 Dredge&Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road(SR 1225)in Goat Neck,Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6. 2019 at the mail/email address above If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919)707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
Additlonal comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME 1-<r
AGENCY NC! 44-2„�s-
SIGNATURE
DATE /2- G
North Carobna Departtaent of Erwiroeraentai Quaky I Division of CaaatatManapen,eva
Morehead Cky(Ace 14000 Caearrrrre Menu I Morehead tafy.Nash Carob*iassz
1528082W;
SWE 4
04
,104
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittingham(ancdenr.gov
SUBJECT: CAMA/Dredge &Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road (SR 1225) in Goat Neck,Tyrrell County
i
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above, If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919) 707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
XThis agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME (AV Yv e((,)i€12,-(
AGENCY AK/PM-
SIGNATURE j i
DATE
E Q
North Carolina Department of Envl,unmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City.North Carolina 28557
252.608 2608
,1,u STATE,0
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittingham(a�ncdenr.gov
SUBJECT: CAMA/Dredge&Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road (SR 1225) in Goat Neck,Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above. If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919) 707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: This gency has no objection to the project as proposed.
* dditional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME / ( 'K2 - ) S_>--."---
AGENCY (CA,
���� 4,�,,2.,,.15 (, .k -C..SIGNATURE yC:/4�G,
DATE l Zl// ///
GD_E Q
.4
t.CanfcA+.xxu
OryYtr rtol of GwWner W ODUrt�
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City.North Carolina 28557
252.808.2808
.r ,,
1 '
rile' i' i''.
.,,QrQva."=
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAELS. REGAN
Secretary
BRAXTON C. DAVIS
Director
November 15, 2019
MEMORANDUM:
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittingham(a�ncdenr.gov
SUBJECT: GAMA I Dredge & Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road (SR 1225) in Goat Neck, Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint cn the proposed project and
return this form bvDecember6, 2019 at the maiVemail address above. If you have any questions
regarding the proposed project, please contact Cathy Brittingham at (919) 707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: _X_ This agency has no objection b the project as proposed.
**Additional comments may be attached**
___ This agency has no comment cn the proposed project
___ This agency approves of the project only if the recommended changes
are incorporated. See attached.
___ This agency objects to the project for reasons described n the attached
comments.
PRINT NAME:Rodney Butler
AGENCY: NC Natural Heritage Program
SIGNATURE:R.A.B.
DATE: 12/12/2019111
EQ,„))
o,,.,,,C.
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City. North Carolina 28557
252.808.2808
� V
■ ��■ Roy Cooper.Governor
*N• ■ NC DEPARTMENT OF
=d���al NATURAL AND CULTURAL RESOURCES Sus Hamilton,Secretary
' Walter Clark,Director, Land and Water Stewardship
NCNHDE-10917
December 12, 2019
Gregg Bodnar
NC Coastal Mgmnt
400 Commerce Avenue
Morehead City, NC 28557
RE: CAMA: Pledger Harbor Road
Dear Gregg Bodnar:
The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide
information about natural heritage resources for the project referenced above.
A query of the NCNHP database indicates that there are records for rare species, important natural
communities, natural areas, and/or conservation/managed areas within the proposed project
boundary. These results are presented in the attached 'Documented Occurrences'tables and map.
The attached 'Potential Occurrences'table summarizes rare species and natural communities that
have been documented within a one-mile radius of the property boundary. The proximity of these
records suggests that these natural heritage elements may potentially be present in the project area
if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one-mile
radius of the project area, if any, are also included in this report.
If a Federally-listed species is documented within the project area or indicated within a one-mile
radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service
(USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here:
httos://www.fws.aov/offices/Directorv/ListOffices.cfm?statecode=37.
Please note that natural heritage element data are maintained for the purposes of conservation
planning, project review, and scientific research, and are not intended for use as the primary criteria
for regulatory decisions. Information provided by the NCNHP database may not be published
without prior written notification to the NCNHP, and the NCNHP must be credited as an information
source in these publications. Maps of NCNHP data may not be redistributed without permission.
Also please note that the NC Natural Heritage Program may follow this letter with additional
correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Clean Water
Management Trust Fund easement, or an occurrence of a Federally-listed species is documented
near the project area.
If you have questions regarding the information provided in this letter or need additional assistance,
please contact Rodney A. Butler at rodney.butlerca ncdcr.aov or 919-707-8603.
Sincerely,
NC Natural Heritage Program
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
Q 121 w.JONES STREET,RALEsGH NC 27603 • 1651 MAIL SERVICE CENTER,RALEIGH NC 27699
OFC 919 7079120 • FAX 919-707.9121
Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Intersecting the Project Area
CAMA: Pledger Harbor Road
December 12, 2019
NCNHDE-10917
No Element Occurrences are Documented within the Project Area
There are no documented element occurrences (of medium to very high accuracy) that intersect with the project area. Please note, however, that although the
NCNHP database does not show records for rare species within the project area, it does not necessarily mean that they are not present; it may simply mean that
the area has not been surveyed. The use of Natural Heritage Program data should not be substituted for actual field surveys if needed, particularly if the project
area contains suitable habitat for rare species. If rare species are found, the NCNHP would appreciate receiving this information so that we may update our
database.
Natural Areas Documented Within Project Area
Site Name . `'tepresentational Rating Colectiv'eatirig '� ,'
Palmetto-Peartree Swamp Forest R2 (Very High) C2 (Very High)
Managed Areas Documented Within Project Area
Managed Area Name Owner Owner Type
Palmetto-Peartree Preserve The Conservation Fund Private
NC Department of Transportation Mitigation Site NC Department of Transportation State
NOTE:If the proposed project intersects with a conservation/managed area,please contact the landowner directly for additional information.If the project intersects with a Dedicated Nature Preserve
(DNP),Registered Natural Heritage Area(RHA),or Federally-listed species,NCNHP staff may provide additional correspondence regarding the project.
Definitions and an explanation of status designations and codes can be found at httos://ncnhde.natureserve.org/content/help.Data query generated on December 12,2019;source:NCNHP,Q4 Oct 2019.
Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database.
Page 2 of 4
Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One-mile Radius of the Project Area
CAMA: Pledger Harbor Road
December 12, 2019
NCNHDE-10917
Element Occurrences Documented Within a One-mile Radius of the Project Area
Taxonomic EO ID Scientific Name Common Name " Last Element Accuracy Federal State Global State
Observation Occurrence S. R; Status Status Rank Rank
Date Rank m"
Bird 8553 Picoides borealis Red-cockaded 2017 E 4-Low Endangered Endangered G3 S2
Woodpecker
Freshwater Fish24087 Acipenser Shortnose Sturgeon 1998-05-18 H? 5-Very Endangered Endangered G3 S1
brevirostrum Low
Freshwater Fish38940 Acipenser oxyrinchus Atlantic Sturgeon 2015-06-02 E 4-Low Endangered Endangered G3T3 S2
oxyrinchus
Mammal 23088 Canis rufus Red Wolf 2019 Er 5-Very Experimental, Threatened G1Q S1
Low nonessential
Mammal 37735 Corynorhinus Eastern Big-eared Bat 2015-11-06 E 2-High --- Special G3G4T S3
rafinesquii macrotis Concern 3
Natural Areas Documented Within a One-mile Radius of the Project Area
Site Name Representational Rating Collective Rating
Palmetto-Peartree Swamp Forest R2 (Very High) C2 (Very High)
Managed Areas Documented Within a One-mile Radius of the Project Area
Managed Area Name Owner Owner Type
Palmetto-Peartree Preserve The Conservation Fund Private
NC Department of Transportation Mitigation Site NC Department of Transportation State
Definitions and an explanation of status designations and codes can be found at bttos://ncnhde natureserve.ora/content/help.Data query generated on December 12,2019;source:NCNHP,Q4 Oct 2019.
Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database.
Page 3 of 4
NCNHDE-10917: CAMA: Pledger Harbor Road
r•1:fr: o.:• 'Yr.",� use+>d y° tiro) 7. ,'
•i
.-1: y ,.....,.....,,....„,.., ..' . : ..'.' '-' . s:".":7,.''', .,, ; ,.; /,,...,,.. x...-11',‘';''''•••1:7:;':.11-11•:$..:.':
OJ
N . ::,. '., , ..
\ a3Js o? OJJ ~\\''S'N:\\\\.„4,...,,,,,
w E - . ' "/. rr
1, :. ��
December 12,2019 1:20,762
D Project Boundary Managed Area(MAREA) 0 0.175 0.35 0.7 mi
I r 1 r r r r il
El Buffered Project Boundary 0 0275 o.ss i.i km
Ej
Natural Heritage Element Occurrence(NHEO) Sources.Esn,HERE,Garin,Inlermap,increment P Corp,GEBCO,USGS,
FAO,NPS,NRCAN,GeoBase.IGN,Kadaster NL,Ordnance Survey.Eon Japan,
NHP Natural Area(NHNA) MEn,Esri China(Hong Kong),(q OpenSVeelMap contributors and the GIS
User Community
Page 4 of 4
T\I1 r, Received: 11/19/2019
d� r o
'�` _ State Historic Preservation Office
s4. �e
ROY COOPER NORTH CAROLINA ER 19-5021
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Otrecror
November 15, 2019 Due -- 12/6/19
MEMORANDUM:
0
FROM: Cathy Brittingham, DCM DOT Project Coordinator AIG
DWR-Transportation Permitting Unit ' 2 l t-Z/ 11
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittingham@ncdenr.gov
SUBJECT CAMA/Dredge &Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road (SR 1225) in Goat Neck,Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above. If you have any questions
regarding the proposed project, please contact Cathy Brittingham at(919) 707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Renee Gledhill-Earley
AGENCY Stateee—tUr
Historic Preservation Office
SIGNATURE p— kta ;
fadet—
DATE i.c • Vo • i d
RE s)
North Carolina Department of Emiruwrcntal Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City,North Carolina 28557
2528082808
NOV 2 0 2019
a� y.Y]0.1a34
x�rti Y dY
QW1M1V6s'.ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
January 21,2020
N.C. Department of Transportation
113 Airport Drive, Suite 100
Edenton,North Carolina 27932
Dear Sir or Madam:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,the
State Dredge and Fill Law, for you to proceed with your project proposal. The original(buff-colored form) is retained by
you and it must be available on site when the project is inspected for compliance.Please sign both the original and the
copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have
waived your right of appeal described below.
If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or
113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27611-6714, (919) 733-2698 within twenty(20)days
of this decision on your permit. You should also be aware that another qualified party may submit an objection to the
issuance of this permit within twenty(20)days.
The project plan is subject to those conditions appearing on the permit form.Otherwise, all work must be carried
out in accordance with your application. Modifications,time extensions,and future maintenance requires additional
approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are
having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit
requirements.
From time to time,Department personnel will visit the project site. To facilitate this review, we request that you
complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit
conditions,environmental safeguards, or problem areas,you may contact Department personnel at any time for assistance.
By working in accordance with the permit,you will be helping to protect our vitally important coastal resources.
Sincerely,
/,7444"44.11
Jonathan Howell
Major Permits Manager
N.C. Division of Coastal Management
Enclosure •
£D_EQ)
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City,North Carolina 28557
252.808.2808
Brittingham, Cathy
From: Brittingham, Cathy
Sent: Friday,January 10, 2020 2:08 PM
To: Paul Williams;Trowell, Steve J
Cc: Kyle Barnes; Greg Daisey; Garcy Ward;Jonathan Howell; Samir Dumpor
(samir.dumpor@ncdenr.gov); Tim Walton (tim.walton@doa.nc.gov); Moser, Mike
(mike.moser@doa.nc.gov); DCR - Environmental_Review;Whitfield, Clif
(clif.whitfield@ncdenr.gov);Jenkins, Shannon;Wilson, Travis;Weychert, Curtis R; Cannon,
Amanda J; Ella M Godfrey (Ella.Godfrey@ncdenr.gov)
Subject: SR 1225, Pledger Harbor Road, CAMA Permit 5-20 issued
Attachments: SR 1225, Pledger Harbor Road, adjacent canal.pdf
Hello,
Please find attached CAMA Major Permit 5-20 authorizing the maintenance excavation of a manmade drainage canal
adjacent to SR 1225 (Pledger Harbor Road) and maintenance/repair of existing riprap revetments at the connection with
the Albemarle Sound in Tyrrell County.
A paper copy will be sent to NCDOT in Edenton.
Please let me or Greg Daisey know if you have any questions or concerns.
Sincerely,
Cathy Brittingham
Cathy Brittingham,Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
Cathy.brittingham(a,ncdenr.gov
Mailing Address:
c/o DWR Transportation Permitting Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor, Room 1204C
Raleigh,NC 27604
Please visit httos://deq.nc.gov/about/divisions/coastal-management/for more information about the N.C.Division of Coastal Management.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties
1
Brittingham, Cathy
From: Brittingham, Cathy
Sent: Tuesday, January 07, 2020 4:40 PM
To: Gibson,Jessica M
Cc: Greg Daisey
Subject: DOT permit fee, SR 1225 (Pledger Harbor Road), in Tyrrell County, New CAMA Major Permit
Attachments: DOT PERMIT FEE BILLING REQUEST.doc
Hi Jessica,
Please see attached.
Please let me or Greg Daisey know if you have any questions or concerns.
Sincerely,
Cathy
Cathy Brittingham,Transportation Project Coordinator
N.C. Division of Coastal Management
(919)707-9149 phone
Cathy.britti ngham ancdenr.gov
Mailing Address:
c/o DWR Transportation Permitting Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12'Floor, Room 1204C
Raleigh,NC 27604
Please visit httos://deo.ncmov/abouUdivisions/coastal-management/for more information about the N.C.Division of Coastal Management.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties
1
DOT PERMIT FEE BILLING REQUEST
Date: 1/7/20
To: Jessica Gibson
CC: Greg Daisey
From: Cathy Brittingham
Transfer Amount: $475
Project Description: Maintenance excavation of a manmade drainage canal at the
confluence with the Albemarle Sound, and maintenance/repair of existing riprap
revetments.
Project Location: SR 1225 (Pledger Harbor Road) in Tyrrell County.
DCM Permit Type and Number: New Major Permit
Fee Division if Applicable: (record amounts to be split with DWR, if applicable)
DCM: 60%
DWR: 40%
WBS Element Number: 1.208911
STHTf 4'.•.
. .
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C. DAVIS
Director
December 23, 2019
Steve Trowell, Environmental Specialist II
N.C. Department of Transportation, Division One
113 Airport Drive, Suite 100
Edenton,NC 27932
Dear Mr. Trowell:
This letter is with reference to the application by the N.C. Department of Transportation
(NCDOT) for a Coastal Area Management Act Major Development Permit for the proposed
maintenance excavation of a manmade drainage canal at its confluence with the Albemarle
Sound located at the terminus of SR 1225 Pledger Harbor Road east of Columbia in the
Community of Goat Neck in Tyrrell County.
Although processing of the application is nearing completion, additional time is needed for this
office to complete the review and make a decision on your request. Therefore, it is necessary
that the standard review time be extended. An additional 75 days is provided by G.S. 113A-
122(c)which would make March 4,2020,the new deadline for reaching a decision on your
request. However,we expect to take action prior to that time and will do so as soon as possible.
In the interim, if you have any questions on the status of your application,please do not hesitate
to contact me by phone(919-707-9149)or e-mail (Cathy.Brittingham@ncdenr.gov).
Sincerely,
Cathy Bri mgham
Transportation Project Coordinator
Cc: Greg Daisey,DCM
Paul Williams,NCDOT
D_EQ oe)
NORTH CAROLINA 4
Depsrernent of Environments!Owl
North Carolina Department of Environmental Quality I Division of Coastal Management
DWR Wetlands Unit 1512 North Salisbury Street 11617 Mail Service Center Raleigh,North Carolina 27699-1617
919.707.9149
Brittingham, Cathy
From: Brittingham, Cathy
Sent: Wednesday, December 11, 2019 4:23 PM
To: Greg Daisey; Kyle Barnes; Garcy Ward; • ; l 1.e er, Mike
(mike.moser@doa.nc.gov); • • 1oj --
4oy_wa maa@Jd^=== ); DCR - Environmental_Review; ENV r, Rodney A
Subject: NCDOT CAMA Major Permit Application, Pledger Harbor Road (SR 1225) in Goat Neck, Tyrrell
County
Hello,
DCM is processing a CAMA major permit application from NCDOT for maintenance dredging of a manmade drainage
canal and maintenance/repair of existing riprap revetments at the connection with the Albemarle Sound in Tyrrell
County. A copy of the CAMA major application was sent to your agency by e-mail for review and comment on
11/15/19. If you did not receive a copy of the application for review,please let me know and I will send you another
copy. Comments from your agency on the application were requested by 12/6/19.
Your agency's comments have not yet been received at the DCM-Raleigh Office. Therefore, we would appreciate it if
you would submit your comments as soon as possible. If DCM does not hear back from your agency within the next
few days, we will likely be moving forward with a final permit decision.
Please let me know if you have any questions or need additional information.
Sincerely,
Cathy Brittingham
Cathy Brittingham,Transportation Project Coordinator
N.C.Division of Coastal Management
(919)707-9149 phone
cathy.brittinghamc ncdenr.gov
Mailing Address:
c/o DWR Transportation Permitting Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor,Room 1204C
Raleigh,NC 27604
Please visit https://deq.nc.gov/about/divisions/coastal-management/for more information about the N.C. Division of Coastal Management.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties
i
4a �
9
AGENCY REVIEW DISTRIBUTION SHEET
FOR
PROJECT COMMENTS
DCM Coordinator: Cathy Brittingham Distributed Yes® No ❑
Applicant: NC DOT Distribution Date: 11/15/2019
AGENCY WARO
Joie Spencer
LPO
Charlan Owens
DCM Planner
US COE (NC DOT) Kyle Barnes
Community Assistance Lee Padrick
Cultural Resources Renee Gledhill-Earley
Div.of Water Infrastructure
(No longer public Water Supply) Clif Whitfield
Marine Fisheries Curt Weychert WARO/ECRO
NC DOT David Harris
Shannon Jenkins
Shellfish Sanitation Sharon Gupton
Tim Walton
State Property Mike Moser
Wanda Hilliard
DEMLR/DWR: NC DOT Kristie Lynn Carpenter
DEMLR
Sediment& Erosion- Samir Dumpor
DWR 401- NC DOT Garcy Ward
WRC(NC DOT) Travis Wilson
National Heritage Program Rodney Butler
C:\Users\emgodfrey\Documents\Major Permits\Maj Comment Distribution Sheet-DOT.docx
Revised:6/29/2018
4
4 10,
it'v-42->'
't..auww,•
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
November 15, 2019
MEMORANDUM.
FROM: Cathy Brittingham, DCM DOT Project Coordinator
DWR-Transportation Permitting Unit
1617 Mail Service Center, Raleigh NC 27699-1617
(Courier 52-01-00)
Cathy.Brittinghamncdenr.gov
SUBJECT: CAMA/Dredge &Fill Application Review
Applicant: NC Department of Transportation
Project Location: Pledger Harbor Road (SR 1225) in Goat Neck, Tyrrell County
Proposed Project: Maintenance dredging of a manmade drainage canal and maintenance/repair
of existing riprap revetments at the connection with the Albemarle Sound
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by December 6, 2019 at the mail/email address above. If you have any questions
regarding the proposed project, please contact Cathy Brittingham at (919) 707-9149. When appropriate,
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
DATE
D_E Q1„ .
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1400 Commerce Avenue I Morehead City.North Carolina 28557
252.808.2808
Brittingham, Cathy
From: Trowell, Steve J
Sent: Wednesday, November 13, 2019 3:51 PM
To: Daisey, Greg
Cc: Brittingham, Cathy; Williams, Paul C
Subject: Re: Pledger Harbor Rd./Canal Maintenance Major Permit Application
The height will be approximately 3' tall or 1' above the NWL
From: Daisey, Greg<Greg.Daisey@ncdenr.gov>
Sent: Wednesday, November 13, 2019 3:07:57 PM
To:Trowell, Steve J <sjtrowell@ncdot.gov>
Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.gov>; Williams, Paul C<pcwilliams2@ncdot.gov>
Subject: RE: Pledger Harbor Rd./Canal Maintenance Major Permit Application
Thanks for that information.
Another follow up question regarding the repair/maintenance of the existing the rip rap revetments:
• The two existing revetments are approximately 30'L by 6'W.After review of the permit application, the submitted
drawings show that all maintenance/repair will be within that footprint/alignment, but what will be the approximate
height of the revetments be once the repair/maintenance is completed?
Thanks for your time.
Greg Daisey
Transportation Projects Field Representative
Division of Coastal Management
North Carolina Department of Environmental Quality
252 264 3901, EXT. 249
Greg.Daisev@ncdenr.gov
401 S. Griffin St., Suite 300
Elizabeth City, NC 27909
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Brittingham, Cathy
From: Trowell, Steve J
Sent: Tuesday, November 12, 2019 3:51 PM
To: Daisey, Greg
Cc: Brittingham, Cathy; Williams, Paul C
Subject: RE: Pledger Harbor Rd. /Canal Maintenance Major Permit Application
Greg:
The refurbishment of the existing riprap will be completed using Class II and Class B. Same size as what is there now. There
should be very little turbidity during the "in-water excavation". The material deposited by wave action creating the shoal is a
course sand. The material to be excavated is like a "washed sand". If push comes to shove NCDOT could use turbidity curtains if
it alleviates some concern but is unnecessary, in my opinion, due to the small scope of the project and material to be
excavated. If there is any turbidity at all it will be short term and localized.
Steve J.Trowell
Division Environmental Specialist
Division One
NC Department of Transportation
(252)482-1876 office
(252) 402-4015 mobile
(252) 482-8722 fax
sitrowell cni ncdot.gov
113 Airport Dr.
Suite 100
Edenton, NC 27932
From: Daisey, Greg<Greg.Daisey@ncdenr.gov>
Sent:Tuesday, November 12, 2019 3:25 PM
To:Trowell, Steve J <sjtrowell@ncdot.gov>
Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.gov>
Subject: Pledger Harbor Rd./Canal Maintenance Major Permit Application
Steve—
Good afternoon.
I have a couple of question that related to the Major Permit application:
1. Please state the size of rip rap NCDOT plans on refurbishing the existing revetments with at the site.The plans state that
this will be a component of the project, but there is no mention of it in the narrative or MP forms.
2. Does NCDOT plan to implement the use of turbidity curtains during in-water excavation?
Thanks for your time.
1
z t
'"a rt.
a,
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
October 14, 2019
Steve Trowell
Environmental Specialist II
NC Department of Transportation
113 Airport Rd.,Suite 300
Edenton,NC 27932
Dear Mr. Trowell:
The NC Division of Coastal Management hereby acknowledges receipt of your application for
State approval for development related to the proposed maintenance excavation of a drainage canal
that connects to the Albemarle Sound at the terminus of Pledger Harbor Rd. (SR 1225) in Goat
Neck,Tyrrell County.It was received complete on October 7,2019 and appears to be adequate for
processing at this time. The projected deadline for making a decision is December 21, 2019. An
additional 75-day review period is provided by law when such time is necessary to complete the
review. If you have not been notified of a final action by the initial deadline stated above, you
should consider the review period extended. Under those circumstances, this letter will serve as
your notice of an extended review. However, an additional letter will be provided on or about the
75th day.
If this agency does not render a permit decision within 70 days from October 7, 2019, you may
request a meeting with the Director of the Division of Coastal Management and permit staff to
discuss the status of your project. Such a meeting will be held within five working days from the
receipt of your written request and shall include the property owner, developer, and project
designer/consultant.
NCGS 113A-119(b)requires that Notice of an application be posted at the location of the proposed
development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted
at the property of your proposed development. You should post this notice at a conspicuous point
along your property where it can be observed from a public road. Some examples would be:
Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your
DE Q1
M��
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1401 South Griffin Street.Suite 300 I Elizabeth City.North Carolina 27909
252.264.3901
Application for CAMA Major Development Permit
Pledger Harbor Rd. (SR 1225)Canal Maintenance
October 11,2019
Page 2
property, or at a point along the road right-of-way where a private road would lead one into your
property. Failure to post this notice could result in an incomplete application.
An onsite inspection will be made,and if additional information is required,you will be
contacted by the appropriate State or Federal agency. Please contact Greg Daisey,
Transportation Projects Field Representative,if you have any questions or would like a copy of
the field report associated with this project.
Sincerely,
(r)\>eI41.
Greg Daisey
Transportation Projects Field Representative
NC Division of Coastal Management
•
FJ/
Enclosure
cc: Braxton Davis,Director, DCM,Morehead City,NC
Cathy Brittingham,NCDOT Projects Coordinator, DCM,Raleigh,NC
E Q�
.1,..A
n.tann.iw Oue\
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1401 South Griffin Street.Suite 300 I Elizabeth City.North Carolina 27909
252.264390i
Brittingham, Cathy
From: Trowell, Steve J
Sent: Monday, October 07, 2019 9:05 AM
To: Daisey, Greg
Cc: Williams, Paul C; Barnes, Kyle W SAW; Brittingham, Cathy
Subject: Major CAMA Application Palmetto Peartree Drainage Canal Maintenance
Attachments: CAMA App Package.pdf
Greg:
Attached is the Major CAMA/Dredge and Fill permit application package for the proposed maintenance excavation of a man
made drainage canal located adjacent SR 1225, Pledger Harbor Road, at it's confluence with the Albemarle Sound east of
Columbia in Tyrrell County, North Carolina. I have a verbal agreement from Kyle to use the Programmatic Regional General
Permit 291 to process this on the Federal side. I copied Kyle as a reminder to him and Cathy to notify her. I am dropping off a
hard copy of the application package this morning in Elizabeth City. If you have any questions or need more information please
let me know.
Steve J.Trowell
Division Environmental Specialist
Division One
NC Department of Transportation
(252) 482-1876 office
(252) 402-4015 mobile
(252)482-8722 fax
sitrowellncdot.gov
113 Airport Dr.
Suite 100
Edenton, NC 27932
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
1
INC ROY COOPER
Governor
MICHAEL S.REGAN
Secretary
Environmental LINDA CULPEPPER
Interim Director
Quality
November 6,2017
Tyrrell County
NCDWR Project No.20171306
SR 1225 canal maintenance
State Project No. 3.5492.4.S2
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr. Paul Williams
North Carolina Department of Transportation
P.O.Box 1587
Greenville,NC 27835
Dear Mr. Williams:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
reestablishing canal drainage patterns and bank stabilization at the end of SR 1225(Pledger Harbor Rd)in Palmetto
Peartree Preserve in Tyrrell County:
Open Water Impacts in the Pasquotank River Basin
Site Open Water Bank Stabilization
(ac) (If)
SR 1225 0.035 72
The project shall be constructed in accordance with your application dated received October 16,2017 and additional
information from the Army Corps of Engineers received November 3,2017. After reviewing your application,we
have decided that these impacts are covered by General Water Quality Certification Numbers 4085 and 4087. These
certifications correspond to the Nationwide Permits 3 and 13 respectively issued by the Corps of Engineers. In
addition,you should acquire any other federal,state or local permits before you proceed with your project including
(but not limited to)Sediment and Erosion Control,Non-Discharge and Water Supply Watershed regulations. This
approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application(unless modified below).
Should your project change,you must notify the NCDWR and submit a new application. If the property is sold,the
new owner must be given a copy of this Certification and approval letter,and is thereby responsible for complying
with all the conditions. If total wetland fills for this project(now or in the future)exceed one acre,or of total
impacts to streams(now or in the future)exceed 150 linear feet,compensatory mitigation may be required as
described in I 5A NCAC 2H .0506(h)(6)and(7). For this approval to remain valid,you must adhere to the
conditions listed in the attached certification and any additional conditions listed below.
Condition(s)of Certification:
I. The issuance of this certification does not exempt the Permittee from complying with any and all statutes,rules,
regulations,or ordinances that may be imposed by other government agencies(i.e. local, state,and federal)
having jurisdiction, including but not limited to applicable buffer rules,stormwater management rules, soil
erosion and sedimentation control requirements,etc
State of North Carolina I Environmental Qualit
1617 Mail Service Center I Raleigh.North Carolina 27699-1 61 7
•
2. The Permittee shall ensure that the final design drawings adhere to the certification and to the drawings
submitted for approval. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
3. During the construction of the project,no staging of equipment of any kind is permitted in waters of the U.S.,or
protected riparian buffers. [I5A NCAC 02H.0506(b)(2)]
4. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels,lubricants,hydraulic fluids,or other toxic materials. [15A NCAC
02H.0506(b)(3)]
5. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design,installation and operation and maintenance of such Best Management Practices in order to protect
surface waters standards[15A NCAC 02H.0506(b)(3)and(c)(3)]:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design, installation,operation,and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed,the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites,the erosion and sediment control measures must be designed, installed,operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
6. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification. [15A NCAC 02H.0506(b)(3)and(c)(3)]
7. The appropriate BMP's shall be used to prevent offsite turbidity and contain turbidity within the work area.
[15A NCAC 02H.0506(b)(3)and(c)(3)]
8. All excavated material shall be properly disposed of in approved upland site. [15A NCAC 02B.0200]
9. Erosion control matting in riparian areas shall not contain a nylon mesh grid which can impinge and entrap
small animals. Matting should be secured in place by staples,stakes,or wherever possible live stakes of native
trees. Riparian areas are defined as a distance 25 feet from top of stream bank. [15A NCAC 02B.0224,.0225]
10. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards(including any requirements resulting from compliance with §303(d)of the Clean Water Act)
and any other appropriate requirements of State and Federal law. If NCDWR determines that such standards or
laws are not being met(including the failure to sustain a designated or achieved use)or that State or federal law
is being violated,or that further conditions are necessary to assure compliance,NCDWR may reevaluate and
modify this certification. [15A NCAC 02B.0200]
11. The Permittee shall report any violations of this certification to the Division of Water Resources within 24
hours of discovery.[15A NCAC 02B.0506(bx2)]
12. Upon completion of the project(including any impacts at associated borrow or waste site),the NCDOT
Division Engineer shall complete and return the enclosed"Certification of Completion Form"to notify
NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(f)]
13. A copy of this Water Quality Certification shall be maintained on site at the construction site at all times. In
addition,the Water Quality Certification and all subsequent modifications,if any,shall be maintained with the
Division Engineer and the on-site project manager. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506
(b)(2)and(c)(2)]
•
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm,except
for official state holidays. The original and one(I)copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five(5)business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh,NC 27699-6714
Telephone:(919)431-3000,Facsimile:(919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Bill F. Lane,General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions,please contact Garcy Ward at(252)946-6481 or garcy.ward@ncdenr.gov.
(---.\sa
Sincerel ,
( krNv, i1 I
• da Culpepper
Interim Director
Division of Water Resources
Electronic copy only distribution:
Kyle Barnes,US Army Corps of Engineers, Washington Field Office
Greg Daisey,NC Division of Coastal Management, Elizabeth City
Cathy Brittingham,NC Division of Coastal Management
Clay Willis,Division 1 Environmental Officer
Garcy Ward,NC Division of Water Resources, Washington Regional Office
File Copy
•
Brittingham, Cathy
From: Daisey, Greg
Sent: Monday, October 14, 2019 11:50 AM
To: Godfrey, Ella M
Cc: Brittingham, Cathy
Subject: Tyrell County Canal Excavation - Acknowledgement Letter/Placard
Attachments: Placard for Pledger Harbor Rd._Tyrrell.docx; Tyrrell Canal AckLtr.pdf
Ella—
Please find attached the Acknowledgement Letter and Placard related to the Major Permit application to be sent to NCDOT in
Edenton (c/o Steve Trowell or Paul Williams).
Please send two (2) placards with the letter.
Thanks for your time.
Greg Daisey
Transportation Projects Field Representative
D_E Q
Division of Coastal Management
North Carolina Department of Environmental Quality
`"""`'""""\ � 252.264.3901,EXT. 249(Office)
Greg-Daisey( cdenr-goy'
Ernescorrespondence to and tan this egitfrWiS IS slatted b the Noah Carr*A.dic Records Law and
rrwy be disclosed to third penes
1
1
J J
CAMA PERMIT
APPLIED FOR
PROJECT: Proposed Maintenance Excavation of Unnamed
Drainage Canal that Connects to the Albemarle Sound
Located at the Terminus of SR 1225 (Pledger Harbor Rd.)
in Goat Neck, Tyrrell County.
COMMENTS ACCEPTED THROUGH 11i05i2019
APPLICANT: FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
Steve Trowel) Greg Daisey, NC Division of
NC Department of Transportation Coastal Management, 401 S.
113 Airport Rd., Suite 100 Griffin St., Suite 300, Elizabeth
Edenton, NC 27932 City, NC 27909; 252-264-3901 , ext.
252-482-1876 249
Brittingham, Cathy
From: Godfrey, Ella M
Sent: Friday, November 15, 2019 10:08 AM
To: Brittingham, Cathy
Cc: Howell, Jonathan; Cannon, Amanda J
Subject: CAMA APPLICATION: NCDOT - Pledger Harbor Road in Tyrrell County
Attachments: CAMA MAJOR - NC DOT SR 1225 - TYRRELL COUNTY.pdf; Site Plan - Pledger Harbor Rd.pdf
Good morning,
Attached is a major permit application for NCDOT. It has been entered in CDAITS,the application number is 2019-25126-AP.
Ella M. Godfrey
Office Assistant IV
Division of Coastal Management
NC Department of Environmental Quality
252-264-3901, ext. 231
252-331-2951 (fax)
ella.godfrey@ncdenr.gov<mailto:ella.godfrey@ncdenr.gov>
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
https://deq.nc.gov/about/divisions/coastal-management/<https://deq.nc.gov/about/divisions/coastal-management/>
i
Brittingham, Cathy
From: Daisey, Greg
Sent: Thursday, March 17, 2016 11:48 AM
To: Brittingham, Cathy
Subject: FW: Palmetto-Peartree Preserve
Attachments: Timelapse.pdf
fyi
From: Williams, Paul C
Sent: Monday, March 14, 2016 4:10 PM
To: Daisey, Greg<Greg.Daisey@ncdenr.gov>
Subject: RE: Palmetto-Peartree Preserve
Some recent historical aerials of the canal site.
Paul
From: Daisey, Greg
Sent: Friday, March 11, 2016 8:27 AM
To: Williams, Paul C
Subject: RE: Palmetto-Peartree Preserve
Wednesday 3/16 works better for my schedule.
Greg Daisey
Transportation Projects Field Representative
Division of Coastal Management
North Carolina Department of Environmental Quality
252 264 3901, EXT. 249
Greg.Daisey(aincdenr.gov
1367 US Hwy 17 South
Elizabeth City, NC 27909
«OLE Object: Picture (Device Independent Bitmap) »
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From:Williams, Paul C
Sent: Friday, March 11, 2016 7:50 AM
1
To: Daisey, Greg<Greg.Daisey@ncdenr.gov>
Subject: RE: Palmetto-Peartree Preserve
Do you have anything scheduled Monday afternoon or anytime on Wednesday?
Paul
Original Appointment
From: Daisey, Greg
Sent: Thursday, March 10, 2016 10:52 AM
To: Williams, Paul C
Subject: Declined: Palmetto-Peartree Preserve
When: Friday, March 11, 2016 9:00 AM-11:00 AM (UTC-05:00) Eastern Time (US &Canada).
Where: gate on Pledger Harbor Road, Tyrrell County
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
2
i
a
,. a , . .7, 4, 1•r '41, 1 f • �,.4 f:•.411.0.10, �, • )• , • + fO:.
•tr .
i. +'r ri 0 a
4.4, ..." , iii,
1 .
r,f ` •r
144::eillor• .• 41.1 je . e•
*4
. . toti .''/ s;AP et ° 1 • 14° ar• .1 . 0 i°
9WI
r1• - ` •� _ _ -,r4e .....
lootrAID. •. Alf -'� 0tiat ° � - * , �
- • tiros .r ,' , _ t.lip. itr
*,.r ;►_4 .
•
/_;) *.144.104 I.- - .
*I •• 4 it
It.
•
i , i� f s .s'• b� T 1 40,04
�y
Cl '
i ,
irM'1�' ' a ' .f
Joe
,, i , .. vs,.. ,.
• ` •Ow, g , _ 0 P
. � 44.*
r . I ; . y
� *
,
Sr
8661
• ,. ;..,,,,C,'-".4:4•4**,•••••......',, „-..
•.
1.`,:;';',-''''' 7- 4.....!....° ''." '''.• '
• •
*1......'•,- , ' ...5. • •- - • ..' .
. . .
r .
•.
•-ft. • .
t •
•, ..
•
.• •
•A..r---... ...... .. - . „
' . .
••'a -,I, . .. .•
• • '., - „ L .
•• IIQZ---ar--4aZir•-•, ., - - ,
'.."0 . :1 ....
• 1A11.•
.. .
:..f.X.** •i•f•-t4. !-, A, - *•
...-.,‘„.•• - 4 kf '. • P " . , ... ., iiti..* i• a,
•
. ... •
.11... . • . a ii*
0:
, .. • 'or • •
. e . . •••• , .i.::II.,. c. 4.
. .• ./ .. .
•
• - -
' ''' 'r
. .V. • 4,.4 •. ,,
• •
• - -.. •• . . .
••••
' ' 101411
, •-.- . •
' ‘• •• - 1 . r -. -.
. . .
, • •,r '': -, .- • w
. 4171010.•, „
. .
• • , , ,••• „, t , • .-, 4. 1r* , • ,,":
it' • ••
. . .
..;.•• .•'* ." ,,
T.. .4
• - -
/ •• •... - - ct., . .i..
• %, ,• A -
•
' .
r•
;'""•:" ' •.. jelt. • ..• r ....\..•:,
. . .
..,, - ••r° Vki!Ir., If - .„
. . ....• ..-, . • -
.1,
'• ' 4
• . .. ... ...
• • .I--„• b. ...-: -' „ , z. •,- • _ . ...,, ., .
...... , . .. •
- • -- --.}" -• -' --•. 4_ ,,--. , . , 4. ' •'• .,,• - .... . r -- - , , .,-,.. :, .• -,
..
.,..,--...-.•-- ... . „,..rltedtgr,,,4.i.,,, , , • '..f 1 .: ..• , . ,. . .-
. , „,,-• .f. /- • la. ..-,•., et • i.4.-t'. 43"..eli,,,,4, ••.** 1.•.!t. 4 a ••• --.,- ,...;-• 1 : ‘
•-4.• „,_
- ,
-44 ' -- • _ •,,„ ... .'. •
'. • -- •_
,..74., --1,i.J.• >, , „, .;i„ .. ..., - • - lisieizs„• . ... •..-.4.m. .• ,
... . .
. ..‘ .-, - 4.4,.. , .t., , .„--. , ,i'' •414!,444`"*: ". • ' - ' ..
•••
• . •
• t )‘-'. ' .. . '',•$(%*!.7 ' ;•'. . . • , ...,, -...,„,. • , ,e .. r.:.-1,....,.._.,• - ,, -.'..,.....,..'',
'"',' A' . • . 1.,-.". .••• --..-„:!, . 3 •', '
a. ,a.• ikt:.' . . . •':;#' ,4i SI.
.. .. 4 - • ,• '4-
.10;`,'atf - •'''..'..1 .. . • ,. a. 40 i. • • *• 44tt
- 1.• e•'7,•",.c a. • ,- l* .• • . • : -0*• a '•'
. .
r•
•
"a. •* .- 4. 4 n .--• :•
.-. c, .... '17".'s * 4 -„,.•-.. ... '.. ,r.• ";--' s. •. -4.Or,r ,.•,;,... .. . . .... _ .< .....,,-...,:1,,....I ... i-. - . • ... . ' • ' ' .._ • •: „.. , .. _ . , .4 .414 4. *
tif, '' . . • ',.. ''• . r: • .. \'• , ' .. .. ._
...a, • • ..• • , *
*• •2),zer c. a.,. trr. pi
4. ..4 ,••••,, - ' . if %; i• ...'• 4: - ..„, f- r .. •
7,04.4. ,# -. 4.i . .- • - - 1'.. .4, .2 . -.1: •-• ....... . --,' f- '....?' - I• '•. . :4 •.#: ,. ' - 11- .' VI jIllali• ••('''. -' -'''air', ' ..?;, • ': , . .1''-•.4 • . .
• !a . * .-.'. 41. '-C,_,' * A.
. ...,Jr, , 1.,„4.:.f.,,,,.....::ie, sit". ,-;,......,.., i :r ...rlotrize ;,... eff.."0 9,..V..40„:...91.:„.... :.3..7. .).,•1. -7:t•:.Atitt),..IP 0..„•7°:.•,, ,,,4 :.-11' :;..*;....
-.p. .'4. -'-ifir .t. ' ,- -, . - 4. . • ...-• ..:;.‘ -4 . 4 . .. ... ,..;,9'eP.,;:r,••• ief ••••iot•r4 . • .-4(Y:. a:t... - ,•-' -• ' • 4.. • . • .-... '' •
. •
. , t
*.- . •
. .-
- -,-''''''' • . - • ''••' .# -s'or . ' 4 •
*: • -
-., . • . . • , • 4 • %
I' I . ...
• •
' . ' g j 1 , •:.. ..,v. )
. , • • `• - % 4, f...,'0.... s. • v.,: .40,
,
...
"• • ilte, _ • ' ',, . 41:0.- ,
14.;e,...;': ,..> /4( .4-1-vai;• 4 , ., ,.. , ......1,...••,, .
... .., •v..4..,,4,:,. „, e ...,. its., ,, ., , .1.• , , ,• • . ' •
.11 k.) rivil4L
..'•. 7 :...." -e.;.- OV, ..' ' 4.1 C:4, . iv • 4 .* •• * ' •(**;P5-r• ' 4s•'
' %.1C.''').4.:i•‘41'''' ‘'''''':. 6.1 ..;:irw 4 i -:4,' ' • . 7
4 i's *44. -it-4.•;*IA,..A - :• • -.•.., .se .
` '.
.. . - -,.. •• ...,. ..,.. ,
,-. .- ' ' • , ' ...4 to. v'X..,.:.. ;•,.., , r....4:. ,... , ../..:-.4...-ii,. .., . , ,_...,,,. ,N, ?o,
s- • " '.1' 1 .. : . .y. ,
v.,4. , •, ,-. ' •
• ,.. :', , if , € • . . •. .
, 4- IA,_,,,,„,z,. - • -.-.....'•ii
N. 1 h',,,fio • 1.••• 4 44i•34 -7'W l' • -P
•._. '" • ' ., ,
t' '-'1 •• •.! A P
•
,.. ys.:,_. --.al.•'.*4.-- . ..e. ,I;e4Pil ... ., _ • 4' rti .N. ilk *,'"t t'' ',, I, '„,) .. i . ..4 i. %.• gilli* %41t
•
�. f aft` -s _ , .,. _ -
� ,
_ .�
� _
_
-.... • • _-_
} •' . - -.
Jam`{
- `.JAI •k .»•. -
r 'ar '- _ —
.`sue 4 {
W
,\p K . . * y
Y'e
•
•
-.A �'` , $fin ` + ? �"t ,y - -
J�i- �y .r i ..f, �, � S li. tr`i r, + ,'rZ r
•
r414-
t,.2'•'.''L 1 r- _ 7�,.. .. sty,sl�`(ff( r �• 1` I•i Ni(` +fJ��iq,..�t, Kj� 'j`'• kI��3.
r
+
r 1. .+ ..• •. -.:�. - s+ r s T'Jr"i�%t`Y�'a✓ Y,+.. 1. . - t--Y c:?.. ..., ' „,,, y ` ,...,',.
•
K~ 1 4\ .- .., h �.', 4y,.,�," 1J 'L�r▪ -F ' '_y R!Y CkT - k t/'
v _ !`,. -*r • rt '- tY-: '- "'ate r.: ... '`.i' '4":ra1T4 '1;4',
w x �,7m . • ,., yr. n,'� r 4 ` t,_ .I. `}ti q-1 ,• F' , ,�t ={ r
".-A*. „,.. „ Vo.P• 0 )„, $ ite is,4)...r *L./ , .__AL't -'
`••" , <.. .! ! +71'i •y r �,},, i� ,..t*i� �v f 'i ..•.
f,-awe ' - '•.'^ Z `, '.1:"*„St-, r +"• ' , A .},0 ,4 "! f! '. 4 �3p f;, '�` .'AY'y' `' 3 _ .� ,Y�j��P'
• £�
? .f iff' T +�.: i .. .� ~J i �"Tr-• +'^14 *M; ` .�'M•. `M..iiYy
.,•'.'"vim ! 1 - . ',7s� d+ ; 4 ! 1 d -'9
�i,P �'l. ,�t- '�,. ., ;, ' ''' ` �"' ! d ' ' '9►r*?'x n ' ' 'ri ' q� ` i .4 ' , ' sNy . `rP
y
+"1t'�1a%1'=t ..`. .,1`•.� a ,='.,_, . �•..•'�....'' •
. • .c'Y'` t. r . e_L,�lk*'l4,!''4i '41 « '1..1' *.,• . r =X•t `ne ay. aer.er ran ie nn n o '�s a A.
• - ***This is a word processing form to be completed in Microsoft Word***
NC Division of Coastal Management
Major Permit Application Computer Sheet
(11/01/2012)
Applicant:NCDOT Date: 11/12/2019
Project Site County: Tyrrell
Staff: Greg Daisey District: ❑Elizabeth City ®Washington
['Morehead City ❑Wilmington
Project Name:Proposed maintenance dredging of a existing Rover File: 35°59'24.77"N 76°04'10.54"W
manmade drainage canal and maintenance/repair of existing
rip rap revetments at the connection with the Albemarle Sound
at the terminus of SF?1225(Pledger Harbor Rd.)in the
community Goat Neck
Date of initial application submittal(EX: 1/8/2007): 10/07/2019
Date application "received as complete"in the Field office(EX: 1/8/2007).: 10/07/2019
Permit Authorization: CAMA ['Dredge&Fill ®Both
SITE DESCRIPTION/PERMIT INFORMATION
PNA: ❑Yes No Photos Taken: Yes
® No❑ Setback Required(riparian): El Yes ®
No
Critical Habitat:❑Yes ®No ❑Not Sure 15 foot waiver obtained:❑Yes No Hazard Notification Returned:
❑Yes ®No
SAV:❑Yes ®No ❑Not Sure Shell Bottom: ❑Yes No ❑Not Temporary Impacts: ❑Yes No
Sure
Sandbags: ❑Yes ®No ❑Not Sun; Did the land use classification come from Mitigation Required(optional):
county LUP.:®Yes ❑No El Yes ❑No
Moratorium Conditions: ❑Yes No Environmental Assessment Done:
DNA ['Yes ❑No®NA
SECONDARY WATER CLASSIFICATION—OPTIONAL(choose MAX of 4)
❑Future Water Supply(FWS) ❑Nutrient Sensitive Waters(NSW) ❑Swamp Waters(SW)
❑High Quality Waters(HQW) El Outstanding Resource Waters(ORW)
WETLANDS IMPACTED
❑ (404)Corp. of Engineers(Jurisdictional El (LS) Sea lavender(Limonium sp.) ❑ (SS) Glasswort(Salicomia sp.)
wetlands)
❑ (CJ)Saw grass(Cladium jamaicense) ❑ (SA)Salt marsh cordgrass(Spartina ❑(SY)Salt reed grass(Spartina
altemiflora) cynosuroides)
❑ (DS)Salt or spike grass(Distichlis ❑ (SC)Bullrush or three square(Scirpus ❑(TY) Cattail(Typha sp.)
spicata) sp.)
❑ (JR)Black needlerush (Juncus ❑ (SP)Salt/meadow grass(Spartina
roemerianus) patens)
APPLICATION FEE
❑ No fee required-$0.00 ❑Ill(A)Private w/D&F up to 1 acre; ❑III(D)Priv.public or comm w/D&F to 1
3490 can be applied-$250 acre;3490 can't be applied-$400
252.808-2808 :: 1-888.4RCOAs i :: www.nccoastalmana9ement.net
revised: Nov. 2012
NC Division of Coastal Mgt, Application Computer Sheet, Page 2 of 6)
❑Minor Modification to a CAMA Major El Major Modification to a CAMA Major ®IV Any development involving D&F of
permit-$100 permit -$250 more than 1 acre-$475
❑Permit Transfer-$100 ❑ Ill(B)Public or commercial w/D&F to 1 ❑Express Permit-$2000
acre;3490 can be applied-$400
El Major development extension request- ❑II. Public or commercial/no dredge
$100 and/or fill-$400
❑1. Private no dredge and/or fill-$250 ❑ Ill(C)Priv.public or comm w/D&F to 1
acre;3490 can be applied;DCM needs
DWQ agreement-$400
revised Nov.2012
• NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 6)
Applicant:NCDOT/Pledger Harbor Rd. Canal Maintenance
Date: 11/12/2019
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order,and units of
measurement found in your Activities code sheet.
TYPE REPLACE
N Choose Choose
Activity Name u One One Dimension 1 Dimension 2 Dimension 3 Dimension 4
m
b
e
r
Maintenance / New Work❑ Replace 75' 20' -1.8'
Dredging Maint® ❑ Y ®N
Repair/Maintenance 2 New Work❑ Replace 30' 6' 3'
of Rip Rap Maint® [' YEN
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ ❑ VEIN
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work❑ Replace
Maint❑ OVEN
New Work❑ Replace
Maint❑ ❑ Y ❑N
New Work 0 Replace
Maint❑ ❑ Y ❑N
revised Nov.2012
NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 6)
Applicant:NCDOT/Pledger Harbor Rd. Canal Maintenance
Date: 11/12/2019
Describe below the HABITAT disturbances for the application. All values should match the name,and units of measurement
found in your Habitat code sheet.
TOTAL Sq.Ft. FINAL Sq.Ft. TOTAL Feet FINAL Feet
(Applied for. (Anticipated final (Applied for. (Anticipated final
DISTURB TYPE Disturbance total disturbance. Disturbance disturbance.
Habitat Name Choose One includes any Excludes any total includes Excludes any
anticipated restoration any anticipated restoration and/or
restoration or and/or temp restoration or temp impact
temp impacts) impact amount) temp impacts) amount)
Shallow Bottom 1,332 1.332
Dredge® Fill❑ Both ❑ Other ❑
Upland Dredge❑ Fill❑ Both ❑ Other El180 180
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge 0 Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill 0 Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other 0
Dredge❑ Fill 0 Both 0 Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
25:2-808-2500 :; 141$0-4RCOA5l :: www.rr,r.oastalcnarraclement.net revised: Nov. 2012
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to SR 1225 Pledger Harbor Road 's
(Name of Property Owner)
property located at the terminus of SR 1225 Pledger Harbor Road adjacent the Albemarle Sound
(Address, Lot, Block, Road, etc.)
unman made canal that drains to Albemarle SouriN Tyrrell County near Columbia , N.C.
(Waterbody) (City/Town and/or County)
The app ant has described to me, as shown below, the development proposed at the above
locatio .
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
Dy'
4 111
Undertake maintenance excavation in the man made drainage canal adjacent R 1 5 at it's confluence with the Albemarle
Sound.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Pro rt w r nformation) ) (Adjacent Property 0 er Information)
Signature T p S TL)!// z//w�R� ,1
Steve Trowell agent for NC Dept. of Transportation I W��
Print or Type Name Print I r_Type N rd'1 /01
113 Airport Drive Suite 100 ?� � r
Mailing Address Mailing Adslrgss
Edenton,North Carolina 27932 &rf*At/ / t 0 7 qt/
City/State/Zip City�/'tate ip /f�
(252)482-1876 "' `4a12 - 55'
Telephone Number Te ph e umber
21 August 2019
Date Dal
(Revised 6/18/2012)
Brittingham, Cathy
From: Theresa Schneider <theresa.schneider@thecoastlandtimes.com>
Sent: Monday, October 14, 2019 6:45 PM
To: Godfrey, Ella M
Cc: Smith,Tricia; Gibson,Jessica M; Brittingham, Cathy; Daisey, Grea
Subject: [External] Re: Public Notice - Tyrell County Canal Excavation
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov<mailto:report.spam@nc.gov>
Good afternoon, Ella.We'll get this set up to run as requested. If there is anything else I can do for you, please let me know.
Thank you
Theresa Schneider
The Coastland Times
thecoastlandtimes.cor,- <ht:p://;:necoastlandtimes.com>
252-473-2105
On Mon, Oct 14, 2019 at 11:13 AM Godfrey, Ella M <Ella.Godfrey@ncdenr.gov<mailto:Ella.Godfrey@ncdenr.gov>>wrote:
Good morning,
Attached is a public notice to be ran in the Wednesday, October 16, 2019 edition.
Thank you.
Ella M. Godfrey
Office Assistant IV
Division of Coastal Management
NC Department of Environmental Quality
252-264-3901, ext. 231
252-331-2951 (fax)
ella.godfrey@ncdenr.gov<mailto:ella.godfrey@ncdenr.gov>
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
1
•
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
BRAXTON C.DAVIS
Director
EMAIL MEMORANDUM
TO: The Coastland Times
PO Box 480
Manteo, NC 27954
legals@thecoastlandtimes.net
FROM: Ella Godfrey, Administrative Assistant
DATE: October 14, 2019
SUBJECT: Public Notice: Proposed Maintenance Excavation of a Drainage
Canal that Connects to the Albemarle Sound on SR 1225 (Pledger
Harbor Rd.) in Goat Neck, Tyrrell County, NC.
Please publish the attached Notice in the Wednesday, October 16, 2019 issue of The
Coastland Times.
The State Office of Budget and Management requires an original Affidavit of Publication
prior to payment for newspaper advertising. Please send the affidavit, an original copy
of the published notice, and an original invoice to Jessica Gibson, NC Division of
Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557,
(Telephone 252-808-2808).
Thank you for your assistance in this matter. If you should have any questions, please
contact me at our Elizabeth City office (252) 264-3901.
Attachment
cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City
Tricia Smith, PIO, DMF, Morehead City
Jessica Gibson, Business Officer, DCM, Morehead City
File
D_E Q?)
NORTH CAHC hl.
0•1.�wn a 6MraimmYi ore e
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1401 South Griffin Street,Suite 300 I Elizabeth City,North Carolina 27909