HomeMy WebLinkAbout88125_Jim Covart_20230217 ICAMA fl DREDGE & FILL ��'S N . 88125 A'
��cour,�� 0 B 'C D
;30 .
.1D#�12S9 A Previous permit
GENERAL PERMIT TT[[ 1 "[ Date previous permit issued 'r
n New n Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC ❑ Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name _ 4 '" Authorized Agent
Address (3 / ` Project Location(County):
City (r. State ZIP Street Address/State Road/Lot#(s) f ',/�
Phone#( ) _
Email Subdivision
City ZIP
Affected n ON n EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): OEA I I IHA I I UW n SPIMA PWS Closest Maj.Wtr.Body •
ORW:yes/no PNA:yes/no
Type of Project/Activity /
(Scale: -)
Shoreline Length
Access Length i -1--- - — f '
Pier(dock)length I �• I j i l -}?
Fixed Platform(s)
I
Floating Platform(s) ( 1 i
Finger pier(s) __
I ;'.
I
Total Platform area i_. . t-- - I , {,::,-
Groin length/# '; --'- , 'P t
Bulkhead/Riprap length ` .- ..__..._--_.T �. F.. _..—. -
Avg distance offshore I ,],.-..-1- 1- _ -1 '
Breakwater/Sill ; ` � ,` L-
Max distance/length i �f
Basin,channel _ 1- �rtr - _ ...
I i
Cubic yards _ ._ ._ ,_.._ ki.�� __-_-___. - j
I--} --� i-----
Boat ramp \ II I
Boathouse/Boatlift I —
Beach Bulldozing
Other_ ir „ (.4)l -_
I i,i ' L f;9,,
SAV observed: yes no '1 . i_; rj j
Moratorium: n/a yes no i + A j ' - ^ -
Site Photos: yes no r I I i�i ... t -, l -.-•
__
Riparian Waiver Attached: yes no I I 1 J , ;
A building permit/zoning permit may be required by: /'
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
IIISee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM A Fi
E OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) "} `'''''''"
Agent or App' nt PRINTED Name„L-4— Permit Officer's PRINTED Name
fst•..
Signature**Please read compliance statement on back of permit** Signature
/ , ,
Application Fee(s) Check if/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
• t Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENMIRONNENTAL QUALftV [)U,e[tor
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources(DWR) regulations 15A NCAC 028.0233 & .0259.The
Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. •
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer '
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your •
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: Le/ / S j < G-cr-4 _
By your signature below you agree to be held responsible for meeting all of the conditions listed above nd verify
that all information provided is complete and accurate.
rn—i/fiNe,S Zrf- sir
Agent or Applicant Printed Name Permit Officer's Signat
I
Agent or Applicant ignJ- Issue Date
CAMA GENERAL PERMIT#: " Y/2—S
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1948.Washington Square Mali Washington.NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington.NC 28405-38451910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 2859 I Z52-808-2808
J
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION (MINOR PERMIT)
CERTIFIED MAIL, RETURN RECEIPT REQUESTED or HAND DELIVERED
I - 30 -cap Z3
aS Avhe% Ay
n A. n Date
N e(74t� entslt Own p
Address
C.- ( RCX
`151�75-
City, Zip
To Whom It May Concern: y,
rt
This correspondence is to notify you as a riparian property owner that I am applying for a CAMA Minor permit to
i n3ST4u, a F'LoA-LiLl &- Do cK
on myproperyat (oah[O SLAdesvtlfe CRec([e- R.e[ SieRAtirOg Od
in N yd e, County,which is adjacent to your property. A copy of the application and project
drawing is(attached/enclosed for your review.
If you have no objections to the proposed activity,please mark the appropriate statement below and return to me as soon
as possible. If no comments are received within 10 days of receipt of this notice,it will be considered that you have no
comments or objections regarding this project.
If you have objections or comments,please mark the appropriate statement below and send your correspondence to:
(LOCAL PERMIT OFFICER,NAME OF LOCAL GOVERNMENT,MAILING ADDRESS CITY,STATE,ZIP CODE)
If you have any questions about the project,please do not hesitate to contact me at my address/number listed below,or
contact(LOCAL PERMIT OFFICER)at(PHONE NUMBER),or by email at:(LPO EMAIL).
Sincerely,
jl 1'e5 Co ri4 R l `r 11 - S—g2-341 16
Property Owner's Name Telephone Number
(al0 StAdasdit - CRdIeRA
ScRAMTO N NC- a7%IS
Address City State Zip
1` ., I have no objection to the project described in this correspondence.
I I have objection(s)to the roject described in this correspondence.
/-3G - Za2?
Adjacent Riparian Signature Date
Or s ike.n.ne>a • ,ecs /— z5-2 —SO = 2Z.99
Print or Type Name Telephone Number
Address City State Zip
it>> S55 S- hhd Z5Z aIN VWNLs
•
•
I•
• ,;i
..� i _ fib • •.• '* /I� '•Il/ v
-tip 6v> ,