Loading...
HomeMy WebLinkAbout80-12 Oversized PlansM®®Mob — Q s• (D 1 x i 1 1 � Co 1 ? 1 \ 1 � CID 1 I' a 01 1 1 CD i CID -n 1-° 1 .> -o 3 CD01 1 0 0 1 -0°o 00 io \ 1 CD Q 1 CD CL10, +1 1 v � 1 I C� . 1 1 CL 1(o (D I 1 (a4 CD 1� 1 � 1(D 1 CD CD 1E 100 1 00 00 10000 -> 1 1 � 1 1 � 1 1 1 � 1 1 X. 1 I These boundaries (lines) appear to be intended as 1 1 one in the some per CAMA Permit 113-88. The enlarged harbor area would thereby begin at this line. This discrepancy together with the _ "0 Nr ;;development condition (particularly the high 1 CD 1 1 ground excavated in accordance with initial permit 1 m I to create the "east basin") confuse the delineation 1 °- 1 of the project's eastern riparian limits. The 1 CD j predevelopment conditions and the permitted 1 1 construction indicate a riparian boundary a minimum of 15ft from the existing construction. This limit is ;CD 1 assumed intrinsic to the existing construction and 1 1 the herein proposed redevelopment. I 1 o0 1 L - r _ W BLACK & WHITE MARK 9.0' DEPTH +O0s 6' 'N 0 -� 0) TOMCREEK N ��1 -E�EA- --RBOR) NN 'cs � W t b d uvuci vvI 00ft (+/-) uy 3 rn'< o ❑ 'BLACK & WHITE MARK .2' DEPTH t � BLACK & WHITE MARK ❑ 5.0' DEPTH EEK REVISIONS 9/1/2011 per CPSI 1 9/7/2011 per CPSI 9/8/2011 per CPSI 9/20/2011 per CPSI I I 9/22/2011 per CPSI I for GP dredging I 10/6/2011 per CPSI l � I _ _ J 11 /1 /2011 per CPSI ! _ 11/7/2011 per CPSI 11/14/2011 per CPSI 11/17/2011 per CPSI 11/30/2011 per CPSI 2/6/2012 per CPSI/DCM xis m3 u e / 2.54 AC (continuous full �J shoreline length) —� \ Riparian Boundary per Existing Construction do Permit 113-88 _ — NI6'57'45"E _ _ -- ._ — \ 234.59' ------ 32.15 FUEL T1. 5 00 + ° • I \ i I s p' '►'_/� \ • $ �I ► • • 0 0R' ' + p • Too-&" ♦ �, 6,03 y Q r �� O`S® ° + • `' . ' s . D ♦ s ♦ • . + " PIPES , p♦ , . D \ i !) O s o zT �' O? STORAGE r p • 4 "�.� .. • '� p •� .... a ♦ , d / i ' L O _ o � < , , / �•, p , � • . � ; . s' � ► • 1 � (�('�'1�` CEO f 215.74 L/ -.�� �•b 'y . s / J7 ® / t. \ p ' } / I. , 30ft ,Huffer, . . , , . / \ ` . •3 .......... ...... 80 LJJ co 1 / / / / / / / / / STATE OF NORTH CAROLINA Normal High Water at PIN15: 730613134823000 E ' t' B Ikh ad DB 1192, PG 241 12 Ui Q ' \ 12'RCP NVERT 3.9! INVERT 159 %LOCT 'r> FRAME 8 INcDErK \ / 0 0 , /' ` / � — —� "' `_ \ ASPHALT PArm1NGi YARD INLET AVERT 4.61 oa TOP-b.70 OS OUT 4'CP-4.67 II 'rpMP 6•30 x ,. IN 1*PVC-3.fl5 30ft Buffer II OUT 18'RCP-387 BOTTOM BCx-2.3• I Oss+ 0 06+ II IN 9"x,e•. 4c-5.: -S 174a' 18"W RAMP II _ OR Ott C O� O°A 01, 0+ O,+ 61, 1 COUNTY o c+0 0 0 o + o oo no oo o o of o PIN1S 73DO311409000 O4.93 AC O 0 0+TO, Olt" 042- °s°, 2Ob,p,9O•050. Ikoo OSO J e� 0sO• I I 1.67 0 00 I 0+ 0-f' r e FEs 51 I 00 RUN" ! I 0006b- OF WATER I I I I I 1 General Notes I ® This plan dc: ument for NCDENR_ DCM CAMA Permitting P -poses ONLY I I ADA L HINSOti • Construction ,hall be in accordance with all PN,5DB79-n23230I OB , PC 6 I applicable BI- ilding, Accessibility & other Codes I 1.61 AC and Standar( 3. I I • All dimension-:;, locations, utilities, et cetera to I be carefully verified by owner and contractor I prior to stru .tural or other further design &/c construction. I SHEET INDEX 1. EXISTING CONDITIONS 2. PROPOSED DOCKS & BULK'-1EAD REPLACEMENT xr� 3. PROPOSED DOCKS WITH E� ISTING OVERLAY 4. DREDGING PLAN AND DETAILS GRAPHIC SCALE 20 40 80 ( iN r'EET ) 40 ft. LJ Q n: aroC . CCT = Lu as L Vd aun ALL 00 o N N '� U co � CLL z O �rn (jJ ro N U Z 1 4-J * Q o E CL C tf) 0 C o E QJ `_' p C4 O " ( j `�/ r I W O w L `C Z Q f°1 �a 5; 72 U U o I J J �.. Z Q � 00 g W Y U ui W v U � U) o Z r 0 [DRAWN ATE: 1-14-08 160 ROJECT: 07-71 BY: JF SHEET: 1 of 4 W'Mompol Fuel Dispenser/Pump & Meter ; (Gas--G or Diesel—D) Existing 7 [M Proposed Fuel Hose Reel & Disp. Nozzle 5 C` (Gas—G or Diesel—D) ® ® 46 ° Fire suppression FF t \o� Fish Cleaning Station © r \o/ Fish Weigh Station rFWS7 (' 0 Waste Pump Out (Existing) ME ;Waste Pump Out Station 8' 37' -- (Proposed Satellite) Existing Concrete Pile Guardrail I' l l l l I' � I � Floating Dock 12 A y. Floating Dock with Provisions Existing Boardwalk for Wave Attenuation 5' - 3 7' Notes: Fire Suppre%,ion Stations, Fish Cleaning Station & Fish Weigh Station are Proposed Fuel Dispensing egyipment (including reel locations) to be sheltered (covered/protected from inclement weather, theft, et cetera per owners) 4.5' 37' Cn U1 4, 4.5' -31' A /,YJFAVA,III EDGE OF WATEI` Proposed Bulkhead at NHW (Replacement) Total I 1,120 Linear Feet EXISTING ASPHALT PARKING EXISTING ASPHALT PARKING Finger Pier do Double Berth Widths Typical for all Slips w/ Lifts (Coordinate installation (verify) with selected boat lift manufacturer) 4' / 1 Proposed Bulkhead at NHW (Replacement) `�---� Total 1,120 Linear Feet NG STEEL BULKHF-AD EXIS ( IN FE `r > IL REVI, IONS N�R�N CGR��O a3 9/1/2011 per CPSI N N 9/7/2011 per CPSI 9/8J2011 per CPSI Proposed Bulkhead at NHW 9/20/2011 per CPSI (Replacement) Total _ 1,120 Linear Feet (+/—) 9/22/2011 per CPSI for GP dredging • 00 e O ° 10/6/2 EXISTING 011 per CPSI FUEL TANKS 11/1/2011 per CPSI , 0 _ 7 5 _ PSI f- D D 4/2011 per CPSI e t. D 11/1 a�? "•`.-fib - .g �. ° ° D C> Travel Lift / ° ° ° ° 11/17/2011 per CPSI Well 11/30/2011 per CPSI - ° 0 0 Co ' O O N N O O 9 Ul f. \ ` ` ` fa4 t`` F �� D �.J . 5' S5' w _ 7-1 �j U D v C t° 46 Existing �oo�w Concrete D n m - ° O CJi O 1 i O I _.. C O C ° b W Ln = ti _ . Ln" D ° ► CT� D D D D U } 55 n \ D b D D D Ec: 55 F_ C �46 b c ,�aN 6 5 ,O 1 O L M � � 3 U. W N ° \ N N �I w. D D D D N c) Z ° O b 4-j Cr.O CL STORAGE ° >'' . > b t , n Fan wa r x , G gE, �'/*. ,v.L; `t 1 ..Eaciating Boardwalk �,. ` - l ,ice-=.,`-f/-{! V ../y`j,``.J -"`I.-.`t`,,�= �1..-•- {;L`v_., �`�.`� 1 X _7�,1''lc. � -d r, 1 ...f r --7 y_• ..1 _ -I`- •f:_".ty ,,,.1 _ �,.�:. i, ` - ,may_ I-1-vv�C a �¢� f '� `• O b ? o can ° 1�1(� I c.n I I I � I' ` I v•!'' "ellII ' c EXISTING D X SM ASPHALT g awl o 0 0 o c� '�' PARKING D ii �;�oncrete„ ° a o o �' o !! l ° ° j ° _ \ .� �1y EXISTING TWO 5 T )RY 8 °max FRAME BUILDING X X X 1 3 7' 3 7' �--- 3 7 37' 18' 1 =.► EXISTING FRAME BUILDING & DECK �i � EXISTING ��� ��� ���PARKING 0 t n " ASPHALT NEW"1 1 1 I 1LU b_ MINE :. A. ou- - . Lei a u --•ram yK - v.:.... E+' S .. 1 i I ._.. ►i ► 1 I► r , ..::,.. • III II�AI i I rl � - wit I � � '�► • - ! • • -; r� ��11��1 �it 'i ,I ►II �II �N I ,Q►I ! II L]d 9 ►11 1 I .. , :... ... ..... .. ►111 ill►_,►I i .I .. _, _ _ 111�_JII Ill_►11 � .. u I _, , , , , ; _ I I 1 111,_JII Ill ►, , , _�I 111,_Jil _►JIIIII_J,111�,_►lll 111_�1�1 �I_JIII . .. ..,.i _ _ _ _ _ �t �tii bl I►il I►�tl I►�tl I�ii ►_ ; by�tl �til i►�tl I►y,ri I►i I►rLU .• SEEN DATE: 1-14-08 • - ..• --. PROJECT 07-71 Existing Floating Dock • • • • - -• -. • - 0 8' Floating Dock )=NLW -5 Proposed Bottom (1Oft Below NLW) Mooring Pile (Beyond Section) n II _ Attenuation Per Manufacturer 5' Floatina Dock Mooring Pile (Beyond Section) n \X\X\ X/ X� X/ \X/ X X \1 X X// X// \N X x /\\ \/Z /X Dredging Plan EXISTING DEPTHS RELATIVE TO NLW = 0 Calculation Methodology per NCDENR—DCM Agent Guidance Proposed Final NLW Depth = 10ft GRAPHIC SCALE Im so ( IN FEET ) CA � D D D 0 + CD U 0 0 0 0 �► Grid Size ♦ 50ft x 50ft (Y C ` ' G Existing Depth i 2 50.0 (typ) C/) 0 C/) � D D D D D 0 ��, O cr 0 0 O o to cn 0 - � { D y D D D +CJi +0 O O 0 00 0 O CD 5' Floatina Dock LEGEND Proposed Dredging Area 'o 24"x24" ti Cast —in —Place aBoardwalk Existing/Finished Concrete Cap Ground Surface Beam e \�` � % f � � 8' Floating Dock 0/1 f Concrete Dead Man f\ Anchor Precast Concrete --- Sheet Piling / Basin Floor Finished Depth = 10ft � ��' p / Washed Gravel i (Creek Bottom) \ /�\ Min. \ \ \ Embedment All construction subject to structural design, selected manufacturer specifications & applicable Building Codes & standards. Fixed Dock Boat Lift Boat Lift Fixed Dock 4' — — 26' 4' Guide Poles Stringer Girder Cross Bracing 0 = NLW -5 Proposed Bottom (1 �Below � A rB-"'*N rFIXED DOCKS & LIFTS SECTION /'TYP FLOATING DOCK Construction wl P.T. Lumber, HDG or Better Fasteners & Appropriate For Use & Location All construction subject to structural design, selected manufacturer specifications & applicable Building Codes & standards. Design and Installation Per MFR REVISIONS 9/1/2011 per CPSI 9/7/2011 per CPSI 9/8/2011 per CPSI 9/20/2011 per CPSI 9/22/2011 per CPSI for GP dredging 10/6/2011 per CPSI 11 /1 /2011 per CPSI 11/712011 per CPSI - 11/14/2011 per CPSI 11/17/2011 per CPSI 11/30/2011 per CPSI 2/6/2012 per CPSI/DCM Q ui a a L• C_ W W (n ITT- C N N W �+ ai M V z� o oo�m� U L �U. W 16 V = c Ld § p o°: o� U Logo ' w� �N Wes' -a Z - ti Z (n �0 "a U V� 7! J J }. _Z Q Cr m a WUJI Y ULLJ Z v W Z U o Z 0 u 5 Lui4. L)CM_NTRO c ATV DATE: 1-14-08 PROJECT: 07-71 DRAWN BY: JF SHEET: 4 of 4