HomeMy WebLinkAbout88134_Brain Spalding_20230220 `"4 1lCAMA 7 DREDGE & FILL TES N9 88134 A BCD
GENERAL PERMIT -ry 123l02 Previous permit
Date previous permit issued
New ['Modification U Complete Reissue U Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC n Rules attached. General Permit Rules available at the following link:www.deo.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected n CW n EW n PTA n ES ❑PTS Adj.Wtr.Body - (nat/man/unk)
AEC(s): n OEA n IHA n UW n SPIMA ❑PWS Closest Maj.Wtr.Body
ORW:yes/no PNA;yes/no
Type of Project/Activity
(Scale:
Shoreline Length
Access Length - -
Pier(dock)length
Fixed Platform(s)
Floating Platform(s)
Finger pier(s)
Total Platform area
Groin length/#
I
Bulkhead/Riprap length
Avg distance offshore
Breakwater/Sill
Max distance/length
Basin,channel i ".
Cubic yards
Boat ramp
Boathouse/Boatlift
Beach Bulldozing
Other
SAV observed: yes no
Moratorium: n/a yes no
Site Photos: yes no
Riparian Waiver Attached: yes no
A building permit/zoning permit may be required by:
Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
•
•
•
' ROY COOPER
ti Governor
MICHAEL S. REGAN • -
Seaetary
CaastalManagement BRAXTON DAVIS
ENVIRONMENTAL QUALBY
afiah7r
BUFFER AUTHORIZATION CERTIFICATE •
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& - i
Neuse River Riparian buffer per Division of Water Resources(DWR) regulations LEA NCAC 02B.0233 & .0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization •
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
t. Crossing is Perpendicular: Pier and docking facility access way must cross the SO ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The .
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch,or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet. •
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your •
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
® Pre-project site conditions: 2-0/nd /a 5 ill4=5 e ZacJ,1
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
3 aft, (I .
Agent or Appli ant Printed Name Permit Officer's Signature
•
,Ce.4
A nt or Applicant Signature Issue Date
CAMA GENERAL PERMIT 4: gJ 3/
State of North Carorma I Environmental Quality I Coastal Management
Washington Office I943•Washington Square Mall Washington.NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Ext Wilmington,NC 28405-384519I0-796-721S
Morehead City Office i 400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
DocuSign Envelope ID:4407BB5D-C65D-4239-A153-697D252688E9
ADJACENT RIPARIAN PROPERTY( OWNER STATEMENT
�
I hereby certify that I own property adjacent to i�Pitin Sprc,d 1.4 5 's
(Name of Property Owner)
property located at_ ' r�1 Sv is 1)l
(Address, Lot, Block, oad, etc.)
on e,:5 ,4- arcl,..,J cc,e , in Oc,e�t-�f , N.C.
(Watorbody (City/Town( tY/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
X I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
0
30/V
4.1
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15'from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
X I do not wish to waive the 15'setback requirement.
(Property Owner Information) (Adjac Property Owner Information)
DocuSigned by: ocuSignenet d by:
tstG.te ci Co• o1•IN E ":75k,
• �a77A4D6 � /i. *8431
p tringlu Li a !May
gii5 lETYPP tO Drive ?OA9rType Name
�i des$7527 ktaliikg idqfl§f.h, NC 28512
City/5tete/Zip ► /S aW ip
2 y15/2Q23 9"15j2tt
PPIIIIIIIIIIIIIIIIIII
r
W{ } III
\tfp
` C
II
' $ Z y:
� a i
v- -4 i-;,-),1 i,L.s.
i I I i i , 0-5. --,-.1 . VI 2 1 :
'r IIIIj � ti% a
' ItI ! I !f
zi \ \ I\
1 \.,
. .7 1 1
. +/ E i
p 1k
. AziN\
\\
3:40 ., LTE I•
Done na4.docusign.net AA C',
AGENT AUTHOR!ZAI iON FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit B Spradling _
Mailing Address : 1129 Ncusc Ridge Drive
Clayton, NC 27527
Phone Number: 919-599-2998
Email Address: bsprad@ icloud.com
J.M.H. Marino Construction
! certify that I have authorized . -.--:----: :
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining
all GAMA permits
necessary for the following proposed development:
at my property located at 309 Peninsula Drive,Oriental,NC. 28571 _
in Pamlico County .
I furlhennore certify that I am authorized to grant, and do in fact
grant permission to Division of Coastal Management staff, the Local
Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating
information related to this permit application
Property Owner Information:
oocuSigned by:
67E232A9377A4D6... Signature
B Spradling
Print or Type Name
Title
0