HomeMy WebLinkAbout88118_Brendon Kearns_20230220 �`°"`�-r,� CAMA H DREDGE & FILL CI S No. 88118 A B C 1 D
aDate1 GENERAL PERMIT Previous permit
�D$� "i�3�0 3
previous permit issued
H New I Modification El Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I SA NCAC n Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
•
Phone#( )
Email Subdivision
City ZIP
Affected CW I I EW n PTA n ES PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA I I IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
•
Type of Project/Activity
(Scale: Vic) )
Shoreline Length
Access Length
Pier(dock)length
Fixed Platform(s) '
Floating Platform(s)
Finger pier(s)
Total Platform area ------ !
Groin length/# .'�
Bulkhead/Riprap length , .
Avg distance offshore
Breakwater/Sill .
•
Max distance/length
Basin,channel _ --+--
Cubic yards ~�
Boat ramp
Boathouse/Boatlift
Beach Bulldozing
Other
SAV observed: yes no •
Moratorium: n/a yes no "�"
•
Site Photos: yes no
Riparian Waiver Attached: yes no •
A building permit/zoning permit may be required by:
Permit Conditions •
TAR/PAM/NEUSE/BUFFER(circle one)
See note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check if/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
;fi ROY COOPER.
' t Gornto,
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALFTV
DIrector
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 028.0233 &.0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water •
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
•
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: I" r 5 u-4'C L el cU( C — s
By your signature below you agree to be held responsible for meeting all of the conditions listed abov d verify
that all informatio plete and accurate.
Age i or Appli ant Printed Name Pemmi Q 'ce gnature
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT#: SD (g
State of North Carolina I Environmental Quality f Coastal Management
Washington Office I 943 Washington Square Mall Washington.NC 27889 1252-946-6481
• Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215
Morehead City Office i 400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
From: Christina Kearns chrissyd@ptd.net
Subject: Re:Dock&Bulkhead Project
Date: February 14,2023 at 9:35 AM
To: Brandi Robertson brandiprobertson@gmail.com
Hi Brand:.
In response to your email, I give permission for Prescott Marine/Brandi Prescott Robertson to act as Authorized Agent on behalf of
Brendan Kearns and myself to obtain necessary permits related to 130 Orchard Pount Road.Oriental NC.
Please call if you have questions or require additional info to proceed with the project.
Thank you.
Christina Kearns
Sent from my iPhone
On Feb 8,2023,at 2:13 PM,Brandi Robertson< andiprobertson@gmail.com>wrote:
Dear Mrs. Kearns..
I hope you and your family are doing well.
I have received the signed Adjacent Property Notifications from your neighbors on Orchard Pointe Rd.and am ready to schedule the
site visit with the CAMA Rep, Mr.Vaughan. The permit from the Dept.of Environmental Quality should be issued at the time of the
meeting.
In order for me to obtain the permit on your behalf I am requesting that you grant me permission to act as your Authorized Agent. This
distinction allows me to sign for the permit and eliminates the need for you to be present at the time of the site visit. Please respond to
this email confirming that I have permission to act as your Authorized Agent.
Please feel free to reach out to me if you have any questions.
Thank you,
Brandi Prescott Robertson
B Prescott Martine Construction, LLC
BrandipRobertson@gmai. :.
252.249.0149
N.C. DIVISION OF COASTAL MANAGEMENT
• ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
r_ '3
Name of Property OwneVe n 6.Q.n °I. O h ta: C4R-r 1)\
Address of 3() QrdarZ. P�- .)h O'I ems, MC
- _ [Wading Address of Owner. `12 3 _Bloc 1i� �d 51a1(X7D(J �f-r /, 3
� �owners email: Chrt5S' rd -ok.ne-+O �sp e#`51b-Lt( -02,
Agent's Name__ r(JIi'Y,Cf P Obd Agent Phone,* __-p� -digq
Agent's Emai: bri .( 1 eir t3ooP,orn tl t CO lan
' ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(R 4frbr r,nrfion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me,as shown on the attached drawing, the development they are proposing_A
description or drawing.with dimensions-must be provided with this letter_ VG11/. i <,
I DO NOT have objections to this proposal_ I DO have objections to this proposal_ bn 'Act'
If you have objections to what is being Proposed, you must notifjr the MC_ Division of Coastal
Management(DCM)in writing within 10 days of receipt of this notice_ Correspondence should be
•
mailed to 943 Washington Square Mall, Washington, NC 27813't. DCM representatives can also be
contacted at(252)946-6481. No response is considered the same as no objection if you have been
notified by Certified Mak
*AMER'
IVER
, SECTION
I understand that any proposed pier,dock,Ong p►i ngs,boat ramp,breakwater,boathouse,lift,or
groin must be set back a minimum distance of-15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revelments).(If you wish to waive the setback,you rous
the appropriate blank below_)
I DO wish to waive somelall of the 15'setback
Signature of Adjacent Riparian Pranw.>f,
I do not wish to waive the 15 setback requirement(initial the blank)
ii
Signature of Adjacent Ripai ian Prot._- L�
Typed!Printed nary...+f A on.w
^.ddressofARPO:
•email:_ O'- ARPs Phn - -
vote: -waiver is valid for up to o ayiarfr..:.l'r.�'S 5;4---4.;;;_
Revised -
, .
- . .
, .
..
's i " .. ' S Aro. ccit . . ‘
,. .
! .:- ,-....„15o °Wha. .. , ,
.c,,k JO:to' ,
. t.
• ,
ow risicupc Q154 ) !,: . :. -f: , -,_.
7 . ..
. '
. . . .
•
. .
. . . .
. , .
. k .
.. .. . . •
-- I 1-\•
, .. .. /2-2/ • .
z-- '' '' • ' : T-77---) -,.. .-..:) -
\ e/Ai rs
- • f sa1/4-) ._ .„
A
prope,,,v
ptext-cescpAylY3D -
5-itpitaN I 5>el 0
. ... . -
#.._ ....- . .
:..-
...
r' I-I el ntrOann
— • -- , 1 \, 1_
H .
" . . , ' . •
. . ,
. • , .
. ,
.
•
---------- -- -------- - - .