HomeMy WebLinkAbout88133_Jeff Byvne_20230220 °p(o"srk ❑CAMA DREDGE & FILL No 88133 A B C D
a' Previous permit
f ) GENERAL PERMIT �� 7 2 3�S Date previous permit issued
n New n Modification n Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected n CW 0 EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA n IHA n UW I I SPIMA I 1 PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity ' - ',/', .
(Scale: / _ )
Shoreline Length ''''''`"
Access Length
-
Pier(dock)length h
Fixed Platform(s) '- ��
Floating Platform(s)
i .j F
Finger pier(s)
Total Platform area
I
Groin length/#
! i ! I I
Bulkhead/Riprap length
Avg distance offshore -
Breakwater/Sill --- ` '
{
Max distance/length l
Basin,channel ,- r
Cubic yards t •. .. f ,/...._.. }
Boat ramp
xi {r t r_ ' C
Boathouse/Boatlift ,
Beach Bulldozing ' I ! ,
Other I j
} a
SAV observed: yes no i - ` ( i -i--i i i t_N_/_..i;L q ; r�
Moratorium: n/a yes ,rTo' h' " --- _ S_ I .
` . .
Site Photos: yes �� t -.-.._ _._� -�--1— I..-.
Riparian Waiver Attached: yes no L '.-�_�:_,# ;_; _� I .1.._:. _7.___ __1._.._.._f
A building permit/zoning permit may be required by:
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signattre**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
•
A ROY COOPER
a
Vi
tt Coce har
MICHAEL S. REGAN -
- seavhay
Coastal Management ' BRAXTON DAVIS
Env[eoNHSNtAi.QVAUN Ofrector .
• BUFFER AUTHORIZATION CERTIFICATE •
FOR PIER AND DOCKING FACILITIES ACCESS WAY _
•
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& •
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 028.0233 & .0259.The
•
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the .
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation, •
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch,or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
. 4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facilityand any requested access way.This
drawing will be used to aid in compliance Z,and" /
monitoring efforts: /
a Pre-project site conditions: ;5 Joittc7'>Aa_aa .
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information pded is complete and accurate._ rovi
Agent Applicant Printed Name Permit 0 Icer s Signature
/�/ '`-� •
f 24 20'2-- ?
A nt or Applicant Signature Issue Date
CAMA GENERAL PERMIT#: gl?,33
•
State of North Carorma I Environmental Quality f Coastai Management
Washington Office 1943.washington Square Mall Washington NC 27889125Z-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wimington,NC28405-38451910-1%-72E5
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808