HomeMy WebLinkAbout88121_Tim Klugh_20230214 30..°``°u'"‘N, CAMA DREDGE & FILL "?1�� No. 88121 A s C D
GENERAL PERMIT ��
I -7
Previous permit
/ Date previous permit issued
•
0 New n Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC n Rules attached. General Permit Rules available at the following link:www.dea.nc.gov/CAMNwIes
Applicant Name i Authorized Agent
Address . -, L.'s..." `J1 Project Location(County): _ ' '
City State ->`- ZIP '- Street Address/State Road/Lot#(s)
Phone#(. -7 5 1 - cp(-4 k_i;
Email .t. lc'it)C 1 L / C "1 ,)Gi)/ . �'CY1 Subdivision �X l.•'✓?
City JZIP; S, ;�
Affected n CW ❑EW 7PTA n ES ❑PTS Ad(.Wtr.Body / i,i'` ' ( wt/unk)
AEC(s): ❑OEA n IHA UW ElSPIMA ❑PWS Closest Maj.Wtr.Body ' U 1 1/
I) ( t 1 U U
ORW:yes�o2 PNA:yes/no
Type of Project/Activity A 3 x 2 - - _..-
_ (Scale:/ -3(.)
Shoreline Length _ -_ram__
Access Length , I., l i 0r'-L-- _ L Y*e)�
Pier(dock)length -'` - j I "' --a.
Fixed Platform(s) L 1. -% CI.. 7 . — -1 --' I — N
{ Pr, 0 '\'1 t]ti .5 c- -'t—�l' 7
L. I t
Floating Platform(s) / �t 4 Y.`� : I 1'a 1
4-- ' i -_-
l Y I C-C.76 i ,, ti-
_ti
Finger pier(s) i � J �-t i r f S f+i � { ._-..
+fir �. ` —` -+--_ - - ', .{{. t i 1�ex ? f �:
Total Platform area . ) + j 1,
Groin length/#
Bulkhead/Rira length --- - I"1rr-+'F, \ '{-' -
Rip rap � �--�-���
Avg distance offshore - •
Breakwater/Sill ' '
I i 1 I
Max distance/length -f ' `" t °"' i
i a �_
Basin,channel 1 T___ � h
Cubic yards ___._ ice _.. �� _
_._ \ . i� i
Boat ramp j l ? Jtlo•`1 ��(d Cam+ )i ('
t^ 1 •
Boathouse/Boatlift ( 7
Beach Bulldozing +
1
Other $ , 1 — l Y
SAV observed: yes no j D
tL.
Moratorium: n/a yes no I tI1(Fv 3� " y ( , '
Site Photos: yes no : - � .� 1 --mac . roc.r}c j
Riparian Waiver Attached: yes no ,..-., I I i 1 L. L:1 1�'..-gal i
A building permit/zoning permit may be required by: .. +,.t {- ' ''F (_-
Permit Conditions :. -- a -wl'- 1(,) 1.... :-- L n TAR/PAM/NEUSE/BUFFER(circle one)
-' c v ', ,�-'c, E'L.-0.`C c-�-,,, " .`-e s c)r ,`t ?/e I I See note on back regarding River Basin rules
/"' I r
G 7 t ^' n See additional notes/conditions on back
S,
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) '
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
� t n
/
Signature"Please read compliance statement on back of permit** Signature , j
1 ' ( -- p",/, _ zn?,: - /y - �ca%JY - 223
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
sr ROY COOPER.
Governor
MICHAEL S. REGAN
- secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY
ector
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water •
Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. •
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: Z.1:2)--- 1S / j
a/J.1 a Pe
By your signature below you agree to be held responsible for meeting all of the onditions listed above an verify
that all information provided is complete and accurate.
y Cad on
Agent or A Cady
t Printed Name Permit 0 I is Signature - --
y � �� _ Zvz3
Agent Applicant Signature Issue Date
CAMA GENERAL PERMIT i#: SS I al
State of North Carolina I Environmental Quaky(Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 I2S2-946-6481
Wilmington Office 127 Cardinal Drive Ext.Wt nington.NC 28405-3845 1910-T9(rT21S
Morehead City Office 1400 Commerce Avenue Morehead City.NC 2855? 1252-808-2808
1/30/23,3:54 PM Mail-Tim Kiugh-Outlook
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit I IVN -LA4464
Mailing Address: 49 E) tt-l. t
ape N C Z'i$08
Phone Number: 3 i-iselq
Email Address: &k(tst,SZ R tnilGit I 1 Ccn�✓1
I certify that I have authorized COt:s•-i C t 'a-Q_1 o
Agent t Contractor
to act on my behalf,for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: itifl-.-«WIr.n`1
o bbetA DNL- - SA-WtE coOlee fss ��
at my property located at i7 1tss Lt-u-. vis(r 9 l t 270Dg'
in Fcumotcr County.
I furthermore certify that 1 am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff,the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information
ls�O
' _ 1 uk.scivt
Print or Type a Name
Title
I i30 , Z3
Date
A y
( This certification is.valid through G_ / _ ` 1
e
a 1
1
hitpsi/outlook.office.com/malUinbo>fid/AAOkADA1 MTg 1 NmM1 LTQzNzAtN DhkNl1 iNTMLTg1 MjleN2RINjMyYgAQAE%2BGuy%2F1wGd PlQdyeedwyw... 1/1
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
If
I hereby certify that I own property adjacent to ; i - -'a''1C4= " '
j ame of Property Owner)
property located at v`(4 C' 5w L•- L.�`;•,` 4 �'t:
7' (Address, Lot, Block Road, etc.)
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below the development proposed at the above
location.
✓ I have no objection to this proposal
I have objections to this proposai.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
0
•rvtito...1... r,•►1ia?
wart.v
0
sTr
f-c- l br-c-7:. ►F N► d F 4v►LK�aF�n
• '�� TvLl OSS
WAIVER SECTION
understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
v rsn to waive the setback, you must initial the appropriate blank below.)
'. do wish to waive the 15'setback requirement.
do not wish to waive the 15' setback requirement.
Property Owner Info 4•n) (Adjac t Pro erty Owner Information)
' ` •
iignature
..k OliVI14'v
Print or Type Name ;orna
Mailing Address r rr,Q Addres
tec
City/State/Zip , /Sta
Telephone pro probr r Tele hrimeer
Dare De
(Revised 6/1 e/2012)
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to `'u' {Ci �`�
I.Jeme of Property Owner)
property located at Q qc s '4`r y k L\-
(Address, Lot, Bloc Road, etc.)
on t t f\L , in , N
(1Naterbody) (City/Town and/or County)
The applicant has described to me, as shown below. the development proposed at the above
Joys).
I have no objection to this propose).
I have objections to this proposal_
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
0
/ 6,Ips-6.3_ 41.10 tJ
/ l
f,-- SFi w ��G
O 4t cor-.cc,vws 9•v.t-' F-fit.
iii% To_.‘i)bS
WAIVER SECTION
i understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (if yoL
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15'setback requirement.
(Property Owner Info ' n) • (Adjaaceentt Property Owner Information)
vkL/A-C-/ pii4.5-or)
S, atur�_. Signature
Print or Type Name Print o Type Name
�'1 A.u' -:L19
Marline Address Maitrr�4q4 Address.L �."7�0$ {-tan?! //truer
City/State/Zip City/Slat r
Telephone um Telephone Number
'Z c� Z.o z3 )Sol - 1 l S' — 4�4�'1
Dive Date
Date �.— 9"'" 3
(Revised 6/1 E/2012)