Loading...
HomeMy WebLinkAbout88130_Cutter Bay_20230216 pu riCAMA I 1 DREDGE & FILL S N° 88130 A,.,..,A '' C D GENERAL PERMIT =N722 Previous permit `.6 jDate previous permit issued n New Modification I I Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I SA NCAC - 1--3 c_-- `"-' n Rules attached. I ` I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name (I Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#(_) Email - Subdivision City ZIP Affected In CW In EW 1n PTA I I ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): In OEA IHA n UW 1 I SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ,_.) ) Shoreline Length 7 f Access Length ___,,-I..__ -.,--,•-,. 1..-.. F # i. . Pier(dock)length I _ �t_1r-_ r -- ■ Fixed Platform(s) i I 1E61 Floating Platform(s) I I - I d , .. j 7' Finger pier(s) 1 ii- Total Platform area Groin length/# I I I IJ Bulkhead/Riprap length i Avg distance offshore Breakwater/Sill i 1 , Max distance/length _ _ II "- _-_—' MINIBasin,channel - f --_ k t .._ j Cubic yards i, i ; I i Boat ramp 1 i I . Boathouse/Boatlift 74 1 j Beach Bulldozing__; . ,_ Other TI - f) . SAV observed: yes no -r _._ i , Moratorium: n/a yes no -- -- -• t 1 •Site Photos: yes no I .. _ + I Riparian Waiver Attached: yes no -T_- ,._ . __ 1111® MIMI A building permit/zoning permit may be required by: Permit Conditions In TAR/PAM/NEUSE/BUFFER(circle one) IIISee note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit* Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 <7-) /7-r1✓ N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion t be completed by owner or their ag nt) 7 Name of Property Owner: C A-A, DAViz/ ��1/ti, Z-1( Address of Property: / Q$7 kiwi � I J VJ 6'i-o i'V .(. 2 es S7� MailingAddress of Owner: b 15! IZi ;041 -11I I/ l Iji/C 523 Owner's email6kr6:4/1-4/l1t'45 iv,4404114er's Phone#: .2-52 355---- t /o Agent's Name: - BLII ck, YC►"L Agent Phone#: 252 - ,)7 393 Agents Email: 1Ch11i 6) A,,k,( 1-10,,tic,t oce---:)ciatl iw.t cs-,lf • ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description ar drawing,with dimensions, must be provided with this letter. r; I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier,dock, mooring pilings, boat ramp,breakwater, boathouse, lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments).(If you wish to waive the setback,you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback ,,` / 4/ ate) A--- Sign ure o Adjacent Riparian 'roperty Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) • Signature of Adjacent Riparian Property Owner: t��, Typed/Printed name of ARPO! Q 4' — cD Mailing Address of ARPO: '-r5:5 14")/it • ,55E ./!`Gr2 ^�- i� -2675E d ARPO's email: 41$-. 1�y o ARPO's Phone#: 5�-674 'G) Date: . -/3- 3 *waiver is valid for up to one year from ARPO's Signature* Revised July 2021 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their ag nt) Name of Property Owner: -- 9#14- /A 7 ,DgV g/ lvt lam' Address of Property: / 7á'37 L5Yl-O Mailing Address of Owner: Ant Nit- /<.Jr� L�K/Y�L✓�� frt. AC., �� 7 Y311 1. 64k h 25;2 S - L6/O Owner's email: �Z�/Ji..1_- �- ,e wn r s Phone#: -7 �`�j Agent's Name: �� Agent Phone#: 7 'tom�/ / 2_3. Agent's Email: 46 fa - i L4K4 4 r //(� /ke—,e601-1 ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions, must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback y a.t Signature of Adjacent Riparian Property Owner -OR- ! do not wish to waive the 15' setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: a/1 • Typed/Printed name of ARPO: ,1 r �)' i' r Mailing Address of ARPO: �r , '7 � I E' w'i f , "1/4_,.J ARPO's email: C?./-3 n2 �1� ,: __ ARPO's Phone#: 7 S2 ' ./Aiv f c�.5�1 >~ . t� '::(-07 , Date: 2//-3i waiver a or up to one year from ARPO's Signature* Revised July 2021 r d fr -- , Ha / 1 ,r',a `ip el T:p a � Vaughan, Kent D From: Billy Holton <billyholtonconstructionllc@yahoo.com> Sent: Thursday, February 16, 2023 11:15 AM To: Vaughan, Kent D Subject: [External] Fwd: Operating Agreement CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Report Spam. Sent from my iPhone Begin forwarded message: From:griffgarner@suddenlinkmail.com Date:January 9, 2023 at 2:33:35 PM EST To: Billy Holton <billyholtonconstructionllc@yahoo.com> Cc:Wilson Greene<wilsongreene12@outlook.com> Subject: RE: Operating Agreement Billy, This email authorizes you, on behalf of Cutter Bay Development, LLC(hereinafter CBD), to sign any real estate contracts obligating CBD to the purchase of the two lots contiguous to CBD's property on the west/north side of our current entrance at a purchase price not to exceed $50,000. As manager of CBD, I also authorize you to sign any permit applications for dock construction on any property owned by CBD. Finally, I authorize you to sign any other contracts related to the development activities of CBD up to a value for any single contract not to exceed $20,000. Any contracts in excess of$20,000 will require separate approval. Thanks, Griff Garner Manager Cutter Bay Development, LLC From:Wilson Greene<wilsongreene12@outlook.com> Sent: Monday,January 9, 2023 11:43 AM To:griffgarner@suddenlinkmail.com Cc: Billy Holton<billyholtonconstructionllc@yahoo.com> Subject: Re: Operating Agreement Griff, As per Scott Davis, section 4.10 gives you the authority to grant Billy permission to sign on behalf of Cutter Bay Development, LLC for specific purposes. Scott said for you to email Billy with your authorization for him to sign for the purchase of the two properties contiguous to the west/north side of 1 our entrance and to also authorize him to sign permit applications for dock construction and I would add for development activities at Cutter Bay. Thanks, Wilson Sent from my iPad On Jan 9, 2023, at 9:26 AM,griffgarner@suddenlinkmail.com wrote: Wilson, I have attached the original operating agreement and its five amendments. Grill Original Message From: Wilson Greene<wilsongreene12@outlook.com> Sent: Monday,January 9, 2023 9:12 AM To: Griff Garner<griffgarner@suddenlinkmail.com> Subject: Operating Agreement Griff, Scott would like to see the operating agreement so we can prepare an Affidavit for Billy to give him certain authorities. If you email it to me I'll forward it to him. Thanks, Wilson Sent from my iPad 2