Loading...
HomeMy WebLinkAbout88082_David St. Hilaire_20230123 l'INIII7CAMA I I DREDGE & FILL 12'"e5 No 88082 A ®C D GENERAL PERMIT �{-72113 Previous permit �,4 ��'CI Date previous permit issued Af/A fl New n Modification n Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC 0 7A'/421("47 I j ' les attached. n General Permit Rules available at the following link:www.deq.nc.govICAMArules Applicant Name .0/,r✓,: J 7i. /i</T•/'A_ Authorized Agent �/ 4. lYYiy1 ,/ / Address `/ � .4 ci wirey1 cc'- '. 'e- Project Location(County): ' H'ei v J City Sc,'x.., i+�,‘ State N L ZIP vZ 7t27�� Street Address/State Road/Lot#(s) /55 L-4., -ve.-e e Z--Gv L. Phone#(4/q) 2 'y- 959-5 Email Subdivision City -_..C.L fr_,,,, 1.1, ZIP 7,7_5 Affected I I CW If#^ 1 TA 1 I ES n PTS Adj.Wtr.Body f w��,� ✓•moo (nat/man/unk) AEC(s): ❑OEA n IHA ❑UW n SPIMA I I PWS Closest Maj.Wtr.Body / L+nj, A/ ORW:yes/x6 i PNA:yes Type of Project/Activity Au T 1,,,, e/ la. /CI v` n J ` <—,'f-4 /6 ,'',2 l ' ,oi Ii�"' (Scale1`=.7 /) Shoreline Length L,2OO f „IS n Access Length 0 r Pi S Pier(dock)length /©o ' \ lit v1 S, I YCr Fixed Platform(s) /6 ' >`a21 Floating Platform(s) Finger pier(s) 7 Total Platform area J-3 (f a Groin length/# 5 / /7 t* Bulkhead/Riprap length + iaj.V '} l Avg distance offshore /(4 F4 rit c�1 Breakwater/Sill 4 Max distance/length Basin,channel Cubic yards Boat ramp '.�) Boathouse/Boatlift Beach Bulldozing_ "S c� 1 r Other e re <s^�' ek,(�i`-1 f✓L 4 ,v,„SAV observed: yes n Moratorium: n/a yes o ✓/``�' Site Photos: yes �-r,.,c (�r '� /f (I F:, Riparian Waiver Attached: yes S /f, �a•ry A building permit/zoning permit may be required by: 1/7 IA/ Permit Conditions Sec C7/-/, 1.20L TAR/PAM/NEUSE/BUFFER(circle one) Pee-note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,C C RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. /(Please Initial) F LJ FO C-( / trj Nrr--(4v S n. �T�-a/e•.,- Agent or Applicant PRI _..--- Permit .ce ' PRINTE�e , Signature**PI e read compliance statement on back of permit" 7 Signature Application Fee(s) Check#/Money Order Issuing Date xpiration Date / --2 ."-.z' _5'/,..2 7 2 Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 "� ROY COOPER i4 Governor MICHAEL S. REGAN . - SeQerary Coastal Management BRAXTON DAVIS ENM RONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 1SA NCAC 02B.0233 & .0259. The Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewe.d your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. • >. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly(which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six(6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way.This drawing will be used to aid in compliance and monitoring efforts. • Pre-project site conditions: h z✓ 1`� r i' By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. V i re 11 r c Agent or Applicant Pri led Name Permit Officer's Signature Agent o pplicant Signature Is ue D e CAMA GENERAL PERMIT#: d D O State of North Carolina I Environmental Quality f Coastal Management Washington Office f 943 Washington Square Mail Washington.NC 27889 1252-946-6481 • Wilmington Office 1127 Cardinal Drive Ext.Wilmington.NC 28405-3845 1910-796-7215 Morehead City Office i 400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 B. F. Warren & Son, Inc. 180 Taylor Farm Road,Belhaven NC 27810 Office(252)964-4628 Fax(252)964-6861 Forrest cell(252)945-2492 Freddy cell(252)945-4240 ' NC General Contractor License#72600 wwwitcpiers.com email:bfwarrennson@rsnetorg Authorized Agent Consent Agreement To:State of North Carolina Department or LocalIGovisnment Department from whom this permitisbeing applied fot. . I,the undersigned property owner,do hereby authorize B.F.Warren&SonsINC.to act on my behalf in obtaining the necessary permits for the below.!'Wed projects.I have contracted their services to perform the work permitted.This agreement mited anlyto the specific activity of obtaining permits for the below specified projects. 1,fmttemrore certify teat lam authorized to most,.and do in fact grant perm®on to Division of Coastal Management staff,the LoralPemit Officer their agents to enter on the rmdermentionedlands in connection with evaluating information related to this permit/s application. Projects: Dock and boatlif pilings Project location/address: 155 Lawrence Lane Scranton,NC 27875 Body of Water. Pungo River Property Owner Mailing Address: • David Stl3ilaire • 155 Lawrence Lane Scranton,NC 27875 {919)264-9395 /' Property Owner's Signature: Date: 1 7i' (2oz3 Authorized Agent Signature: Date: f 11(1203 •• i 1 2r a r ^ n ] Gto 4 { C U O O O C—5 4 pflings for future lift I 7 0 Pungoo River David S&Hilatre • 155 Lawrence Lane Scranton:NC 27375 y r 919 284-9395 • Job Locatiorc 155 Lawrence Lane Scranton'.NC 27875 Prepared by B F Warren S Son Inc. For pennddng purposes only. NOTTO SCALE • BFW202//30108 • • eSO'e fi /S west Warren Date re NWL € u lL Et aril r- "Y gi a a, .e e a .. e • .-. _®-- _e:o — — 4r1►rrAw FY 4.4 _�- {Ip�� ' Pincher Property St.H3alre Property Shoran+/-200B i i 1 i llli! Charnbes'Property 11; si irrit 55 =N.C. DIVISION'OF COASTAL' MANAGEMENT - „, _ ` , I , ' . ADJACENT RIPARIAN PROPERTY�OWNER NOTIFIC tTIONIWAIVER FORM , ' $ CERTIFIED MAIL • RETURNiRECEIPTREQUESTEDfor HAND DELIVERY , , < i - ' (Top portion to-be completed by owner ortheir agent) ? ' x i' Name of Property Owner. 'David St:Hilaire ; Addressrof Property: .15,5 Lawrence Lane, Scranton,-NC 27875- , Mailing,Address of Owner: 155 Lawrence Lane Scranton, NC 27875 - � ' i Owner's email; dsthilaire@imdnc.com 'Owner's Phone# .919 264-9395 .u' ' B F Warren?& Son`,Inc a 252=964-4628$ � l�gent`sName: . � Agent Phone# �` Agenes Email .bfwarrennson@rsnet•org A. 1 ADJACEN] RIPARIANiPROPERTYQWNER'S CERTIFICATION i . , (Bottom_portion to be,completed by the AdiacentProperty_Owner)' ' i I hereby certify that I own propereyadjacentot the`above referenced prdperty The;individual:applying for this ? - permit has described to me„as shown.on the'attached'drawng, the,:development they,:are proposing A ,,' ' u1, ` description ordrawina, with'dimensions must,be-provided`,with this letter, Y`„ ' >S: i DO,NOT have objections to this proposal _. I DO have objections to thistproposal. .. ' - if you have,objettient to What;is being proposed, you must notify the'+N C Division•of Coastal Xt. ' i Management in writing within 10 days*of receipt of thisnotice. Correspondence-should ke 5 mailed to 943 Washington Square Mall, Washington; NO27889 OCM representatives can also be ;,, ; contacted at(252) 94ti-6481 No response is considered`the saine`esno objection if you have been 1 } ' notified Certified Mail.: ,' -• J WAIVER SECTION , • - I understand-that any proposed pier, dock, moorirfg,pilings,boat ramp,breakwater, boathouse;lift, or '„ i', I " groin must be set back a minimum distance of 15'from my-area of riparian access unless waived by me j 1 (this does not apply to bulkheads orriprap revetments) ;Of you wish toawaive the setback,you must sign i the appropriate blank below)` ` " t [. qf I DQ wish,to waive some/all 9f the 16.Setback eY .l` , Signature'of Adjacent Riparian Property Owners , s; - I OR I do not wish to waive the 15'setback requirement(initial the blank .�. n ' I 5 Signature;o'fAdjacent Riparian Property Owner. "L'' ' , n ,� ,;,—c.:C , k t 'Typed/Printed name ofARPO: . 'I e-rut`7. -; C* ./v1 Mailing'Addres's of ARPO 9 L - / y` c r Si[) .e.. !Z , , C , ,IL„,.,,,,- , `eft ►trail: c[ ./�. o p, 'P tPoss Phone# °'07 o ARPO's e{' :'� I Date: _(/ i j 12�Q 2 •awaiverr-is valid for uP to one year from ARPO's Si 9 nature". • I }. ,� Revised Jury 2021 tl mil, R '^$ t • N.C. DIVISION OF COASTAL MANAGEMENT ' ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: David St.Hilaire Address of Property: 155 Lawrence Lane, Scranton, NC 27875 Mailing Address of Owner: 155 Lawrence Lane, Scranton, NC 27875 owner's email: dsthilaire@irndnc.com Owner's Phone#: 919-264-9395 Agent's Name: B F Warren & Son Inc Agent Phone#:252-964-4628 Agent's Email: bfwarrennson@rsnet.org ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adlecent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. a )escriotion or drawing,with dimensions. must be provided with this letter. .b t I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what Is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 948-6481.No response is considered the same as no objection if you have been notified by Certified Mall. WAIVER SECTION I understand that any proposed pier,dock, mooring pilings,boat ramp, breakwater,boathouse, lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me . (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must alan the appropriate blank below.). I DO wish to waive somelall of the 15'setback • Signature of Adjacent Riparian Property Owner -OR- GG I do not wish to waive the 15'setback requirement(initial the blank) --riff Signature of Adjacent Riparian Property Owner.;e TypediPrinted name of ARPO: James B Fincher Mailing Address of ARPO: 1026 Silver Run Valley Rd, West Minster, MD 21158 ARPO's email: egfincher@comcast.net ARPO's Phone#: 410-346-7244 Date: *waiver Is valid for up to one year from ARPO's Signature* Revised July 2021