HomeMy WebLinkAbout87976_John DeHog_20230106 40 nCAMA DREDGE & FILL N° 87976 A B C D
°F`�
GENERAL PERMIT Previous permit
.�41.�01-5 Date previous permit issued
n New ❑Modification Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC I I Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( ) _
Email Subdivision
City ZIP
Affected n CW I I EW I I PTA ES ❑PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA n IHA n UW n SPIMA ❑PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
I (Scale: l' )
Shoreline Length
Access Length l. .. I ....
II
Pier(dock)length �� J _. II
l .IIMIIIIM n��M
Fixed Platform(s) j I IMill
Floating Platform(s) i I i II!II
i. , a
Finger pier(s) R i��/ i IM
Total Platform area �' i 555 ■l
Groin length/# 55555®�� - �� a::a
Bulkhead/Riprap length .-,
,
__g HIUIUIflflIHHUH
Avg distance offshore
Breakwater/Sill H'IIH
}T'1111111 - 1 IIHhIIHI1HhI1IIII
Max distance/length I'r
Basin,channelCubic 1 1 i'-11111
immonn
Boat ramps 1 .. a11---4-,-i
111111111
Boathouse/Boalift H
Beach Bulldozing44
Other
SAV observed: yes no WWI ■■ ■.r■aaaa■■. ■
Moratorium: n/a yes ,.nbj ow 4! a __x. -----
1 u_i_■.a asaasaaa
um
Site Photos: yes il
Riparian Waiver Attached: yes o
A building permit/zoning permit may be required by:
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
111 See note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
frue, ROY COOPER
t Governor
• MICHAEL S. REGAN -
.. senrlmy -
Coastal Management BRAXTON DAVIS
armRONNeNru.OUaure Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 028.0233 & .0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations. -
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
•
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facilityand any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
® Pre-project site conditions: 6E
By your signature below you agree to be held responsible for meeting all of the conditions listed above nd verify
that all information provided is complete and accurate.
.1 O Ca—.
Agent or Applicant Printed Name Permit Offic ignature
•
�� ture st
Agent or Applicant Signature l e Date
CAMA GENERAL PERMIT it: S2 el 76
State of North Carolina 1 Environmental Quality[Coastal Management
Washington Office 1943.Washington Square Mall Washington.NC 278891252-946-6481
Wihnfhgton Office l 127 Cardinal Drive Ext Wilmington,NC 28405-3845 1910-796-M5
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2608
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: ` 612-4+-(C .
Mailing Address: - C s f /4- v A
SA-Dt. LE i . r A P1 (7-7ys.e
Phone Number: (p o 1 ) el a-s°O2 C - y'1 7- S ' 7- 1/4402 c)_3
Email Address: =n C lb\ac,krocl - C
I certify that I have authorized Bobby Cahoon Construction. Inc.
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: Sec_ .' ..,1( b o w--�
at my property located at 9 8 la tti)Q.c+ t3 ..( 67-- ; «< b r /4"
in ' County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Signature
Print or Type Name
Title
Dale
This certification is valid through la 15 l a o a 3
,e- r a-
' � !' COMPLETE THIS SECTION ON DELIVERY
SENDER: COMPLETE THIS SECTION ,� 9 . re
0 Agent
NI Complete items 1,2,and 3. AddreGs"=
■ Print your name and address on the reverse /I C.psre of,-livery
so that we can return the card to you. .yam, -a Name) 1�
■ Attach this card to the back of the mailpiece.
or on the front if space permits. from item 141 D. la delivery,enter del a iff dd tress below:1? ❑No
1. Article Addressed to: l es
It YES,
M r. �O►rn is e . rat:.,h:c,lc
1o0 1 r4h�Rov,eY Rol -
,q0.1 .2
3. Service Type O Priority Mail Expresse
it.
�I I'lll�l I I I III {I'I„I'II II I�II CI Adult Signature 0 Registered Mail',
Adult Signature Restricted Delivery 0 Registered Mail Restricted
II"I 1 Delivery
•Certified Mail' 0 Return Receipt for
9590 9402 5511 9249 0296 09 0 Certified Mail Restricted Deivery❑Collect on Delivery Merchandise
❑Signature rr ation„
■Colliem-Delivery Restricted Delivery ❑Signature Confrmation
�,, � fr.... r -• Restricted Delivery
2' 7021 0950 0000 1368 8804 lestrictedDeliverY
Domestic Return Receipt
Ps Form 3811,July 2015 PSN 7530-02-000-6059
N.C.DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM
CERTIFIED MAIL• RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner. John & Fran Dettra
Address of Property: 986 West Burton Farm Dr.. Arapahoe. NC
Mailing Address of Owner. 54 E Allendale Rd., Saddle River, NJ 07458
Owner's email: frances.dettra@biackrociccom Owner's Phone#: 917-597-4203
Agents Name:Bobby Cahoon Construction, Inc. Agent Phonefk 252-249-1617
Agent's Email: bobbycahoonconstruction@yahoo.com
ADJACENT RIPARIAN-PROPERTY OWNER'S'CERTIFICATION
(Bottom portion to bo completed by the Arliecent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The Individual applying forthls
permit has described to me,as shown on the attached drawing,the development they are proposing.9
description or drawina.With dimensions.must be provided with this letter.
y I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed,you must notify the N.C. Division of Coastal
Management(DCM)In writing within 10 days of receipt of this notice. Correspondence should be
mailed to 400 Commerce Ave;Morehead City,NC28557.DCM representatives can also be contacted
at(252)808-2808.No'response is considered the same as no objection if you have been notified by
Certified Mail.
WAIVER SECTION
I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply totulkheads or dprap revetments).(If you wish to waive the setback,you must slag
the appropriate blank below.)
I DO wish to waive some/all of the 15'setback
Signature of Adjacent Riparian Property Owner
OR •
I do not wish to waive the 15'setback requirement(Initial the blank) 77P
Signature of Adjacent Riparian Property Owner: ? "�--
Typed/Printed name of ARPO: lr a n,a s F /t/puns
Mailing Address of ARPO: 96 Gianna ®r c./a rib n., NG �.•75z7
ARPO'semail: #narmonO52/enwr%rp4RPO'sPhone# 336 - 943- 09 Z.
Date: /2/2/X.Z. 'waiver la valid for up to one year from ARPO's Signature'
Revised July 2021
JOHN & FRAN DETTRA
986 WEST BURTON FARM DR.
ARLINGTON PLACE
ARAPAHOE, NC
DESCRIPTION
We propose to install a new vinyl seawall. Wall will be 130' long with 5' +/-
exposure. This includes a 30' long wingback on the right side of the property.
This will include the installation of additional tieback rod extensions.
We propose to install a subsurface rock drain system behind the seawall.
We propose to install a new concrete pier consisting of a 5' wide x 110' long
walkway connecting to a 13' wide x 20' long platform.
We propose to install a new boat lift with remote control. This will include the
installation of four (4) new 10" x 30' long pilings.
We propose to install a new bench with backrest on the concrete pier.
•
Drawing by Bobby Cahoon Construction for:
Fran Dettra
986 W Burton Farm Dr / Lot 300
Arlington Place
Proposed New Concrete Pier
�t 13x20'
,�
Platform
it 0 '®
5 x 20'
Step Down
HI C)
0 0 0
♦ - -40
„........-e
• ® ® 121.( lte
II
C .i.,74 5'x110' Walkway I _ '1
461
4-lis ,
0 . - _ _
OP ,
This drawing is the sole property of 10,000# Boat Lift
w/ 10" x 30' Pilings
�il.
Bobby Cahoon Construction Inc.
W' Gu . and is not intended for use by any other entity.