Loading...
HomeMy WebLinkAbout88117_David Kovacs_20230123 /0coAsh'`'x,� CAMA I I DREDGE & FILL � c No 88117 ABCD 3 GENERAL PERMIT Previous permit �p "� 2`O�' Date previous permit issued 7 New n Modification Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) -_- Email Subdivision City ZIP Affected I I CW I I EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA n IHA UW In SPIMA n PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length ' , — • Pier(dock)length Fixed Platform(s) , y j 1 Floating Platform(s) —__ , — i �' II II Finger pier(s) f ' A * Ii • I .. Total Platform area__ Groin length/# i Bulkhead/Riprap length i---Avg distance offshore + • . 'r Breakwater/Sill ; I r - Max distance/length { Basin,channel ` Cubic yards I { I , Boat ramp Boathouse/Boatlift ({( -I __ Beach Bulldozing I I tt L_.... . ....._ __Other t • 1 SAV observed: yes no r._ Moratorium: n/a yes no Y N F ,i } —"'' Site Photos: yes no f- f' — - ,�1 vi),. _ i- r, Riparian Waiver Attached: yes no W_ .�_ A building permit/zoning permit may be required by: TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions riSee note on back regarding River Basin rules nSee additional notes/conditions on back t. -sire ` I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) t Agent or Applicant PRINTED Name ,__, Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 A RQY COOPER . `4, Coiemor MICHAEL S. REGAN - Secretary Coastal Management BRAXTON DAVIS ENV'ROP(XENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACIUTIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& Neuse River Riparian buffer per Division of Water Resources(DWR) regulations 15A NCAC 028.0233 &.0259.The Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer ' perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM_The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch,or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet. 4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facilityand any requested access way.This drawing will be used to aid in compliance and monitoring efforts. • Pr project site conditions: 2_0( /S �'la —"e4Or7 �sr /iA__ By your signature below you agree to be held responsible for meeting all of the conditions listed above d verify that all infor ation provided is complete and accurate. Takily Ida-W. t or A plc t Printed Name Pe it cer' ignature Agen or App icant Signa ure 1 ue Date CAMA GENERAL PERMIT i#: 8g 1 i-7 State of North Carolina I Environmental Quality f Coastal Management washington Office 1943 Washington Square Nall Washington.NC 278891252-946-8481 Wilmington Office 1127 Cardinal Drive Ext Wilmington,NC 28405-3845!910-79h-7215 Morehead City Office 400 Commerce Avenue Morehead City.NC 213557 1252-808-2808 r P I U 1' } CERTIFIED MAIL - RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM Name of Property Owner: David & Pamela Kovacs Address of Property: 5306 Trade Winds Rd. New Bern,NC 28560 (Lot or Street#, Street or Road, City & County) Agent's Name#: Mailing Address: Agent's phone#: I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing_the development they are proposing. A description or drawing, with dimensions, must be provided with this letter. iff, I have no objections to this proposal. I have objections to this proposal. If you have objections to what is being proposed,you must notify the Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 400 Commerce Ave., Morehead City,NC, 28557. DCM representatives can also be contacted at(252)808- 2808.No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. (,JF 11 I do not wish to waive the 15' setback requirement. operty Owner Infor }o (Adjacent Property Owner Infofnation) VAPO ignature Signature David & Pamela Kovacs William Diamond Print or Type Name Print or Type Name 5306 Trade Winds Rd 5310 Trade Winds Rd Mailing Address Mailing Address New Bern, NC 28560 New Bern, NC 28560 City/State/Zip City/State/Zip (603)252-8911 0 Telephone Number Telephone Number Dc e Date Revised 6/18/2012 Adiacent Riparian Property Owner Statement- David & Pamela Kovacs 5306 Trade Winds Rd. (lot#129) Northwest Creek in New Bern, NC Description of proposed development Install an 80" x 164" EZ Boatport between existing pilings taking up 1 of 2 boat slips.—Not increasing slips. Also attaching a 40"x 180" dock section to the front of the Boatport. See attached diagram— David & Pamela Kovacs-01/06/23