HomeMy WebLinkAbout88117_David Kovacs_20230123 /0coAsh'`'x,� CAMA I I DREDGE & FILL � c No 88117 ABCD
3 GENERAL PERMIT Previous permit
�p "� 2`O�' Date previous permit issued
7 New n Modification Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
ISA NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( ) -_-
Email Subdivision
City ZIP
Affected I I CW I I EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): OEA n IHA UW In SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
Access Length
' , — •
Pier(dock)length
Fixed Platform(s) , y j 1
Floating Platform(s) —__ , — i
�' II
II
Finger pier(s) f ' A * Ii •
I ..
Total Platform area__
Groin length/# i
Bulkhead/Riprap length i---Avg distance offshore + •
. 'r
Breakwater/Sill ; I r -
Max distance/length {
Basin,channel `
Cubic yards I
{ I ,
Boat ramp
Boathouse/Boatlift ({( -I __
Beach Bulldozing I I tt
L_.... . ....._ __Other t
• 1
SAV observed: yes no r._
Moratorium: n/a yes no Y N F ,i } —"''
Site Photos: yes no f- f' — - ,�1 vi),. _ i-
r,
Riparian Waiver Attached: yes no W_ .�_
A building permit/zoning permit may be required by:
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
riSee note on back regarding River Basin rules
nSee additional notes/conditions on back
t.
-sire `
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) t
Agent or Applicant PRINTED Name ,__, Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
A RQY COOPER
. `4, Coiemor
MICHAEL S. REGAN
- Secretary
Coastal Management BRAXTON DAVIS
ENV'ROP(XENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACIUTIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources(DWR) regulations 15A NCAC 028.0233 &.0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer '
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM_The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch,or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facilityand any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
• Pr project site conditions: 2_0( /S �'la —"e4Or7 �sr /iA__
By your signature below you agree to be held responsible for meeting all of the conditions listed above d verify
that all infor ation provided is complete and accurate.
Takily Ida-W.
t or A plc t Printed Name Pe it cer' ignature
Agen or App icant Signa ure 1 ue Date
CAMA GENERAL PERMIT i#: 8g 1 i-7
State of North Carolina I Environmental Quality f Coastal Management
washington Office 1943 Washington Square Nall Washington.NC 278891252-946-8481
Wilmington Office 1127 Cardinal Drive Ext Wilmington,NC 28405-3845!910-79h-7215
Morehead City Office 400 Commerce Avenue Morehead City.NC 213557 1252-808-2808
r
P
I
U 1'
}
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
Name of Property Owner: David & Pamela Kovacs
Address of Property: 5306 Trade Winds Rd. New Bern,NC 28560
(Lot or Street#, Street or Road, City & County)
Agent's Name#: Mailing Address:
Agent's phone#:
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing_the development
they are proposing. A description or drawing, with dimensions, must be provided with this letter.
iff, I have no objections to this proposal. I have objections to this proposal.
If you have objections to what is being proposed,you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 400
Commerce Ave., Morehead City,NC, 28557. DCM representatives can also be contacted at(252)808-
2808.No response is considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
(,JF 11 I do not wish to waive the 15' setback requirement.
operty Owner Infor }o (Adjacent Property Owner Infofnation)
VAPO
ignature Signature
David & Pamela Kovacs William Diamond
Print or Type Name Print or Type Name
5306 Trade Winds Rd 5310 Trade Winds Rd
Mailing Address Mailing Address
New Bern, NC 28560 New Bern, NC 28560
City/State/Zip City/State/Zip
(603)252-8911 0
Telephone Number Telephone Number
Dc e Date
Revised 6/18/2012
Adiacent Riparian Property Owner Statement-
David & Pamela Kovacs
5306 Trade Winds Rd. (lot#129)
Northwest Creek in New Bern, NC
Description of proposed development
Install an 80" x 164" EZ Boatport between existing pilings taking up 1 of 2 boat slips.—Not
increasing slips. Also attaching a 40"x 180" dock section to the front of the Boatport.
See attached diagram—
David & Pamela Kovacs-01/06/23