HomeMy WebLinkAbout91-96 Letter of Refinement 12/13/2007 Bald Head Island Limited LLC-- r
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
Mr. Bruce Mazek ?' December 11, 2007 IVEE �TI """""j.li!
PO Box 3069 DEC 1 7 Z007 4'i
Bald Head Island, NC 28461
Dear Mr. Marek: Morehead City DCM
This is with reference to your request to modify State Permit #91-96, which was issued to Bald Head Island,
Limited on June 3, 1996. It expires on 12/31/07. The action proposed in your submittal is to reinforce a portion of the
existing bulkhead within Deep Point Marina, adjacent to the Cape Fear River, in Southport, Brunswick County. As
shown in the plans, the area to be reinforced would measure approximately 40' in length, adjacent to the "baggage
holding area". Upon reviewing the submittal and contacting our Major Permits Processing Coordinator, I have
determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the
original purpose and intent of the permit. However, please be aware that this refinement does not authorize any fill
between the bulkhead and the pilings to be installed.
I hereby submit this Letter of Refinement authorizing the modification of State Permit #91-96, as described in
your letter and plans dated December 4, 2007. By copy of this letter we are also notifying the U. S. Army Corps of
Engineers of our action.
If you have any questions concerning the above or if I can be of any other assistance, please advise.
*Sincerely, k4lr��
Steven H. Everhart, PhD
District Manager
cc: Doug Huggett, DCM
Dave Timpy, COE
Linda Lewis, DWQ
Wayne Strickland, LPO
Wilmington Files
127 Cardinal Drive Extension, Wilmington North Carolina 28405-3845
Phone: 910-796-7215 \ FAX: 910-395-3964 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper
YYiY 1111� fUW1i
Land
Cross
Section A -A
Pilings set 1 foot
from bulkhead
face to allow
[I for concrete
whalers,
1`
MLW 0'
1 u r I --�
Existing
bottom depression
I
I I
I 1
r ,
I I
I !
r I
1 �
I I
r �
F
PthtR A R uoaA
TAIR
G.3
EtEC RRRI
uose
04
5,66t FMSI
1`
MLW 0'
_41
M
I
I
I
I
I
Proposed large!
rip -rap rocks.
WM�94
M
--- - O
{ G U 0 0 0 0 0 0 0 o a
W E 3 T CUR 8S I➢E PICK-UP -- ENTRY I EI T EAST CU R B SI BE PICK-UP
III .S
1106 .A SIIpf. AFEA } IfUI6 EAT
t 7AREA
lies
BAGGAGE RACKS
1 2 3 4 5 6
RATION-£_
IWF-LI1411 AREA -
7 -6'
Ilea
BAGGAGE DEVICE
�Ii€ i111YY1Ia1B=.Ig=€9Re4 -
2i
Initial Repair T
40± Feet
Area of ! o;nd�i,rip Struction A►rn i h11J11 head 230± Fee' -
Reinforcement Location Plan
Front Ele ,a+ion D
/,--(5) Propos d pressure treated pilings,
Prop sed 12" x 12" concrete whalers
1
1 1
1 1
1 1
1 1
I I
! E
1 1
t t
1 1
36 inch
1 1
! !
i
t --
{ rip -rap
! concrete
f
r fill material.
sheet pile
Air % A � of,& P/1x vM vS
(existing)
Existing
; '
br-�tom A,Ii,VbA Ro p �g`4ve3T
'cI4r,ession",
contour
r
t
N
1 1
I I
I I
I
A
!
,
!!
I I
I I
t•,a�et
20 40
SCALE: 1' = ?o'
Notes:
t,,�tt
tttp�
w`
1) INITIAL REINFORCEMENT TO BE DONE ALONG 40111- FEET AS
SHOAVN.
2) RE UIF I <Al `' =T -5 . � _ DDITIONAL RE I NF O R C E MENT SHALL
BE DECIDED AS LANII-SIDE CONSTRUCTION PROCEEDS
ALONG THE BULKHEAD.
REVISION ATES
CAMA 91-96
1
==
L; .
REIFOR
LETTER OF F1ENT
FOR: Bald Head Island
Planning Dept.
E MARE', .-.
P.O. BALD HEAD I LAND,
CIRTH CAROLIN
(910) 457.751
a T, NC
BULKHEAD
REINFO—M—EMUNT
Bulkhead Reinen n'Gn (Nc>t to Scd _'/
w d c..-.. '`me✓ 6�..: way em..°
DCM WILMINGTON, NC
DEC 0 4 2007