Loading...
HomeMy WebLinkAbout91-96 Letter of Refinement 12/13/2007 Bald Head Island Limited LLC-- r North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary Mr. Bruce Mazek ?' December 11, 2007 IVEE �TI """""j.li! PO Box 3069 DEC 1 7 Z007 4'i Bald Head Island, NC 28461 Dear Mr. Marek: Morehead City DCM This is with reference to your request to modify State Permit #91-96, which was issued to Bald Head Island, Limited on June 3, 1996. It expires on 12/31/07. The action proposed in your submittal is to reinforce a portion of the existing bulkhead within Deep Point Marina, adjacent to the Cape Fear River, in Southport, Brunswick County. As shown in the plans, the area to be reinforced would measure approximately 40' in length, adjacent to the "baggage holding area". Upon reviewing the submittal and contacting our Major Permits Processing Coordinator, I have determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of the permit. However, please be aware that this refinement does not authorize any fill between the bulkhead and the pilings to be installed. I hereby submit this Letter of Refinement authorizing the modification of State Permit #91-96, as described in your letter and plans dated December 4, 2007. By copy of this letter we are also notifying the U. S. Army Corps of Engineers of our action. If you have any questions concerning the above or if I can be of any other assistance, please advise. *Sincerely, k4lr�� Steven H. Everhart, PhD District Manager cc: Doug Huggett, DCM Dave Timpy, COE Linda Lewis, DWQ Wayne Strickland, LPO Wilmington Files 127 Cardinal Drive Extension, Wilmington North Carolina 28405-3845 Phone: 910-796-7215 \ FAX: 910-395-3964 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper YYiY 1111� fUW1i Land Cross Section A -A Pilings set 1 foot from bulkhead face to allow [I for concrete whalers, 1` MLW 0' 1 u r I --� Existing bottom depression I I I I 1 r , I I I ! r I 1 � I I r � F PthtR A R uoaA TAIR G.3 EtEC RRRI uose 04 5,66t FMSI 1` MLW 0' _41 M I I I I I Proposed large! rip -rap rocks. WM�94 M --- - O { G U 0 0 0 0 0 0 0 o a W E 3 T CUR 8S I➢E PICK-UP -- ENTRY I EI T EAST CU R B SI BE PICK-UP III .S 1106 .A SIIpf. AFEA } IfUI6 EAT t 7AREA lies BAGGAGE RACKS 1 2 3 4 5 6 RATION-£_ IWF-LI1411 AREA - 7 -6' Ilea BAGGAGE DEVICE �Ii€ i111YY1Ia1B=.Ig=€9Re4 - 2i Initial Repair T 40± Feet Area of ! o;nd�i,rip Struction A►rn i h11J11 head 230± Fee' - Reinforcement Location Plan Front Ele ,a+ion D /,--(5) Propos d pressure treated pilings, Prop sed 12" x 12" concrete whalers 1 1 1 1 1 1 1 1 1 I I ! E 1 1 t t 1 1 36 inch 1 1 ! ! i t -- { rip -rap ! concrete f r fill material. sheet pile Air % A � of,& P/1x vM vS (existing) Existing ; ' br-�tom A,Ii,VbA Ro p �g`4ve3T 'cI4r,ession", contour r t N 1 1 I I I I I A ! , !! I I I I t•,a�et 20 40 SCALE: 1' = ?o' Notes: t,,�tt tttp� w` 1) INITIAL REINFORCEMENT TO BE DONE ALONG 40111- FEET AS SHOAVN. 2) RE UIF I <Al `' =T -5 . � _ DDITIONAL RE I NF O R C E MENT SHALL BE DECIDED AS LANII-SIDE CONSTRUCTION PROCEEDS ALONG THE BULKHEAD. REVISION ATES CAMA 91-96 1 == L; . REIFOR LETTER OF F1ENT FOR: Bald Head Island Planning Dept. E MARE', .-. P.O. BALD HEAD I LAND, CIRTH CAROLIN (910) 457.751 a T, NC BULKHEAD REINFO—M—EMUNT Bulkhead Reinen n'Gn (Nc>t to Scd _'/ w d c..-.. '`me✓ 6�..: way em..° DCM WILMINGTON, NC DEC 0 4 2007