Loading...
HomeMy WebLinkAbout24-08 Minor Mod 6/2022 East Carolina University LLC Oversized PlansQ� I 1 I 1 � SITE I( VICINITY MAP I NOT TO SCALE I i I I I 1 SITE SHEET INDEX I I I 1-0.0 OVERALL SITE COMPOSITE PLAN I 1-0.1 EXISTING CONDITIONS PLAN AND EROSION, SEDIMENT CONTROL & 1 GRADING NOTES L1,1 CONCRETE LAYOUT AND MATERIALS PLAN AND DETAILS i PROJECT ADDRESS: COASTAL STUDIES INSTITUTE 850 NC 345 WANCHESE, NC 27981 THE AREA DEPICTED IS LOCATED IN ZONE AE AND IS LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA AS TAKEN FROM N.F.I.P. RATE MAP DATED JUNE 19, 2020 COMMUNITY PANEL NUMBER 3720978800K (BFE = 4). PROJECT AREA IS LOCATED IN AN ENVIRONMENTALLY SENSITIVE REGION AND ALL IMPROVEMENTS MUST BE LIMITED TO THE DESIGNATED LIMITS OF LAND DISTURBANCE. THE CONTRACTOR SHALL ENSURE THAT AREAS OUTSIDE OF THE LIMITS OF LAND DISTURBANCE ARE NOT ADVERSELY IMPACTED BY ANY CONSTRUCTION ACTIVITIES. a OVERALL SITE COMPOSITE �cgMq EXISTING PARKING LOT AREA a Nnr \ I f I i f I I 1 { i i � I I 1 _ II )URTYA D ON AR A ' I Y Q Q VI WmW� N� U Cyuj�, Q o: ¢I n OI' UI O to I I I I I I i• I I I I I I I I I i / / / / / / N 20 10 0 20' 1 "=20'-0" 7SE SEAL RECEIVED APR 2 g 2022 DC _(Jr) c� M N M m z Lli a_ oQ o LL- a W U V) W� o� N N C N � I 0 w Q HIT TEG PROJECT N0, 20210125 CLIENT PROJECT NO. AIM-1735 PROJECT TITLE ECU COASTAL STUDIES INSTITUTE OUTDOOR CLASSROOM CONCRETE ADDITION DRAWING TITLE OVERALL SITE COMPOSITE PLAN DRAWING NO. I BUILDING ABOVE \ SILT FENCE _ x x X —x— — — x— \ LIMIT OF DISTRUBANCE \- — — — — — — —... — — — — — — — — i i i i i i i i / EXISTING CONDITIONS - WEST EROSION NOTES: 1. SEED AND MULCHING OR OTHERWISE PROVIDE GROUND COVER DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION FOR ALL EXPOSED SLOPES WITHIN 14 WORKING DAYS OF COMPLETING ANY PHASE OF GRADING. 2. CONTRACTOR SHALL INSPECT AND MAINTAIN AS NEEDED ALL EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH 1.0" OVER 24-HOUR PERIOD RAINFALL EVENT. FAILURE TO KEEP EROSION CONTROL DEVICES IN GOOD WORKING ORDER MAY RESULT IN ISSUANCE OF A STOP WORK ORDER OR CIVIL PENALTIES UP TO $5,000 PER DAY OF VIOLATION. STIES UTILIZING SEDIMENT TRAPS MUST ALSO SPECIFY A MAXIMUM DEPTH OF SEDIMENT PRIOR TO CLEAN OUT. 3. ALL DEWATERING OPERATIONS SHALL BE FILTERED PRIOR TO LEAVING THE SITE. 4. ALL STREETS SHOULD BE SWEPT AS NEEDED BUT AT LEAST WEEKLY TO CONTROL SEDIMENT FROM LEAVING THE SITE DURING GRADING ACTIVITIES. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND SEPARATION FOLLOWING EVERY 1.0" OVER 24-HOUR PERIOD RAINFALL EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMEi 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATION IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 4. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES ONCE ±80% PERMANENT VEGETATION STABILIZATION IS ESTABLISHED. x EXISTING COLUMN (TYP. ) X LAWN 50' DEQ SETBACK ----------------_ 30' CAMA SETBACK ---- -- N O GRADING NOTES: 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 2. AFTER STRIPPING TOPSOIL AND PRIOR TO PLACING FILL, IT IS RECOMMENDED THAT ALL BUILDING, PARKING AND DRIVEWAY AREAS BE ROLLED WITH A VIBRATORY ROLLER TO CONSOLIDATE LOOSE SOILS IN THE UPPER SUBGRADE. COMPACTION TEST RESULTS OF AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY WILL BE REQUIRED PRIOR TO ENGINEER'S APPROVAL FOR FILL PLACEMENT. CONTRACTOR SHALL CONTACT THE ENGINEER AND SCHEDULE A PROOF ROLL FOR SUBGRADE AND WHEN AGGREGATE BASE COURSE HAS BEEN INSTALLED. 3. ALL FILL SHALL PLACED IN 8" LIFTS AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (AST M D698). 4. GRADE ALL AREAS FOR POSITIVE DRAINAGE AWAY FROM BUILDING. 5. GRADING CONTRACTOR SHALL TEMPORARY SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE NTH THE SPECIFICATIONS WITHIN 14 DAYS OF COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GEN17RAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 6. ALL EXCESS TOPSOIL STRIP MATERIAL TO BE HAULED OFF -SITE AND DISPOSED OF AT AN APPROVED SITE. 7. ALL GRASS AREAS SHALL BE BACKFILLED WITH I TOPSOIL AND RAKED DOWN, REMOVING ALL CLODS AND ROOTS, AND LEFT READY FOR SEEDING AND PLANTING AREAS. CJONST UCTION / 1 / x / LAWN VN � � \ EXISTING COLUMN \ (TYP. ) x W I \ > \O m Q x \ CAI z � o , __j_Im • IXL m ry � I - r I I � X � I —LAWN J � I I EXISTING CONDITIONS - EAST SEED BED PREPERATION NOTES 1. SCARIFY SOIL TO A DEPTH OF THREE (3) INCHES AND WORK INTO A SATISFACTORY SEED BED BY DISKING, USE OF CULTIPACKERS, HARROWS, DRAGS AND OTHER APPROVED MEANS. 2. PREPARATION OUTLINED ABOVE SHALL NOT BE DONE WHEN THE SOIL IS FROZEN, WET OR OTHERWISE IN AN UNFAVORABLE CONDITION. 3. BEGIN AND COMPLETE SEEDING OPERATIONS AS OUTLINED AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED, BUT IN NO EVENT LATER THAN 14 CALENDAR DAYS AFTER COMPLETION OF FINAL GRADING. 4. DISTRIBUTE LIME AND FERTILIZER, UNIFORMLY OVER SEED BED AND HARROW, RAKE, OR OTHERWISE WORK SAME INTO SEED BEDS. 5. DISTRIBUTE SEED UNIFORMLY OVER SEED BED. COVER SEED LIGHTLY AFTER SEEDING. 6. NO LIME, FERTILIZER, OR SEED SHALL BE APPLIED DURING A STRONG WIND, WHEN SOIL IS WET OR OTHERWISE UNWORKABLE. SHOULD RAIN FOLLOW SEEDING BEFORE ROLLING IS BEGUN, THE BED SHALL NOT BE ROLLED. LAWN x _x — TEMPORARY SEEDING DATE APR 15-AUG 14 GERMAN MILLET AUG 15-APR 14 RYE (GRAIN) U 50 LBS/ACRE 50 LBS/ACRE YEAR ROUND FERTILIZER 10-20-20 400 LBS/ACRE ANALYSIS SEEDING AND MULCHING ALL ROADWAY AREAS 10 5 0 10' 1 "=10'-0" MARCH 1 - AUGUST 31 SEPTEMBER 1 - FEBRUARY 28 50# TALL FESCUE 50# TALL FESCUE 10# CENTIPEDE 1 O# CENTIPEDE 25# BERMUDAGRASS (HULLED) 35# BERMUDAGRASS (HULLED) 500# FERTILIZER 500# FERTILIZER 4000# LIMESTONE 4000# LIMESTONE WATER AND BORROW LOCATIONS MARCH 1 - AUGUST 31 SEPTEMBER 1 - FEBRUARY 28 75# TALL FESCUE 75# TALL FESCUE 25# BERMUDAGRASS (HULLED) 35# BERMUDAGRASS (HULLED) 500# FERTILIZER 500# FERTILIZER 4000# LIMESTONE 4000# LIMESTONE NOTE: 50# OF BAHIAGRASS MAY BE SUBSTITUTED FOR EITHER CENTIPEDE OR BERMUDAGRASS ONLY UPON ENGINEER'S REQUEST. :U44,1�ml SEAL Y U U ::E V) m 0 z W c- ry I__o a o:� w U ::) cn v) oL N N LLJ wQ TEG PROJECT NO. 20210125 CLIENT PROJECT NO. AIM-1735 PROJECT TITLE ECU COASTAL STUDIES INSTITUTE OUTDOOR CLASSROOM CONCRETE ADDITION DRAWING TITLE EXISTING CONDITIONS PLAN AND EROSION CONTROL & GRADING NOTES DRAWING NO. LO ■ a K + (X.XX) EXISTING SPOT ELEVATION + X.XX PROPOSED SPOT ELEVATION TP TOP OF PAVEMENT TS TOP OF STEP TW TOP OF WALL NG NATURAL GRADE M.E. MATCH EXISTING LAWN - 00 \ f N + 6.83 I BUILDING ABOVE ALIGN WITH EXISTING SCORING OF UPPER PLAZA (3' OC±) Si-- _X X — X -- - x — LIMIT OF DISTRRBANCE x I TP + 17.29 It NG — — _1 6.83 LAWN x Zn W x U� � I co00 Li CD Ld I j WQ CD I Q � I qP q 75' AEC SETBACK EXISTING COLUMN (TYP. ) 50' DEQ SETBACK PROPOSED IMPERVIOUS NOTES: • ADDITIONAL IMPERVIOUS = 258 SF AEC AREA NOTES: • AREA IN AEC BEYOND BUILDING OVERHANG = 15 SF • AREA IN AEC UNDER BUILDING OVERHANG = 338 SF PROPOSED LAYOUT AND MATERIALS — WEST O NOTE: • SCORE CONCRETE PER PLANS. • JOINTS TO MACH EXISTING. • CONCRETE FINISH TO MATCH EXISTING. CVIC,mKin nnnlrlDC-= 4--Tr-pc WA1 I nR WAI W I ^^L1^f-Ar' 2% MAX. IN ALL DIRECTIONS. ONCRETE TO DRAIN. L01 0 CD X EXISTING BUILDING LAWN I T "r W (TYP.) LAWN ( TYP.) o SILTENCE x x x x LIMIT OF DISTURBANCE �— U W U W Q PROPOSED LAYOUT AND MATERIALS —EAST O =TE, WALLS, CURBS, ETC. STRAW BAL 10 mil PLASTIC NOTES: S x 1-6"L ® 18" O.0 EMBEDMENT INTO LINING G CONCRETE WITH HILTI HIT—HY 200 ADHESIVE NATIVE MATERIAL SANDBA 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD BUT NOT WITHIN 50FT EXISTING CONCRETE EXTENDS 6" OR MORE BELOW GRADE) (OPTIONAL) 10 mil PLASTIC OF A PROPOSED/ EXISTING CATCH BASIN AND/ OR INLETS, TOP OF LINING BANK OF PERENNIAL STREAM, SURFACE WATER BODY, OR WETLAND. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED IN CLOSE PROXIMITY OF THE AREA AND SHALL BE CLEARLY VISIBLE. SEE PLAN WOOD OR �— \-BERM 3. GEOMEMBRANE BASIN LINER SHALL CONSIST OF A POLYPROPLENE OR 24 BINDER WIRE METAL I POLYETHYLENE 10 MIL THICK GEOMEMBRANE. SECTIION@"B STAKES (2��� A_A 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE SEED ALL DISTURBED AREAS. PER BALE) REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE GRADE TO DRAIN. 10' MIN 10' MIN BLACK LETTERS BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION. SEE /,- SANDBA PLYWOOD 48" X 24" 6" HEIGHT PLAN �� O O ❑ ■ MAINTENANCE a a I 1 I —III —I I—i -� '�f�' ^� �`` ^` 1�{� ❑ PAINTED WHITE AG SCREWS 1. MAINTAIN WASHOUT STRUCTURE TO PROVIDE ADEQUATE CAPACITY PLUS STEEL "T" POST A MINIMUM OF 12 INCHES, REMOVE AND DISPOSE HARDENED CONCRETE I3 ❑ CONCRETE AND RETURN THE STRUCTURE TO A FUNCTIONAL CONDITION AFTER III Ell Ell —III—III-I I i= WASHOUT REACHING 75% CAPACITY. -I I -I I—) I —I g A A WOOD POST 2. INSPECT WASHOUT STRUCTURE FOR DAMAGE AND MAINTAIN FOR MIN. 10 GA. WI —1 I I —I I I I I II l I� I o o ❑ 3 3.5" X 3.5" X 8' EFFECTIVENESS WEEKELY. I II I II WOOD OR f 3. REMOVE CONCRETE STRUCTURE AND SIGN ON PROJECT COMPLETION, I— METAL DISPOSE CONCRETE IN APPROVED LANDFILL SITE OR RECYCLE. 9J% COMPACTED STAKES (2 4. GRADE THE EARTH MATERIAL TO MATCH EXISTING CONTOURS AND SEED 6"COMPACTED i,' SUBGRADE PER BALE) ❑ LATH AND 3' FLAGGING 1 ACCORDINGLY TO PLANT SCHEDULE. MULCH AREA ACCORDINGLY. 5. PROVIDE 2" SAND LAYER TO CONCRETE WASHOUT PIT. AGGREGATE �" 6X6—W2.1 XW2.1 WWF _.__ �— �-- �-- �-- — ON 3 SIDES BASE COURSE I I _ = �- =�� �� - = �= ❑ ERM 6" 10 mil PLASTIC 10 mil PLASTIC DET 4000 PSI LINING STRAW BALE LINING OR CONCRETE TYP BU D FOR ANY OPTION VEHICULAR CONCRETE WITH TURN -DOWN EDGE IALliCONCRETE WASHOUT DETAIL 0 I I I I I Y I al Q ml m v i LI 0 Li :�ii LI Q UI 0 0l L0I I 10 5 0 I 10' 1 "=10, - 0" STEEL "T" POST WIRE MESH FENCE CRIMP RING CONNECTOR SYNTHETIC WOVEN FILTER FABRIC #57 WASHED STONE FILL SLOPE 1 GROUND LINE SIDE VIEW TO ANCHOR BOTTOM DIG IN 6" DOWN & 6" OUT 8'-0" MAX. ri_", SILT FENCE DETAIL L1.0 N.T.S. THE EAST GROUP ■ Engineering ■ Architecture ■ Surveying ■ Technology ■ Corporate Office 324 Evans Street Greenville, NC 27858 Tel 252.758.3746 Fax 252.830.3954 ■ Branch Office 4325 Lake Boone Trail, Suite 311 Raleigh, NC 27607 Tel 919.784.9330 Fax 919.784.9331 ■ NC Engineering License No. C-0206 NC Architectural License No. 50213 NC Landscape Architectural License No. C-427 SEAL still t®a®8 CAj® RP` '% .4151 1509 A� D�--2D--22 SEAL Y U cn m z W 0_ � o LD it W U w o cn N N N o I et O w Q TEG PROJECT NO. 20210125 CLIENT PROJECT NO. AIM-1735 PROJECT TITLE ECU COASTAL STUDIES INSTITUTE OUTDOOR CLASSROOM CONCRETE ADDITION DRAWING TITLE CONCRETE LAYOUT & MATERIALS PLAN AND DETAILS DRAWING NO. L 1 ■ N.T.S. N.T.S.