HomeMy WebLinkAbout14-23 Moore
Town of North Topsail Beach
Issued by DCM
14-23
Permit Number
Issued to Andrew and Jennifer Moore, authorizing development in the Ocean Hazard (AEC) at 6200 15th Ave, in North Topsail
Beach, Onslow County, as requested in the permittee’s application, dated January 1, 2023, and received on February 3, 2023. This
permit, issued on February 21, 2023, is subject to compliance with the application and site drawing (where consistent with the
permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes: 12 x 45 Deck
(1) All proposed development and associated construction must be done in accordance with the permitted site plan drawings(s) dated by
DCM – MHD CITY February 3, 2023.
(2) The structure must set back a minimum of 60 feet from the first line of stable natural vegetation, as determined by the DCM, the LPO,
or other assigned agent of the DCM.
(3) The proposed dwelling shall each be less than 5,000 square feet of conditioned space and located a minimum distance of 60’
landward of the First Line of Stable Natural Vegetation (FLSNV). No fill or excavation of wetlands is allowed.
(4) All buildings constructed within the Ocean Hazard Area shall comply with the NC Building Code and the Local Flood Damage
Prevention Ordinance as required by the National Flood Insurance Program. If any provisions of the building code or a flood damage
prevention ordinance are inconsistent with any of the following AEC standards, the more restrictive provision shall control.
(5) The oceanfront uncovered deck within the setback area shall not exceed a footprint of 500 square feet.
(Additional Permit Conditions on Page 2)
This permit action may be appealed by the permittee or other qualified persons
within twenty (20) days of the issuing date. From the date of an appeal, any
work conducted under this permit must cease until the appeal is resolved. This
permit must be on the project site and accessible to the permit officer when the
project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on:
DECEMBER 31, 2026
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances. This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management.
Tina Martin
NC Division of Coastal Management
400 Commerce Ave
Morehead City, NC 28557
PERMITTEE or Authorized Agent
(Signature required if conditions above apply to permit)
CAMA
MINOR DEVELOPMENT PERMIT
as authorized by the State of North Carolina, Department of Environmental Quality and
the Coastal Resources Commission for development in an area of environment concern
pursuant to Section 113A-118 of the General Statutes, "Coastal Area Management"
Name: Moore
Minor Permit # 14-23
Date: February 21, 2023
Page 2
(6) The permittee is required to contact the Division of Coastal Management shortly before beginning construction to arrange a
setback measurement that will be effective for sixty (60) days barring a major shoreline change. Substantial progress on
construction must begin within sixty (60) days of the determination or the measurement is void and must be redone.
(7) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Disturbed areas shall be vegetated and stabilized (planted and mulched) within
14 days of construction completion.
(8) The first-floor level of the sills and joists must meet the 100-year flood level elevation.
(9) Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in
shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time when it becomes
imminently threatened, and in any case upon its collapse or subsidence. However, if natural shoreline recovery or beach
renourishment takes place within two years of the time the structure becomes imminently threatened, so that the structure is no
longer imminently threatened, then it need not be relocated or dismantled at that time. This condition shall not affect the permit
holder's right to seek authorization of temporary protective measures allowed under CRC rules.
(10) In no case shall a beach access structure or stairs be constructed in or over the starter dune or berm. Posts and rope
may be used on and over the berm not to exceed six feet beyond the seaward toe of the berm or starter dune.
(11) The beach accessway must not exceed six feet in width and shall provide only pedestrian access to the ocean beach.
(12) The beach accessway must be constructed so as to make negligible alterations to the frontal dunes. This means that the
accessway must be constructed on raised posts or pilings of five feet or less in depth, so that wherever possible only the posts
or pilings touch the frontal dunes without any alteration to the dunes.
(13) Construction of the accessway be shall consistent with all other applicable local ordinances and N. C. Building Code standards.
(14) Any change or changes in the plans for development, construction, and/or land use activities will require re-evaluation and
modification of this permit. All construction shall conform to the N.C. Building Code requirements and all other local, State and
Federal regulations, applicable local ordinances, and FEMA Flood Regulations.
(15) A copy of this permit shall be posted or available on site. Contact this office at 252.725.3908 for a final inspection at
completion of work.
(16) This permit does not authorize any square footage of non-heated or non-air-conditioned areas elevated above ground level,
excluding attic space that is not designed to be load-bearing.
(17) Pursuant to 15A NCAC, Subchapter 7J.0406(b), this permit may not be assigned, transferred, sold, or otherwise disposed of to
a third-party.
(18) The Permittee and/or the Permittee’s Authorized Agent shall be responsible for obtaining any and all necessary authorizations, approvals, or zoning and building permits from the local government having jurisdiction (Town of
North Topsail Beach and/or Onslow County) prior to commencing work.
SIGNATURE:
PERMITTEE or AUTHORIZED AGENT
DATE:
NC Division of Coastal Management
Cashier's Official Receipt
Received From:
Permit No.: IA i?
Applicant's Name:
Project Address:
I i J
20235 A s )D
Date:— 20 L
$ ll) -�/
Check No.{3Q J qIL/ q If��
County: CV sIa")
Please retain receipt for your records as proof of payment for permit issued.
Signature of Agent or Applicant:
r
Signature of Field Representative:
Date:
Date: JiiiLl^
SITE DRAR'ING/APPLICATION CHECKLIST
Please ..rake sure your site drawing includes tire following information required for a CAMAinmor development pemrit.
The Local Permit Officer will help you. if requested.
PHYSIGSL D MENSIONS
J
abelroads
abel highways right-of-ways
abel local setback linesabel any and all structures and driveways currently existing on property
abel adjacent waterbody
PHYSICAL
��+CHARACTERISTICS
Draw and label normal high water line (contact LPO for assistance)
Draw location of on -sue wastewater system
Ifyou s'11 be working in the ocean hazard area
Draw and label dune ridges (include spot elevations)
Draw and label toe of dunes
Identify and locate first line of stable vegetation (contact LPO for assistance)
Draw and label erosion setback line (contact LPO for assistance)
Draw and label topographical features (optional)
If you will be working in a coastal shoreline area:
Show the roofoverhmrg as a dotted line around the structure
Draw, and label landward limit of AEC
Draw and label all wetland lines (contact LPO for assistance)
Draw and label the 30-foot buffer line
DEVELOPMENT PLANS
raw and label all proposed structures
Draw and lalrel areas that will be disturbed and/or landscaped
Note size ofpiling and depth to be placed in ground
Draw and label all areas to be payed or graveled
Show all areas to be disturbed
Show landscaping
NOTE TO APPLICANT
Have you:
completed all blanks and/or indicated if not applicable?
notified and listed adjacent property owners?
included your site drawing?
signed and dated the application?
enclosed the $100.00 fee?
completed an AEC Hazard Notice, if necessary? (Must be signed by the property owner)
FOR STAFF USE
Site Notice Posted _ Final Inspection Fee Received —
Site Inspections
Date of Action: Issued Exempted Denied _Appeal Deadline (20 days from permit action)
�= APPLICATION FOR
y
CAMA MINOR
DEVELOPMENT
Coastal Management
ENVIRONMENTAL QUALITY PERMIT
In 1974, the North Carolina General Assembly passed the Coastal Area Management Act
(CAMA) and set the stage for guiding development in fragile and productive areas that
border the state's stands and oceanfront. Along with requiring special care by those who
build and develop, the General Assembly directed the Coastal Resources Commission
(CRC) to implement clear regulations that minimize the burden on the applicant.
This application for a minor development permit under CAMA is part of the
Commission's effort to meet the spirit and intent of the General Assembly. It has been
designed to be straightforward and require no more time or effort than necessary from
the applicant. Please go over this folder with the Local Permit Officer (LPO) for the
locality in which you plan to build to be certain that you understand what information he
r—
or she needs before you apply.
r
Under CAMA regulations, the minor permit is to be issued within 25 days once a
{
complete application is in hand. Often less time is needed if the project is simple. The
process generally takes about 18 days. You can speed the approval process by making
certain that your application is complete and signed, that your drawing meets the
specifications given inside and that your application fee is attached.
Other permits are sometimes required for development in the coastal area. While these
are not CAMA-related, aye urge you to check with the Local Permit Officer to determine
which of these you may need. A list is included on page two of this folder.
We appreciate your cooperation with the North Carolina Coastal Management Program
and van willingness to build in a way that protects the resources of our beautiful and
productive coast.
Coastal Resources Commission
Division of Coastal Management
REGEWFD
m
FEB
O Q C
Y
D(;Nii-MHD CITY
❑ o
DCM Fatal E01952--2015 Ri,,ocd
Locality
Permit Number ly— ,3
Ocean Hazard _ Estuarine Shoreline_ ORW Shoreline _ Public Trust Shoreline_ Other
(For official use unity
GENERALINFORMATION
LAND OWNER - MAILING
le—
Address
`r.0 uS1aM � Zip4_8�Rhone 11O33%O�bl
31 .._..1 _ _V 1UQ7's.__ 1 -- _-04
WA
am rfirmwm wind �
OF PROJECT: (Address, street name and/or directions to site; name of the
DESCRIPTION OF PROJECT: B-fifall proposed construction and land disturbance.)
ale(.( nn Vy"_Ck-- 4 L'r'
SIZE OFLOT/PARCEL: square feet acres
PROPOSED USE: Residential (Single-family Multi -family ❑ I Commercialiladustrial ❑ Other
COMPLETE EITHER (I) OR (2) BELOW (Comae/ your Loral Permit Officer ifyaa are moisture which AEC applies
to your property):
(1) OCEAN HAZARD AECs: TOTAL FLOORAREA OF PROPOSED STRUCTURE: _ square feet (includes
air conditioned living space, parking elevated above ground level, nun -conditioned space elevated above ground level but
excluding non -load -bearing attic space)
(2) COASTAL SHORELINE AECs: SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT
UPON SURFACESI" square feet (includes the area of the foundation of all buildings, driveways, covered decks,
concrete or masonry patios, etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a State
Stonnwater Manager ermit issued by the NC Division of Energy, Mineral and Land Resources (DEMLR)?
YES_ NO
Ifyes, list the total built upon area/impervious surface allowed for your lot or parcel: square feet.
OTHER PERMITS MAYBE REQUIRED: The actin ity you are planning may require permits other than die CAMA
minor development permit, including. but not limited to: Drinking Water Well, Septic Tank (or otter sanitary waste
Irealnment system), Building, Electrical, Plumbing, Heating and Air Conditioning. Insulation and Energy Conservation, FIA
Certification, Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway Connection, and
others. Check with your Local Permit Officer for more information.
STATEMENT OF OWNERSHIP:
1, the undersigned, an applicant for a LAMA minor development permit, being either the ownepof property in an AEC or a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person
listed as landowner on this application has a significant interest in the real property described therein,. This interest can be
described as: (check one)
an owner or re ord title, Title is tested in name of P.Qa4'P.LL) n1�Cl
see Deed Book 4(j2Vn page�a, in the (�fNs County Registry of Deeds.
an owner by virtue of inheritance. Applicant is an heir to the estate of
; probate was
County.
_if other interest, such as wrifirn contract or lease, explain below or use a separate sheet & attach to this application.
NOTIFICATION OFADJACENT RIPARIAN PROPERTY OWNERS:
I fuNacrimme certify that time following persons arc owners ofpmpcnies adjoining this property. I affirm that 1 have given
ACTUAL NOTICE to each of them concerning ry intent to develop this property and to apply for a CAMA permit.
1, the underigned, acknowledge that the land owner is aware that the proposed development is planned for an area which
may be susceptible to erosion and'or flooding. I acknowledge that the Local Permit Officer has explained to me the particu-
lar hazard problems associated with this lot. This explanation was accompanied by recommendations concerning stabiliza-
tion and floodproofing techniques.
I furthermore certify that I am authorized to grant, and do in fact grant, permission to Division of Coastal Management staff,
the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information
related to this permit application.
This the _3_1 day of ` .20 ; 3
agent for purpose of filing a CAMA permit application
This application includes: general information lihis form), a site dramring as described on the back of this application, the
ovuership shnen.eni, the Ocean FfamM AEC Notice where necessary, a check for S100.00 made parable to the localim and
an,, in/ou'nuaion as mqr be provided arall.v by the applicant The details ofthe application as described If these smn'ces are
inmrparated without referrnee in am- permit which nigv be issued. Deriation f vat these details brill constitute a violation of
nqv permit Am+person developing in an AEC w8/mur permit is subject to civil, criminal and earn (µ'apq k(prl �
=Ea a 3 2023
DGM-Mrtu CaTY
CJ
C
QJ
T
E
0
U
0
a
c
fl-
u
o
n
C3
U
�
a
U
v�
Q
U
�
�
2
n
E
0
d
U
C )
E
O
O
6
E
N
N
W
G
H �
Z O
Q
� w O
w jza'
O
< o W W
Z O
aO. < (
O V)
J U Y
U
O
U
O
J
FEB a 3 NZ
DCM—MhD CITY
}
z
y � =
_
Q
Q
U
c
Q d
U
d N
O
c
Q
n
A
L
N
N
N
U
c
O
�
O
O
� D
^�
v
\}
V
L
n
VM
U
C'n c
T
O
T
O
C
N
U
d
c
O
OU
N
U
N
T
O
O
V
Q
U
c
O
U
A FCF---iVF-V
FEB 3 3 2023
l7cfb0-mijD G'HY
m
T O U N O N O
OY}f06 mW T mL� O.�E
NWL NNQ XLL
TH ti f 0> Q N U1 N J
NNQVJ� LIOQW> man LX-a
Q J QQ 1 n Q L- Y N O 3 9
E Y M to N O O N N N T O -.
no _N T `U Y TM6
CY T N 3 -O C CL Y.i
N M E I 3 O Q m O m O Y N
m E O 00 m T J E - m O Q N
C N N W > y C 0 M= n Q\�
y N0N 1 wouI Ciro N\ O
U Y Y a' L - C -- T O
mmoN QL(n- F-L N41
OY N
N N 3 •• N N �YL
L L Y 3 N - N L
0Y 163 Q WC
'10- HNU
Y M C N
X N- ¢O O
N O > L
H Y O
❑ Q
J
W