Loading...
HomeMy WebLinkAboutTransmittal - 00033hghqran ffa tt & n i h o l 4700 Falls of Neuse Road Suite 300, Raleigh, NC 27609 PROJECT: FEMA Turtle Restoration Project DATE: 10128-01 SUBJECT: Oak Island Sediment Data TRANSMITTAL ID: PURPOSE: For your Information VIA: FROM NAME Katie Finegan 4700 Falls of Neuse Road Suite 300 Raleigh NC 27609 United States TO EMAIL Transmittal 6/3/2021 00033 Info Exchange PHONE Moffatt & Nichol I kfinegan@moffattnichol.com I (919) 781-4626 NAME COMPANY EMAIL heather.coats@ncdenr.gov PHONE heather.coats@ncdenr.g ov maria.dunn@ncwildlife.or maria.dunn@ncwildlife.org 9 kathryn_matthews@fws.gov kathryn_matthews@fws. gov gregory.e.currey@usace. gregory.e.currey@usace.arm army.mil y.mil Mickey.T.Sugg@usace.a Mickey.T.Sugg@usace.army. rmy.mil mil jonathan.howell@ncdenr. jonathan.howell@ncdenr.gov gov REMARKS: Good afternoon, To assist in our discussion tomorrow morning we are providing: -post construction photos of north facing photos taken every 500 ft. (Sta. 270 - 530) -pdf of sediment lab samples where a resample was requested -pdf of sediment lab samples of resampled results -pdf of additional samples not yet provided, which did not require resampling -excel spreadsheet summarizing all sediment lab samples Please choose the link to Download all associated files' as opposed to downloading files individually. Below is a summary of information we can discuss further at meeting. For color, all Munsell dry colors have been reported as 10YR-5/1 or higher. Transmittal DATE: 6/3/2021 TRANSMITTAL ID: 00033 Please see the north facing post construction photos taken every 500 ft. from Station 270 - 530. Recall the project was from Sta. 295 - 475 so some comparison with native can be observed in photos. For sediment sampling the Contractor was consistently taking a sample between elevation 5-8 around the base of the dune. When samples at Sta. 387, 445, 449, 450, & 454 first came back with carbonate above 25% on May 12 (after weekly construction meeting) & 13, the Engineer did not feel this was representative of the material being placed on the beach, so the Engineer directed the Contractor to resample the stations by taking a sample from top of dune (elevation 14) and midway on front dune (elevation 10). Sta. 442 was also resampled in this batch since it was submitted at same time, even though carbonate was below 25%. These resampled results came back on May 18 and are documented in green on spreadsheet, Sta. 454 resampled results were not received at that time. These resampled results still showed carbonate above 25% with the exception of Sta. 387. Also on May 18 Sta. 437 and 439 results received for first time with carbonate above 25%. On May 19 the Contractor and Engineer had discussions to determine how to sample in a way that was representative given the dune construction methodology. At the weekly construction meeting on May 19, Engineer stated that some sediment samples had been received with carbonate on average 2-3% above 25% allowed and was working with the Contractor to resample. On May 20 Engineer provided Contractor direction to resample Sta. 387, 437, 439, 442, 445, 449, 450, and 454 by taking a composite sample from around dune toe (elevation 7) and mixing with a sample taken from foreshore (elevation 4). The Engineer assisted the Contractor onsite in collecting the composite samples. These resampled results came back on May 26 and are documented in orange on the spreadsheet. The final resampled results show Sta between 26- 27 % (spec 25%). Sta. 6.01 - 6.12% (spec 6%). Thanks, Katie Finegan DESCRIPTION OF CONTENTS . 437 and 454 have a carbonate 442 and 445 have a gravel between CITY DATED TITLE NOTES 1 6/3/2021 Dune facing 1 6/3/2021 210526_Oaklsland_Sediment_new.pdf 1 6/3/2021 Requested_Resample_Oaklsland_Sediment.pdf 1 6/3/2021 Resample_Results_Oaklsland_Sediment.pdf 1 6/3/2021 20_21_Oaklsland_Sediment Summary.xlsx Page 2 of 3 Transmittal COPIES: Dawn York Sam Morrison Johnny Martin Brandon Grant (Moffatt & Nichol) (Moffatt & Nichol) DATE: 6/3/2021 TRANSMITTAL ID: 00033 Page 3 of 3