HomeMy WebLinkAboutPermit_to_Bid_ChangesChange
Permit Sheet
Bid Sheet
Staging Areas have been added/removed.
G-005
C-103
Start of eastern end of project is now Sta. 208+55, was Sta. 210+00.
C-101
C-110
Dune at Sta. 235+00 tapers 100 ft to west.
C-102
C-111
Berm width starting at Sta. 237+00 is now 80 ft, was 70 ft.
C-102
C-111
Berm widths from Sta. 239+00 — 251+00 is now 80 ft and Sta. 252+00 -
C-103
C-112
254+00 is now 85 ft, both were 70 ft.
Berm width is 85 ft up to Sta. 255+00, was 70 ft. Berm width tapers
C-104
C-113
from 85 ft to 70 ft from Sta. 255+00 to 268+00, was 70 ft.
Dune at Sta. 275+00 tapers 100 ft to the east.
C-105
C-114
End of eastern end of project is now Sta. 299+47, was Sta. 295+71, in
C-106
C-115
order to tie into 20/21 Project. Neither 20/21 permit or 21/22 permit
had shown dune in area between 63rd St and 61s' St.
Start of western end of project is now Sta. 466+05 was Sta. 501+00, in
C-107
C-116
order to tie into the 20/21 Project.
Sta. 514+00 to 528+00 baseline shifted seaward approx. 7 ft to
C-108 & C-
C-119 & C-
intersection with emergency dune.
109
120
Sta. 545+00 through 570+00 the dune has a flat tie back into existing
C-110 & C-
C-121 & C-
which varies with dune height (13 ft NAVD88 — 14 ft NAVD88) instead
111
122 AND C-
of the 5H:1V slope to tie into existing.
313 & C-
314
Baseline was shifted landward 5 to 30 ft from Sta. 617+53 through Sta.
C-114
C-125
675+56.
through C-
through C-
118
129
If only `Base Project' is awarded Sta. 620+00 through Sta. 653+50 would
C-115
C-126
not receive any berm when 120 ft berm was shown on permit.
through C-
through C-
117
128
Sta. 627+00 through Sta. 630+00 the dune has a flat tie back into
C-115
C-126 & C-
existing at elevation 13 ft NAVD88 instead of the 5H:1V slope to tie into
318
existing.
If only Base Project is awarded Sta. 653+50 through Sta. 677+34 would
C-117 & C-
C-128 & C-
receive a 60 ft berm when 120 ft berm was shown on permit.
118
129
Sta. 661+00 through Sta. 664+00 the dune has a flat tie back into
C-117
C-128, C-
existing at elevation 15.5 ft NAVD88 instead of the 5H:1V slope to tie
320 & C-
into existing.
321
Sta. 667+00 through Sta. 674+00 after the dune 5H:1V on backslope a
C-116
C-129 & C-
flat tie back into existing at elevation 8.0 ft NAVD88. In permit this
through C-
321
occurred from Sta. 647+50 to Sta. 659+50 & Sta. 665+50 to 676+00 at
118
elevation 7.0 ft NAVD88
Sta. 675+00 and Sta. 676+00 the dune has a flat tie back into existing at
C-118
C-129 & C-
elevation 15.5 ft NAVD88 instead of the 5H:1V slope to tie into existing
321
End of western end of project is now Sta. 679+50 was Sta. 676+34.
C-118
C-129
From Sta. 676+34 the dune now tapers 100 ft to the west and then
tapers approximately 216 ft to tie into existing.
Portion of Zone 1 in Jay Bird Shoals was removed
C-119
C-104