HomeMy WebLinkAbout3.5.22 - Oak Island QC ReportDate: 3/5/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 19 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Clear Visibility: 10 TEMPERATURE (F): Min: 48 Max: 73 WIND SPEED (mph): Max: 12, Gusts to 17 Direction: SSE " '~ WAVE HEIGHT ft.: Jay Bird Shoals: 1-3' CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling 1. Progress Summary: - GLDD continues to provide AD/BD Survey Planning for the following 72 hours The dredges dug from both Jay Bird Shoals and Central Reach. 2. Safety: Pre -Shift Meeting The schedule of activities for the day was discussed which included maintenance on dredge systems and housekeeping on vessels and barges. Safety discussed the ongoing inspections of air tools and accessories. The crews completed Stretch and Flex exercises before starting their shift. SSHO Observation All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications. All security fencing is in good shape and is blocking access to work site and the materials and equipment on the fill site. DREDGE PADRE This Day Cumulative Sand Analysis Dredge Revenue Hours 24.00 23.30 0.70 Results of Daily Sediment Inspection: Dredge Work Hours Dredge DelayHours Est. Pa Volume CY 10,128 224 056 The sample was a mix of light, olive, and greenish gray course - grained sand with some shell fragments. Est. Di Volume CY 13,172 161,136 Midnight Station 637+00 DREDGE DODGE This Day Cumulative Turbidity Dredge Revenue Hours 24.00 22.65 1.35 Results of Daily Visual Turbidity Inspection: Dredge Work Hours Dredge Delay Hours Test conducted and within the 15A NCAC 02b.0220 criteria. Est. Pa Volume CY 11,224 106,985 Est. Dig Volume (CY) 14,597 140,319 Results of nearshore Turbidity Inspection: Midnight Station 637+00 STA. 638+00 22 NTU Depth 1' Pay Volume Remaining CY 524,959 2. Explanation of Primary Downtime: Delays include: PADRE:- DODGE:- GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) Area Description Area Description Dredge and Staging Area AB 114 Beach Fill GL 664 Front-end Loader Dred a and Staciing Area MB 1700 Beach Fill D7 Dozer Dredge and Staging Area Kodaic Beach Fill D7 Dozer Dredge and Staging Area Jack Newman Beach Fill D7 Dozer Dredge and Staging Area Ohio River Beach Fill D6 Dozer Dredge and Staging Area Bobbie Ann Beach Fill Kabota Buggy Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area 1 1 Beach Fill 4. Crew: (Includes subcontractors) Labor Classifications Number of Employees Labor Classifications Number of Employees GLDD Key Personnel Beachfill Op erations Pro'ect Manager 1 General Fill Foreman 1 Site Manager 2 Equipment Operators 5 Site Administrator 1 Welders 1 SSHO 1 Shoreman 3 Pro'ect Engineer 0 0 Assistant Pro'ect Engineer 1 Subtotal 10 Site Engineer 5 Subcontractor TI Coastal Quality Control 1 Superintendent 1 Production Engineer 0 Laboror 2 Admin Assistant 0 Subtotal 3 Dredge Operations Subcontractor Coastwise- PSO Dredges PADRE ISLAND Captain 1 Superintendent 0 Chief Engineer 2 Monitors 4 Lever men 2 Subcontractor Coastwise Consultin Trawler Lady Paige Deck Captain 2 Observer - Lisa Rodriguez 1 Engineer 6 Captains 1 Oiler 1 Subtotal 6 Mate 2 TOTAL PERSONNEL 41 Deck Hand 6 Welder 1 Fuel Used(gallons) Subtotal 35 Dodge Island Padre Island 3735 4097 DODGE ISLAND Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Subtotal 23 5. Quality Control Remarks: List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions. ESO / PSO aborad the Dredges Padre Island and Dodge Island (no detections) Trawler reported no relocations for this day 6. Deficiencies Documented by Client: List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken. N/A 7. Prepared by: John C. Killian, Quality Control Mike Hun erford, Project Manager Signature / l/� Signature Daily / Progress / Task Photos Sand Sample 3.5.22 STA 626+00 AS 33 STA 626+00 AS 32 Project Name: Trawler Name: Trawling forDredge(sj: Date (mm/dd/yyyy): Project Captures: COASTWISE CONSULTING ■.; Relocation Trawl Daily Report US Army Corps of Engineers. Trawl Effort # 1 Tow Numbers: 1 3 - Total Tows: �5� By Species: Cc ,/ Lk ✓ Cm _� Dc Ao Start Time First Tow (24 hrs): QDAQ End Time Last Tow (24 hrs): Biologist / Captains: I J SOQ I rl aY PC I -Tll&,r� C Ops Area, Channel or Borrow Area desienation:~ Ops Area Lat/Long (Shoreward): N 33 a rj W ►y _�%T4 Ops Area Lat/Long (Seaward): N j "�• C7 W --T — • 0 CH/ BA - CR- CH/BA- Beaufort Sea State: 0 1 2 3 4 5 6 7 Air Temperature: la — �% °e/F Wind Direction: Wind Speed: L's k. Nave Height: Water Temperature (1 forhom): 13 16 •C/'F Bottom Type: sck-y-\- ENDANGERED SPECIES CAPTURED, Total for the Day: Species: Tow #: Species: Tow #: Species: Tow #: General Release Location Lat/Long: N W and Other Comments (including dredge presence/absence from the job site: c.h CYrakr�, Irn .�hru o _,)tinPv�, 5�i,r,n, Vag C��9 s End rra i ime: End Time: Trawl Effort Capture # Cc Lk Cm / De / Ei Ao Ab Total_ Total Project Capture # Cc / Lk Cm ,/ De Ei AoAb / Total_ Scanned with CamScanner COASTWISE CONSULTING - ODESS DAILY REPORT DATE: n3 l 05 / 7 0 fm US Army corps of Enghwers. Project Name: Oak Island Renourishment Project USACE District: Wilmington Dredge Name: Dodge Island Dredge Firm: GLDD Contract # SAW-2018-02230 Maintenance X / New Work / Beach 1 Load #s: Q 54 _- (Ao Areas worked (stations, borrow area, etc): (P tIkYLO I OAOA I kx I b%f Start Time First Load: 000 End Time Last Load: 2I Q Project Takes by Species: Cc -Lk 0 Cm 0 DcAoOther Location, Lat/Long: N 5 2 345 x W () 7 3 0 3 S RD Beaufort Sea State: 0 'O O2 03 04 5 6 7 8 9 i0 11 12 AIR TEMP:" lS •S IC / OF Wind Direttion and Speed WATER TEMP: Surface Q • fZ/°F Column (mid -depth) — ° C /°F Bottom ° C /°F Condition of deflector: vo Condition of screening: 06d WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO X Which species? (complete Incident form) �I/ 1� SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% 00°0 4x4 Overflow screening: None 25% 50% 75% QUO-D. -- Other screening: Nune 25% 50% 75% 10 Comments type of material, biological specimens, unnsual ci, utttitst races, etc) - may I YVl`X� SQ1111 __._._..._.......__.-.-- Estimate number screened on this day: Shark (any species)_ 0 Horseshoe crab ff BRIDGE WATCH SUMMARY Time Species # Siehtin2s/# Animals Location/Comments U 11 Aft Observers / Watch 0 40 Project Name: Dredge Name: ftw COASTWISE CONSULTING - ODESS Ills X NWR-0-4 a', .... ....... I a& I DATE: 03_ � 64;'- _l ► ► ■� %khq2W2 Dredge Firm: U'S Anny Corps of Engineers. Contract # �J — — Maintenance !New Work 1 Beach Load #s: <47 _ _ _- �J� Areas worked (stations, borrow area, etc): a A-44 ONCIV. 340" Start Time First Load: End TEme Last Load: 7Z5 7:7 (DW 43r&R Project Takes by Species: Cc�Lk�Cm�DcAoOther _ Location, Lat/Longe. N° Jr2 . ��2i x W° 03 (022(p Beaufort Sea State: 0 1 �,! � � 5 6 7 8 9 10 11 12 AIR 4"bl'F Wind Direction and SP eed I I 3 (a A --I LiYt� WATER TEMP: Surface.J'5H (C�°F Column( dmdepth) I P F Bottom '—' ° C /° F Condition of deflector: Condition of screening: WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? Which species? (complete Incident form) SCREEN TYPE Inflow screening: " Overflow screening:0 ----� ' Other screening: Awl pw-r-A 0 I::,.rd=4 o* Ank _ P-.jsoi, SAA4am I None 25% None 25% None 25% YES NO 50% 75% r 50% 75% O%/o 50% 75% 100% Estimate number screened on this day: Shark (any species) Horseshoe cre6��1� „ lmp� Time SileciesIf observers / Watch Hours BRIDGE WATCH SUMMARY # Siizhtin imals Location/Co ents ZONE 2A. ZONE 2B Depth Range Color from to -10 14.1 16.1 18.1 122 20.1 22.1 24.1 26.1 28 28.1 30 30.1 32 32.1 34 34.1 36 36.1 38 0 38.1 39 39.1 50 q GREAT LAKES DREDGE AND DOCK COMPANY ± 2122 YORK ROAD OAK BROOK IL 60523 CIVIL ENGINEERING /SURVEYING DIVISION Phom.(630)574-3000 Fax. (630)574-1515 PROJECT: 72804 Oak Island Beach Renourlshment PROJECT METADATA LEGEND GRAPTTTC SC.AT'r PAGE OF 1 P-I=s (IN FEET) TITLE: 220305 DI Jay Bird Shoals BA Depth Loads 57-62 DISPOSAL DATE 300 0 150 300 600 1200 „� �2-2 i >a- = soo: n 11 Th6 documentrontellns conhd,,w1andpi'upi'ietar,lri Halloo of Great Lakrs Dredge&Dock Company. /f you have reived thin document in ertor, immediately discard or destroy it without ropying or dtstrlbuting f-hff D rune. e.wsereue box (cbDD)�72g oak isia„mgs Pmd In . oodga isia„mga Dredge n .cu g%72ea oak island Di Dredge T i.g.dw Depth Range Color from to -10 14 14.1 16 16.1 18 18.1 20 20.1 22 22.1 24 24.1 26 26.1 28 28.1 30 30.1 32 32.1 34 34.1 36 36.1 38 38.1 39 39.1 50 W \ I I I a \c u �\ o \ / N i LU ' W N \ r O O O JV o G a 0 o` T V U q GREAT LAKES DREDGE AND DOCK COMPANY y � -� 2122 YORK ROAD, OAK BROOK IL 60523 � CIVIL ENGINEERING /SURVEYING DIVISION 0 Phone.(630)574-3000 Fax (630)574-15/5 PROJECT: 72804 Oak Island Beach RenOUrlshment PROJECT METADATA LEGEND li FiAT�tTT�. SC:a 1.r PAGE OF 1 PAG=I (IN FEET) TITLE: 220305 DI Central Reach BA Depth Loads 57-62 , �=„o.,..l a DISPOSAL DATE zoo o ioo ao soo o aa. i inc = aoo: n This documentrontelns confidential and pruprlelar�lri Halloo ol'Grral LaArs Dredge&Dock Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying or dlstrlbuiing fwthu- � rune. cwsereuc box (cboo)loizea oak iaiarimos vmaunonlooaga iaiarimaa oreage nacungliieoa oak iaiana of oreage irxxine.awg ZONE 1 B ZONE 1A -E ZONE 1C i (,;, -wpt. w E ZONE 2C oZONE 2B\ �1 a v a 0 0 ZONE 3 0 m n 0 rn vu o` M O a 0 m a` a° 0 e a 0 8 0 N s o 0 0 U U Depth Range Color from to -10 14 i 14.1 16 16.1 18.1 18 20 20.1 22 q GREAT LAKES DREDGE AND DOCK COMPANY zlzz Yottx ROAD OAK BROOK IL 60523 ± � � � CIVIL ENGINEERING /SURVEYING DIVISION Phone.(630)574-3000 Fax (630)574-15/5 PROJECT: 72804 Oak Island Beach RerIOUrlShmenf PROJECT METADATA LEGEND li FiAP1TTC SC:a 1.r PAGE OF 1 PAG=s (IN FEET) TITLE: 220305 PI Jay Bird Shoals BA Depth Loads 53-57 Baas„o„aloe DISPOSAL DATE 300 0 150 300 800 1200 i >no d99.99582t This documentrontelns confidential and pruprielar�lr, Halloo ol'Grral LaArs Dredge&Dock Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying or dlstrlbuiing fwthu- � rune. cwsere�ocaeuaa box �ckoo)biieoa oak iaiana�o5 woauawnwaare iaanaba oreaea iack'inerr�saa oak isiana vi oreaee iack'ineaxg w u o. 0 a , r-S, v O / O m O\ H P U O M O a 0 m a` a° 0 /�' a ` V M V w w w w z z z z 8 O �� O O N N N N N 9 s o 0 0 a m T U U Depth Range Color from to -10 14 i 14.1 16 16.1 18 18.1 20 20.1 22 22.1 24 24.1 26 26.1 28.1 30.1 32.1 28 30 32 34 q GREAT LAKES DREDGE AND DOCK COMPANY y -� 2122 YORK ROAD, OAK BROOK IL 60523 � CIVIL ENGINEERING /SURVEYING DIVISION Phone.(630)574-3000 Fax (630)574-15/5 PROJECT: 72804 Oak Island Beach RenOUrlshment PROJECT METADATA LEGEND li FiAPtTTC SC:a 1.r PAGE � OF 1 PAG=1 (IN FEET) TITLE: 220305 PI Central Reach BA Depth Loads 53-57 DISPOSAL DATE zoo o ioo soo aoo eoo n This documentrontelns confidential and pruprlelar,lr, Halloo ol'Grral LaArs Dredge&Dock Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying or dlstrlbuiing fwthu- � rune. cwsere�ocaeuaa box �ckoo)biieoa oak iaiana�o5 woauawnwaare iaanaba oreaea iack'inerr�saa oak isiana vi oreaee iack'ineaxg Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: March 5 2022, Saturday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Dodge Island Database Modification Date: March 6 2022 1:00:19 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 13,792,546 58 07:39 08:04 0.41 24 Off Dredge 13,792,545 58 06:37 07:34 0.94 57 Survey Delay Count: 2 Total Delay (h.hh): 1.35 Work Time (h.hh): 22.65 Time Efficiency: 94.4% -mechanical of - one arm Daily Note No record. Fill Site Fill Site Positioning Computer Survey Created on 3/6/2022 1:00 Page 1 of 10 Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a F Datebase: SQL Daily Mate's Log for: March 5 2022, Saturday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Padre Island Database Modification Date: March 6 2022 10:56:23 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 25,517,163 56 18:26 18:29 0.05 3 Pump out Fouled Bridle Connect/Disconnect 25,517,162 1 13:57 14:08 0.17 10 Pump out Other Connect/Disconnect 25,517,161 1 12:13 12:24 0.18 11 Off Dredge Crane Lift from Crew Boat Crew Boat Transfer/Pre-Sh 25,517,160 1 10:50 11:14 0.00 0 Dredge Pump Other Dredge Pump 25,517,159 1 05:41 05:59 0.30 18 Off Dredge Fill Site Flush Line Fill Site Delay Count: 5 Total Delay (h.hh): 0.69 Work Time (h.hh): 23.31 Time Efficiency: 97.1% -mechanical of -one arm Daily Note No record. ISSUE CONNECTING TO PROBE cleaning debris out of dredge pump Created on 3/6/2022 10:57 Page 1 of 11