HomeMy WebLinkAbout3.5.22 - Oak Island QC ReportDate: 3/5/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 19
GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022
WEATHER CONDITIONS: Events: Clear Visibility: 10
TEMPERATURE (F): Min: 48 Max: 73
WIND SPEED (mph): Max: 12, Gusts to 17 Direction: SSE " '~
WAVE HEIGHT ft.: Jay Bird Shoals: 1-3'
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling
1. Progress Summary:
- GLDD continues to provide AD/BD Survey Planning for the following 72 hours
The dredges dug from both Jay Bird Shoals and Central Reach.
2. Safety:
Pre -Shift Meeting
The schedule of activities for the day was discussed which included maintenance on dredge systems and housekeeping on vessels and barges. Safety discussed
the ongoing inspections of air tools and accessories. The crews completed Stretch and Flex exercises before starting their shift.
SSHO Observation
All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications. All security fencing is in good
shape and is blocking access to work site and the materials and equipment on the fill site.
DREDGE PADRE
This Day Cumulative
Sand Analysis
Dredge Revenue Hours
24.00
23.30
0.70
Results of Daily Sediment Inspection:
Dredge Work Hours
Dredge DelayHours
Est. Pa Volume CY
10,128 224 056
The sample was a mix of light, olive, and greenish gray course -
grained
sand with some shell fragments.
Est. Di Volume CY
13,172 161,136
Midnight Station
637+00
DREDGE DODGE
This Day
Cumulative
Turbidity
Dredge Revenue Hours
24.00
22.65
1.35
Results of Daily Visual Turbidity Inspection:
Dredge Work Hours
Dredge Delay Hours
Test conducted and within the 15A NCAC 02b.0220 criteria.
Est. Pa Volume CY
11,224
106,985
Est. Dig Volume (CY)
14,597
140,319
Results of nearshore Turbidity Inspection:
Midnight Station
637+00
STA.
638+00
22 NTU
Depth
1'
Pay Volume Remaining CY
524,959
2. Explanation of Primary Downtime:
Delays include:
PADRE:-
DODGE:-
GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021
3. Site Equipment
(Indicate items of construction equipment other than hand tools at job site)
Area
Description
Area
Description
Dredge and Staging Area
AB 114
Beach Fill
GL 664 Front-end Loader
Dred a and Staciing Area
MB 1700
Beach Fill
D7 Dozer
Dredge and Staging Area
Kodaic
Beach Fill
D7 Dozer
Dredge and Staging Area
Jack Newman
Beach Fill
D7 Dozer
Dredge and Staging Area
Ohio River
Beach Fill
D6 Dozer
Dredge and Staging Area
Bobbie Ann
Beach Fill
Kabota Buggy
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
1
1 Beach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor Classifications
Number of Employees
GLDD Key Personnel
Beachfill Op
erations
Pro'ect Manager
1
General Fill Foreman
1
Site Manager
2
Equipment Operators
5
Site Administrator
1
Welders
1
SSHO
1
Shoreman
3
Pro'ect Engineer
0
0
Assistant Pro'ect Engineer
1
Subtotal
10
Site Engineer
5
Subcontractor TI Coastal
Quality Control
1
Superintendent
1
Production Engineer
0
Laboror
2
Admin Assistant
0
Subtotal
3
Dredge Operations
Subcontractor Coastwise- PSO Dredges
PADRE ISLAND
Captain
1
Superintendent
0
Chief Engineer
2
Monitors
4
Lever men
2
Subcontractor Coastwise Consultin
Trawler Lady
Paige
Deck Captain
2
Observer - Lisa Rodriguez
1
Engineer
6
Captains
1
Oiler
1
Subtotal
6
Mate
2
TOTAL PERSONNEL
41
Deck Hand
6
Welder
1
Fuel Used(gallons)
Subtotal
35
Dodge Island
Padre Island
3735
4097
DODGE ISLAND
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
Subtotal
23
5. Quality Control Remarks:
List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions.
ESO / PSO aborad the Dredges Padre Island and Dodge Island (no detections)
Trawler reported no relocations for this day
6. Deficiencies Documented by Client:
List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken.
N/A
7. Prepared by:
John C. Killian, Quality Control
Mike Hun erford, Project Manager
Signature / l/�
Signature
Daily / Progress / Task Photos
Sand Sample 3.5.22
STA 626+00 AS 33 STA 626+00 AS 32
Project Name:
Trawler Name:
Trawling forDredge(sj:
Date (mm/dd/yyyy):
Project Captures:
COASTWISE CONSULTING ■.;
Relocation Trawl Daily Report US Army Corps
of Engineers.
Trawl Effort # 1
Tow Numbers: 1 3 - Total Tows: �5�
By Species: Cc ,/ Lk ✓ Cm _� Dc Ao
Start Time First Tow (24 hrs): QDAQ End Time Last Tow (24 hrs):
Biologist / Captains: I J SOQ I rl aY PC I -Tll&,r� C
Ops Area, Channel or Borrow Area desienation:~
Ops Area Lat/Long (Shoreward): N 33 a rj
W ►y _�%T4
Ops Area Lat/Long (Seaward): N j "�• C7
W --T — • 0
CH/ BA - CR-
CH/BA-
Beaufort Sea State: 0 1 2 3 4 5 6 7 Air Temperature: la — �% °e/F
Wind Direction: Wind Speed: L's k. Nave Height:
Water Temperature (1 forhom): 13 16 •C/'F Bottom Type: sck-y-\-
ENDANGERED SPECIES CAPTURED, Total for the Day:
Species: Tow #:
Species: Tow #:
Species: Tow #:
General Release Location Lat/Long: N
W
and Other Comments (including dredge presence/absence from the job site:
c.h CYrakr�, Irn .�hru o _,)tinPv�, 5�i,r,n, Vag C��9
s
End
rra i ime:
End Time:
Trawl Effort Capture # Cc Lk Cm / De / Ei
Ao Ab
Total_
Total Project Capture # Cc / Lk Cm ,/ De Ei
AoAb
/
Total_
Scanned with CamScanner
COASTWISE CONSULTING - ODESS
DAILY REPORT
DATE: n3 l 05 / 7 0
fm
US Army corps
of Enghwers.
Project Name: Oak Island Renourishment Project USACE District: Wilmington
Dredge Name: Dodge Island Dredge Firm: GLDD
Contract # SAW-2018-02230 Maintenance X / New Work / Beach 1
Load #s: Q 54 _- (Ao Areas worked (stations, borrow area, etc): (P tIkYLO I OAOA I kx I b%f
Start Time First Load: 000 End Time Last Load: 2I Q
Project Takes by Species: Cc -Lk 0 Cm 0 DcAoOther
Location, Lat/Long: N 5 2 345 x W () 7 3 0 3 S RD
Beaufort Sea State: 0 'O O2 03 04 5 6 7 8 9 i0 11 12
AIR TEMP:" lS •S IC / OF Wind Direttion and Speed
WATER TEMP: Surface Q • fZ/°F Column (mid -depth) — ° C /°F Bottom ° C /°F
Condition of deflector: vo Condition of screening: 06d
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO X
Which species? (complete Incident form) �I/ 1�
SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% 00°0
4x4 Overflow screening: None 25% 50% 75% QUO-D.
-- Other screening: Nune 25% 50% 75% 10
Comments type of material, biological specimens, unnsual ci, utttitst races, etc) - may
I YVl`X� SQ1111
__._._..._.......__.-.--
Estimate number screened on this day: Shark (any species)_ 0 Horseshoe crab ff
BRIDGE WATCH SUMMARY
Time Species # Siehtin2s/# Animals Location/Comments
U
11
Aft
Observers / Watch
0
40
Project Name:
Dredge Name:
ftw
COASTWISE CONSULTING - ODESS
Ills X NWR-0-4 a', .... ....... I a& I
DATE: 03_ � 64;'- _l
► ► ■� %khq2W2
Dredge Firm:
U'S Anny Corps
of Engineers.
Contract # �J — — Maintenance !New Work 1 Beach
Load #s: <47 _ _ _- �J� Areas worked (stations, borrow area, etc):
a A-44 ONCIV. 340"
Start Time First Load: End TEme Last Load: 7Z5 7:7
(DW 43r&R
Project Takes by Species: Cc�Lk�Cm�DcAoOther _
Location, Lat/Longe. N° Jr2 . ��2i x W° 03 (022(p
Beaufort Sea State: 0 1 �,! � � 5 6 7 8 9 10 11 12
AIR 4"bl'F Wind Direction and SP eed I I
3 (a A --I LiYt�
WATER TEMP: Surface.J'5H (C�°F Column( dmdepth) I P F Bottom '—' ° C /° F
Condition of deflector:
Condition of screening:
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS?
Which species? (complete Incident form)
SCREEN TYPE Inflow screening:
" Overflow screening:0
----� ' Other screening:
Awl pw-r-A 0 I::,.rd=4 o* Ank _ P-.jsoi, SAA4am I
None
25%
None
25%
None
25%
YES NO
50% 75% r
50% 75% O%/o
50% 75% 100%
Estimate number screened on this day: Shark (any species) Horseshoe cre6��1� „ lmp�
Time
SileciesIf
observers / Watch Hours
BRIDGE WATCH SUMMARY
# Siizhtin
imals Location/Co ents
ZONE 2A.
ZONE 2B
Depth Range Color
from to
-10
14.1
16.1
18.1
122
20.1
22.1
24.1
26.1
28
28.1
30
30.1
32
32.1
34
34.1
36
36.1
38
0
38.1
39
39.1
50
q GREAT LAKES DREDGE AND DOCK COMPANY
± 2122 YORK ROAD OAK BROOK IL 60523
CIVIL ENGINEERING /SURVEYING DIVISION
Phom.(630)574-3000 Fax. (630)574-1515
PROJECT: 72804 Oak Island Beach Renourlshment
PROJECT METADATA
LEGEND
GRAPTTTC SC.AT'r
PAGE
OF 1 P-I=s
(IN FEET)
TITLE: 220305 DI Jay Bird Shoals BA Depth Loads 57-62
DISPOSAL DATE
300 0
150
300 600
1200
„�
�2-2
i >a- = soo: n
11
Th6 documentrontellns conhd,,w1andpi'upi'ietar,lri Halloo of Great Lakrs Dredge&Dock
Company. /f you have reived thin document in ertor, immediately discard or destroy it without ropying
or dtstrlbuting f-hff
D rune. e.wsereue box (cbDD)�72g oak isia„mgs Pmd In . oodga isia„mga Dredge n .cu g%72ea oak island Di Dredge T i.g.dw
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
34.1
36
36.1
38
38.1
39
39.1
50
W
\ I I
I
a \c
u �\
o \ /
N
i LU ' W
N \
r
O
O
O
JV
o
G
a
0
o`
T
V
U
q GREAT LAKES DREDGE AND DOCK COMPANY
y � -� 2122 YORK ROAD, OAK BROOK IL 60523
� CIVIL ENGINEERING /SURVEYING DIVISION
0 Phone.(630)574-3000 Fax (630)574-15/5
PROJECT: 72804 Oak Island Beach RenOUrlshment
PROJECT METADATA
LEGEND
li FiAT�tTT�. SC:a 1.r
PAGE
OF 1 PAG=I
(IN FEET)
TITLE: 220305 DI Central Reach BA Depth Loads 57-62
, �=„o.,..l a
DISPOSAL DATE
zoo o
ioo
ao
soo o
aa.
i inc = aoo: n
This documentrontelns confidential and pruprlelar�lri Halloo ol'Grral LaArs Dredge&Dock
Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying
or dlstrlbuiing fwthu-
� rune. cwsereuc box (cboo)loizea oak iaiarimos vmaunonlooaga iaiarimaa oreage nacungliieoa oak iaiana of oreage irxxine.awg
ZONE 1 B
ZONE 1A -E
ZONE 1C
i (,;, -wpt. w E
ZONE 2C
oZONE 2B\ �1
a
v a
0
0
ZONE 3
0
m
n
0
rn
vu
o`
M
O
a
0
m
a`
a°
0
e
a
0
8
0
N
s
o
0
0
U
U
Depth Range Color
from to
-10
14 i
14.1
16
16.1
18.1
18
20
20.1
22
q GREAT LAKES DREDGE AND DOCK COMPANY
zlzz Yottx ROAD OAK BROOK IL 60523
± � �
� CIVIL ENGINEERING /SURVEYING DIVISION
Phone.(630)574-3000 Fax (630)574-15/5
PROJECT: 72804 Oak Island Beach RerIOUrlShmenf
PROJECT METADATA
LEGEND
li FiAP1TTC SC:a 1.r
PAGE
OF 1 PAG=s
(IN FEET)
TITLE: 220305 PI Jay Bird Shoals BA Depth Loads 53-57
Baas„o„aloe
DISPOSAL DATE
300 0
150
300 800
1200
i >no d99.99582t
This documentrontelns confidential and pruprielar�lr, Halloo ol'Grral LaArs Dredge&Dock
Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying
or dlstrlbuiing fwthu-
� rune. cwsere�ocaeuaa box �ckoo)biieoa oak iaiana�o5 woauawnwaare iaanaba oreaea iack'inerr�saa oak isiana vi oreaee iack'ineaxg
w
u
o.
0
a
, r-S,
v
O /
O
m
O\
H
P
U
O
M
O
a
0
m
a`
a°
0 /�'
a ` V M V
w w w w
z z z z
8 O �� O O
N N N N N
9
s
o
0
0
a
m T
U
U
Depth Range Color
from to
-10
14
i
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28.1
30.1
32.1
28
30
32
34
q GREAT LAKES DREDGE AND DOCK COMPANY
y -� 2122 YORK ROAD, OAK BROOK IL 60523
� CIVIL ENGINEERING /SURVEYING DIVISION
Phone.(630)574-3000 Fax (630)574-15/5
PROJECT: 72804 Oak Island Beach RenOUrlshment
PROJECT METADATA
LEGEND
li FiAPtTTC SC:a 1.r
PAGE
�
OF 1 PAG=1
(IN FEET)
TITLE: 220305 PI Central Reach BA Depth Loads 53-57
DISPOSAL DATE
zoo o
ioo
soo aoo
eoo
n
This documentrontelns confidential and pruprlelar,lr, Halloo ol'Grral LaArs Dredge&Dock
Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying
or dlstrlbuiing fwthu-
� rune. cwsere�ocaeuaa box �ckoo)biieoa oak iaiana�o5 woauawnwaare iaanaba oreaea iack'inerr�saa oak isiana vi oreaee iack'ineaxg
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: March 5 2022, Saturday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Dodge Island
Database Modification Date: March 6 2022 1:00:19
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
13,792,546 58 07:39 08:04 0.41 24 Off Dredge
13,792,545 58 06:37 07:34 0.94 57 Survey
Delay Count: 2
Total Delay (h.hh): 1.35
Work Time (h.hh): 22.65
Time Efficiency: 94.4%
-mechanical
of - one arm
Daily Note
No record.
Fill Site Fill Site
Positioning Computer Survey
Created on 3/6/2022 1:00 Page 1 of 10
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a F
Datebase: SQL
Daily Mate's Log for: March 5 2022, Saturday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Padre Island
Database Modification Date: March 6 2022 10:56:23
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
25,517,163 56 18:26 18:29
0.05
3 Pump out
Fouled Bridle
Connect/Disconnect
25,517,162 1 13:57 14:08
0.17
10 Pump out
Other
Connect/Disconnect
25,517,161 1 12:13 12:24
0.18
11 Off Dredge
Crane Lift from Crew Boat
Crew Boat Transfer/Pre-Sh
25,517,160 1 10:50 11:14
0.00
0 Dredge Pump
Other
Dredge Pump
25,517,159 1 05:41 05:59
0.30
18 Off Dredge
Fill Site Flush Line
Fill Site
Delay Count:
5
Total Delay (h.hh):
0.69
Work Time (h.hh):
23.31
Time Efficiency:
97.1%
-mechanical
of -one arm
Daily Note
No record.
ISSUE CONNECTING TO PROBE
cleaning debris out of dredge pump
Created on 3/6/2022 10:57 Page 1 of 11