Loading...
HomeMy WebLinkAbout3.27.22 - Oak Island QC ReportDate: 3/27/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 41 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Fair Visibility: 10 TEMPERATURE (F): Min: 41 Max: 65 WIND SPEED (mph): Max: 25, Gusts to 36 Direction: W WAVE HEIGHT ft.: Oak Island Beach: 1-3' ^ �' CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: TI Coastal - third party surveyor and sediment analysis, Coastwise Consulting - ESO and Trawling, 1. Progress Summary: - GLDD continues to provide AD/BD Survey Planning for the following 72 hours The dredges were digging from BA Jay Bird Shoals, pumped 9 loads and the material was placed between Sta. 496+00 to Sta. 500+00 moved from non-boostered subline 4 to boostered subline 3, pumping material west. 2. Safety: Pre -Shift Meeting The schedule of operations for the day was discussed which included standard dredging operations and maintenance activities on the dredges. Safety discussed the new hard hats and their accessories. Stretch and Flex were conducted at the conclusion of preshift. SSHO Observation All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications. Dredge doing a good job of familiarizing the new crew member to both the vessel and its ongoing operations. PADRE ISLAND This Day Cumulative Sand Analysis Dredge Revenue Hours 24.00 16.17 7.83 Results of Daily Sediment Inspection: Dred a Work Hours Dred a Delay Hours Est. Pa Volume CY 7,899 265,633 The sample was a mix of light, olive, and greenish gray course - grained sand with some shell fragments. Est. Dig Volume CY 10,233 342,980 Midnight Station 492+80 DODGE ISLAND This Day Cumulative Turbidity Dredge Revenue Hours 24.00 16.98 7.02 Results of Daily Visual Turbidity Inspection: Dredge Work Hours Dredge Delay Hours Test conducted and within the 15A NCAC 02b.0220 criteria. Est. Pay Volume CY 7,993 1 214,688 Est. Dig Volume (CY) 10,355 379,706 Results of Nearshore & Baseline Turbidity Inspection: Midnight Station 492+80 STA. TI Boat availability Depth Pay Volume Remaining CY 275 679 2. Explanation of Primary STA. TI Boat availability Delays include: PADRE:- Weather, Standby for Subline #3, Crew boat transfer DODGE:- Weather, Standby for Subline #3, & debris in draghead Depth GL# 072804 -Oak Island Re -nourishment Project 2020 12021 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) Area Description AB 114 MB 1700 Kodaic Jack Newman Ohio River Bobbie Ann I Area Descri tion Dredge and Staging Area Beach Fill GL 664 Front-end Loader Dredge and Staging Area Beach Fill D7 Dozer Dredge and Staging Area Beach Fill D7 Dozer Dredge and Staging Area Beach Fill D7 Dozer Dredge and Staging Area Beach Fill D6 Dozer Dredge and Staging Area Beach Fill 1 Kabota Buggy Dredge and Staging Area Beach Fill Challenger Tractor Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area I Beach Fill 4. Crew: (Includes subcontractors) Labor Classifications Number of Employees Labor Classifications Number of Employees GLDD Key Personnel Beachfill Operations Site Manager 1 Site Administrator 1 SSHO 1 Pro'ect Engineer 0 Assistant Pro'ect Engineer 2 Site Engineer 4 Quality Control 1 Production Engineer 0 Admin Assistant 0 Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 E ISLAND Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Quality Control Remarks: ESO / PSO aborad the Dredge Dodge Island and Padre Island (no detections) Trawler reported no relocations for this day, see attahced report 6. Deficiencies Documented by Client: Fuel Used(gallons) Dodge Island 3520 Padre Island 3403 7. Prepared by: John C. Killian, Quality Control Mike Hun erford, Pro'ect Manager Signature C Signature Daily / Progress / Task Photos =t1 . 3.27.22 Sand Samnle Beach Fill Operations DODGE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED DAILY REPORT OF OPERATIONS- HOPPER DREDGES Report # 34 DISTRICT Wilmington, NC DREDGE Dodge Island EXACT LOCATION OF WORK Oak Island Renourishment Project Oak Island, North Carolina [ ] NEW WORK [ ] MAINTENANCE [ X ] BEACH FILL/REHAND DATE 27-Mar-2022 NUMBER OF PERSONS IN CREW 16 Length of Cut 6500 ft CHARACTER OF MATERIAL HOPPER CAPACITY 3600 CU. YDS Width of Cut 3280 ft AVG INSITU DENSITY 1.850 kg/L AV. VOL. BIN WATER 2200 CU. YDS RT to dump 17 NM DENSITY OF WATER 1.025 kg/L AV. UNFILLED CAP. 1400 CU. YDS NAVIGATION AND OTHER DREDGING AIDS (Describe and include statement on adequacy and recommendations) DGPS position track plotting equipment in use. WORK PERFORMED DRAFT FOR LOAD NO. (for one load only) DREDGING AND HAULING AGITATING LIGHT LOADED # OF LOADS TOT. CU. YDS DISPOSAL AREA TOT. CYD.. FORWARD 8.0 19.5 5 9,112 Subline 4 AFT 8.0 19.5 DRAG DEPTH 32 ft Cumulative I I INDICATORS LAST CHECKED ON 2/21/2022 1261 265,924 1 GAS EJECTORS USED NO 0 % OF PUMPING TIME DISTRIBUTION OF TIME AND MILES RUN EFFECTIVE WORKING TIME PUMPING AGITATING DREDGING & HAULING MINUTES HOURS KILOMETERS RUN 214 3.57 TURNING 59 0.98 TO DUMP 217 3.62 CONNECT 33 0.55 DUMPING OR PUMPOUT 247 4.12 DISCONNECT 26 0.43 TO CUT 223 3.72 TOTALS 1019 16.98 NON -EFFECTIVE WORKING TIME TAKING ON FUEL AND SUPPLIES TO AND FROM WHARF OR ANCHORAGE LOSS DUE NATURAL ELEMENTS 93 LOSS DUE TRAFFIC AND BRIDGES MINOR OPERATING REPAIRS TRANSFERRING BETWEEN WORKS LAY TIME FIRE AND BOAT DRILLS MISCELLANEOUS 328 TOTALS 421 LOST TIME MAJOR REPAIRS AND ALTERATIONS CESSATION COLLISIONS TOTAL LOST TIME 0 TOTAL TIME IN PERIOD 1440 AVERAGE SPEED OF DREDGE MINUTES RADAR IN USE CONTINUOUSLY LOADING 0 to 3 knots RTK/Predicted Tides AGITATING TODAY TO DATE GALS. OF FUEL OIL CONSUMED 3,520 118,136 Weather GALS. OF WATER CONSUMED 1,000 28,300 3-15 mph NW. Fair, 40-65 deg REMARKS LOCATION IN CHANNEL: Jay Bird Shoals BA Zone 2A, 2B, 2C DISPOSAL LOCATION: Subline 4 CONTR. REP. PROJ. INSP. ENG. FORM 27A DATE: 3/28/2022 DODGE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED DATE: 3/27/2022 CUBIC YARDS RETAINED (in terms of in place material) PADRE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED DAILY REPORT OF OPERATIONS - HOPPER DREDGES I Report # 35 DISTRICT Wilmington, NC 1DREDGE Padre Island EXACT LOCATION OF WORK Oak Island Renourishrient Project Oak Island, North Carolina [ ] NEW WORK [ ] MAINTENANCE [ X ] BEACH FILUREHAND DATE 27-Mar-2022 NUMBEROFPERSONS IN CREW 16 Length OFCL 3,000 FT CHARACTER OFMATERIAL HOPPER CAPACITY 3600 CU.YDS Width oiCut 700 FT AVG INSITU DENSITY 1.850 kgA. I AV.VOL.BINWATER 2200 CU.YDS FITtodump 17 NM DENSITY OFWATER 1.025 kgA. AV. UNFILLED CAP. 1400 CU.YDS NAVIGATION AND OTHER DREDGING AIDS P—dbe and Include alalement w adequacy and Iecolrrnetrletlons) DGPS position trackplotting equipment in use. W ORKPERFORMED DRAFTFOR LOAD NO. (for One load Only) DREDGING AND HAULING AGITATING LIGHT LOADED #OFLOAD TOT. CIYDS DISPOSAL AREA TOT.CYD.. FORWARD 8.0 19.5 4 9,005 Subline 4 AFr 8.0 19.5 DRAG DEPTH 32 FT Cumulative 1/20/2022 1331 318,960 GAS EJECTORS USED NO 0%OFPUMPINGTIME DISTRIBUTION OF TIMEAN D MILES RU N PUMPING AGITATING REDGING&HAULING MINUTES HOURS 225 3.75 KILOMETERS RUN TURNING TODUMP CONNECT DUMPING OR PUMPOUT 5 230 49 198 0.08 3.83 0.82 3.30 DISCONNECT 291 0.48 TOCUT 173 2.88 TOTALS 909 15.15 NON -EFFECTIVE WORKING TIME TAKING ON FUEL AND SUPPLIES TOAND FROM WHARF OR ANCHORAGE LOSSDUENATURAL ELEMENTS 83 LOSS D U E TRAFFIC AND BRIDGES MINOR OPERATING REPAIRS TRANSFERRING BETWEEN WORKS LAYTIME FIR E AN D BOAT D RILLS MISCELLANEOUS 448 TOTALS 531 LOST TIME MAJOR REPAIRS AN D ALTERATIONS CESSATION COLLISIONS TOTAL LOST TIME 0 TOTAL TIME IN PERIOD 1440 OFOREDGE MINUTES RADAR IN USGo LV LOADING 0 to 3 knots TIDE DATA FROM RTK/Predicted Tides AGITATING TODAY TO DATE GALS, OF FUEL OIL CONSUMED 3,403 128,329 Weather GALS. OFWATER CONSUMED 1,000 35,000 Fair, Temperature: 41-65 deg F,Wind:0-25 mph NNW,Seas: 1'-3', Precipitalon:0.0" REMARKS LOCATION IN CHANNEL Jay Bird Shoals Borrow Area Zone 2( DISPOSAL LOCATION: Subline 4 CONTR. REP. PROD. INSP. ENG. FORM 27A DATE: 3/28/2022 PADRE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED DATE: 3/27/2022 CUBIC YARDS RETAINED (in terms of in place material) Ilil Ilia 11111MMIalllall -•-. ----. ------� --...+•-•------•------•-•------------. - -- -- .- -•-•-------., ---. -;,-� --- --- --------�o--------.... -- - - 7ON rt' i 34' NAVD ZONE 2 37' N,�`�VD Depth Range Color from to -10 14 14.1 16 16.1 18 18.1 20 20.1 22 22.1 24 24.1 26 26.1 28 28.1 30 30.1 32 32.1 34 34.1 36 36.1 38 38.1 39 39.1 50 GREAT LAKES DREDGE AND DOCK COMPANY 0.. 2122 YORK ROAD, OAK BROOK IL 60523 U CIVIL ENGINEERING /SURVEYING DIVISION �eYoa� Phone (630J 574-3000 Far (630) 574-751.5 PROJECT: 72804 Oak Island Beach Renourlshment PROJECT METADATA LEGEND GRAPHIC SCALE PAGE 1 OF 1 PAGES (IN FEET) TITLE: 220327 DI Jay Bird Shoals BA Depth Loads 123-127 „o DISPOSAL DATE 30D o Aso aao sao �zao �oery - �0.PWNB- onno, E_ a,� i inc soo n ee rve -IT snaen n s e - Th!'dxnment ronlaln' on(tdentlel andp'p'Iary lni'or anon of Creal Lakes Dredge&Dock Compeoy./fy-have erelved the doc ,tfierror, immediately dls ,, destroy,t without ropying or dst,,buling f-hff �E rvnniE C.1U—WC g pb-(cLDD)--n oek is+anaM vmauclomooage is1-11M-1,.T—k.,,-22-111—oek Islam of Oreage T—k.,, 1, ZONE 1 B ZONE 1A -E ZONE 1C ZONIF�: 2A,� W E 4' "'lAVDZONE 2C 88 ` S 37' NAVD88 ZONE J t N �V Ir 9 e r ZONE 3 � �JY G a 8 N n U U 29' NAVD88 0 0 a 0 e 0 0 e a 0 / 0 N s 9 0 Q 0 U Depth Range Color from to -10 14 14.1 16 16.1 18 18.1 20 20.1 22 22.1 24 24.1 26 26.1 28 28.1 30 30.1 32 32.1 34 34.1 36 PROJECT: 7'z8O4 Oak Island BeachR21lOUfISll lll2llt PROJECT METADATA LEGEND G�lAPHIC" Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a F Datebase: SQL Daily Mate's Log for: March 27 2022, Sunday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Dodge Island Database Modification Date: March 28 2022 9:12:24 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 13,792,601 16:00 21:00 5.00 300 Off Dredge Fill Site Fill Site 13,792,600 125 13:37 13:51 0.23 14 Off Dredge Fill Site Flush Line Fill Site 27,267,286 11:43 11:54 0.18 11 Drag Head Clean Drag Head/Trash Drag Head 27,267,285 11:27 11:38 0.18 11 Drag Head Clean Drag Head/Trash Drag Head 27,267,284 11:13 11:22 0.15 9 Drag Head Clean Drag Head/Trash Drag Head 27,267,283 10:54 11:07 0.22 13 Drag Head Clean Drag Head/Trash Drag Head 27,267,281 08:16 08:23 0.12 7 Drag Head Clean Drag Head/Trash Drag Head 27,267,280 07:58 08:10 0.20 12 Drag Head Clean Drag Head/Trash Drag Head 13,792,599 07:44 07:57 0.23 14 Drag Head Other Drag Head 13,792,598 00:00 01:33 1.56 94 Weather Weather Weather Delay Count: 10 Total Delay (h.hh): 7.02 Work Time (h.hh): 16.98 Time Efficiency: 70.8% -mechanical of - one arm Repairs for debris in draghead Repairs for debris in draghead Repairs for debris in draghead Repairs for debris in draghead Repairs for debris in draghead Repairs for debris in draghead big pipe in draghead Created on 3/28/2022 11:14 Page 1 of 13 Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: March 27 2022, Sunday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Padre Island Database Modification Date: March 28 2022 11:09:18 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 25,517,232 13:55 20:14 6.32 379 Off Dredge Add / Remove Subline Subline 25,517,231 08:32 08:44 0.19 12 Off Dredge Crew Boat Transfer Crew Boat Transfer/Pre-Sh 25,517,230 130 00:12 01:36 1.39 83 Weather Weather Weather Delay Count: 3 Total Delay (h.hh): 7.90 Work Time (h.hh): 16.10 Time Efficiency: 67.1% - mechanical oM - one arm Daily Note No record. Created on 3/28/2022 11:10 Page 1 of 8 COASTME CONSULTING ` ' L Relocation Trawl Daily Report us Of Err veers. Project Name: _ O A K A E 5 Tn 2 ,9 T(-, j 114y J F c-'r Trawler Name: LA P X P n 14 I% Trawl Effort # i Trawling for Dredge(s): t o 94 E -+ P a D?_ C IS JA rI 4 Date (mm/dd/yyyy): 103 )2 20 2Z Tow Numbers:. 2 ! % - I Z J Total Tows: •Z Project Captures: 10 By Species: Cc J Lk I Cm 0 Dc GL Ao 21 Start Time First Tow (24 firs): 2 151 End Time Last Tow (24 firs): S Biologist / Captains : 4 A N in I E Z I k 4 4, I Cf W 1 L L I Oos Area. Channel or Borrow Area desienation: Ops Area Lat/Long (Shoreward): N 33 W 7R Ops Area Lat/Long (Seaward): N 3' W 79 sz ? sy 03 SSs SI 9dl 1 S?L Of/ BA- JCS CH / BA- J R f Beaufort Sea State: 0 1 2 3 4 5 6 7 AirTempwdWre: Wind Direction: ti' ��' w - Wind Speed: ' J — / S k k r Wave Height: Water Temperature (1 fathom): > > , i N Bottom Type: S„ v ,� ENDANGERED SPECIES CAPTURED, Total for the Day: Species: Species: Species: General Release Location Lat/Long: l;11111111 Bycatch and Other Comments (including dredge presence/absence from the job site: 140a rF 1I-Io6 CAA ( .S ) BI-a e4,r 6 . JEGcyF! r End Tune: End Time: End rune: —T2/1 W LC 2 D2nP/'r D nn1�2 ODZ i�l�>' U �' Q/I! �2 F02 1jAY L/L K7' f' �FP9/ L,-r/4. 0,700 Trawl Effort Capture # Cc2 Lk Cm� Dc Ei�- Ao Z ? Abf� Total 1,,, Total Project Capture # Cc 3 Lk `1 Cm --A— DC-4 Ei_4_Ao Ab_V Total J,, , COASTWISE CONSULTING - ODESS DAILY REPORT US Army corps of Engineers DATE:_0,3 / 2-1 / 2 2 + Project Name: ChA r�1ar7d Qen0urk5hme,nf USACE District: .__ �1 `h'j n O Lnn Dredge Name: s i Dredge Firm: _ L IDS Contract # _5A Y,J -aD 1`2 - 0.0 n Maintenance �� / New Work / Beach Load #s:_L Z 12 rp Areas worked (stations, borrow area, etc): ZOnc — -A, $ , (� , Start Time First Load: 3' 26 End Time Last Load: oZ n Project Takes by Species: Cc_Lk N Cm_!S� Dc Ao__t�,_Other Location, L.at/Long: N. 33 5a 339 x W 71 ° 03 (1P Beaufort Sea State: 0 1 4 5 6 7 S 9 10 11 12 AIR TEMP " .`7 ° C F Wind Direction and Speed S, W, N1 1, N NW1. Vr/ iB$— W ATER TEMP: Surface 16.Z ° D/° F Column (mid -depth) ° C /° F Bottom l ° C :"' F Condition of deflector: Ccc oct Condition of screening: 0d' WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO 1 Which species? (complete Incident form)_ _7 SCREEN TYPE L4 Y14 Inflow screening: None 25% 50% 75% slo Overflow screening: None 25% 50% 75% Other screening: None 25% 50% 75% Estimate number screened on this day: Shark (any species) Horseshoe crab BRIDGE WATCH SUMMARY Time Species Observers / Watch Hou # Siahtines/# Animals Location/Comments 33'S3.2-*g Al / COASTWISE CONSULTING - ODESS �.■. DAILY REPORT US Army Corps of Engineers, DATE: Ofi Project Name:���,��. Vcua szxsarndai Ek= U-SACE Dis ct: � Dredge Name:- Dredge Firm: C o ntra ct #. i c� - ()7 --7 32r -N _ maintenance 1 New Work 1 Beach .._ Load fto. le - � Areas worked (stations, borrow area, etch: , "cA u.,an �aSOm&L ?A�,�� Start Time First Load: End Time Last Load: M 031 2!0 Project Takes by Species: Cct2 Lk�c M De Ao Other Location, LatlLonge N��° '.52 (06!5 x W :2!1 D 3 �51 Beaufort Sea State: 0 1 2 3 4j) 5 6 7 8 9 10 11 12 AIR TEMP:. l —11;3L Q/D F Wind Direction and Speed WATER TEMP: Surface -.A 5• KP F Column (mid -depth) ^--- ° C /° F Bottom ° C JIDF Condition of deflector, I (�7� Condition of screen4k ing: WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES WIM NO which species? (complete Incident form) SCREEN TYPE;� k 0 Inflow screening: None �S��a 50% 75%0 40 1 � Overflow screening: None 25% 50% 75% 100% Other screening: None 25% 50% 75% 100% Comments (type of material, bl"ological specimens, unusual circumstances, etc): 4.1") XL5- a I Ascr Now __V O.V- .1) Z Estimate number screened an this day: Shark (any species) Flvrseshoe crab BRIDGE WATCH SUMMARY Dine Snecies # SightingsM Animals Location/Comments Observc.rs 1 Watch Hours Q1 I— C7 VA-X.l000 1 --- �� ��