HomeMy WebLinkAbout3.27.22 - Oak Island QC ReportDate: 3/27/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 41
GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022
WEATHER CONDITIONS: Events: Fair Visibility: 10
TEMPERATURE (F): Min: 41 Max: 65
WIND SPEED (mph): Max: 25, Gusts to 36 Direction: W
WAVE HEIGHT ft.: Oak Island Beach: 1-3' ^ �'
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name: TI Coastal - third party surveyor and sediment analysis, Coastwise Consulting - ESO and Trawling,
1. Progress Summary:
- GLDD continues to provide AD/BD Survey Planning for the following 72 hours
The dredges were digging from BA Jay Bird Shoals, pumped 9 loads and the material was placed between Sta. 496+00 to Sta. 500+00
moved from non-boostered subline 4 to boostered subline 3, pumping material west.
2. Safety:
Pre -Shift Meeting
The schedule of operations for the day was discussed which included standard dredging operations and maintenance activities on the dredges. Safety
discussed the new hard hats and their accessories. Stretch and Flex were conducted at the conclusion of preshift.
SSHO Observation
All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications. Dredge doing a good job of
familiarizing the new crew member to both the vessel and its ongoing operations.
PADRE ISLAND
This Day
Cumulative
Sand Analysis
Dredge Revenue Hours
24.00
16.17
7.83
Results of Daily Sediment Inspection:
Dred a Work Hours
Dred a Delay Hours
Est. Pa Volume CY
7,899
265,633
The sample was a mix of light, olive, and greenish gray course -
grained
sand with some shell fragments.
Est. Dig Volume CY
10,233
342,980
Midnight Station
492+80
DODGE ISLAND
This Day
Cumulative
Turbidity
Dredge Revenue Hours
24.00
16.98
7.02
Results of Daily Visual Turbidity Inspection:
Dredge Work Hours
Dredge Delay Hours
Test conducted and within the 15A NCAC 02b.0220 criteria.
Est. Pay Volume CY
7,993
1 214,688
Est. Dig Volume (CY)
10,355
379,706
Results of Nearshore & Baseline Turbidity Inspection:
Midnight Station
492+80
STA.
TI Boat availability
Depth
Pay Volume Remaining CY
275 679
2. Explanation of Primary
STA.
TI Boat availability
Delays include:
PADRE:- Weather, Standby for Subline #3, Crew boat transfer
DODGE:- Weather, Standby for Subline #3, & debris in draghead
Depth
GL# 072804 -Oak Island Re -nourishment Project 2020 12021
3. Site Equipment (Indicate items of construction equipment other than hand tools at job site)
Area
Description
AB 114
MB 1700
Kodaic
Jack Newman
Ohio River
Bobbie Ann
I
Area
Descri tion
Dredge and Staging Area
Beach Fill
GL 664 Front-end Loader
Dredge and Staging Area
Beach Fill
D7 Dozer
Dredge and Staging Area
Beach Fill
D7 Dozer
Dredge and Staging Area
Beach Fill
D7 Dozer
Dredge and Staging Area
Beach Fill
D6 Dozer
Dredge and Staging Area
Beach Fill
1 Kabota Buggy
Dredge and Staging Area
Beach Fill
Challenger Tractor
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
I Beach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor
Classifications
Number of Employees
GLDD Key Personnel
Beachfill Operations
Site Manager
1
Site Administrator
1
SSHO
1
Pro'ect Engineer
0
Assistant Pro'ect Engineer
2
Site Engineer
4
Quality Control
1
Production Engineer
0
Admin Assistant
0
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
E ISLAND
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
Quality Control Remarks:
ESO / PSO aborad the Dredge Dodge Island and Padre Island (no detections)
Trawler reported no relocations for this day, see attahced report
6. Deficiencies Documented by Client:
Fuel Used(gallons)
Dodge Island
3520
Padre Island
3403
7. Prepared by:
John C. Killian, Quality Control Mike Hun erford, Pro'ect Manager
Signature C Signature
Daily / Progress / Task Photos
=t1 .
3.27.22 Sand Samnle Beach Fill Operations
DODGE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED
DAILY REPORT OF OPERATIONS- HOPPER DREDGES
Report #
34
DISTRICT Wilmington, NC
DREDGE
Dodge Island
EXACT LOCATION OF WORK
Oak Island Renourishment Project
Oak Island, North Carolina
[ ] NEW WORK
[ ] MAINTENANCE
[ X ] BEACH FILL/REHAND
DATE
27-Mar-2022
NUMBER OF PERSONS IN CREW
16
Length of Cut 6500 ft
CHARACTER OF MATERIAL
HOPPER CAPACITY
3600
CU. YDS
Width of Cut 3280 ft
AVG INSITU DENSITY
1.850 kg/L
AV. VOL. BIN WATER
2200
CU. YDS
RT to dump 17 NM
DENSITY OF WATER
1.025 kg/L
AV. UNFILLED CAP.
1400
CU. YDS
NAVIGATION AND OTHER DREDGING AIDS (Describe and include statement on adequacy and recommendations)
DGPS position track plotting equipment in use.
WORK PERFORMED
DRAFT FOR LOAD NO.
(for one load only)
DREDGING AND HAULING
AGITATING
LIGHT
LOADED
# OF LOADS
TOT. CU. YDS
DISPOSAL AREA
TOT. CYD..
FORWARD
8.0
19.5
5
9,112
Subline 4
AFT
8.0
19.5
DRAG DEPTH
32 ft
Cumulative
I
I
INDICATORS LAST CHECKED ON
2/21/2022
1261
265,924
1
GAS EJECTORS USED
NO
0 % OF PUMPING TIME
DISTRIBUTION OF TIME AND MILES RUN
EFFECTIVE WORKING TIME
PUMPING
AGITATING
DREDGING & HAULING
MINUTES
HOURS
KILOMETERS RUN
214
3.57
TURNING
59
0.98
TO DUMP
217
3.62
CONNECT
33
0.55
DUMPING OR PUMPOUT
247
4.12
DISCONNECT
26
0.43
TO CUT
223
3.72
TOTALS
1019
16.98
NON -EFFECTIVE WORKING TIME
TAKING ON FUEL AND SUPPLIES
TO AND FROM WHARF OR ANCHORAGE
LOSS DUE NATURAL ELEMENTS
93
LOSS DUE TRAFFIC AND BRIDGES
MINOR OPERATING REPAIRS
TRANSFERRING BETWEEN WORKS
LAY TIME
FIRE AND BOAT DRILLS
MISCELLANEOUS
328
TOTALS
421
LOST TIME
MAJOR REPAIRS AND ALTERATIONS
CESSATION
COLLISIONS
TOTAL LOST TIME
0
TOTAL TIME IN PERIOD
1440
AVERAGE SPEED OF DREDGE
MINUTES RADAR IN USE
CONTINUOUSLY
LOADING 0 to 3 knots
RTK/Predicted Tides
AGITATING TODAY TO DATE
GALS. OF FUEL OIL CONSUMED 3,520
118,136
Weather
GALS. OF WATER CONSUMED 1,000
28,300
3-15 mph NW. Fair, 40-65 deg
REMARKS
LOCATION IN CHANNEL: Jay Bird Shoals BA Zone 2A, 2B, 2C
DISPOSAL LOCATION:
Subline 4
CONTR. REP.
PROJ. INSP.
ENG. FORM 27A
DATE: 3/28/2022
DODGE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED DATE: 3/27/2022
CUBIC YARDS RETAINED
(in terms of in place material)
PADRE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED
DAILY REPORT OF OPERATIONS - HOPPER DREDGES
I Report # 35
DISTRICT Wilmington, NC
1DREDGE Padre Island
EXACT LOCATION OF WORK
Oak Island Renourishrient Project
Oak Island, North Carolina
[ ] NEW WORK
[ ] MAINTENANCE
[ X ] BEACH FILUREHAND
DATE
27-Mar-2022
NUMBEROFPERSONS IN CREW
16
Length OFCL 3,000 FT
CHARACTER OFMATERIAL
HOPPER CAPACITY 3600 CU.YDS
Width oiCut 700 FT
AVG INSITU DENSITY 1.850 kgA.
I
AV.VOL.BINWATER 2200 CU.YDS
FITtodump 17 NM
DENSITY OFWATER 1.025 kgA.
AV. UNFILLED CAP. 1400 CU.YDS
NAVIGATION AND OTHER DREDGING AIDS P—dbe and Include alalement w adequacy and Iecolrrnetrletlons)
DGPS position trackplotting equipment in use.
W ORKPERFORMED
DRAFTFOR LOAD NO. (for One load Only)
DREDGING AND HAULING
AGITATING
LIGHT
LOADED
#OFLOAD
TOT. CIYDS
DISPOSAL AREA
TOT.CYD..
FORWARD
8.0
19.5
4
9,005
Subline 4
AFr
8.0
19.5
DRAG DEPTH
32 FT
Cumulative
1/20/2022
1331 318,960
GAS EJECTORS USED
NO
0%OFPUMPINGTIME
DISTRIBUTION OF TIMEAN D MILES RU N
PUMPING
AGITATING REDGING&HAULING
MINUTES HOURS
225 3.75
KILOMETERS RUN
TURNING
TODUMP
CONNECT
DUMPING OR PUMPOUT
5
230
49
198
0.08
3.83
0.82
3.30
DISCONNECT
291
0.48
TOCUT
173
2.88
TOTALS
909
15.15
NON -EFFECTIVE WORKING TIME
TAKING ON FUEL AND SUPPLIES
TOAND FROM WHARF OR ANCHORAGE
LOSSDUENATURAL ELEMENTS
83
LOSS D U E TRAFFIC AND BRIDGES
MINOR OPERATING REPAIRS
TRANSFERRING BETWEEN WORKS
LAYTIME
FIR E AN D BOAT D RILLS
MISCELLANEOUS
448
TOTALS
531
LOST TIME
MAJOR REPAIRS AN D ALTERATIONS
CESSATION
COLLISIONS
TOTAL LOST TIME
0
TOTAL TIME IN PERIOD
1440
OFOREDGE
MINUTES RADAR IN USGo LV
LOADING 0 to 3 knots
TIDE DATA FROM
RTK/Predicted Tides
AGITATING TODAY TO DATE
GALS, OF FUEL OIL CONSUMED 3,403 128,329
Weather
GALS. OFWATER CONSUMED 1,000 35,000
Fair, Temperature: 41-65 deg F,Wind:0-25 mph NNW,Seas: 1'-3', Precipitalon:0.0"
REMARKS
LOCATION IN CHANNEL Jay Bird Shoals Borrow Area Zone 2( DISPOSAL LOCATION: Subline 4
CONTR. REP. PROD. INSP.
ENG. FORM 27A DATE: 3/28/2022
PADRE ISLAND BREAKDOWN OF LOADS DREDGED AND HAULED DATE: 3/27/2022
CUBIC YARDS RETAINED
(in terms of in place material)
Ilil
Ilia
11111MMIalllall
-•-. ----.
------�
--...+•-•------•------•-•------------.
-
--
-- .-
-•-•-------.,
---.
-;,-�
---
---
--------�o--------....
-- - -
7ON rt' i
34' NAVD
ZONE 2
37' N,�`�VD
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
34.1
36
36.1
38
38.1
39
39.1
50
GREAT LAKES DREDGE AND DOCK COMPANY
0.. 2122 YORK ROAD, OAK BROOK IL 60523
U CIVIL ENGINEERING /SURVEYING DIVISION
�eYoa�
Phone (630J 574-3000 Far (630) 574-751.5
PROJECT: 72804 Oak Island Beach Renourlshment
PROJECT METADATA
LEGEND
GRAPHIC SCALE
PAGE
1
OF 1 PAGES
(IN FEET)
TITLE:
220327 DI Jay Bird Shoals BA Depth Loads 123-127
„o
DISPOSAL DATE
30D
o
Aso
aao sao
�zao
�oery -
�0.PWNB-
onno,
E_
a,�
i inc soo n
ee rve
-IT snaen n
s e
-
Th!'dxnment ronlaln' on(tdentlel andp'p'Iary lni'or anon of Creal Lakes Dredge&Dock
Compeoy./fy-have erelved the doc ,tfierror, immediately dls ,, destroy,t without ropying
or dst,,buling f-hff
�E rvnniE C.1U—WC g pb-(cLDD)--n oek is+anaM vmauclomooage is1-11M-1,.T—k.,,-22-111—oek Islam of Oreage T—k.,, 1,
ZONE 1 B
ZONE 1A -E
ZONE 1C
ZONIF�:
2A,� W E
4' "'lAVDZONE 2C
88 ` S
37' NAVD88
ZONE
J t N �V Ir 9
e r
ZONE 3
� �JY
G
a
8
N
n
U
U
29' NAVD88
0
0
a
0
e
0
0
e
a
0
/
0
N
s
9
0
Q
0
U
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
34.1
36
PROJECT: 7'z8O4 Oak Island BeachR21lOUfISll lll2llt
PROJECT METADATA
LEGEND
G�lAPHIC"
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a F
Datebase: SQL
Daily Mate's Log for: March 27 2022, Sunday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Dodge Island
Database Modification Date: March 28 2022 9:12:24
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
13,792,601
16:00 21:00
5.00
300 Off Dredge
Fill Site
Fill Site
13,792,600
125 13:37 13:51
0.23
14 Off Dredge
Fill Site Flush Line
Fill Site
27,267,286
11:43 11:54
0.18
11 Drag Head
Clean Drag Head/Trash
Drag Head
27,267,285
11:27 11:38
0.18
11 Drag Head
Clean Drag Head/Trash
Drag Head
27,267,284
11:13 11:22
0.15
9 Drag Head
Clean Drag Head/Trash
Drag Head
27,267,283
10:54 11:07
0.22
13 Drag Head
Clean Drag Head/Trash
Drag Head
27,267,281
08:16 08:23
0.12
7 Drag Head
Clean Drag Head/Trash
Drag Head
27,267,280
07:58 08:10
0.20
12 Drag Head
Clean Drag Head/Trash
Drag Head
13,792,599
07:44 07:57
0.23
14 Drag Head
Other
Drag Head
13,792,598
00:00 01:33
1.56
94 Weather
Weather
Weather
Delay Count: 10
Total Delay (h.hh):
7.02
Work Time (h.hh):
16.98
Time Efficiency:
70.8%
-mechanical
of - one arm
Repairs for debris in draghead
Repairs for debris in draghead
Repairs for debris in draghead
Repairs for debris in draghead
Repairs for debris in draghead
Repairs for debris in draghead
big pipe in draghead
Created on 3/28/2022 11:14 Page 1 of 13
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: March 27 2022, Sunday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Padre Island
Database Modification Date: March 28 2022 11:09:18
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
25,517,232 13:55 20:14
6.32 379 Off Dredge Add / Remove Subline Subline
25,517,231 08:32 08:44
0.19 12 Off Dredge Crew Boat Transfer Crew Boat Transfer/Pre-Sh
25,517,230 130 00:12 01:36
1.39 83 Weather Weather Weather
Delay Count:
3
Total Delay (h.hh):
7.90
Work Time (h.hh):
16.10
Time Efficiency:
67.1%
- mechanical
oM - one arm
Daily Note
No record.
Created on 3/28/2022 11:10 Page 1 of 8
COASTME CONSULTING ` '
L
Relocation Trawl Daily Report us
Of Err veers.
Project Name: _ O A K A E 5 Tn 2 ,9 T(-, j 114y J F c-'r
Trawler Name: LA P X P n 14 I% Trawl Effort # i
Trawling for Dredge(s): t o 94 E -+ P a D?_ C IS JA rI 4
Date (mm/dd/yyyy): 103 )2 20 2Z Tow Numbers:. 2 ! % - I Z J Total Tows: •Z
Project Captures:
10 By Species: Cc J Lk I Cm 0 Dc GL Ao 21
Start Time First Tow (24 firs): 2 151 End Time Last Tow (24 firs): S
Biologist / Captains : 4 A N in I E Z I k 4 4, I Cf W 1 L L I
Oos Area. Channel or Borrow Area desienation:
Ops Area Lat/Long (Shoreward): N 33
W 7R
Ops Area Lat/Long (Seaward): N 3'
W 79
sz ? sy
03 SSs
SI 9dl
1 S?L
Of/ BA- JCS
CH / BA- J R f
Beaufort Sea State: 0 1 2 3 4 5 6 7 AirTempwdWre:
Wind Direction: ti' ��' w - Wind Speed: ' J — / S k k r Wave Height:
Water Temperature (1 fathom): > > , i N Bottom Type: S„ v ,�
ENDANGERED SPECIES CAPTURED, Total for the Day:
Species:
Species:
Species:
General Release Location Lat/Long:
l;11111111
Bycatch and Other Comments (including dredge presence/absence from the job site:
140a rF 1I-Io6 CAA ( .S ) BI-a e4,r 6 . JEGcyF! r
End Tune:
End Time:
End rune:
—T2/1 W LC 2 D2nP/'r D nn1�2 ODZ i�l�>' U �' Q/I! �2 F02 1jAY L/L K7' f' �FP9/
L,-r/4. 0,700
Trawl Effort Capture # Cc2 Lk Cm� Dc Ei�- Ao Z ? Abf� Total 1,,,
Total Project Capture # Cc 3 Lk `1 Cm --A— DC-4 Ei_4_Ao Ab_V Total J,, ,
COASTWISE CONSULTING - ODESS
DAILY REPORT US Army corps
of Engineers
DATE:_0,3 / 2-1 / 2 2 +
Project Name: ChA r�1ar7d Qen0urk5hme,nf USACE District: .__ �1 `h'j n O Lnn
Dredge Name: s i Dredge Firm: _ L IDS
Contract # _5A Y,J -aD 1`2 - 0.0 n Maintenance �� / New Work / Beach
Load #s:_L Z 12 rp Areas worked (stations, borrow area, etc): ZOnc — -A, $ , (� ,
Start Time First Load: 3' 26 End Time Last Load: oZ n
Project Takes by Species: Cc_Lk N Cm_!S� Dc Ao__t�,_Other
Location, L.at/Long: N. 33 5a 339 x W 71 ° 03 (1P
Beaufort Sea State: 0 1 4 5 6 7 S 9 10 11 12
AIR TEMP " .`7 ° C F Wind Direction and Speed S, W, N1 1, N NW1. Vr/
iB$—
W ATER TEMP: Surface 16.Z ° D/° F Column (mid -depth) ° C /° F Bottom l ° C :"' F
Condition of deflector: Ccc oct Condition of screening: 0d'
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO 1
Which species? (complete Incident form)_ _7
SCREEN TYPE L4 Y14 Inflow screening: None 25% 50% 75% slo
Overflow screening: None 25% 50% 75%
Other screening: None 25% 50% 75%
Estimate number screened on this day: Shark (any species) Horseshoe crab
BRIDGE WATCH SUMMARY
Time
Species
Observers / Watch Hou
# Siahtines/# Animals Location/Comments
33'S3.2-*g Al
/
COASTWISE CONSULTING - ODESS �.■.
DAILY REPORT US Army Corps
of Engineers,
DATE: Ofi
Project Name:���,��. Vcua szxsarndai Ek= U-SACE Dis ct: �
Dredge Name:- Dredge Firm:
C o ntra ct #. i c� - ()7 --7 32r -N _ maintenance 1 New Work 1 Beach .._
Load fto. le - � Areas worked (stations, borrow area, etch: , "cA u.,an �aSOm&L
?A�,��
Start Time First Load: End Time Last Load:
M 031 2!0
Project Takes by Species: Cct2 Lk�c M De Ao Other
Location, LatlLonge N��° '.52 (06!5 x W :2!1 D 3 �51
Beaufort Sea State: 0 1 2 3 4j) 5 6 7 8 9 10 11 12
AIR TEMP:. l —11;3L Q/D F Wind Direction and Speed
WATER TEMP: Surface -.A 5• KP F Column (mid -depth) ^--- ° C /° F Bottom ° C JIDF
Condition of deflector,
I (�7� Condition of screen4k
ing:
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES WIM NO
which species? (complete Incident form)
SCREEN TYPE;� k 0 Inflow screening: None �S��a 50% 75%0
40 1 � Overflow screening: None 25% 50% 75% 100%
Other screening: None 25% 50% 75% 100%
Comments (type of material, bl"ological specimens, unusual circumstances, etc):
4.1") XL5- a I Ascr Now
__V O.V- .1) Z
Estimate number screened an this day: Shark (any species) Flvrseshoe crab
BRIDGE WATCH SUMMARY
Dine Snecies # SightingsM Animals Location/Comments
Observc.rs 1 Watch Hours Q1 I— C7 VA-X.l000 1 --- �� ��