HomeMy WebLinkAbout3.1.22 - Oak Island QC ReportDate: 3/1/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 16
GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022
WEATHER CONDITIONS: Events: Light Rain Visibility: 10
TEMPERATURE (F): Min: 38 Max: 58
WIND SPEED (mph): Max: 14, Gusts to 18 Direction: NNE " '~
WAVE HEIGHT ft.: Jay Bird Shoals: 1-3'
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling
1. Progress Summary:
- GLDD continues to provide AD/BD Survey Planning for the following 72 hours
The material of these loads was placed between stations 621+00 and 625+00
Structure at Sta 22+75 / 5121 W Beach Drive that is in the template has been filled in to the request of the CE
PI dug with the starboard draghead pinned during all loads, As a result, a total of six 1-arm digging delays occurred during loads 43 through 46
2. Safety:
Pre -Shift Meeting
The schedule of activities for the day was discussed which included getting the dredge ready to go to the port and take on fuel along with making repairs.
Safety discussed precautions to take while fueling the dredge. The crews completed Stretch and Flex exercises before starting their shift.
SSHO Observation
All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications.
Observed crew members working around operating heavy equipment maintaining the required safety zone and communicating with the equipment
operators prior to entering the safety zone.
DREDGE PADRE
This Day Cumulative
Sand Analysis
Dredge Revenue Hours
24.00
21.17
2.83
Results of Daily Sediment Inspection:
Dredge Work Hours
Dredge Delay Hours
Est. Pay Volume CY
9,255 96,481
The sample was a mix of light, olive, and greenish gray course -
grained
sand with some shell fragments.
Est. Dig Volume CY
12,037 125,273
Midnight Station
618+0=77771
DREDGE DODGE
This Day
Cumulative
Turbidity
Dredge Revenue Hours
24.00
21.95
2.05
Results of Daily Visual Turbidity Inspection:
Dredge Work Hours
Dredge Delay Hours
Test conducted and within the 15A NCAC 02b.0220 criteria.
Est. Pay Volume CY
9,671
75,074
Est. Dig Volume (CY)
12,577
98,819
Results of nearshore Turbidity Inspection:
Midnight Station
618+00
STA.
620+00
25 NTU
Depth
1'
Pay Volume Remaining CY
584,445
2. Explanation of Primary Downtime:
Delays include:
PADRE:- Gimbal Pad eye broken, One arm digging
DODGE:- Broken STBD Gimbol Hoist Wire, Retrieve Gimbol, Fill Site add pipe
GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021
3. Site Equipment
(Indicate items of construction equipment other than hand tools at job site)
Area
Description
Area
Description
Dredge and Staging Area
AB 114
Beach Fill
GL 664 Front-end Loader
Dred a and Staciing Area
MB 1700
Beach Fill
D7 Dozer
Dredge and Staging Area
Lady Theo
Beach Fill
D7 Dozer
Dredge and Staging Area
Jack Newman
Beach Fill
D7 Dozer
Dredge and Staging Area
Ohio River
Beach Fill
D6 Dozer
Dredge and Staging Area
Bobbie Ann
Beach Fill
Kabota Buaav
Dredge and Staging Area
Beach Fill
Dred a and Staainq Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
IBeach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor Classifications
Number of Employees
GLDD Key Personnel
Beachfill Op erations
Project Manager
1
General Fill Foreman
1
Site Manager
2
Equipment Operators
5
Site Administrator
1
Welders
1
SSHO
1
Shoreman
3
Pro'ect Engineer
0
0
Assistant Pro'ect Engineer
1
Subtotal
10
Site Engineer
5
Subcontractor TI Coastal
Quality Control
1
Superintendent
1
Production Engineer
0
Laboror
2
Admin Assistant
0
Subtotal
3
Dredge Operations
Subcontractor Coastwise- PSO Dredges
PADRE ISLAND
Captain
1
Superintendent
0
Chief Engineer
2
Monitors
4
Lever men
2
Subcontractor Coastwise Consulting
Trawler
Lady Paige
Deck Captain
2
Observer - Lisa Rodriguez
1
Engineer
6
Captains
1
Oiler
1
Subtotal
6
Mate
2
TOTAL PERSONNEL
41
Deck Hand
6
Welder
1
Fuel Used
allons
Subtotal
35
Dodge Island
5140
DODGE ISLAND
Padre Island
4500
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
Subtotal
23
5. Quality Control Remarks:
List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions.
ESO / PSO aborad the Dredges Padre Island and Dodge Island (no detections)
Trawler reported no sightings or relocations of endangered species.
DI had Broken Gimbal, Retreval, had to bottom dump in Barrow area, Load never left area, Gimbal fixed
6. Deficiencies Documented by Client:
List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken.
N/A
7. Prepared by:
John Killian, Contractor Quality Control
Mike Hun erford, Project Manager
Signature C
Signature
AN
i�
Daily / Progress / Task Photos
x.
u.
Sand Sample 3.1.22
+ +
STA 621 00 AS 31 STA 621 00 AS 32
PlIf
PUP
STA 622+75 / 5121 W. Beach Drive
STA 622+75 / 5121 W. Beach Drive
STA 622+75 / 5121 W. Beach Drive
LL
F
STA 625+00 AS 32
STA 626+00 AS 33
COASTWISE CONSULTING
Relocation Trawl Daily Report US Army Corps
of Engineers.
ProjectName: lJ k- I AU
Trawler Name: ATrawl Effort #
Trawling for Dredge(s):
Date (mm/dd/yyyy): i a) ` Tow Numbers: LI � 3 — �'+ Total Tows: — Q
Project Captures: —1 By Species: Cc -e� Lk / Cm Cc ' Ao A_
Start Time First Tow (14 hrs): a,)5 QU L Z'b� End Time Last Tow (14 hrs): P'
Biologist / Captains
Ops Area, Channel or Borrow Area designation; �,'� �,,
Ops Area Lat/Long (Shoreward): N � c� �7 Q r%
W LAC)
Ops Area Lat/Long (Seaward): N 5 ° sa
W
CH/ BA -
CH/BA- 2'
Beaufort Sea State: 3 4 5 5 7 Air Temperature: -4• 5 — ( L4' -:.CD/-:.CD/Wind Direction: 1 Wind Speed: "41 �0 �1 Y a
Wave Height: _
Water Temperature (1 fathom): 10 DU t 1F Bottom Type:
ENDANGERED SPECIES CAPTURED, Total for the Day:
Species: Tow N: End 'me:
Species: Tow f!: End Time:
Species: Tow M End Time:
General Release Location Lat/Long: N
W
Byca ch and other Comments,�inclu&ng dredge presence/absence from the job site:
?cS�S
x )Lxx
Trawl Effort Capture # Cc / Lk Cm Dc Ei /111 Ao_ f± Ab Total
Total Project Capture # Cc-Z—/ Lk Cm De Ei / A04 Ab Total y
Scanned with CamScanner
COASTWISE CONSULTING -- ODESS .,
DAILY REPORT US Army corps
of Englneerso
DATE: 0 3 ! 01 / 20 Z Z
Project Name: Oak Island Renourishment Project USACE District: Wilmington
Dredge Name: Dodge Island Dredge Firm: GLDD
Contract # SAW-2018-02230 Maintenance X / New Work / Beach
Load #s: 0 317 - 041 Areas worked (stations, borrow area, etc): Zone 2
Start Time First Load: 7-3 H OlAnd Time Last Load:
Project Takes by Species: Cc-0Lk-�—Cm-)LDc AO-91 —Other
Location, Lat/Long: N3_° 5 2 . to x W— -48_° 03
Beaufort Sea State: 0 D1 4 5 6 7 8 9 10 11 12
AIR TEMP: 1 - - . 0 / ° F Wind Direction and'Speed
WATER TEMP: Surface_/° F Column (mid -depth) ° C /° F Bottom ° C /OF
Condition of deflector: GIDDA Condition of screening: G cry J
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO
Which species? (complete Incident form)____
SCREEN TYPE 4x4 inflow screening:
None
25%
50%
75% 10 °
4x4 Overflow screenwg:
None
25%
50%
75% 005
_ Other screening:
None
25%
50%
75% 100%
(type of material, biological specimens, unusual circumstances, etc):J�,JCL- of W'.,SayxG +fl/1;1 A
Estimate number screened on this day: Shark (any species) Horseshoe crab
Time
BRIDGE WATCH SUMMARY
Species # Sightines/# Animals Location/Comments
Observers / Watch Hours �+' bV f,n (Z330_1150) sk, N
1i a i.130-
COASTWISE CONSULTING — ODESS fall
=`< DAILY REPORT us Army Corps
' of Engineers,
DATE.D. n5
Project Name:0A1'r-:1�S1AJUZ-7USACE District:Wor
Dredge Name: ���}� �� �rr� Dredge Firm: (T[����
Contract #_Zn k9� - n �� Maintenance I New Work 1 Beacli
L o a d #,% Areas worked (stations, borrow area, etc): iF
Start l'gime First Load: 2IO End Time Last Load: 193C
top -I 674zK)
Project Takes by Species: Cc LkCm De f?i Ao Other vi
Location, Lat[Loncr: N �j3 —" x W �g 3�
Beaufort Sea State: 0 I 2 �� (�D 5 6 7 8 9 10 11 12
AIR TEMP:(0 i0,' ILI•G ; /"F Wind Direction and Speed nla. wi
WATER TEMP: Surface IIIII? •o Ct )/'F Column (mid -depth) I ° C /° F Bottom — ° C /" F
Condit -ion of deflector: Condition of screening:
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES N 0 ,�
0 Which species? (complete Ineidenr forrn)
SCREED TYPE Inflow screening: None 25% 50% 75% U �
" � "' Overflow screening: None 25% 50% 75% lUU%,
Other screening: Mane 25% 50% 75% o
Comments (ta of material, biological specimens, unusual circumstances, etc)
i
a
Estimate number screened on this dad: Shark (any species) Horseshoe crab
BRIDGE wa'fCm SUMMARY
Timeeci i hti # Animals Locati r m nts
7,4
r�
5RIP
Observcr� / N:
itch Hours—Mv�-1---
ZONE 1
ZON
2A--
�--- W E
ZONE2ti
a v
f (
o ZON 3
0
-9
a
N
a
P
0
a
/
Q
a
0
a
0
N
s
/
s
9
P PROJECT: GRAPHIC SCALE
72804 Oak Island Beach Renourishment PROJECT METADATA LEGEND
GREAT LAKES DREDGE AND DOCK COMPANY PAGE
2122 YORK ROAD, OAK BROOK IL 60525 TITLE: 220301 DI Jay Bird Shoals BA Depth Loads 37-42
s CIVIL ENGINEERING /SURVEYING DIVISIONone. 1
r+.o..,�st` OeNO- ORPWNOY- E, a,�
Ph(630J 5743000 Fa c: (630J 579-1515 DISPOSAL DATE
,oe do ,..�. �.�Eo e. ova s E
Tht'd mentrontaln' on(ldenttal andp 'etary pmf'or �atlon o(C�eat LaArs Di edged Dock OF 1 PAGES
�e Nn�re. e� eo.(c�oo�wnaoa oep isiana�os a.oauc�lon�oage kl—IM—re .Tr-m,,1Tzaoa oek isiena oforeage T-1.,n 1,, Comp,,y./f you have—d this docume�tfi erzo� irzuned,-lyd do, destroylt without ropymg
or distributing forth,,.
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
Bottom Dump End
I
I
u
0
0
v
0
0
a
0
m
n
0
Botto Du p Start
M
O
a
m
rn
0
o
a
N
O
O
a
O
m
N
r
0
/
0
0
ig
0
o'
c`
U
PROJECT: 72804 Oak IslandBeach
q GREAT LAKES DREDGE AND DOCK COMPANY
zfzz PORK ROAD OAK BROOK IL 60523
i ® �
CIVIL ENGINEERING /SURVEYING DIVISION
Phone.(630)574-3000 Fax (630)574-15/5„o
RenOUI'I$Ilfll@Ilt
PROJECT METADATA
LEGEND
li Fi aT�JTT�. SC:a 1.r
PAGE
1
(IN FEET)
TITLE: 220301 DI Jay Bird Shoals BA Bottom Dump
ao„
u. 1
DISPOSAL DATE
=74-17
74 149
297
=
i inc 148.7188aL
�is.„eo a.
.aB
sine
This documentrontelns confidential and pruprielar�lri Halloo ol'Grral LaArs Dredge&Dock
Company. /f you have rereived lh, document in error, immediately discard or destroy if wifAou[ ropying
or dlstrlbuiing fwthu-
� rune. e.r m. (—o)wneoa oax iaanaw5 Pmaucamrooaga ielanawa oaage iack'cgvxaaa oak isiana of oreage iracung.avq
A
-i OWN I� 9
7()NE 2B
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
ZONE 1B
ZONE 1 C
q GREAT LAKES DREDGE AND DOCK COMPANY
r 2122 YORK ROAD, OAK BROOK IL 60523
CIVIL ENGINEERING /SURVEYING DIVISION
Phone (630) 574-3000 Fax: (630) 574-1515
PROJECT: 72804 Oak Island Beach Renourlshment
PROJECT METADATA
LEGEND
GRAPHIC SCALE
PAGE
1
OF 1 PAGES
(IN FEET)
TITLE: 220301 PI Jay Bird Shoals BA Depth Loads 43-46
„o
DISPOSAL DATE
aoo
o
Aso
aao sao
1z00
oRAwr,e
a,�
l inc d999958lt
oe „o
-IT 111Eo
Th,d-111t rontaln' on(1d1-1 and p'p' tart' lni'or atlon of Crest Lakes Dredge&Dock
Compeoy lfyoa have —re this doc ,tfiefroc, immediately dls ,, destroylt-h—ropyl�g
o, drstrlb,ttng f-hu
�rvnniE c.�userswMomsonT veox leLoorwnaoa oek isiena�os vmauceonwaere isienaw3 oreage Trecking�r2eo�oak isiane Pi oreage Tree Jng awg
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: March 1 2022, Tuesday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Dodge Island
Database Modification Date: March 2 2022 8:27:21
ID
Load
Start
Finish
Duration
Li!min
Category
Subcategory
Delay Type
Description
5;� 13,792,538 22:28 23:59 1.52 91 Gimbal Hoist
13,792,537 39 11:51 12:12
0.34 20 Off Dredge
13,792,536 39 10:31 10:38
0.13 8 Off Dredge
13,792,535 37 01:41 01:46
0.09 5 Off Dredge
Delay Count:
4
Total Delay (h.hh):
2.08
Work Time (h.hh):
21.92
Time Efficiency:
91.3%
-mechanical
oM - one arm
Daily Note
No record.
Wires Gimbal Hoist WIRE BROKE. HAVE TO
RETRIEVE GIMBAL
Crane Lift from Crew Boat Crew Boat Transfer/Pre-Sh STORES
Fill Site Fill Site
Fill Site Fill Site
Created on 3/2/2022 8:27 Page 1 of 11
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: March 1 2022, Tuesday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Padre Island
Database Modification Date: March 2 2022 7:03:31
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
5;�
25,505,567
1
20:35
22:39
2.07
124 Drag Head Hoist
Other
Drag Head Hoist
5;�
25,505,566
1
15:53
17:34
1.68
101 Drag Head Hoist
Other
Drag Head Hoist
5;�
25,505,565
1
12:36
12:45
0.15
9 Drag Head Hoist
Other
Drag Head Hoist
5;�
25,505,564
1
10:52
12:28
1.60
96 Drag Head Hoist
Other
Drag Head Hoist
25,517,153
43
09:48
09:58
0.16
10 Off Dredge
Crew Boat Transfer
Crew Boat Transfer/Pre-Sh
5;�
25,505,563
1
06:55
07:31
0.60
36 Drag Head Hoist
Other
Drag Head Hoist
3;�
25,505,562
1
05:37
06:51
1.23
74 Drag Head Hoist
Other
Drag Head Hoist
5;�
25,517,152
43
02:33
05:10
2.62
157 Gimbal Hoist
Other
Gimbal Hoist
25,517,151 42 01:01 01:04
0.05 3 Off Dredge
Delay Count:
9
Total Delay (h.hh):
10.16
Work Time (h.hh):
13.84
Time Efficiency:
57.7%
911 -mechanical
of - one arm
Fill Site Flush Line
Fill Site
1-arm digging
1-arm digging
1-arm digging
1-arm digging
1-arm digging
1-arm digging
Recover Port DragArm . Gimbal
Pad eye ripped off pipe
Created on 3/2/2022 7:04 Page 1 of 11