Loading...
HomeMy WebLinkAbout3.1.22 - Oak Island QC ReportDate: 3/1/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 16 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Light Rain Visibility: 10 TEMPERATURE (F): Min: 38 Max: 58 WIND SPEED (mph): Max: 14, Gusts to 18 Direction: NNE " '~ WAVE HEIGHT ft.: Jay Bird Shoals: 1-3' CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling 1. Progress Summary: - GLDD continues to provide AD/BD Survey Planning for the following 72 hours The material of these loads was placed between stations 621+00 and 625+00 Structure at Sta 22+75 / 5121 W Beach Drive that is in the template has been filled in to the request of the CE PI dug with the starboard draghead pinned during all loads, As a result, a total of six 1-arm digging delays occurred during loads 43 through 46 2. Safety: Pre -Shift Meeting The schedule of activities for the day was discussed which included getting the dredge ready to go to the port and take on fuel along with making repairs. Safety discussed precautions to take while fueling the dredge. The crews completed Stretch and Flex exercises before starting their shift. SSHO Observation All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications. Observed crew members working around operating heavy equipment maintaining the required safety zone and communicating with the equipment operators prior to entering the safety zone. DREDGE PADRE This Day Cumulative Sand Analysis Dredge Revenue Hours 24.00 21.17 2.83 Results of Daily Sediment Inspection: Dredge Work Hours Dredge Delay Hours Est. Pay Volume CY 9,255 96,481 The sample was a mix of light, olive, and greenish gray course - grained sand with some shell fragments. Est. Dig Volume CY 12,037 125,273 Midnight Station 618+0=77771 DREDGE DODGE This Day Cumulative Turbidity Dredge Revenue Hours 24.00 21.95 2.05 Results of Daily Visual Turbidity Inspection: Dredge Work Hours Dredge Delay Hours Test conducted and within the 15A NCAC 02b.0220 criteria. Est. Pay Volume CY 9,671 75,074 Est. Dig Volume (CY) 12,577 98,819 Results of nearshore Turbidity Inspection: Midnight Station 618+00 STA. 620+00 25 NTU Depth 1' Pay Volume Remaining CY 584,445 2. Explanation of Primary Downtime: Delays include: PADRE:- Gimbal Pad eye broken, One arm digging DODGE:- Broken STBD Gimbol Hoist Wire, Retrieve Gimbol, Fill Site add pipe GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) Area Description Area Description Dredge and Staging Area AB 114 Beach Fill GL 664 Front-end Loader Dred a and Staciing Area MB 1700 Beach Fill D7 Dozer Dredge and Staging Area Lady Theo Beach Fill D7 Dozer Dredge and Staging Area Jack Newman Beach Fill D7 Dozer Dredge and Staging Area Ohio River Beach Fill D6 Dozer Dredge and Staging Area Bobbie Ann Beach Fill Kabota Buaav Dredge and Staging Area Beach Fill Dred a and Staainq Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area IBeach Fill 4. Crew: (Includes subcontractors) Labor Classifications Number of Employees Labor Classifications Number of Employees GLDD Key Personnel Beachfill Op erations Project Manager 1 General Fill Foreman 1 Site Manager 2 Equipment Operators 5 Site Administrator 1 Welders 1 SSHO 1 Shoreman 3 Pro'ect Engineer 0 0 Assistant Pro'ect Engineer 1 Subtotal 10 Site Engineer 5 Subcontractor TI Coastal Quality Control 1 Superintendent 1 Production Engineer 0 Laboror 2 Admin Assistant 0 Subtotal 3 Dredge Operations Subcontractor Coastwise- PSO Dredges PADRE ISLAND Captain 1 Superintendent 0 Chief Engineer 2 Monitors 4 Lever men 2 Subcontractor Coastwise Consulting Trawler Lady Paige Deck Captain 2 Observer - Lisa Rodriguez 1 Engineer 6 Captains 1 Oiler 1 Subtotal 6 Mate 2 TOTAL PERSONNEL 41 Deck Hand 6 Welder 1 Fuel Used allons Subtotal 35 Dodge Island 5140 DODGE ISLAND Padre Island 4500 Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Subtotal 23 5. Quality Control Remarks: List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions. ESO / PSO aborad the Dredges Padre Island and Dodge Island (no detections) Trawler reported no sightings or relocations of endangered species. DI had Broken Gimbal, Retreval, had to bottom dump in Barrow area, Load never left area, Gimbal fixed 6. Deficiencies Documented by Client: List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken. N/A 7. Prepared by: John Killian, Contractor Quality Control Mike Hun erford, Project Manager Signature C Signature AN i� Daily / Progress / Task Photos x. u. Sand Sample 3.1.22 + + STA 621 00 AS 31 STA 621 00 AS 32 PlIf PUP STA 622+75 / 5121 W. Beach Drive STA 622+75 / 5121 W. Beach Drive STA 622+75 / 5121 W. Beach Drive LL F STA 625+00 AS 32 STA 626+00 AS 33 COASTWISE CONSULTING Relocation Trawl Daily Report US Army Corps of Engineers. ProjectName: lJ k- I AU Trawler Name: ATrawl Effort # Trawling for Dredge(s): Date (mm/dd/yyyy): i a) ` Tow Numbers: LI � 3 — �'+ Total Tows: — Q Project Captures: —1 By Species: Cc -e� Lk / Cm Cc ' Ao A_ Start Time First Tow (14 hrs): a,)5 QU L Z'b� End Time Last Tow (14 hrs): P' Biologist / Captains Ops Area, Channel or Borrow Area designation; �,'� �,, Ops Area Lat/Long (Shoreward): N � c� �7 Q r% W LAC) Ops Area Lat/Long (Seaward): N 5 ° sa W CH/ BA - CH/BA- 2' Beaufort Sea State: 3 4 5 5 7 Air Temperature: -4• 5 — ( L4' -:.CD/-:.CD/Wind Direction: 1 Wind Speed: "41 �0 �1 Y a Wave Height: _ Water Temperature (1 fathom): 10 DU t 1F Bottom Type: ENDANGERED SPECIES CAPTURED, Total for the Day: Species: Tow N: End 'me: Species: Tow f!: End Time: Species: Tow M End Time: General Release Location Lat/Long: N W Byca ch and other Comments,�inclu&ng dredge presence/absence from the job site: ?cS�S x )Lxx Trawl Effort Capture # Cc / Lk Cm Dc Ei /111 Ao_ f± Ab Total Total Project Capture # Cc-Z—/ Lk Cm De Ei / A04 Ab Total y Scanned with CamScanner COASTWISE CONSULTING -- ODESS ., DAILY REPORT US Army corps of Englneerso DATE: 0 3 ! 01 / 20 Z Z Project Name: Oak Island Renourishment Project USACE District: Wilmington Dredge Name: Dodge Island Dredge Firm: GLDD Contract # SAW-2018-02230 Maintenance X / New Work / Beach Load #s: 0 317 - 041 Areas worked (stations, borrow area, etc): Zone 2 Start Time First Load: 7-3 H OlAnd Time Last Load: Project Takes by Species: Cc-0Lk-�—Cm-)LDc AO-91 —Other Location, Lat/Long: N3_° 5 2 . to x W— -48_° 03 Beaufort Sea State: 0 D1 4 5 6 7 8 9 10 11 12 AIR TEMP: 1 - - . 0 / ° F Wind Direction and'Speed WATER TEMP: Surface_/° F Column (mid -depth) ° C /° F Bottom ° C /OF Condition of deflector: GIDDA Condition of screening: G cry J WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO Which species? (complete Incident form)____ SCREEN TYPE 4x4 inflow screening: None 25% 50% 75% 10 ° 4x4 Overflow screenwg: None 25% 50% 75% 005 ­_ Other screening: None 25% 50% 75% 100% (type of material, biological specimens, unusual circumstances, etc):J�,JCL- of W'.,SayxG +fl/1;1 A Estimate number screened on this day: Shark (any species) Horseshoe crab Time BRIDGE WATCH SUMMARY Species # Sightines/# Animals Location/Comments Observers / Watch Hours �+' bV f,n (Z330_1150) sk, N 1i a i.130- COASTWISE CONSULTING — ODESS fall =`< DAILY REPORT us Army Corps ' of Engineers, DATE.D. n5 Project Name:0A1'r-:1�S1AJUZ-7USACE District:Wor Dredge Name: ���}� �� �rr� Dredge Firm: (T[���� Contract #_Zn k9� - n �� Maintenance I New Work 1 Beacli L o a d #,% Areas worked (stations, borrow area, etc): iF Start l'gime First Load: 2IO End Time Last Load: 193C top -I 674zK) Project Takes by Species: Cc LkCm De f?i Ao Other vi Location, Lat[Loncr: N �j3 —" x W �g 3� Beaufort Sea State: 0 I 2 �� (�D 5 6 7 8 9 10 11 12 AIR TEMP:(0 i0,' ILI•G ; /"F Wind Direction and Speed nla. wi WATER TEMP: Surface IIIII? •o Ct )/'F Column (mid -depth) I ° C /° F Bottom — ° C /" F Condit -ion of deflector: Condition of screening: WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES N 0 ,� 0 Which species? (complete Ineidenr forrn) SCREED TYPE Inflow screening: None 25% 50% 75% U � " � "' Overflow screening: None 25% 50% 75% lUU%, Other screening: Mane 25% 50% 75% o Comments (ta of material, biological specimens, unusual circumstances, etc) i a Estimate number screened on this dad: Shark (any species) Horseshoe crab BRIDGE wa'fCm SUMMARY Timeeci i hti # Animals Locati r m nts 7,4 r� 5RIP Observcr� / N: itch Hours—Mv�-1--- ZONE 1 ZON 2A-- �--- W E ZONE2ti a v f ( o ZON 3 0 -9 a N a P 0 a / Q a 0 a 0 N s / s 9 P PROJECT: GRAPHIC SCALE 72804 Oak Island Beach Renourishment PROJECT METADATA LEGEND GREAT LAKES DREDGE AND DOCK COMPANY PAGE 2122 YORK ROAD, OAK BROOK IL 60525 TITLE: 220301 DI Jay Bird Shoals BA Depth Loads 37-42 s CIVIL ENGINEERING /SURVEYING DIVISIONone. 1 r+.o..,�st` OeNO- ORPWNOY- E, a,� Ph(630J 5743000 Fa c: (630J 579-1515 DISPOSAL DATE ,oe do ,..�. �.�Eo e. ova s E Tht'd mentrontaln' on(ldenttal andp 'etary pmf'or �atlon o(C�eat LaArs Di edged Dock OF 1 PAGES �e Nn�re. e� eo.(c�oo�wnaoa oep isiana�os a.oauc�lon�oage kl—IM—re .Tr-m,,1Tzaoa oek isiena oforeage T-1.,n 1,, Comp,,y./f you have—d this docume�tfi erzo� irzuned,-lyd do, destroylt without ropymg or distributing forth,,. Depth Range Color from to -10 14 14.1 16 16.1 18 18.1 20 20.1 22 22.1 24 24.1 26 26.1 28 28.1 30 30.1 32 32.1 34 Bottom Dump End I I u 0 0 v 0 0 a 0 m n 0 Botto Du p Start M O a m rn 0 o a N O O a O m N r 0 / 0 0 ig 0 o' c` U PROJECT: 72804 Oak IslandBeach q GREAT LAKES DREDGE AND DOCK COMPANY zfzz PORK ROAD OAK BROOK IL 60523 i ® � CIVIL ENGINEERING /SURVEYING DIVISION Phone.(630)574-3000 Fax (630)574-15/5„o RenOUI'I$Ilfll@Ilt PROJECT METADATA LEGEND li Fi aT�JTT�. SC:a 1.r PAGE 1 (IN FEET) TITLE: 220301 DI Jay Bird Shoals BA Bottom Dump ao„ u. 1 DISPOSAL DATE =74-17 74 149 297 = i inc 148.7188aL �is.„eo a. .aB sine This documentrontelns confidential and pruprielar�lri Halloo ol'Grral LaArs Dredge&Dock Company. /f you have rereived lh, document in error, immediately discard or destroy if wifAou[ ropying or dlstrlbuiing fwthu- � rune. e.r m. (—o)wneoa oax iaanaw5 Pmaucamrooaga ielanawa oaage iack'cgvxaaa oak isiana of oreage iracung.avq A -i OWN I� 9 7()NE 2B Depth Range Color from to -10 14 14.1 16 16.1 18 18.1 20 20.1 22 22.1 24 24.1 26 26.1 28 28.1 30 30.1 32 32.1 34 ZONE 1B ZONE 1 C q GREAT LAKES DREDGE AND DOCK COMPANY r 2122 YORK ROAD, OAK BROOK IL 60523 CIVIL ENGINEERING /SURVEYING DIVISION Phone (630) 574-3000 Fax: (630) 574-1515 PROJECT: 72804 Oak Island Beach Renourlshment PROJECT METADATA LEGEND GRAPHIC SCALE PAGE 1 OF 1 PAGES (IN FEET) TITLE: 220301 PI Jay Bird Shoals BA Depth Loads 43-46 „o DISPOSAL DATE aoo o Aso aao sao 1z00 oRAwr,e a,� l inc d999958lt oe „o -IT 111Eo Th,d-111t rontaln' on(1d1-1 and p'p' tart' lni'or atlon of Crest Lakes Dredge&Dock Compeoy lfyoa have —re this doc ,tfiefroc, immediately dls ,, destroylt-h—ropyl�g o, drstrlb,ttng f-hu �rvnniE c.�userswMomsonT veox leLoorwnaoa oek isiena�os vmauceonwaere isienaw3 oreage Trecking�r2eo�oak isiane Pi oreage Tree Jng awg Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: March 1 2022, Tuesday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Dodge Island Database Modification Date: March 2 2022 8:27:21 ID Load Start Finish Duration Li!min Category Subcategory Delay Type Description 5;� 13,792,538 22:28 23:59 1.52 91 Gimbal Hoist 13,792,537 39 11:51 12:12 0.34 20 Off Dredge 13,792,536 39 10:31 10:38 0.13 8 Off Dredge 13,792,535 37 01:41 01:46 0.09 5 Off Dredge Delay Count: 4 Total Delay (h.hh): 2.08 Work Time (h.hh): 21.92 Time Efficiency: 91.3% -mechanical oM - one arm Daily Note No record. Wires Gimbal Hoist WIRE BROKE. HAVE TO RETRIEVE GIMBAL Crane Lift from Crew Boat Crew Boat Transfer/Pre-Sh STORES Fill Site Fill Site Fill Site Fill Site Created on 3/2/2022 8:27 Page 1 of 11 Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: March 1 2022, Tuesday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Padre Island Database Modification Date: March 2 2022 7:03:31 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 5;� 25,505,567 1 20:35 22:39 2.07 124 Drag Head Hoist Other Drag Head Hoist 5;� 25,505,566 1 15:53 17:34 1.68 101 Drag Head Hoist Other Drag Head Hoist 5;� 25,505,565 1 12:36 12:45 0.15 9 Drag Head Hoist Other Drag Head Hoist 5;� 25,505,564 1 10:52 12:28 1.60 96 Drag Head Hoist Other Drag Head Hoist 25,517,153 43 09:48 09:58 0.16 10 Off Dredge Crew Boat Transfer Crew Boat Transfer/Pre-Sh 5;� 25,505,563 1 06:55 07:31 0.60 36 Drag Head Hoist Other Drag Head Hoist 3;� 25,505,562 1 05:37 06:51 1.23 74 Drag Head Hoist Other Drag Head Hoist 5;� 25,517,152 43 02:33 05:10 2.62 157 Gimbal Hoist Other Gimbal Hoist 25,517,151 42 01:01 01:04 0.05 3 Off Dredge Delay Count: 9 Total Delay (h.hh): 10.16 Work Time (h.hh): 13.84 Time Efficiency: 57.7% 911 -mechanical of - one arm Fill Site Flush Line Fill Site 1-arm digging 1-arm digging 1-arm digging 1-arm digging 1-arm digging 1-arm digging Recover Port DragArm . Gimbal Pad eye ripped off pipe Created on 3/2/2022 7:04 Page 1 of 11