HomeMy WebLinkAbout2.26.22 - Oak Island QC ReportDate: 2/26/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 13
GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022
WEATHER CONDITIONS: Events: Cloudy Visibility: 10
TEMPERATURE (F): Min: 44 Max: 63
WIND SPEED (mph): Max: 15, Gusts to 0 Direction: NNE "
WAVE HEIGHT ft.: Jay Bird Shoals: 1-3'
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling
1. Progress Summary:
- GLDD continues to provide AD/BD Survey Planning for the following 72 hours
- The material of these loads was placed between stations 576+00 and 572+00, flipped pipe west and placed material between 608+00 to 610+00
2. Safety:
Pre -Shift Meeting
The schedule of activities for the day was discussed which included replacing drag head wires on the dredge. Safety discussed performing housekeeping
on vessels and barges to minimize tripping hazards. The crews completed Stretch and Flex exercises before starting their shift.
SSHO Observation
All GLDD personnel and worked with proper PPE being worn in compliance with GLDD policies and contract specifications.
Observed corrective actions for deficiencies on the Lady Theo. The vessel did a good job of correcting items. In addition, vessel was was in good order
and housekeeping was very good.
DREDGE PADRE
This Day 11
Cumulative
Sand Analysis
Dredge Revenue Hours
24.00
22.75
1.25
Results of Daily Sediment Inspection:
Dredge Work Hours
Dredge Delay Hours
Est. Pay Volume CY
11,569
66,080
The sample was a mix of light, olive, and greenish gray course -
grained
sand with some shell fragments.
Est. Dig Volume CY
15,046
85,735
Midnight Station
576+00
DREDGE DODGE
This Day
Cumulative
Dredge Revenue Hours
24.00
21.85
2.15
Results of Daily Visual Turbidity Inspection:
Dredge Work Hours
Dredge Delay Hours
Test conducted and within the 15A NCAC 02b.0220 criteria.
Est. Pay Volume CY
5,511
44,674
Est. Dig Volume (CY)
7,167
59,284
Results of nearshore Turbidity Inspection:
Midnight Station
576+00
STA.
564+50
23 NTU
De th
1'
Pay Volume Remaining CY
645,246
2. Explanation of Primary Downtime:
Delays include:
PADRE:- Flush Line and Dye Test
DODGE:- Repair Broken Gimbol Wire, Fill Site pipe move/ Dye Test, Fill Site GPS signle issue
GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021
3. Site Equipment
(Indicate items of construction equipment other than hand tools at job site)
Area
Description
Area
Description
'Dredge and Staging Area
AB 114
Beach Fill
GL 664 Front-end Loader
Dred a and Staciing Area
MB 1700
Beach Fill
D7 Dozer
Dredge and Staging Area
Lady Theo
Beach Fill
D7 Dozer
Dredge and Staging Area
Miami River
Beach Fill
D7 Dozer
Dredge and Staging Area
Ohio River
Beach Fill
D6 Dozer
Dredge and Staging Area
Beach Fill
Kabota Buaav
Dredge and Staging Area
Beach Fill
Dred a and Staqinq Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
SUBCONTRACTOR
EQUIP
Beach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor Classifications
Number of Employees
GLDD Key Personnel
Beachfill Op erations
Project Manager
1
General Fill Foreman
1
Site Manager
2
Equipment Operators
5
Site Administrator
1
Welders
1
SSHO
1
Shoreman
3
Pro'ect Engineer
0
0
Assistant Pro'ect Engineer
1
Subtotal
10
Site Engineer
5
Subcontractor TI Coastal
Quality Control
1
Superintendent
1
Production Engineer
0
Laboror
2
Admin Assistant
0
Subtotal
3
Dredge Operations
Subcontractor Coastwise- PSO Dredges
PADRE ISLAND
Captain
1
Superintendent
0
Chief Engineer
2
Monitors
4
Lever men
2
Subcontractor Coastwise Consulting
Trawler
Lady Paige
Deck Captain
2
Observer - Lisa Rodriguez
1
Engineer
6
Captains
1
Oiler
1
Subtotal
6
Mate
2
TOTAL PERSONNEL
41
Deck Hand
6
Welder
1
Fuel Used
allons
Subtotal
35
Dodge Island
3841
DODGE ISLAND
Padre Island
4340
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
Subtotal
23
5. Quality Control Remarks:
List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions.
ESO / PSO aborad the Dredge Dodge Island (no detections)
Trawler reported no relocations for this day
Whale spotted in path of travel aborad dredge Padre Island, Report and sighting reported to NOAA. See attached report
Upon Sighting Vessels inacted speed restiction in accordance with Specification and SARBO appendix
6. Deficiencies Documented by Client:
List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken.
N/A
7. Prepared by:
John Killian, Contractor Quality Control
Mike Hun erford, Project Manager
Signature �& /
Signature
Daily / Progress / Task Photos
a
576+00 AS 22 576+00 AS 23
581+00 AS 23
COASTWISE CONSULTING
Relocation Trawl Daily Report
US ArmyneCorps
of Engiers
Project Name:
Trawler Name:
Trawling for Dr
Date (mm/dd/yyyy): @ I C�� l ,�! � Tow Numbers: �� - �) i t Total Tows: y V
Project Captures: _�— ii—i tiff—===�� By Species: Cc — Lk —
Start Time First Tow (24 hrs): _213 �f a5� End Vane Last Tow (24 hrs
Biologist/ Captains : L
Ohs Area, Channel or Borrow Area designation
Ops Area Lat/Long (Shoreward): N 33 °
W� °
Ops Area Lat/Long (Seaward): N °
W �.
Ll
y3 �LQ
Cm — Dc — A
CH/ BA - — n's
CH/BA- T155
Beaufort Sea State: 0 1 7 3 4 5 6 7 Air Temperature: I` I-57 C F
Wind Direction: NNE , ij Wind Speed: Wave Height: II O-a
Water Temperature (1 fathom): V °C/° Bottom Type: _ &"
ENDANGERED SPECIES CAPTURED, Total for the Day:
Species:
Species:
Species:
General Release L tion Lat/Long:
Tow it:
Tow #:
Tow #:
N
W
Bycatch and Other Comments (including dredge presence/absence from the ioh sits.
End
Time:
End Time:
Trawl Effort Capture # Cc_.o_ Lk_ Cm4 Dc_ M4 Ao 3 AbA Total 3
Total Project Capture # Cc4 Lk_ Cm_ DcA Ei, Ao_a AbZ Total 3
Scanned with CamScanner
FI '% . A ''A . 6 %'dr 11L Pff AFEM - -% R me " a -a dr— n M a 0 % M -qqhl. K ff IF 9 1 "1 r __
K 1% 1 A f
COASTWISE CONSULTING - ODESS
-DAILY REPORT
I DATE: 62 / 2G / Z
Project Name: -
Dredge Name:_?,L_ZR
USACE District:
Dredge Firm:
US Army Cords
of Engineer.
Contract Maintenance New Work / Beac
h
Load :. _ 27 Areasworked stations borrow area,
Start "Y'imc First Laid: //,3a End Time Last Load. 22.2,2
(e) Ji ozI -bs)
Project Takes by Species: CcAo
Location, LatlLong: N �j � �° 2 � W0 3?OC� • � 3�
Beaufort Sea State: 0 1
iIII TEMP*r11"b1('F
z 3 � s s
Wind Direction and Speed
WATER TEMP*. Surface 3. 0 ° F
Condition of deflector:
W
Column (mid -depth)
7 8 9 10 11 12
'C F Bottom 100da ------ w--..m " C /n F
Condition of screening: 0
WERE THERE ENDANGERED OR PRQTEC"CED SPECIES INCIDENTS?
'V<<tiich species? (complete Incident farm)1'k
YES
SCREEN TYPE �' #' Inflow er Rincy:
None
%
%
7%
;, Overflow screening:
None
%
%
7 %
4-' Other screening-,
Done
%
%
75%
I'A -woft I -..- � -CL (—Ik 'F _LL' A & Ar-,
NO
r NO 0/0�.
1 UD °ro
Estimate number screened on this day: Shark (any species) Horseshoe crab
Time
Species
BRIDGE WATCH SUMMARY
Sightins/ft Animals
1,ocation/Comments
Observers / Watch Hours
re me Name:
COASTWISE CONSULTING — ODESS
LARC'T N111:1LL OBSERNATION 111"ORNI
Dredge F1FM
1j 31101 1
r
US Array Corp
of Engineers
1 _ _
[-0ad 4 M 16 Times Sian End � UM
P, Pjk/�
I focallon(I t/1oncr) k0A1 tR, SCcl ,tit
Wind Direction_ Speed -. 'Loud Cover H2O ut-fA Tenn p Aj �-iN
Stall i liii Ti�� Vessel l ci-Itio rs (l-1tr,l0z10 _ � --4i�0 dZ - 7-Yu!�)
Mt�€�ii c: ri r t i �rii a� � Esti m,-it eel L i sla ncL�
i)ecl s observed
ed
bi
Vessel's )1JF- %-0 t .
F= i 11 s or fl i p1- s ob sei-ved _ Sn.-L lb
ehavi ors ob s v d `,-
ull,fici iicy inteR-als (ume and distance) ^j 9
En itihn �, Time. a4c, �7ess l location Oat/lono)
� �_ � � � 0(a , CkC� -
Com ni e rats N\ as w-haI e' s b ehavi i- effected b y vessel " h0�� filr -Iiid i II w I1at dI r-CC R Io11 (IT, (l � IlaI e(s) III \.c
d u I-1 n L, ob sei-vati on? who k�---a s u on Fi ed 'I)
1
t-�A�A W-Aj-V� ( \��P — Z-13,,) -�Alk k 1�� G C%�:Ilj -k �"qws ("7 Irz
COASTWISE CONSULTING - ODESS Fol
DAILY REPORT US Army corps
of Engineers
® DATE: O ? / 2le/ 27
Project Name: Oak Island Renourishment Project USACE District: Wilmington
Dredge Name: Dodge Island Dredge Firm: GLDD
Contract # SAW-2018-02230 Maintenance X / New Work / Beach
Load #s: 02 '� - o 25 Areas worked (stations, borrow area, etc): Zone 2G
Start Time First Load: d 101 End Time Last Load: N 3 le
Project Takes by Species: Cc-0Lk4CmkDc_)Lf_Ao_X _Other /
Location, Lat/Long: N 33 ° b 2 . U5!8 x W-15 ° 03 . A
Beaufort Sea State: 0 1 2 03 4 5 6 7 8 1I9 10 11 12
AIR TEMP: • 3 ° C / ° F Wind Direction and Speed
WATER TEMP: Surface-0 .10 ° C /° F Column (mid -depth) — ° C /° F Bottom — ° C P F
Condition of deflector: C pod Condition of screening: and
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO
® Which species? (complete Incident form) 1 vl PI
SCREEN TYPE 4x4 Inflow screening: None
25%
50%
75%
4x4 Overflow screening: None
25%
50%
75%
Volo
— Other screening: None
25%
50%
75%
of material, biological specimens, unusual circumstances, etc): �60LC . Sard Nu.fA
Estimate number screened on this day: Shark (any species) Horseshoe crab
Time
BRIDGE WATCH SUMMARY
Species # SiehtinQs/# Animals
/
Location/Comments
Observers / Watch
Great Lakes Dredge & Dock Company ]ro
Created by Delay Tracker 3000a
Datebase: SQL 4
Daily Mate's Log for: February 26 2022, Saturday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Dodge Island
Database Modification Date: February 27 2022 0:34:50
ID
Load
Start
Finish
Duration
LZmin
Category
Subcategory
Delay Type
Description
13,792,529
23:30
Off Dredge
Fill Site
Fill Site
13,792,528
25 18:43 18:48 0.08
5 Off Dredge
Fill Site
Fill Site
13,792,527
24 13:41 14:14 0.56
34 Survey
Calibration
Survey
5;� 13,792,526
23 00:00 01:00 1.01
61 Gimbal Hoist
Wires
Gimbal Hoist
Delay Count: 4
Total Delay (h.hh): 1.65
Work Time (h.hh): 22.35
Time Efficiency: 93.1%
-mechanical
oM - one arm
Daily Note
No record.
DYE TEST
WIRE BROKE. HAVE TO
RETRIEVE GIMBAL
Created on 2/27/2022 0:34 Page 1 of 9
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: February 26 2022, Saturday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Padre Island
Database Modification Date: February 27 2022 1:57:56
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
25,517,141 31 17:22 17:40
0.30
18 Off Dredge
Fill Site Flush Line
Fill Site
25,517,140 30 12:59 13:04
0.09
5 Off Dredge
Fill Site Flush Line
Fill Site
25,517,139 30 11:06 11:53
0.79
47 Survey
Calibration
Survey
25,517,138 28 02:57 03:02
0.08
5 Off Dredge
Fill Site Flush Line
Fill Site
Delay Count:
4
Total Delay (h.hh):
1.26
Work Time (h.hh):
22.74
Time Efficiency:
94.8%
-mechanical
oM - one arm
Daily Note
No record.
dye test
Created on 2/27/2022 1:58 Page 1 of 9
0
70Nr::
L. /.
9B
Ir
sw�70NP:
` —
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
LEGEND
GRAPHIC SCALE
m-mmm-m---m
----W�----
Tht' dxvment rontaliti confldenYtal and proprletary Inf'--t— of Creat Lakrs Dr cdge 6 Duck
Compeay. /f you have,—d this document fi e irzuned,-Jy drerd or destroy It mth- ropy! g
or distributing further.
A
U N:y
ZONE 2B
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
ZONE 1B
ZONE 1 C
q GREAT LAKES DREDGE AND DOCK COMPANY
± zfzz PORK ROAD OAK BROOK IL 60523
CIVIL ENGINEERING /SURVEYING DIVISION
Phone.(630)574-3000 Fax (630)574-15/5
PROJECT: 72804 Oak Island Beach RenoUrishment
PROJECT METADATA
LEGEND
GRAPTTTC SC:a T'r
PAGE
OF 1 PA-S
(IN FEET)
TITLE : 220226 PI Jay Bird Shoals BA Depth Loads 28-33
„„asee.a. rye
DISPOSAL DATE
300 0
150
300 800
1200
i >a� = soo: t<
��er..,oa„o
�Ta.„eo a.
em
sine
This documentrontellns confidential and pruprietar,iri Halloo oi'Greal LaArs Dredge&Dock
Company. /f you have rerei thin document in ertor, immediately discard or destroy it without ropying
or dtstrlbuting f-hef-
rune. GAU. NM.mem m (GLDD)wtieaa oak ieia„d�Predecdon d. isiaeeba Dredge Tackiegtneoa oak lsba d Pi Dredge Tackieg.dw