HomeMy WebLinkAbout2.25.22 - Oak Island QC ReportDate: 2/25/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 12
GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022
WEATHER CONDITIONS: Events: Dense Fog Visibility: 10
TEMPERATURE (F): Min: 55 Max: 81
WIND SPEED (mph): Max: 18, Gusts to 0 Direction: SSW " '~
WAVE HEIGHT ft.: Jay Bird Shoals: 1-3'
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling
1. Progress Summary:
- GLDD continues to provide AD/BD Survey Planning for the following 72 hours
The material of these loads was placed between stations 583+00 and 576+00
2. Safety:
Pre -Shift Meeting
The schedule of activities for the day was discussed which included checking the condition of pipeline on the beach and making repairs to pipeline. Safety
discussed maintaining security fencing and signage on the fill site. The crews completed Stretch and Flex exercises before starting their shift.
SSHO Observation
All GLDD personnel worked with proper PPE being worn in compliance with GLDD policies and contract specifications. Observed equipment operators on
the fill site usingtheir horn rior to movingthe a ui ment to alert crew members on the round that the equipment would be movin .
DREDGE PADRE
This Day
Cumulative
Sand Analysis
Dredge Revenue Hours
24.00
22.98
1.02
Results of Daily Sediment Inspection:
Dred a Work Hours
Dred a DelayHours
Est. Pa Volume CY
11,308
54,511
The sample was a mix of light, olive, and greenish gray course -
grained
sand with some shell fragments.
Est. Di Volume CY
14,707
70,689
Midni ht Station
583+00
DREDGE DODGE
This Day
Cumulative
Turbidity
Dredge Revenue Hours
24.00
20.45
3.55
Results of Daily Visual Turbidity Inspection:
Dredge Work Hours
Dredge Delay Hours
Test conducted and within the 15A NCAC 02b.0220 criteria.
Est. Pay Volume CY
9,145
39.163
Est. Dig Volume (CY)
11,893
52,117
Midni ht Station
583+00
Pay Volume Remaining C
662,326
2. Explanation of Primary Downtime:
Delays include:
PADRE:-
DODGE:- Repair gimbal hoist wire
GI_# 072804 - Oak Island Re -nourishment Project 2020 / 2021
3. Site Equipment
(Indicate items of construction equipment other than hand tools at job site)
aDescription
Area
Description
Area
'Dredge and Staging Area
AB 114
Beach Fill
GL 664 Front-end Loader
Dredge and Staging Area
MB 1700
Beach Fill
D7 Dozer
Dredge and Staging Area
Lady Theo
Beach Fill
D7 Dozer
Dredge and Staging Area
Miami River
Beach Fill
D7 Dozer
Dred a and Staging Area
Ohio River
Beach Fill
D6 Dozer
Dredge and Staging Area
Beach Fill
Kabota Buggy
Dredge and Staging Area
Beach Fill
Dred a and Staqinci Area
Beach Fill
Dredge and Staginq Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
SUBCONTRACTOR EQUIP
Beach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor Classifications
Number of Employees
GLDD Key Personnel
Beachfill Op erations
Project Manager
1
General Fill Foreman
1
Site Manager
2
Equipment Operators
5
Site Administrator
1
Welders
1
SSHO
1
Shoreman
3
Pro'ect Engineer
1
0
Assistant Pro'ect Engineer
1
Subtotal
10
Site Engineer
3
Subcontractor TI Coastal
Quality Control
1
Superintendent
1
Production Engineer
0
Laboror
2
Admin Assistant
0
Subtotal
3
Dredge Operations
Subcontractor Coastwise- PSO Dredges
PADRE ISLAND
Captain
1
Superintendent
0
Chief Engineer
2
Monitors
4
Lever men
2
Subcontractor Coastwise Consulting
Trawler Lady Paige
Deck Captain
2
Observer - Lisa Rodriguez
1
Engineer
6
Captains
1
Oiler
1
Subtotal
6
Mate
2
TOTAL PERSONNEL
41
Deck Hand
6
Welder
1
Fuel Used allons
Dodge Island 3687
Padre Island 4933
Subtotal
34
DODGE ISLAND
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
Subtotal
23
5. Quality Control Remarks:
List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions.
ESO / PSO aborad the Dredge Padre and Dodge Island (no detections)
Trawler reported no relocations for this day
6. Deficiencies Documented by Client:
List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken.
N/A
7. Prepared by:
John Killian, Contractor Quality Control
Mike Hun erford, Project Manager
Signature /LJa'i C
Signature
Daily / Progress / Task Photos
,.i
Sand Sample 2.25.22
Project Name:
Trawler Name:
Trawling for Dredge(s):
COASTWISE CONSULTING
Relocation Trawl Daily Report US Army Corps
of Engineers
4- lt-(ar C. S
Trawl Effort q
Date (mm/dd/yyyy): 0 Ci S (5a Tow Numbers: 'All — 3S(0 Total Tows: 3�4
Project Captures: 13p By Species: Cc 4— Lk _ Cm Dc Ao 1
� 7—
Start Time First Tow (24 hrs): , O End Time Last Tow (24 hrs):
Biologist / Captains:
Ops Area,_ Channel or Borrow Area designation; "J r
Ops Area Lat/Long (Shoreward): N 33 ° ia�
W -:Q 03 c io
Ops Area Lat/Long (Seaward): N 33 53_.S3
W _° (53 l
Beaufort Sea State: D 1 2 3 4 5 6
Wind Direction: \') J5kj Wind Speed:
Water Temperature (1 fathom): )2-) •,—o "C
ENDANGERED SPECIES CAPTURED, Total for the Day:
Species:
Species:
Species:
General Release Location Lat/Long:
CH/ BA - a
CH/BA-
-116S
7 Air Temperature: ( 'C3 O .5" °C/
Wave Height:
IF Bottom Type:
Tow H: En me:
Tow f#: End Time:
Tow #: End Time:
N °
W
In and Other Comments (including dredge presence/absence from the job site:
r0r )in : M"" � 1n nlDn . 0reyl Vo.1 -, P1It X'-'l' err -t1nn><i,
Y- I` l
ob Sj
Trawl Effort Capture # Cc_o_ Lk_ Cmj�_ Dc_ Ei_a Ao 3 Ab—P— Totals
Total Project Capture # Cc_�Lk_q_ Cm_0_ Dc41 Ei__0 Ao_3_ Ab_ Total 3
Scanned with CamScanner
COASTWISE CONSULTING — ODESS
DAILY REPORT US Army corps
DATE: 02 / 25 / 2 Z of Enpinsers.
Project Name:_ Oak Island Renourishment Project USACE District: Wilmington
Dredge Name: Dodge Island Dredge Firm: GLDD
Contract # SAW-2018-02230 Maintenance X / New Work / Beach
Load #s: n 11, - (Y Areas worked (stations, borrow area, etc): Zone B, 2G
Start Time First Load: 7-01 2 End Time Last Load:
Project Takes by Species: Cc_�_Lk_Cm_Dc_Ao_4_Other
Location,Lat/Long: NA-�—° Jr2 ornUtp x W 1 b ' ° 03 541P
Beaufort Sea State: 0 Ol 6 40 5 6 7 8 9 10 11 12
AIR TEMP:11.b- 24 9 ^®/"F Wind Diredtion and Speed �,IV�,SS�� WSvJ o 113 W
WATER TEMP: Surface--°®/° F Column (mid -depth) ° C r F Bottom ° C /° F
Condition of deflector:- ('100A Condition of screening: 6004
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO Y
Which species? (complete Incident form) N �A
SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% 0 °
4x4 Overflow screening: None 25% 50% 75%
Other screening: None 25% 50% 75% 100%
Comments (type of material, biological specimens, unusual circumstances, etc): ULtt(la 1'• CI�n d YvuYpri
1n dl'..qu.l\� \N(lne\
o M.:c.
Estimate number screened on this day: Shark (any species)_- x ---_Horseshoe crab
Time
Species
BRIDGE WATCH SLTNDLL R`f<
# Siahtin¢s/# Animals Location/Comments
L.J
Observers / Watch Hours r ' " k u
Condition of deflector.-p- L` Condition. ofscxeen►ug:
.WERE THERE �;I�i7A1VlC�EIiED OR PRO�ECT�D SPECIES INCIDENTS? YES _.
Wbl'cb species? (-mpc Yete Incident %ram)
SCREEN TYPE In.flw.uscreening: None, 25% 50% 75%
OvQrflow sGr�cnin•. Wone 25%-..50% 7S%
.Other screening. N'one 25% 50% 75% 100%
Comments(typemat�� aL biological "ens, unusual UM r�� ID
• _ _ _ �� _ .� C . Z �_ _ _ ern _ _ — �iC � � �r '�1r T �� _ _ _ _ _ _
. --- q,_jjkp,-
Eshiri4te civil r� i this daym Shark (any specleoA-
BRIDGE WATCTI S Y
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 4
Daily Mate's Log for: February 25 2022, Friday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Dodge Island
Database Modification Date: February 26 2022 0:00:48
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
5;� 13,792,526 20:29
13,792,525 22 17:20 17:22 0.03
13,792,524 01:07 01:43 0.55
Delay Count: 3
Total Delay (h.hh): 0.03
Work Time (h.hh): 23.97
Time Efficiency: 99.9%
- mechanical
oM - one arm
Daily Note
No record.
Gimbal Hoist Wires Gimbal Hoist
2 Off Dredge Fill Site Fill Site
33 Dredge Pump Engine Other Dredge Pump Engine
WIRE BROKE. HAVE TO
RETRIEVE GIMBAL
repacking pump. inspected stuffing
box. went inside pump for
inspectoin
Created on 2/26/2022 0:00 Page 1 of 11
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 4
Daily Mate's Log for: February 25 2022, Friday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Padre Island
Database Modification Date: February 26 2022 11:35:08
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
25,517,137 26 16:45 16:51
0.11
7 Off Dredge Fill Site Flush Line Fill Site
25,517,136 1 10:24 11:12
0.80
48 Pump out Other Connect/Disconnect
25,517,135 1 02:22 02:28
0.11
7 Off Dredge Fill Site Flush Line Fill Site
Delay Count:
3
Total Delay (h.hh):
1.02
Work Time (h.hh):
22.98
Time Efficiency:
95.8%
- mechanical
oM - one arm
Daily Note
No record.
trouble connecting
Created on 2/26/2022 11:35 Page 1 of 9
\ N
� I
ZONE 1
�1
i - \ W E
ZONE 2A
' � I
ZONE 2B
ZONE
ZO N
9
0
a
N
n
a
P
0
a
a
a
Q
a
o \
a 1
0
N
s
s
9
P PROJECT: GRAPHIC SCALE
72804 Oak Island Beach Renourishment PROJECT METADATA LEGEND
GREAT LAKES DREDGE AND DOCK COMPANY PAGE
;;j
2122 YORK ROAD, OAK BROOK IL 60525 TITLE: 220225 DI Jay Bird Shoals BA Depth Loads 19-23
s CIVIL ENGINEERING /SURVEYING DIVISION 1
r+.o..,�st` OeNO- ORPWNOY- E, e,�a
Phne. o(630) 5743000 Fa c: (630J 579-1515 DISPOSAL DATE
,oe do ,..�. �.�Eo e. ova s E
Thb'd mentrontaln' on(ldenttal andp p'etary mf'or tatlon of G—t L,krs D, Id, 6 Dock OF 1 PAGE9
�e Nn�re. e� eo.(c�oo�wnaoa oep isiana�os a.oauc�lon�oage isana�o3 oreage Tada�e�Tzaoa oek isiena oforeage T-1, I- Comp,,y./fy-have—d this docum—erzo�irzuned,-ly&ward,, destroylt without ropymg
or distributing forth,,.
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
24.1
26
26.1
28
28.1
30
30.1
32
32.1
34
ZONE 1 B
ZONE
ZONE 1C
} W E
ZONE �i( � �{ fit. -fir` r
t �.
V,
S
ZONE
2C
t\o ` \
ZONE 2B
�j
N
H
aP
U
OZONE 3
a`
0
v
0C.
a
m
"
/
0
c°
o'
0
z
/
U
Depth Range Color
from to
-10
14
14.1
16
16.1
18
18.1
20
20.1
22
22.1
24
q GREAT LAKES DREDGE AND DOCK COMPANY
zfzz PORK ROAD OAK BROOK IL 60523
± � �
ENGINEERING /SURVEYING DIV/SIONPhone.(630)574-3000 Fax(630)57415/5�isA„eoa.amau�eDISPOSAL
PROJECT: 72804 Oak islandBeachRenOUI'I$Ilfll@Ilt
PROJECT METADATA
LEGEND
li Fi aT�JTT�. SC:a 1.r
PAGE
OF 1 PA-S
(IN FEET)
TITLE: 220225 PI Jay Bird Shoals BA Depth Loads 23-28
„„asaoQal�e
DATE
300 77,
300 ZO...
OCIV/L
I—.,
I ...
I —.-
I
I —
1 —1-1—
>a� = soo: t<
This documentrontelns confidential and pruprielar,lri Halloo ol'Grral LaArs Dredge&Dock
Company. /f you have rereived thin document in error, immediately discard or destroy if wifAou[ ropying
or dlstrlbuiing fwthu-
cwaerewraom— mx (ekoo)wrieaa oak iaan— woaucaonwaare isianaba oreage iackinerneoa oak i—a Pi oreaga iackine.awg
A