HomeMy WebLinkAbout2.23.22 - Oak Island QC ReportDate: 2/23/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 10
GLDD# 072804 - Oak Island Renourishment
Project 2021 / 2022
WEATHER CONDITIONS: Events: Clear Visibility:
TEMPERATURE (F): Min: 61 Max:
WIND SPEED (mph): Max: 16, Gusts to 0 Direction:
WAVE HEIGHT ft.: Jay Bird Shoals: 1-3'
10
82
WSW A
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling
1. Progress Summary:
- progressed on the beach from Station 607+90 to 603+00, 500 feet of fill placed.
Beach access closures are 51st PL, 42nd PI
Padre Island discovered UXO aboard the dredge, USCG and Authoritites were contacted, and UXO was retreaved and disposed of by USCG
2. Safety:
Pre -Shift Meeting
The schedule of activities for the day was discussed . Stop work authority and hazard mitigation reviewed with crew.
The crews completed Stretch and Flex exercises before starting their shift.
SSHO Observation
Safe manual lifting practices being followed by crew lifting items by hand. Safe vessel transfer procedures being followed by crew.
DREDGE PADRE
This Day 9F
Cumulative
Beach Station
Dredge Revenue Hours
24.00
22.83
1.17
Midnight Location of Discharge
Dredge Work Hours
Dredge DelayHours
Results of Dail Sediment Inspection:
Est. Pa Volume CY
6,466
29,795
The sample was a mix of light, olive, and greenish gray course -
grained
sand with some shell fragments.
Est. Dig Volume CY
8,409
1 38,544
DREDGE DODGE This Day Cumulative
ISLAND
Dredge Revenue Hours 24.00
Dredge Work Hours 23.57
Dredge Delay Hours 0.43
Est. Pay Volume CY 8,889 20,78
Est. Dig Volume CY 11,561 28,214
Pay Volume Remaining CY 1,135,421
2. Explanation of Primary Downtime:
Delays include:
PADRE:- 53 Minute delay for USCG safety shutdown for UXO removal and disposal
DODGE:-
Beach Station
Midnight Location of Discharge
Results of Daily Visual Turbidity Inspection:
Test conducted and within the 15A NCAC 02b.0220 criteria.
GL# 072804 - Oak Island Re -nourishment Project 2020 / 202
3. Site Equipment
(Indicate items of construction equipment other than hand tools at job site)
Area
Description
Descri tion
Dredge and Staging Area
AB 114
Beach Fill
GL 664 Front-end Loader
Dredge and Sta in Area
MB 1700
Beach Fill
D7 Dozer
Dredge and Staging Area
Lady Theo
Beach Fill
D7 Dozer
Dredge and Staging Area
Miami River
Beach Fill
D7 Dozer
Dredge and Staging Area
Ohio River
Beach Fill
D6 Dozer
Dredge and Staging Area
Beach Fill
Kabota Buggy
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Will SUBCONTRACTOR
EQUIP
Beach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor Classifications
Number of Employees
GLDD Key Personnel
Beachfill Op erations
Project Manager
1
General Fill Foreman
1
Site Manager
2
Equipment Operators
5
Site Administrator
1
Welders
1
SSHO
1
Shoreman
3
Pro'ect Engineer
1
0
Assistant Pro'ect Engineer
1
Subtotal
10
Site Engineer
3
Subcontractor TI Coastal
Quality Control
1
Superintendent
1
Production Engineer
0
Laboror
2
Admin Assistant
0
Subtotal
3
Dredge Operations
Subcontractor Coastwise- PSO Dredges
PADRE ISLAND
Captain
1
Superintendent
0
Chief Engineer
2
Monitors
4
Lever men
2
Subcontractor Coastwise Consulting
Trawler
Lady Paige
Deck Captain
2
Observer - Lisa Rodriguez
1
Engineer
6
Captains
1
Oiler
1
Subtotal
6
Mate
2
TOTAL PERSONNEL
41
Deck Hand
6
Welder
1
Fuel Used
allons
Subtotal
34
Dodge Island
4064
DODGE ISLAND
Padre Island
2684
Captain
1
Chief Engineer
2
Lever men
2
Deck Captain
2
Engineer
6
Oiler
1
Mate
2
Deck Hand
6
Welder
1
Subtotal
23
5. Quality Control Remarks:
List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions.
ESO / PSO aborad the Dredge Padre and Dodge Island (no detections)
Trawler reported the relocation of one (1) Atlantic Sturgeon -see attached relocation report and photo documentation of species
Receieved Whale Notification, relayed to dredges, trawler, and vessels to maintain speed restriction for the time frame in accordance with permit.
6. Deficiencies Documented by Client:
List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken.
N/A
7. Prepared by:
John Killian, Contractor Quality Control
Mike Hun erford, Pro'ect Manager
,Cct
Signature9eq�& 1 � � l=�
Signature
Daily / Progress / Task Photos
71
596+00 AS 27
596+00 AS 26
591+00 AS 26
:- - _ `
• fir. `• . Y T .I ^ .
cQ4�AA AQ')c cQK—AA AQ')n
23
AGE,
576+00 AS22 571+00 AS 22 Sand Sample 2.23.22
COASTWISE CONSULTING - ODESS IMI
DAILY REPORT US Army corps
r of Engineers.
DATE: OZ / 2-3 / ZZ S
Project Name: Oak Island Renourishment Project USACE District: Wilmington
Dredge Name: Dodge Island Dredge Firm: GLDD
Contract # SAW-2018-02230 Maintenance X / New Work / Beach
Load #s:- `�Q� - 011 Areas worked (stations, borrow area, etc):
Zone 2 A ZB
Start Time First Load: I 2/ 27 End Time Last Load: qq q q
Project Takes by Species: Cc_J_Lk 0 Cm Dc Ao V Other
Location, Lat/Long: N 3 3 57 . 3910 x W 2g 035 S 2
Beaufort Sea State: 0 01 l/ 3 4 5 6 7 8 9 10 11 12
AIR TEMP: F Wind Direddon and'Speed W$N W
WATER TEMP: Surface --AZ C F Column (mid -depth) J ° C//`° F Bottom ° C /° F
Condition of deflector: GaEO Condition of screening: C�7 Lb
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES --NO JC
Which species? (complete Incident form) N/ A
SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% eOo
4x4 Overflow screening: None 25% 50% 75%
Other screening: None 25% 50% 75% 100%
Comments ( e of material, biological specimens, unusual circumstances, etc): M[�Y 1 r \' SCU 1d
r1YJ\V \L i�(�fil 1 \ iG•_L110.�1.ya��
Estimate number screened on this day: Shark (any species)_.
Horseshoe crab
BRIDGE WATCH SUMMARY
Time Species # SiehtinesN Animals Location/Comments
Observers / Watch Hours ' V �'I t l y (1'3 �O' I
V- nw�
COASTWISE CONSULTING - ODESS
DAILY REPORT us Army Corps
• of Engineers..
DATE:_02.. / 23 / ZoZz
Project Name%&rCj&G0,.k.",����- a'f- _ USACE District: 1P��1t�rT�� --
Dredge Name: r%-,� Dredge Firm: _ Cn_1,7
Contract # SAiZ� �D�� - a7,2,Sc> Maintenance ! New Work 1 Beach_7�c
_
Load #s:jam, -__ Iq Areas worked (stations, borrow area, etc): SN'hije, 2
Start Time First Load: 2�453 End Time Last Load: 99-4:ZZ4
Project Takes by Species: Cc�Lk�CmDe �AoOther _
Location, Lat/Long: N3S ° 52, . x W_" 03 . oR2
._.__
Beaufort Sea State: 0 1 2 � 4 5 6 7 8 9 10 ll 12
AJR TEMP: W 4- .4 / " F Wind Direction and Speed S. SLj
WATER TEMP: Surface 12.0 ° C /"F Column (mid -depth) — ° c r F Bottom —' ° C /° F
Condition of deflector; p �� _ _ Condition of screening: Q z2 Cs � %,
WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS?. YES NO
40 Which species? (contplete Incident form)
SCREEN TYPE y "� ii " Inflow screening:
None
25%
50%
75%
°
61,1)LL4' Overflow screening:
None
25%
50%
75%
00%
--J Other screening:
None
25%
50%
75%
100%
Comments (type of material, biological specimens, unusual circumstances, etc);IFNI
Estimate number screened on this day: Shark zany species) Horseshoe crab
BRIDGE WATCH SUMMARY
l'�m_c S_pec�es # SjghtinLs/# Animals Loc.%tion/Comments
/of
Observers 1 Watch fours\3i>) - �
5pecies:
Species:
General Release Location Lat/Long:
COASTWISE CONSULTING
Relocation Trawl Daily Report US Army Corps
0 of Engineers
Project Name:
Trawler Name:
Trawling for Dre
Date (mm/dd/yyyy): oq 3 o1a Tow Numbers: Total Total Tows:
Project Captures: By Species: Cc Lk CmDc —0—Ao
Start Time First Tow (24 hrs): (a ldl) End Time Last Tow (24 hrs): a3ack
Biologist / Captains :
Ops Area, Channel or Borrow Area designation;
Ops Area Lat/Long (Shoreward): N �' .5 of CH/ BA -
Ops Area Lat/Long (Seaward): N 33 a� CH / BA-
W ��° 63 19
Beaufort Sea State: 0 t �2 4 5 6 7 Air Temperature: ) L4 — °C F
Wind Direction: S _4" Wind Speed: 3 ` l5 �� Wave Height: 2
Water Temperature (1 fothom): I °C F Bottom Type: sclnA
ENDANGERED SPECIES CAPTURED, Total for the Day: I
Species: A. crwi A Tow #: a Lib End Time: Oa 0 $
Tow #: End Time:
Tow #:
End Time:
N -33 5a 59S
W -4 "K ° os 3a
- __-__A n.L__ r......,�. +. li.,.•L.rlino rlrorioo nrPaPnrPhhSencP from the iob Site:
Trawl Effort Capture # Cc__(�5 LkT Cm J Dc_4_ Ei (1) Ao I Ab 0 Total I
Total Project Capture # Cc__q Lk gL Cm ( Dc'o Ei_(�_ Ao r Ab-�L Total {
Scanned with CamScanner
Coastwise Consulting
STURGEON CAPTURE AND RELOCATION DATA FORM US Army Corps
of Engineers=
UA'TE: � ! � 3 / ���
PROJECT: 0 1��'�4Urc'� 1 Channel Sect/ BA: �)g
Trawler Name: cxi`- Pok L Trawl Effort #: Biologist Luca ;�c�.r,Q,�
Trawling for Dredge(s) �c �� ►ti c �'e ZS�ctnjCapt(s): G, r P (e--
H2O Temp I,) O a C Tide ('Time, High Or Low): �b 1 hrs, H hr , H L
Air Temp o C Wind Spd / Dir 10-15k� J,�(,)Wave Ht O -1 Bottom Type �ar,
TOW #: -,
Times (24hrs): Start End
Tow Start: Latitude 30 5 a - -2-� Longitude
Tow End: Latitude 73' C)3.ocolo Longitude _��° • ,���
Port Net or Starboard Net S-h�C� Bib Nets: Yes _C No Rollers: Yes _Y No
STURGEON SPECIES: Atlantic Shortnose Gulf
MEASUREMENTS:
Total Length: 51 . cm Fork Length: �` - cm
Mouth Width (inside lips): 3 .Lf cm Interorbital Width: 1 S cm
Genetic sample taken: Yes -,?c No Photos taken: Yes -X No
General Condition, Scars, Injuries, Etc: CxCcA1-e •k' Cg,,-A<110n
PIT TAG SCAN: Yes Y. No PREVIOUSLY TAGGED? Yes No
PREVIOUS TAG ID: PIT % TAGS APPLIED ID: PIT $ Op G ,Olal 19 1
RELEASE INFO: /
Time Q93 Latitude 5S' 5a , 59 5 Longitude -TV CSu 3-3`A
COMMENTS:
Trawl Effort Capture # Cc 0 Lk Cm_ Dc__T Ei_J Ao 1 Ab_ Total�k
Total Project Capture # Cc
_�& Lk_I) Cm_ De 3 Ei QD Ao 1 Ab_ Total
Scanned with CamScanner
,¢ s
1
P
L
1
�^
COASTWISE CONSULTING - ODESS
LARGE WHALE OBSERVATION FORM
` . US Army Corps
of Engineers -
Date a / a3 l J a
Project Name:- L�`C�'��'�{tea -� USACE District: i n__
I f W rne:' Dredge Firm: G LIB
Load # o4C4 Times: Start la0'> End
Location(latAong) 33P 5a • \ -A3 X �$`' 0a.`� � -'- Beau Sea State o�
Wind Direction _S0 Speed I k-�- Cloud Cover (%) _ , H2O Surf. Temp I L t)
StartSighting Time 1 a `§Q Vessel location (Iat/long) 3do 5 a . 1 X '4$ G O 0 .`
Magnetic bearing to sighting \0 _Estimated distance (� 0.�k
Species observed M . n000-1-LaAck \i 0.0 ( vY)Qb,�Ck) # ofan6mals
Vessel's heading �. Animal's heading SE
Estimated length of whale(s)�-D�
Coloration %3iaG%L-
Fins or flippers o
_V111_%
Behaviors observed --ircov cl i yx! Z
Surfacing intervals (time and distance) '— ;SrninS vY\cj „-\ slow,. 5E
End Sighting Time Vessel location (lat/long)
Duration of observation 15 rn i n.5
Comments (was whale's behavior effected by vessel9 how far and in what direction did whale(s) move
during wh
o ho was notified.) � 15 �e�ov10( u+tea 1 � � ha4e
-ku OL [r6 \e o l sl2
Par LOCLS C,�rf \Je�f65 r'1 kk ckvc 5
Y\rAj;iec� a Spa ns� I\`SO (Q�OC'+ec� 'CZD \,QknL11j� tli`�LP.
Observers Names u Sc, Y'Cty�
Scanned with CamScanner
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: February 23 2022, Wednesday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Dodge Island
Database Modification Date: February24 2022 3:10:10
ID
Load
Start
Finish
Duration
Category
Subcategory
Delay Type
Description
h.hh
min
13,792,519 13 23:30 23:56 0.43
Delay Count: 1
Total Delay (h.hh): 0.43
Work Time (h.hh): 23.57
Time Efficiency: 98.2%
31X1 -mechanical
of - one arm
Daily Note
No record.
26 Off Dredge Fill Site
Fill Site
Created on 2/24/2022 3:10 Page 1 of 10
Great Lakes Dredge & Dock Company
Created by Delay Tracker 3000a
Datebase: SQL 41Aff
Daily Mate's Log for: February 23 2022, Wednesday
Project Number: 072804
Project Name: Oak Island Renourishment Project
Project Location: Oak Island, NC
Project Description: Oak Is Beach, NC 2021
Delays
Vessel Type: Hopper Dredge
Vessel Name: Padre Island
Database Modification Date: February 24 2022 8:00:32
ID
Load
Start
Finish
Duration
Li!min
Category
Subcategory
Delay Type
Description
25,517,129 17 18:15 19:07 0.88 53 Other
Safety Shutdown
Other Non -Mechanical
25,517,128 1 16:52 16:59
0.12
7 Off Dredge
Fill Site Flush Line
Fill Site
25,517,127 1 12:34 12:37
0.05
3 Off Dredge
Fill Site Flush Line
Fill Site
25,517,126 13 03:18 03:22
0.07
4 Off Dredge
Fill Site Flush Line
Fill Site
25,517,125 13 02:16 02:19
0.06
3 Off Dredge
Fill Site
Fill Site
Delay Count:
5
Total Delay (h.hh):
1.17
Work Time (h.hh):
22.83
Time Efficiency:
95.1%
-mechanical
of -one arm
Daily Note
No record.
USCG unidentified mech ... CG