Loading...
HomeMy WebLinkAbout2.23.22 - Oak Island QC ReportDate: 2/23/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 10 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Clear Visibility: TEMPERATURE (F): Min: 61 Max: WIND SPEED (mph): Max: 16, Gusts to 0 Direction: WAVE HEIGHT ft.: Jay Bird Shoals: 1-3' 10 82 WSW A CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling 1. Progress Summary: - progressed on the beach from Station 607+90 to 603+00, 500 feet of fill placed. Beach access closures are 51st PL, 42nd PI Padre Island discovered UXO aboard the dredge, USCG and Authoritites were contacted, and UXO was retreaved and disposed of by USCG 2. Safety: Pre -Shift Meeting The schedule of activities for the day was discussed . Stop work authority and hazard mitigation reviewed with crew. The crews completed Stretch and Flex exercises before starting their shift. SSHO Observation Safe manual lifting practices being followed by crew lifting items by hand. Safe vessel transfer procedures being followed by crew. DREDGE PADRE This Day 9F Cumulative Beach Station Dredge Revenue Hours 24.00 22.83 1.17 Midnight Location of Discharge Dredge Work Hours Dredge DelayHours Results of Dail Sediment Inspection: Est. Pa Volume CY 6,466 29,795 The sample was a mix of light, olive, and greenish gray course - grained sand with some shell fragments. Est. Dig Volume CY 8,409 1 38,544 DREDGE DODGE This Day Cumulative ISLAND Dredge Revenue Hours 24.00 Dredge Work Hours 23.57 Dredge Delay Hours 0.43 Est. Pay Volume CY 8,889 20,78 Est. Dig Volume CY 11,561 28,214 Pay Volume Remaining CY 1,135,421 2. Explanation of Primary Downtime: Delays include: PADRE:- 53 Minute delay for USCG safety shutdown for UXO removal and disposal DODGE:- Beach Station Midnight Location of Discharge Results of Daily Visual Turbidity Inspection: Test conducted and within the 15A NCAC 02b.0220 criteria. GL# 072804 - Oak Island Re -nourishment Project 2020 / 202 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) Area Description Descri tion Dredge and Staging Area AB 114 Beach Fill GL 664 Front-end Loader Dredge and Sta in Area MB 1700 Beach Fill D7 Dozer Dredge and Staging Area Lady Theo Beach Fill D7 Dozer Dredge and Staging Area Miami River Beach Fill D7 Dozer Dredge and Staging Area Ohio River Beach Fill D6 Dozer Dredge and Staging Area Beach Fill Kabota Buggy Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Will SUBCONTRACTOR EQUIP Beach Fill 4. Crew: (Includes subcontractors) Labor Classifications Number of Employees Labor Classifications Number of Employees GLDD Key Personnel Beachfill Op erations Project Manager 1 General Fill Foreman 1 Site Manager 2 Equipment Operators 5 Site Administrator 1 Welders 1 SSHO 1 Shoreman 3 Pro'ect Engineer 1 0 Assistant Pro'ect Engineer 1 Subtotal 10 Site Engineer 3 Subcontractor TI Coastal Quality Control 1 Superintendent 1 Production Engineer 0 Laboror 2 Admin Assistant 0 Subtotal 3 Dredge Operations Subcontractor Coastwise- PSO Dredges PADRE ISLAND Captain 1 Superintendent 0 Chief Engineer 2 Monitors 4 Lever men 2 Subcontractor Coastwise Consulting Trawler Lady Paige Deck Captain 2 Observer - Lisa Rodriguez 1 Engineer 6 Captains 1 Oiler 1 Subtotal 6 Mate 2 TOTAL PERSONNEL 41 Deck Hand 6 Welder 1 Fuel Used allons Subtotal 34 Dodge Island 4064 DODGE ISLAND Padre Island 2684 Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Subtotal 23 5. Quality Control Remarks: List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions. ESO / PSO aborad the Dredge Padre and Dodge Island (no detections) Trawler reported the relocation of one (1) Atlantic Sturgeon -see attached relocation report and photo documentation of species Receieved Whale Notification, relayed to dredges, trawler, and vessels to maintain speed restriction for the time frame in accordance with permit. 6. Deficiencies Documented by Client: List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken. N/A 7. Prepared by: John Killian, Contractor Quality Control Mike Hun erford, Pro'ect Manager ,Cct Signature9eq�& 1 � � l=� Signature Daily / Progress / Task Photos 71 596+00 AS 27 596+00 AS 26 591+00 AS 26 :- - _ ` • fir. `• . Y T .I ^ . cQ4�AA AQ')c cQK—AA AQ')n 23 AGE, 576+00 AS22 571+00 AS 22 Sand Sample 2.23.22 COASTWISE CONSULTING - ODESS IMI DAILY REPORT US Army corps r of Engineers. DATE: OZ / 2-3 / ZZ S Project Name: Oak Island Renourishment Project USACE District: Wilmington Dredge Name: Dodge Island Dredge Firm: GLDD Contract # SAW-2018-02230 Maintenance X / New Work / Beach Load #s:- `�Q� - 011 Areas worked (stations, borrow area, etc): Zone 2 A ZB Start Time First Load: I 2/ 27 End Time Last Load: qq q q Project Takes by Species: Cc_J_Lk 0 Cm Dc Ao V Other Location, Lat/Long: N 3 3 57 . 3910 x W 2g 035 S 2 Beaufort Sea State: 0 01 l/ 3 4 5 6 7 8 9 10 11 12 AIR TEMP: F Wind Direddon and'Speed W$N W WATER TEMP: Surface --AZ C F Column (mid -depth) J ° C//`° F Bottom ° C /° F Condition of deflector: GaEO Condition of screening: C�7 Lb WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES --NO JC Which species? (complete Incident form) N/ A SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% eOo 4x4 Overflow screening: None 25% 50% 75% Other screening: None 25% 50% 75% 100% Comments ( e of material, biological specimens, unusual circumstances, etc): M[�Y 1 r \' SCU 1d r1YJ\V \L i�(�fil 1 \ iG•_L110.�1.ya�� Estimate number screened on this day: Shark (any species)_. Horseshoe crab BRIDGE WATCH SUMMARY Time Species # SiehtinesN Animals Location/Comments Observers / Watch Hours ' V �'I t l y (1'3 �O' I V- nw� COASTWISE CONSULTING - ODESS DAILY REPORT us Army Corps • of Engineers.. DATE:_02.. / 23 / ZoZz Project Name%&rCj&G0,.k.",����- a'f- _ USACE District: 1P��1t�rT�� -- Dredge Name: r%-,� Dredge Firm: _ Cn_1,7 Contract # SAiZ� �D�� - a7,2,Sc> Maintenance ! New Work 1 Beach_7�c _ Load #s:jam, -__ Iq Areas worked (stations, borrow area, etc): SN'hije, 2 Start Time First Load: 2�453 End Time Last Load: 99-4:ZZ4 Project Takes by Species: Cc�Lk�CmDe �AoOther _ Location, Lat/Long: N3S ° 52, . x W_" 03 . oR2 ._.__ Beaufort Sea State: 0 1 2 � 4 5 6 7 8 9 10 ll 12 AJR TEMP: W 4- .4 / " F Wind Direction and Speed S. SLj WATER TEMP: Surface 12.0 ° C /"F Column (mid -depth) — ° c r F Bottom —' ° C /° F Condition of deflector; p �� _ _ Condition of screening: Q z2 Cs � %, WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS?. YES NO 40 Which species? (contplete Incident form) SCREEN TYPE y "� ii " Inflow screening: None 25% 50% 75% ° 61,1)LL4' Overflow screening: None 25% 50% 75% 00% --J Other screening: None 25% 50% 75% 100% Comments (type of material, biological specimens, unusual circumstances, etc);IFNI Estimate number screened on this day: Shark zany species) Horseshoe crab BRIDGE WATCH SUMMARY l'�m_c S_pec�es # SjghtinLs/# Animals Loc.%tion/Comments /of Observers 1 Watch fours\3i>) - � 5pecies: Species: General Release Location Lat/Long: COASTWISE CONSULTING Relocation Trawl Daily Report US Army Corps 0 of Engineers Project Name: Trawler Name: Trawling for Dre Date (mm/dd/yyyy): oq 3 o1a Tow Numbers: Total Total Tows: Project Captures: By Species: Cc Lk CmDc —0—Ao Start Time First Tow (24 hrs): (a ldl) End Time Last Tow (24 hrs): a3ack Biologist / Captains : Ops Area, Channel or Borrow Area designation; Ops Area Lat/Long (Shoreward): N �' .5 of CH/ BA - Ops Area Lat/Long (Seaward): N 33 a� CH / BA- W ��° 63 19 Beaufort Sea State: 0 t �2 4 5 6 7 Air Temperature: ) L4 — °C F Wind Direction: S _4" Wind Speed: 3 ` l5 �� Wave Height: 2 Water Temperature (1 fothom): I °C F Bottom Type: sclnA ENDANGERED SPECIES CAPTURED, Total for the Day: I Species: A. crwi A Tow #: a Lib End Time: Oa 0 $ Tow #: End Time: Tow #: End Time: N -33 5a 59S W -4 "K ° os 3a - __-__A n.L__ r......,�. +. li.,.•L.rlino rlrorioo nrPaPnrPhhSencP from the iob Site: Trawl Effort Capture # Cc__(�5 LkT Cm J Dc_4_ Ei (1) Ao I Ab 0 Total I Total Project Capture # Cc__q Lk gL Cm ( Dc'o Ei_(�_ Ao r Ab-�L Total { Scanned with CamScanner Coastwise Consulting STURGEON CAPTURE AND RELOCATION DATA FORM US Army Corps of Engineers= UA'TE: � ! � 3 / ��� PROJECT: 0 1��'�4Urc'� 1 Channel Sect/ BA: �)g Trawler Name: cxi`- Pok L Trawl Effort #: Biologist Luca ;�c�.r,Q,� Trawling for Dredge(s) �c �� ►ti c �'e ZS�ctnjCapt(s): G, r P (e-- H2O Temp I,) O a C Tide ('Time, High Or Low): �b 1 hrs, H hr , H L Air Temp o C Wind Spd / Dir 10-15k� J,�(,)Wave Ht O -1 Bottom Type �ar, TOW #: -, Times (24hrs): Start End Tow Start: Latitude 30 5 a - -2-� Longitude Tow End: Latitude 73' C)3.ocolo Longitude _��° • ,��� Port Net or Starboard Net S-h�C� Bib Nets: Yes _C No Rollers: Yes _Y No STURGEON SPECIES: Atlantic Shortnose Gulf MEASUREMENTS: Total Length: 51 . cm Fork Length: �` - cm Mouth Width (inside lips): 3 .Lf cm Interorbital Width: 1 S cm Genetic sample taken: Yes -,?c No Photos taken: Yes -X No General Condition, Scars, Injuries, Etc: CxCcA1-e •k' Cg,,-A<110n PIT TAG SCAN: Yes Y. No PREVIOUSLY TAGGED? Yes No PREVIOUS TAG ID: PIT % TAGS APPLIED ID: PIT $ Op G ,Olal 19 1 RELEASE INFO: / Time Q93 Latitude 5S' 5a , 59 5 Longitude -TV CSu 3-3`A COMMENTS: Trawl Effort Capture # Cc 0 Lk Cm_ Dc__T Ei_J Ao 1 Ab_ Total�k Total Project Capture # Cc _�& Lk_I) Cm_ De 3 Ei QD Ao 1 Ab_ Total Scanned with CamScanner ,¢ s 1 P L 1 �^ COASTWISE CONSULTING - ODESS LARGE WHALE OBSERVATION FORM ` . US Army Corps of Engineers - Date a / a3 l J a Project Name:- L�`C�'��'�{tea -� USACE District: i n__ I f W rne:' Dredge Firm: G LIB Load # o4C4 Times: Start la0'> End Location(latAong) 33P 5a • \ -A3 X �$`' 0a.`� � -'- Beau Sea State o� Wind Direction _S0 Speed I k-�- Cloud Cover (%) _ , H2O Surf. Temp I L t) StartSighting Time 1 a `§Q Vessel location (Iat/long) 3do 5 a . 1 X '4$ G O 0 .` Magnetic bearing to sighting \0 _Estimated distance (� 0.�k Species observed M . n000-1-LaAck \i 0.0 ( vY)Qb,�Ck) # ofan6mals Vessel's heading �. Animal's heading SE Estimated length of whale(s)�-D� Coloration %3iaG%L- Fins or flippers o _V111_% Behaviors observed --ircov cl i yx! Z Surfacing intervals (time and distance) '— ;SrninS vY\cj „-\ slow,. 5E End Sighting Time Vessel location (lat/long) Duration of observation 15 rn i n.5 Comments (was whale's behavior effected by vessel9 how far and in what direction did whale(s) move during wh o ho was notified.) � 15 �e�ov10( u+tea 1 � � ha4e -ku OL [r6 \e o l sl2 Par LOCLS C,�rf \Je�f65 r'1 kk ckvc 5 Y\rAj;iec� a Spa ns� I\`SO (Q�OC'+ec� 'CZD \,QknL11j� tli`�LP. Observers Names u Sc, Y'Cty� Scanned with CamScanner Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: February 23 2022, Wednesday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Dodge Island Database Modification Date: February24 2022 3:10:10 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 13,792,519 13 23:30 23:56 0.43 Delay Count: 1 Total Delay (h.hh): 0.43 Work Time (h.hh): 23.57 Time Efficiency: 98.2% 31X1 -mechanical of - one arm Daily Note No record. 26 Off Dredge Fill Site Fill Site Created on 2/24/2022 3:10 Page 1 of 10 Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: February 23 2022, Wednesday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Padre Island Database Modification Date: February 24 2022 8:00:32 ID Load Start Finish Duration Li!min Category Subcategory Delay Type Description 25,517,129 17 18:15 19:07 0.88 53 Other Safety Shutdown Other Non -Mechanical 25,517,128 1 16:52 16:59 0.12 7 Off Dredge Fill Site Flush Line Fill Site 25,517,127 1 12:34 12:37 0.05 3 Off Dredge Fill Site Flush Line Fill Site 25,517,126 13 03:18 03:22 0.07 4 Off Dredge Fill Site Flush Line Fill Site 25,517,125 13 02:16 02:19 0.06 3 Off Dredge Fill Site Fill Site Delay Count: 5 Total Delay (h.hh): 1.17 Work Time (h.hh): 22.83 Time Efficiency: 95.1% -mechanical of -one arm Daily Note No record. USCG unidentified mech ... CG ShutDown Created on 2/24/2022 8:01 Page 1 of 9