Loading...
HomeMy WebLinkAbout2.22.22 - Oak Island QC ReportDate: 2/22/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 9 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Clear Visibility: TEMPERATURE (F): Min: 40 Max: WIND SPEED (mph): Max: 15, Gusts to 22 Direction: WAVE HEIGHT ft.: Jay Bird Shoals: 1-3' 10 70 S A CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: TI Coastal - third party surveyor and sediment analysis. Coastwise Consulting - ESO and Trawling 1. Progress Summary: progressed on the beach from Station 607+90 to 603+00, 500 feet of fill placed. Beach access closures are 51st PL, 48th PI, 2. Safety: Pre -Shift Meeting The schedule of activities for the day was discussed . Stop work authority and hazard mitigation reviewed with crew. The crews completed Stretch and Flex exercises before starting their shift. SSHO Observation Fill site operators performing heavy equipment pre -use inspections before operating equipment. Good communication utilizing radios between shore personnel and equipment operators. DREDGE PADRE This Day Cumulative qr Beach Station Dredge Revenue Hours 24.00 23.47 0.53 Midnight Location of Discharge Dredge Work Hours Dredge Delay Hours Results of Daily Sediment Inspection: Est. Pay Volume CY 12,021 23,329 The sample was a mix of light, olive, and greenish gray course - grained sand with some shell fragments. Est. Dig Volume CY 14,305 30,135 DREDGE DODGE ISLAND This Day Cumulative 24.00 23.43 0.57 8,634 11,895 12,087 16,653 1 150 776 Beach Station Dredge Revenue Hours Midnight Location of Discharge Dredge Work Hours Dredge Delay Hours Results of Daily Visual Turbidity Inspection: Est. Pay Volume CY Test conducted and within the 15A NCAC 02b.0220 criteria. Est. Dig Volume CY Pay Volume Remaining CY 2. Explanation of Primary Downtime. Delays include: PADRE:- DODGE:- GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) Area Description Area Description Dredge and Staging Area AB 114 Beach Fill GL 664 Front-end Loader Dredge and Staging Area MB 1700 Beach Fill D7 Dozer Dredcle and Staging Area Lady Theo Beach Fill D7 Dozer Dredge and Staging Area Miami River Beach Fill D7 Dozer Dredge and Staging Area Ohio River Beach Fill D6 Dozer Dredge and Staging Area Beach Fill Kabota Buggy Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dred a and Sta in Area Beach Fill Dred a and Sta in Area Beach Fill Dred a and Staging Area Beach Fill Dredge and Staging Area I SUBCONTRACTOR EQUIP 4. Crew: (Includes subcontractors) Beach Fill Beach Fill Labor Classifications Number of Employees Labor Classifications Number of Employees GLDD Key Personnel Beachfill Op erations Pro'ect Manager 1 General Fill Foreman 1 Site Manager 2 Equipment Operators 5 Site Administrator 1 Welders 1 SSHO 1 Shoreman 3 Pro'ect Engineer 1 0 Assistant Pro'ect Engineer 1 Subtotal 10 Site Engineer 3 Subcontractor TI Coastal Quality Control 1 Superintendent 1 Production Engineer 0 Laboror 2 Admin Assistant 0 Subtotal 3 Dredge Operations Subcontractor Coastwise- PSO Dredges PADRE ISLAND Captain 1 Superintendent 0 Chief Engineer 2 Monitors 4 Lever men 2 Subcontractor Coastwise Consulting Trawler Lady Paige Deck Captain 2 Observer - Lisa Rodriguez 1 Engineer 6 Captains 1 Oiler 1 Subtotal 6 Mate 2 TOTAL PERSONNEL 41 Deck Hand 6 Welder 1 Fuel Used(gallons) Subtotal 34 Dodge Island 4458 DODGE ISLAND Padre Island 2684 Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Subtotal 23 5. Quality Control Remarks: List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions. ESO / PSO aborad the Dredge Padre and Dodge Island (no detections) Trawler reported no relocation (report attached) Members of the Town of Oak Island on site to remove previously installed sand fence from project limits Submitted Dredge Inspection. 6. Deficiencies Documented by Client: List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken. N/A 7. Prepared by: John Killian, Contractor Quality Control Mike Hun erford, Pro'ect Manager Signature Signature Daily / Progress / Task Photos ww—_ ��� COASTWISE CONSULTING .� Relocation Trawl Daily Report U5 Army Corps of Engineers Project Name: Trawler Name: Trawling for Dr Date (mm/dd/yyyy): c2 ci a Tow Numbers: 8�1 Qa5 Total Tows: 340 Project Captures: By Species. Cc Lk Cm Dc_ Ao _( Start Time First Tow (24 hrs): 935 (Q 3at End Time Last Tow (24 hrs): 3 Biologist / Captains:. "'� r ti uC.Z f 0.r C— Dos Area. Channel or Borrow Area deslenation: Ops Area Lat/Long (Shoreward): NJa3 W �O Ops Area Lat/Long (Seaward): NJ W 5 a . I so 03 . 4.�l 53 . a 38 o�. CH/ BA - ---T-j1� CH / BA - .�]S Beaufort Sea State: D 3 4 5 5 7 Air Temperature; 1-I— ice- Wind Direction: SSE Wind Speed: , �`7 k�- 5 Wave Height: r Water Temperature (1 fathom): (� OF Bottom Type: C-Y.tY-1-0: ENDANGERED SPECIES CAPTURED, Total for the Day: 0 Species: Species: Species: General Release Location lat/Long: Tow M End T' e: Tow M nd Time: Tow i#: End Time: N in and Other Comments (including dredge presence/absence from the job site: 3 Trawl Effort Capture # Cc (5 Lk OnDc Ei Ao Ab Total` Total Project Capture # Cc (1) Lk (D Cm__0 De Ei_q _ Ao Ab� Total NLI) Scanned with CamScanner COASTWISE CONSULTING -- ODESS I..,; DAILY REPORT us Army Coirps of Engineers_ • DATE., 020 /24 / 2m Project Name:xWow *k" USACE District: WIL&OItwMN1W W_ Dredge Name: Dredge Firm; A OPW Contract # S3iD Maintenance 1 New Work 1 Beach Load #s:Areas worked (stations, borrow area, etc):_Z�,N a b " 2 _ Start Time First Load: End Time Last Load: 2 Project Takes by Species,: Cc_Lk0(-CmDc_Ao_Other Location, Lat/Long: N�° S2 . WWI Beaufort x W_° D3 Beaufort Sea State: 0 1 Q30 4 5 6 7 8 9 10 11 12 AIR TENW: .S-� � ° / ° F Wind Direction and Speed S 8,S�'�j' WATER TEMP: Surfacej.3 • G '° F Column (mid -depth) — ° C /° F Bottom. -- ° C )° F Condition of deflector: L160i Condition of screening: WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO 7<: • Which species? (complete Incident form).J.0% SCREEN TYPE N '" Inflow screening: None 25% 50% 75% 100% 1' " Overflow screening: None 25% 50% 75% a ~-~ Other screening: None 25% 50% 75% 10 Q Comments (type of material, biological specimens, unusual circumstances, etc): _ _ �, Ja, bo�a a 5VV Vrz I JL I ^a-awm is I -M-6,0W LF VW. M Estimate number screened on this days. Shark zany species) Horseshoe crab loe BRIDGE WATCH SUMMARY T� Species _ # Sightin-s1_ Animals Location/Comments Observers 1 Watch Hours L.1." ebb r -� � COASTWISE CONSULTING — ODESS ; M DAILY REPORT us Army corps of Engineers, DATE: 02 / 22 / 22 Project Name: Oak Island Renourishment Project USACE District: Wilmington Dredge Name: Dodge Island Dredge Firm: GLDD Contract # SAW-2018-02230 Maintenance X / New Work / Beach Load #s: M - (� 0_1 Areas worked (stations, borrow area, etc): Zone 2A, /l B Start Time First Load: 2140 LZ/ 21 End Time Last Load: ZI @ Project Takes by Species: Ce� _LkCm-Dc Ao Other Location, Lat/Long: NIL- 52 `3n _x W_M__° I o5 G Beaufort Sea State: 0 Q 0 3 4 5 6 7 8 9 10 11 12 AIR TEMP: I3•b-1-15 / °F Wind Direction and Speed WL&� x0 NNC,SSW I -I o V46 WATER TEMP: Surface 3 . u ° C ° F Column (mid -depth) ° C /° F Bottom — ° C /° F Condition of deflector: C1 G�6 Condition of screening: G DIVJ WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NO ® Which species? (complete Incident form )/A SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% 000/ 4x4 Overflow screening: None 25% 50% 75% 0% �____ Other screening: None 25% 50% 75% 100% Comments (type of material, biological specimens, unusual circumstances, etc): CV�U�e.Y 1f� S" r\n �XP d ,n��,\�hnrte,t�noe, h;nta C tea � S �`c`' y ,, ry-k:N, ,(st kioA� rcwe. Estimate number screened on this day: Shark (any species) Horseshoe crab 1z BRIDGE WATCH SUMMARY Time Species # Si2htinQs/# Animals Location/Comments Observers / Watch Hours �' 11 V L�/' ` (233h- U30� Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: February 22 2022, Tuesday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Padre Island Database Modification Date: February 23 2022 14:57:05 ID Load Start Finish Duration Category Subcategory Delay Type Description h.hh min 25,505,382 1 21:28 21:40 0.20 12 Off Dredge Fill Site Fill Site 25,505,385 1 17:03 17:06 0.04 3 Off Dredge Fill Site Fill Site 25,505,384 1 13:13 13:20 0.12 7 Off Dredge Fill Site Fill Site 25,517,121 1 03:58 04:08 0.17 10 Off Dredge Fill Site Flush Line Fill Site Delay Count: 4 Total Delay (h.hh): 0.52 Work Time (h.hh): 23.48 Time Efficiency: 97.8% -mechanical oM - one arm Daily Note No record. Created on 2/23/2022 14:57 Page 1 of 10 Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: February 22 2022, Tuesday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Dodge Island Database Modification Date: February 23 2022 2:58:14 ID Load Start Finish Duration LZmin Category Subcategory Delay Type Description 13,792,518 5 11:55 12:15 0.34 21 Off Dredge 5;� 13,792,517 5 10:15 10:28 0.22 13 Dredge Pump Delay Count: 2 Total Delay (h.hh): 0.56 Work Time (h.hh): 23.44 Time Efficiency: 97.7% -mechanical of - one arm Daily Note No record. Crane Lift from Crew Boat Crew Boat Transfer/Pre-Sh stores Other Dredge Pump leak in pipe Created on 2/23/2022 2:58 Page 1 of 10