Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2.21.22 - Oak Island QC Report
Date: 2/21/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 8 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Clear TEMPERATURE (F): Min: 40 WIND SPEED (mph): Max: 15, Gusts to 22 WAVE HEIGHT ft.: Jay Bird Shoals: 1-3' Visibility: 10 Max: 70 Direction: S CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: 1. Progress Summary: JL - Performed Paint Test, Start-up Inspection, and draghead calabrations for Dodge Island progressed on the beach from Station 608+25 to 607+70 Pre -Shift Meeting The schedule of activities for the day was discussed . Rigging equipment inspections reviewed. Stop work authority and hazard mitigation reviewed with crew as well. The crews completed Stretch and Flex exercises before starting their shift. SSHO Observation Sling and shackle inspections being performed by crew prior to performing rigging operations. Safe vessel transfers being performed by crew members transferring from the marina dock to the crew vessel. DREDGE PADRE ISLAND This Day Cumulative Beach Station dge Revenue Hours 24.00 23.75 0.25 Midnight Location of Discharge a Work Hours rDre,'dge Dela Hours Results of Daily Sediment Inspection: Pa Volume CY 9 896 11,308 The sample was a mix of light, olive, and dark gray course -grained sand. TIC collected a sample for analysis. Dia Volume CY 13,854 15,830 DREDGE DODGE IRLANn This Day Cumulative Beach Station Dredge Revenue Hours 24.00 12.13 11.87 Midnight Location of Discharge Dredge Work Hours Dredge Delay Hours Results of Daily Visual Turbidity Inspection: Est. Pay Volume CY 3261 3,261 Test conducted and within the 15A NCAC criteria. Est. Dig Volume CY 4,566 1 4,566 Pay Volume Remaining CY 1,171,431 2. Explanation of Primary Downtime: Delays include: PADRE:- DODGE:- Sail time to Oak Island from Brunswick. GL# 072804 - Oak Island Re -nourishment Project 2020 / 2021 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) Area Description Area Description Dredge and Staging Area AB 114 Beach Fill GL 664 Front-end Loader Dred a and Staainq Area MB 1700 Beach Fill D7 Dozer Dredge and Staging Area Lady Theo Beach Fill D7 Dozer Dredge and Staging Area Miami River Beach Fill D7 Dozer Dredge and Staging Area Ohio River Beach Fill D6 Dozer Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dred a and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dred a and Staging Area Beach Fill SUBCONTRACTOR EQUIP 4. Crew: (Includes subcontractors) Beach Fill Labor Classifications Number of Employees Labor Classifications Number of Employees Beachfill O erations General Fill Foreman 1 Equipment Operators 5 Welders 1 Shoreman 3 0 Subtotal 10 Subcontractor TI Coastal Superintendent 1 Laboror 2 Subtotal 3 Subcontractor Coastwise- PSO Dredges Superintendent 0 Monitors 4 Subcontractor Coastwise Cons Iting Trawler Lady Paige Observer - Lisa Rodriguez 1 Captains 1 Subtotal 6 TOTAL PERSONNEL 41 Fuel Used(gallons) Dodge Island 5354 Padre Island 4283 GLDD Key Personnel Project Manager 1 Site Manager 2 Site Administrator 1 SSHO 1 Project Engineer 1 Assistant Project Engineer 1 Site Engineer 3 Quality Control 1 Production Engineer 0 Admin Assistant 0 Dredge Operations PADRE ISLAND Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Subtotal 34 DODGE ISLAND Captain 1 Chief Engineer 2 Lever men 2 Deck Captain 2 Engineer 6 Oiler 1 Mate 2 Deck Hand 6 Welder 1 Subtotal 23 5. Quality Control Remarks: List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions. ESO / PSO aborad the Dredge Padre and Dodge Island (no detections) Trawler reported no relocation (report attached) Beach Closures 602+00 to 612+50 UXO discoved in Jay Bird Shoal aboard Padre Island, USCG and local Sheriff respond and disposed 6. Deficiencies Documented by Client: List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken. N/A 7. Prepared by: John Quality Control Mike Hun erford, Project Manager /Killian, ,CContractor Signature // v / l� Signature � ar Daily / Progress / Task Photos - Sand Sample 2.21.22 Dodge Stat-u 4 COASTWISE CONSULTING • Relocation Trawl Daily Report US Army Corps j r � of Engineers, Project Name; © �Sf� i ]turuj Trawler Name: �_a W JJ Trawl Effort # Trawling for Dredge(s): i ��, f nz' -) % Date (mm/dd/yyyy): c a \ a Tow Numbers: 150 8 `6 Total Tows: 3 Project Captures: T By Species: Cc -I—, Lk_ Cm _ Dc Ao Start Time First Tow (24 hrs): 42-sy 3End Time Last Tow (24 hrs): ,3 Biologist / Captains : Lr c` 2o4r � --z Ops Area, Channel or Borrow Area designation; Ops Area Lat/Long (Shoreward): N �3 W Ops Area Lat/Long (Seaward): N 33 W_�� Sa S OLA CH/ BA - —TgJ d 3 5LO-+ '5a -2 (( CH/BA- L2J 0�3 aSQ Beaufort Sea State: 0 2 3 4 5 6 7 Air Temperature: $ ") S Wind Direction: �JE I E SE Wind Speed: Ste- is Wave Height: - Z Water Temperature U fathom): 1) • t °C/JF Bottom Type: S0,YJ ENDANGERED SPECIES CAPTURED, Total for the Day: 0 Species: Tow #: Species: Tow #: Species: Tow #: General Release Location Lat/Long: N W Bycatch and Other Comments (including dredge presence/absence from the job site: XEnd Time: End Time: d Time: Trawl Effort Capture # Cc-9— Lk(Z Cm_ Dc_ (Z Ei__(� Ao_�6 Ab_ Total` Total Project Capture # Cc_Q_ Lk(P_ Cm__L DcJ_ Ei_Z) Ao_'0 Ab Tota4— Scanned with CamScanner COASTWISE CONSULTING - ODESS DAILY REPORT US Army Corps of Englneers� DATE: 1i 2 / 21 / 22 Project Name: Oak Island Renourishment Project USACE District: Wilmington Dredge Name: Dodge Island Dredge Firm: GLDD Contract # SAW-2018-02230 Maintenance X / New Work _/ Beach Load #s: 001 - 'Ob 2 Areas worked (stations, borrow area, etc): Zone 3,2 Start Time First Load: 115 0 End Time Last Load: 2 0 3 �P / Project Takes by Species: Cc_0__Lk0Cm'0Dc__0_Ao__J�__0ther / Location,Lat/Long: N3° 52 . x W 2' ° o 459 Beaufort Sea State: 0 @ 20 3 4 5 6 7 8 9 10 11 12 AIR TEMP: b` 5•q 0/ ° F Wind Direction and Speed \NKVA .SS W 25 Pb WATER TEMP: Surface_q-b oC /° F Column (mid -depth) / ° C /° F Bottom ° C /° F Condition of deflector: G"CA Condition of screening: Cnd WERE THERE ENDANGERED OR PROTECTED SPECIES INCIDENTS? YES NOY ® Which species? (complete Incident form) / Ff SCREEN TYPE 4x4 Inflow screening: None 25% 50% 75% 4x4 Overflow screening: None 25% 50% 75% / Other screening: None 25% 50% 75% 100% Comments (type off, material, biological specimens, unusual circumstances, etc): MCA Estimate number screened on this day: Shark (any species)__._ V Horseshoe crab BRIDGE WATCH SUMMARY 2 Time Species # Sishtines/# Animals Location/Comments-- Observers / Watch Hours�tq30' 0301 )UX1� N31D - 223oJ� COASTWISE CONSULTING - ODESS [:I � DAILY REPORT us tinny corps of Engineers* DATE:_ DZ ProJect Name* _RW&A41SACT, District: 0na Dred e Natneo.FA9z - ._ Dredge 1"irin:,. � .� Contract SAW -. _,0. N1111111C114111ce _ 1 New Work,....../Beach�,� Loyd Or -_ � _ A reiu worked (stalloij%, horrow area, ctc): Start,nnic Fin...t Load: COO-5 End Tlmc Ln�1 I,ned: Project Takes by Species,: Cc..� I'lik � C1110_Dc_�j�o� Other Locadon, 1,stA1,onjj,@, N� _° 52 , (01(� x W_'�� � Beaufort Sea Stale: 0 1 0 � 4 S 6 7 K 9 10 11 12 tilt, TEMLP:,1*&1vn SoZ (S)! " I Wind Directloit and Si)ccdr w Ka��� NVATER TEMP,: Surface It., 1k DP F Column mid -depth) _ "CPFBottom °C/°F Condition of denector. 04bhi� _, ,,, Coijd1flon or screening: nQ _ ..._., WERE 'THERE ENDANGERED Oft 111K0`VF.C`TqFJ) SPECIES INCIDENTS? VES NOe< Which species? (complete Incident form) P*j SCREEN TYPE " "Inflow screening. Hone 25% 50% 75% C1� "4 V,y" Overflow scrccning: None 25% 50% 75% 000 Other screening: None 25% 50% 715% 100% Comments (type oFtuatrrjal, b1ologicul specimens, unusual cireumstsnces�etc): 1W � u� IF dAM Wpm �. Estimate number screened on this day,: Shark (any species) I forseshoe crab BRIDGE WATCH SUMMARY Time S tc # Siebtingsl# Animals Location/Comments. \\She, Great Lakes Dredge & Dock Company Created by Delay Tracker 3000a Datebase: SQL 41Aff Daily Mate's Log for: February 21 2022, Monday Project Number: 072804 Project Name: Oak Island Renourishment Project Project Location: Oak Island, NC Project Description: Oak Is Beach, NC 2021 Delays Vessel Type: Hopper Dredge Vessel Name: Dodge Island Database Modification Date: February 22 2022 0:27:19 ID Load Start Finish Duration LZmin Category Subcategory Delay Type Description 13,792,516 1 10:45 11:52 1.11 67 Survey Delay Count: 1 Total Delay (h.hh): 1.11 Work Time (h.hh): 22.89 Time Efficiency: 95.4% 31X1 -mechanical of - one arm Daily Note No record. Calibration Survey Created on 2/22/2022 0:27 Page 1 of 6