Loading...
HomeMy WebLinkAbout2.20.22 - Oak Island QC ReportDate: 2/20/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 7 GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022 WEATHER CONDITIONS: Events: Rain Visibility: TEMPERATURE (F): Min: 31 Max: WIND SPEED (mph): Max: 12, Gusts to 0 Direction: WAVE HEIGHT ft.: Jay Bird Shoals: 1-3' 10 53 E CONTRACTOR AND AREA OF RESPONSIBILITY: Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill SUBCONTRACTOR AND AREA OF RESPONSIBILITY: Subcontractor Name: 1. Progress Summary: - Performed Paint Test, Start-up Inspection, and draghead calabrations for Padre Island TI Coastal performed BD Surveys Sta 578+00 to Sta. 613+00 2. Safety: Pre -Shift Meeting The schedule of activities for the day was discussed .Stop work authority and hazard mitigation discussed with crew as well. The crews completed Stretch and Flex exercises before starting their shift. SSHO Observation Pre -use inspections being performed on heavy equipment. All crews wearing the proper PPE for the job task. DREDGE PADRE This Day Cumulative Beach Station Dredge Revenue Hours 24.00 11.02 12.98 Midnight Location of Discharge Dredge Work Hours Dredge Delay Hours Results of Daily Sediment Inspection: Est. Pay Volume CY 1,412 1,412 Est. Dig Volume CY 1,976 1,976 DREDGE DODGE This Day Cumulative 0.00 0 0 1,184,588 Beach Station Dredge Revenue Hours Midnight Location of Discharge Dredge Work Hours Dredge Delay Hours Results of Daily Visual Turbidity Inspection: Est. Pay Volume CY Test conducted and within the 15A NCAC criteria. Est. Dig Volume CY Pay Volume Remaining C 2. Explanation of Primary Downtime: Delays include: PADRE:- DODGE:- GL# 072804 - Oak Island Re -nourishment Project 2020I 2027 3. Site Equipment (Indicate items of construction equipment other than hand tools at job site) qF Area Description Are Description Dredge and Staging Area AB 114 Beach Fill GL 664 Front-end Loader Dredge and Staging Area MB 1700 Beach Fill D7 Dozer Dredge and Staging Area Lady Theo Beach Fill D7 Dozer Dredge and Staging Area Miami River Beach Fill D7 Dozer Dredge and Staging Area Ohio River Beach Fill D6 Dozer Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area Beach Fill Dredge and Staging Area IBeach Fill SUBCONTRACTOR EQUIP Beach Fill 4. Crew: (Includes subcontractors) Labor Classifications Number of Employees Labor Classifications Number of Employees GLDD Key Personnel Beachfill Operations Project Manager 1 General Fill Foreman 1 Site Manager 1 Equipment Operators 5 Site Administrator 1 Welders 1 SSHO 1 Shoreman 3 Pro'ect Engineer 1 0 Assistant Pro'ect Engineer 0 Subtotal 10 Site Engineer 4 Subcontractor TI Coastal Quality Control 1 Superintendent 1 Production Engineer 0 Laboror 2 Admin Assistant 0 Subtotal 3 Dredge Operations Subcontractor Coastwise- PSO Dredges PADRE ISLAND Captain 1 Superintendent 0 Chief Engineer 1 Monitors 2 Tug Chief Engineer 1 Subcontractor Coastwise Consulting Trawler Lady Paine Lever men 2 Observer - Lisa Rodriguez 1 Deck Captain 2 Captains 1 Engineer 6 Subtotal 4 Oiler 4 TOTAL PERSONNEL 55 Mate 6 Deck Hand 4 Fuel Used(gallons) Welder 1 Dodge Island Derrick Operator 1 Padre Island 2797 Tug Captain 1 Boat Operator 1 Subtotal 41 DODGE ISLAND Captain 0 Mate 0 Chief Engineer 0 Drag Tender 0 A/B 0 Engineer 0 Electrician 0 Mess Mate 0 Oiler 0 Steward 0 Subtotal 0 5. Quality Control Remarks: List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions. E50 / PSO aborad the Dredge Padre Island (no detections) Trawler reported no relocation of turtles (report attached) Beach Closures 602+00 to 612+50 6. Deficiencies Documented by Client: List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken. N/A 7. Prepared by: John Killian, Contractors Quality Control Mike Hun erford, Project Manager Signature lGiL /1� Signature u COASTWISE CONSULTING •` Relocation Trawl Daily Report US Army Carps 4 at Engineers Project Name Trawler Name. � , Trawl Effort H Trawling for Dredges) Date (mm/dd/yyyy): _L2_Jad_X13__ Tow Numbers: I l a — ' L+cA Total Tows Project Captures: (� By Species: Cc { Lk Cm Start Time First low (24 hrs): _0 __ End Time Last Tow (14 hrs): Biologist / Captains Sn I`OC,� 1ctVCZ �� la c �, Ops Area, Channel or Borrow Area designation; Ops Area Lat/Lang (Shoreward): N 33 ° W _Ti�__ ° Ops Area Lat/Long (Seaward): N ,33 ` W. 7:[ �) • S a 9,13 b 3 Ll _-_r3 63 c�ga I/- DC Ao 1r` t CH/ BA ,J _ CH/BA- : TRS Beaufort Sea State: 0 1 2 3 4 5 6 T Air Temperature: S —) c) -C/ F Wind Direction: C I IyE I ESE Wind Speed: 10 - 20 Y--ti 5 Wave height: Water Temperature (1 fathom): { 4 OF Bottom Type: -,3a r\Ck ENDANGERED SPECIES CAPTURED, Total for the Day: Species: Species: Species: General Release Location Lat/long: Tow M Tc Tc N W Bycatch and Other Comments including dredge presence/absence from the job site: �t� 'RV rmr,rl : I-ellsV, . 0 YUC kJ ,V,-. ffial Via 6_- 4A - A11 End Time: End Time: End Time: ,,. y Trawl Effort Capture # Cc_ Lk_(tL Cm_J_ Dc_o_ Ei_o_ Ao_ Ab__0 Total Total Project Capture # Cc(P Lk_ Cm(P Dc_g) Ei C� Ao) Ab QJ Total Scanned with CamScanner 0 0 • COASTWISE CONSULTING - ODESS DAILY REPORT I)ATE:—" _�10 -22? US Army Caps n(Engineers: Pro"ect Name: .11119 all�� USAC�� I)'strict: D Idbed ge N a ni e: _0VeE - - _ _ Dredge Firm: Contract ���_-. ���--��3p Nlaintenance --�, !New Wr,rk �' Breach Lead 4s; Areas worked (stations, borrow area, etc):��� Start "Fime Firsl Load: tq-S' End Time Last Project Takes by Species; Cc-0 Lkt­0—CmDc_�Ao_� Other Location.j.,atil,ong: N IoLx 1�r_�" p3 Beaufort Sea State. 0 1 2 3 (4� 5 6 7 8 9 10 11 1� AIR "TEMP: G,q-A.2_010F Wind Direction and Speed � WATER TEMP: Surloace- 11 - X (9"F Column (mid -depth) Condition of deflector: Un- 1004k±s Condition of screening WF,-.R,E THEla ENDANGERED ORPROTECTED SPECIES INCIDE S. Which species? (complete Incident form) J. SCREEN TYPE Li %A14 InfloivfiF X L4 Overflow sreenin g: Other screening: C PF Bottum ---- � C !° F yESN.-O -.,K . None 25% 50% 75% None 25% 50% 77050% None 25% 50% 75% 100°i;, Comments (type of material, biological specimens, unusual circumstances, etc): � 05 Estimate nurtiber screened on this day: Shark (any species) Horseshoe crab Time BIODGE WA"rcm SUNINIARA Sighfiijus/# A I Location/Comments Observers 1Watch Hairs