HomeMy WebLinkAbout2.20.22 - Oak Island QC ReportDate: 2/20/22 DAILY CONTRACTOR QUALITY CONTROL REPORT Report #: 7
GLDD# 072804 - Oak Island Renourishment Project 2021 / 2022
WEATHER CONDITIONS: Events: Rain Visibility:
TEMPERATURE (F): Min: 31 Max:
WIND SPEED (mph): Max: 12, Gusts to 0 Direction:
WAVE HEIGHT ft.: Jay Bird Shoals: 1-3'
10
53
E
CONTRACTOR AND AREA OF RESPONSIBILITY:
Great Lakes Dredge & Dock Company, L.L.C.: Dredging and Beach fill
SUBCONTRACTOR AND AREA OF RESPONSIBILITY:
Subcontractor Name:
1. Progress Summary:
- Performed Paint Test, Start-up Inspection, and draghead calabrations for Padre Island
TI Coastal performed BD Surveys Sta 578+00 to Sta. 613+00
2. Safety:
Pre -Shift Meeting
The schedule of activities for the day was discussed .Stop work authority and hazard mitigation discussed with crew as well.
The crews completed Stretch and Flex exercises before starting their shift.
SSHO Observation
Pre -use inspections being performed on heavy equipment. All crews wearing the proper PPE for the job task.
DREDGE PADRE
This Day
Cumulative
Beach Station
Dredge Revenue Hours
24.00
11.02
12.98
Midnight Location of Discharge
Dredge Work Hours
Dredge Delay Hours
Results of Daily Sediment Inspection:
Est. Pay Volume CY
1,412
1,412
Est. Dig Volume CY
1,976
1,976
DREDGE DODGE
This Day Cumulative
0.00
0
0
1,184,588
Beach Station
Dredge Revenue Hours
Midnight Location of Discharge
Dredge Work Hours
Dredge Delay Hours
Results of Daily Visual Turbidity Inspection:
Est. Pay Volume CY
Test conducted and within the 15A NCAC criteria.
Est. Dig Volume CY
Pay Volume Remaining C
2. Explanation of Primary Downtime:
Delays include:
PADRE:-
DODGE:-
GL# 072804 - Oak Island Re -nourishment Project 2020I 2027
3. Site Equipment
(Indicate items of construction equipment other than hand tools at job site)
qF
Area
Description
Are
Description
Dredge and Staging Area
AB 114
Beach Fill
GL 664 Front-end Loader
Dredge and Staging Area
MB 1700
Beach Fill
D7 Dozer
Dredge and Staging Area
Lady Theo
Beach Fill
D7 Dozer
Dredge and Staging Area
Miami River
Beach Fill
D7 Dozer
Dredge and Staging Area
Ohio River
Beach Fill
D6 Dozer
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
Beach Fill
Dredge and Staging Area
IBeach Fill
SUBCONTRACTOR
EQUIP
Beach Fill
4. Crew: (Includes subcontractors)
Labor Classifications
Number of
Employees
Labor Classifications
Number of Employees
GLDD Key Personnel
Beachfill Operations
Project Manager
1
General Fill Foreman
1
Site Manager
1
Equipment Operators
5
Site Administrator
1
Welders
1
SSHO
1
Shoreman
3
Pro'ect Engineer
1
0
Assistant Pro'ect Engineer
0
Subtotal
10
Site Engineer
4
Subcontractor
TI Coastal
Quality Control
1
Superintendent
1
Production Engineer
0
Laboror
2
Admin Assistant
0
Subtotal
3
Dredge Operations
Subcontractor Coastwise- PSO Dredges
PADRE ISLAND
Captain
1
Superintendent
0
Chief Engineer
1
Monitors
2
Tug Chief Engineer
1
Subcontractor Coastwise Consulting
Trawler Lady Paine
Lever men
2
Observer - Lisa Rodriguez
1
Deck Captain
2
Captains
1
Engineer
6
Subtotal
4
Oiler
4
TOTAL PERSONNEL
55
Mate
6
Deck Hand
4
Fuel Used(gallons)
Welder
1
Dodge Island
Derrick Operator
1
Padre Island
2797
Tug Captain
1
Boat Operator
1
Subtotal
41
DODGE ISLAND
Captain
0
Mate
0
Chief Engineer
0
Drag Tender
0
A/B
0
Engineer
0
Electrician
0
Mess Mate
0
Oiler
0
Steward
0
Subtotal
0
5. Quality Control Remarks:
List any discussions with the Owner. Cover issues that give rise to delays, any conflicts in plans, and specifications or instructions.
E50 / PSO aborad the Dredge Padre Island (no detections)
Trawler reported no relocation of turtles (report attached)
Beach Closures 602+00 to 612+50
6. Deficiencies Documented by Client:
List any discussions given by the Owner regarding construction deficiencies, testing required, etc., with action to be taken.
N/A
7. Prepared by:
John Killian, Contractors Quality Control
Mike Hun erford, Project Manager
Signature lGiL /1�
Signature
u
COASTWISE CONSULTING •`
Relocation Trawl Daily Report US Army Carps
4 at Engineers
Project Name
Trawler Name. � , Trawl Effort H
Trawling for Dredges)
Date (mm/dd/yyyy): _L2_Jad_X13__ Tow Numbers: I l a — ' L+cA Total Tows
Project Captures: (� By Species: Cc { Lk Cm
Start Time First low (24 hrs): _0 __ End Time Last Tow (14 hrs):
Biologist / Captains
Sn I`OC,� 1ctVCZ �� la c �,
Ops Area, Channel or Borrow Area designation;
Ops Area Lat/Lang (Shoreward): N 33 °
W _Ti�__ °
Ops Area Lat/Long (Seaward): N ,33 `
W. 7:[ �) •
S a 9,13
b 3 Ll _-_r3
63 c�ga
I/- DC Ao 1r`
t
CH/ BA ,J _
CH/BA- :
TRS
Beaufort Sea State: 0 1 2 3 4 5 6 T Air Temperature: S —) c) -C/ F
Wind Direction: C I IyE I ESE Wind Speed: 10 - 20 Y--ti 5 Wave height:
Water Temperature (1 fathom): { 4 OF Bottom Type: -,3a r\Ck
ENDANGERED SPECIES CAPTURED, Total for the Day:
Species:
Species:
Species:
General Release Location Lat/long:
Tow M
Tc
Tc
N
W
Bycatch and Other Comments including dredge presence/absence from the job site:
�t� 'RV rmr,rl : I-ellsV, . 0 YUC kJ ,V,-. ffial Via 6_- 4A
- A11
End Time:
End Time:
End Time:
,,. y
Trawl Effort Capture # Cc_ Lk_(tL Cm_J_ Dc_o_ Ei_o_ Ao_ Ab__0 Total
Total Project Capture # Cc(P Lk_ Cm(P Dc_g) Ei C� Ao) Ab QJ Total
Scanned with CamScanner
0
0
•
COASTWISE CONSULTING - ODESS
DAILY REPORT
I)ATE:—" _�10 -22?
US Army Caps
n(Engineers:
Pro"ect Name: .11119 all�� USAC�� I)'strict:
D Idbed ge N a ni e:
_0VeE - - _ _ Dredge Firm:
Contract ���_-. ���--��3p Nlaintenance --�, !New Wr,rk �' Breach
Lead 4s; Areas worked (stations, borrow area, etc):���
Start "Fime Firsl Load: tq-S'
End Time Last
Project Takes by Species; Cc-0 Lkt0—CmDc_�Ao_� Other
Location.j.,atil,ong: N IoLx 1�r_�" p3
Beaufort Sea State. 0 1 2 3 (4� 5 6 7 8 9 10 11 1�
AIR "TEMP: G,q-A.2_010F Wind Direction and Speed �
WATER TEMP: Surloace- 11 - X (9"F Column (mid -depth)
Condition of deflector:
Un- 1004k±s
Condition of screening
WF,-.R,E THEla ENDANGERED ORPROTECTED SPECIES INCIDE S.
Which species? (complete Incident form) J.
SCREEN TYPE Li %A14 InfloivfiF
X L4 Overflow sreenin g:
Other screening:
C PF Bottum ---- � C !° F
yESN.-O -.,K .
None
25%
50%
75%
None
25%
50%
77050%
None
25%
50%
75%
100°i;,
Comments (type of material, biological specimens, unusual circumstances, etc): �
05
Estimate nurtiber screened on this day: Shark (any species) Horseshoe crab
Time
BIODGE WA"rcm SUNINIARA
Sighfiijus/# A
I
Location/Comments
Observers 1Watch Hairs