HomeMy WebLinkAbout3_Oak Island_21_22_MP_1252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
DCM MP-1
APPLICATION for
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Town Of Oak Island
Project Name (if applicable)
2021/2022 Oak Island Renourishment Project
Applicant 1: First Name
David
MI
Last Name
Kelly
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
4601 E Oak Island Drive
PO Box
City
Oak Island
State
NC
ZIP
28465
Country
USA
Phone No.
910 - 278 – 5011
910 - 201 - 8002 ext.
FAX No.
- -
Street Address (if different from above)
City
State
ZIP
-
Email
DKelly@ci.oak-islandnc.us
2. Agent/Contractor Information
Business Name
Moffatt & Nichol
Agent/ Contractor 1: First Name
Johnny
MI
D
Last Name
Martin
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
4700 Falls of Neuse Road, Suite 300
PO Box
City
Raleigh
State
NC
ZIP
27609 Phone No. 1
919 - 781 - 4626 ext.
Phone No. 2
- - ext.
FAX No.
919 781 4869
Contractor #
Street Address (if different from above)
City
State
ZIP
-
Email
JMartin@moffattnichol.com
<Form continues on back>
Form DCM MP-1 (Page 3 of 5) APPLICATION for
Major Development Permit
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
3. Project Location
County (can be multiple)
Brunswick
Street Address
McGlamery St to SE 63rd St; 7th/10th PL W to West End Beach
Access
State Rd. #
N/A
Subdivision Name
City
Oak Island
State
NC
Zip
28465 -
Phone No.
- - ext.
Lot No.(s) (if many, attach additional page with list)
, , , ,
a. In which NC river basin is the project located?
Lumber
b. Name of body of water nearest to proposed project
Atlantic Ocean
c. Is the water body identified in (b) above, natural or manmade?
Natural Manmade Unknown
d. Name the closest major water body to the proposed project site.
Atlantic Ocean
e. Is proposed work within city limits or planning jurisdiction?
Yes No
f. If applicable, list the planning jurisdiction or city limit the proposed
work falls within.
Town of Oak Island
4. Site Description
a. Total length of shoreline on the tract (ft.)
26,100 ft
b. Size of entire tract (sq.ft.)
N/A
c. Size of individual lot(s)
N/A, , ,
(If many lot sizes, please attach additional page with a list)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
-10 to 15.5 ft NAVD88 (-11.8 ft to 13.7 ft MHW)
NHW or NWL
e. Vegetation on tract
Primary dune vegetation including sea oats and bitter panicum; heavily eroded and escarped dune and native dune
vegetation will be replaced during project construction
f. Man-made features and uses now on tract
No man-made features other than beach access stairs/dune walkovers; uses include public recreation and habitat for sea
turtles, shorebirds, etc.
g. Identify and describe the existing land uses adjacent to the proposed project site.
Developed - residential
h. How does local government zone the tract?
N/A
i. Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
Yes No NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? Yes No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy.
If yes, by whom?
Yes No NA
Tidewater Atlantic Research, Inc.
l. Is the proposed project located in a National Registered Historic District or does it involve a
National Register listed or eligible property?
Yes No NA
<Form continues on next page>
Form DCM MP-1 (Page 4 of 5) APPLICATION for
Major Development Permit
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
m. (i) Are there wetlands on the site?
(ii) Are there coastal wetlands on the site?
(iii) If yes to either (i) or (ii) above, has a delineation been conducted?
(Attach documentation, if available)
Yes No
Yes No
Yes No
n. Describe existing wastewater treatment facilities.
The Town's wastewater treatment is handled by an off-site treatment center.
o. Describe existing drinking water supply source.
Potable water in Oak Island is provided by Oak Island Public Utilities Department & utilizes deep groundwater wells and the
Cape Fear River for water supply
p. Describe existing storm water management or treatment systems.
No impervious area - all stormwater infiltrates on the beach
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? Commercial Public/Government
Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The proposed project consists of excavating up to 1,667,000 cy (includes 30% dredge losses) of beach-quality sediment.
from the Jay Bird Shoals borrow area, located approximately one mile offshore of Oak Island/Caswell Beach, and from
Central Reach Borrow area, located approximately 1.8 miles offshore of the western end of Oak Island. The renourishment
placement area will cover approximately 26,100 ft along the oceanfront shoreline of Oak Island. See attached project
narrative for more information.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
The proposed project would involve use of a hopper dredge and/or cutter suction dredge to excavate beach compatible sand
from Jay Bird Shoals and Central Reach Borrow Areas. Placement and grading activities on the beach would involve the use
of bulldozers to redistribute and grade the beach fill material to the proposed beach profile. Land-based equipment will be
brought to the site over public roads and will enter the beach at existing permanent beach access points and stored in upland
staging areas. See attached project narrative for more information.
d. List all development activities you propose.
Excavation and filling by hopper and/or cutter suction dredge and pipeline for beach renourishment; dune restoration and
planting.
e. Are the proposed activities maintenance of an existing project, new work, or both? Both
f. What is the approximate total disturbed land area resulting from the proposed project? 197 Sq.Ft or Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
that the public has established use of?
Yes No NA
h. Describe location and type of existing and proposed discharges to waters of the state.
Dredge slurry discharge of approximately 75% water and 25% sand along the proposed renourishment placement reaches
i. Will wastewater or stormwater be discharged into a wetland?
If yes, will this discharged water be of the same salinity as the receiving water?
Yes No NA
Yes No NA
j. Is there any mitigation proposed?
If yes, attach a mitigation proposal.
Yes No NA