Loading...
HomeMy WebLinkAbout91-96 12-14-2009a NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary MEMORANDUM Rk sl!zTO: Doug Huggett EC 1 6 �999 DCM, Permits Section Morehead CityDCM FROM: Heather Coats M DCM, Field Representative, Wilmington C7 Oven THRU: Steve EverhartC1 DCM, District Manager, Wilmington �GL DATE: December 14, 2009 SUBJECT: Request for Renewal of State Permit #91-96 Deep Point Marina Brunswick County Mr. Bruce Marek, acting as agent for Bald Head Island Limited, LLC is requesting renewal of State Permit #91- 96, issued for the excavation of access channel and upland basin and construction of Deep Point Marina. Numerous modifications have been issued for the permit over the years. The permit was last renewed on December 13, 2007 and is due to expire on December 31, 2009. This permit is subject to extension by the Session Law 2009-406, the Permit Extension Act, therefore the processing fee has been waived and renewal of the permit is authorized without exception. cc: WiRO File 127 Cardinal Drive Ext., Wilmington, NC 28405 One Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.n=astalmanagement.net North /C�/arrofina An Equal Opponunity\ Afirma6ve Acton Employer Nat allff c Bruce Marek, P.E. P.O. Box 3069 Bald Head Island, NC 28461 Cell:910-228-2484 Fax:910-457-7463 December 7, 2009 Ms Heather Coats NC DENR — Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 CAMA Permit Renewal: #91-96 (Bald Head Island Limited, LLC) Deep Point Marina Dear Ms Coats, Bald Head Island Limited, LLC would like to respectfully request a formal renewal letter for the Deep Point Marina, 1301 Ferry Road, Southport, NC. The recent Letter of Refinement dated 11/23/09 for Marina Area Update based on my drawing and letter date 11/20/09 included the permit extension based on Session Law 2009-406 until 12/31/2012. In order to keep the Bald Head Island Limited, LLC Planning Department's files consistent in the manner of tracking renewals for the many CAMA Major Permits, we feel that it would be best to have a separate renewal letter. The system has worked well for many years, and has allowed new people in the Planning Department to chronologically follow the many years of permits, letters of refinement and minor modification. While opening of the new Main Passenger Ferry Terminal, the parking facility and the 82 slip recreational portion of the marina have been milestones this year, there are still several years of development remaining. Major items remaining are the Administration Building, Harbormaster Office, Marina Retail Complex, Restaurant and Hotel, and emptying of the Spoil Basin. With this down economy, projects aren't moving quite as quickly. And of course, with time, we usually seem to come up with better, more eco-friendly ideas. I do anticipate future LOR's and Minor Modifications to this permit, but not quite at the hectic pace of this year. Thanks for all of your kind assistance on the Deep Point Marina Project. Please do not hesitate to call me at 910-228-2484 or 799-9245 if you have any questions and/or comments. When complete„ please e-mail to me or fax to 910-457-7463. Sincerely, Bruce Marek, P.E. For: Bald Head Island Limited, LLC Planning Department CC: Jim Henry — Director of Planning & Development M. Kent Mitchell, CEO; Steve Robertson — COO j;e:sioivq o..0 1} 'n 56PgR I c Y = 156 : Q 69 .,ENG�S�� GCE ncl.t_-1 VED DCM WILMINGTON, NC DEC 0 8 2009