Loading...
HomeMy WebLinkAbout91-96 Letter of Refinement 2015 Bald Head Island Limited LLCNCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary March 12, 2015 RECEIVED Mr. Bruce Marek PO Box 3069 MAR J H 1015 Bald Head, Island, NC 28461 Dear Mr. Marek: This is with reference to your request to modify State Permit #91-96, acting as agent for Bald Head Island Limited, LLC. The permit was issued on June 3, 1996 and expires on November 15, 2016. The action proposed in your submittal, as submitted in your March 2, 2015 request, is to modify the dimensions of the ferry maintenance dock. The dock was originally authorized at 95' in length by 8' in width. The modified dock would include a 16' in length by 10' in width floating ramp landing platform connecting to a 70' in length by 6.25' in width dock. Ferry access dock steps leading to a cantilevered platform would be constructed approximately midway along the dock. Twelve dolphin pilings, each consisting of 4 pilings, are also proposed along the dock. In reviewing the information provided, the Division of Coastal Management has determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of the permit. This Letter of Refinement authorizes the modification of State Permit #91-96, as described in your letter dated March 12, 2015 and plan labeled "Sheet: Deep Point Marina Floating Maintenance Dock", dated March 12, 2015. All permit conditions remain in effect. Please note this refinement does not authorize any work not expressly described above, nor does it eliminate the need to obtain any other additional state, federal or local permits, approvals or authorizations that may be required. By copy of this letter we are also notifying the U. S. Army Corps of Engineers and the NC Division of Energy, Minerals & Land Resources of our action. If you have any questions concerning the above or if I can be of any other assistance, please advise. Sincerely, Debra Wilson District Manager cc: Jonathan Howell, DCM Wayne Strickland, LPO Tyler Crumbley, COE Wilmington Files Chad Coburn, DWR 127 Cardinal Drive Ext, Wilmington, North Carolina 28405 Phone: 910-796-7215\ Intemet: www.ncdenr.gov An Equal Opponunity \ Ai6rmabve Action Er pbyer - Made in pat by recycled paper Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910-228-2484 March 12, 2015 Ms. Heather Coats RECEIVED NCDENR Division of Coastal Management MAR 1 g P05 127 Cardinal Drive Extension u` i Wilmington, NC 28405 Re: CAMA Permit #91-96 Letter of Refinement Request: Deep Point Marina Floating Maintenance Dock Dear Ms. Coats: I am submitting 5 copies each 11 "x17" of my 3-12-15 seal date drawing "Deep Point Marina - Floating Maintenance Dock" in support of this Letter of Refinement Request for Bald Head Island Limited, LLC. Per our conversation yesterday, I could not submit both a parallel and perpendicular floating dock alternative. This morning the decision was made to go with the as permitted perpendicular floating dock. An 8'x95'Fioating (Marine) Maintenance Finger has been in the Deep Point CAMA # 91-96 Permit since at least 2009. Today's drawing is based on a/ my 5-13-09 seal date L.O.R. drawing. As you are aware, CAMA #172-87 Minor Modification dated 1-15-15 allows for the re -configuration of the A -Dock slips at Bald Head Island Marina. The reconfiguration eliminated one of the 70' x 6.25' +/- floating finger docks. We wish to repurpose that floating dock and use it as the never built permitted 95' x 8' ferry maintenance dock at Deep Point. We request to add a 10' wide x 16' Rooting dock, with an angle gusset as depictied in the drawing, as the ramp landing floating dock. With this Letter of Refinement Request, we are indicating extending the existing marine maintenance holding tank pump -out lines to service the subject floating dock. As we are still unsure if the existing pump can handle the extra length, we would like to qualify this request to allow installing a sufficient size pump -out pump at the floating dock. If this qualifies for a State /CAMA grant, please advise us of whom we should contact. I have listed 16 items of "Anticipated Typical Dock/Marine Maintenance Items" that I feel are/should be part of this project. It may not be totally complete, as the marine maintenance department may have additional needs for maintaining the ferries. If any item(s) are not permit -able, please permit all that are allowed. The 70' dock has already been delivered to Deep Point for final positioning. If you have any questions and/or comments, please call me at 910-799-9245 or my cell 228-2484. Additionally, when the Letter of Refinement is completed, please e-mail me a copy. Thanking you in advance for attention to this matter. GpROLN OQ�o�SSIOygi:9 Z .. ra gEP� _ Bruce Marek, P.E. Cc: Jim Henry, Bald Head Island Limited, LLC Director of Planning & Development Ben Traynham, BHI Harbormaster Claude McKernan, BHI Transportation Mgr Na RECEIVED DCM WILMINGTON, NC MAR 1 2 2015 Y" a RECEIVED 8'X 95' FDMD DOCK PER LDR 10-22-07 F'DMD F'EM UFT sYSM (Not in immediate plain at this time but to remain in permit for future consideration) 81 95' FLOATING — DOCK, From 5-13-09 IAR DWG (Or earlier) Subject o1 this LOR Proposed repurposing of 70'ze.25• floating dock from Bald Head Island Marina A -Dock Reconfiguration (CAMA 172-87, January 15. 2015 Minor Mod) RAI misin miss sea as, Permit Conditions from 5-13-09 EMPE Seal Date Drawing som less saw was s ass 9....... Ad' 2P. 10. ". �. &.AM MPT DCJ12 w/aelra6 DC111 This entire list is new. Not shown as red for clarity. ,. PµOLUy ''' ., For: Bald Head Island Limited, LLC G A ''ii [ Planning Dept. Q��yStONkf ���7 CAMA 91-96 LETTER OF REFINEMENT REQUEST DWG: -Z:� FPS =_ - a S REVISE B'X 95' (UNBUILT) DEEP 4r. POINT MARINA MARINE MAINTENANCE FLOATING DOCK G. EN•'�G. (From 5-13-09 seal date g' ' E" PM O. R. drawing) to use ' repurposed 6.25't x 70't Floating Dock from Bald Head Island Marina A -Dock Reconfiguration (CAMA 172-87 Minor Mod 1-15-15), and adding a 10'x16' nominal 77 ^ c� ramp landing dock as shown. CT r' o 01 N rt e,N `y o y"y�ti r�IratM 4— � i we Was This drawing better defines items associated wth the floating dock installation. A set of wood dock stairs are indicated about j the way out on the 70' floating dock. This will be positioned to best fit the 3 different sized ferries that will need access from the floating dock. A cantilevered platform is shown, similar to what is on the maintenance pier. Also indicated is the intended provision to add a second marine maintenance holding tank pump out station on the floating dock, either by extended piping or addition of second pump. Hurricane tie-up dolphins are H EC E I V ED better defined. DCM WILMINGTON, N general, revised items are MAR 1 2 2015 in red. LIST OF ANTICIPATED TYPICAL DOCK ARINE MAINTENANCE ITEMS TO BE INCLUDED N1TH TH FLOATING DOCK x u ose w on o na scan urn ion UMKINorninal Vpx luxio o re u ose an existing x ramp or purchase new auminum ram size o e a ermn 3. FERRY A CESS STEPS On 70floatin d Sim t Maintenance Pier for Eas Accessto BoardingGate 4. ELECTRICAL P DES ALS: 1 20B Volt 3 Phase ore Power Pedestal exists at o x ram location I ward of bulkhead cap Add 1 208 Volt 3 Phase + 23 110 V Ll ht Pedestals on noatln Dack Positions D. With Has s Gn Outlets . FIRE EXTINGUISHE RUNTS: PER N A :T a ABC 75 Max di Fence to fire extinguisher, plus myother NFPA t 6. RING BUOYith Line FLOATING7. DOCK M. .. LA D endent on Hurricane Dolphin Installation: only 5twor Dollard A r or or ram a k d an + wa er + a e en 1. P.T. TIMBER DOI I am —ter or a ter. fee o our ie hins: d ns II 12, H L ING TANK UM OUT Passible extension of existings em M intenonce Piar New m —out If insufficient head. ff H MAKINA NUN 14. : For Marine Maintenance Purposes: 1 ACONNF-11014 DECK OVER BULKHEAD: P.T. Wood C;onsbuclilons to A—D Docks.lows Van ono ore over ectric cab es wa er and -was a lines oww ea own ramp m to ralandingdo Bruce Marek, P.E. P.O. Box 3069 Bald Head Island North Carolina 28461 (910) 228-2484 DEEP POINT MARINA FLOATING MAINTENANCE DOCK 7*2 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 12, 2015 Mr. Bruce Marek PO Box 3069 Bald Head Island, NC 28461 Dear Mr. Marek: Donald R. van der Vaart Secretary RECEIVED MAR 16106 k4t;�-4vAl)H }� r h•i This is with reference to your request to modify State Permit #91-96, acting as agent for Bald Head Island Limited, LLC. The permit was issued on June 3, 1996 and expires on November 15, 2016. The action proposed in your submittal, as submitted in your March 2, 20I S request, is to construct a temporary parking lot outside of the 30' Estuarine Shoreline buffer and partially within the 75' Estuarine Shoreline Area of Environmental Concern (AEC), adjacent to the Harbour Master building and pool. In reviewing the information provided, the Division of Coastal Management has determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of the permit. This Letter of Refinement authorizes the modification of State Permit #91-96, as described in your letter dated March 2, 2015 and plan labeled Sheet CI- Deep Point Marina Harbour Master Temp Parking Lot, dated March 2, 2015 (received by DCM March 3, 2015). All permit conditions remain in effect. Please note this refinement does not authorize any work not expressly described above, nor does it eliminate the need to obtain any other additional state, federal or local permits, approvals or authorizations that may be required. By copy of this letter we are also notifying the U. S. Army Corps of Engineers and the NC Division of Energy, Minerals & Land Resources of our action. If you have any questions concerning the above or if I can be of any other assistance, please advise. Sincerely, V-4f" 01 Debra Wilson District Manager cc: Jonathan Howell, DCM Wayne Strickland, LPO Tyler Cmmbley, COE Wilmington Files Dan Sams, DEMLR 127 Cardinal Drive Ext, Wilmington, North Carolina 28405 Phone: 910-796-7215\ Internet: www.nodenr.gov An Equal Opportunity 1 AftirnuiWa Action Employer— Made in pat by raWde0 papa Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910-228-2484 RECEIVED March 2, 2015 MAR 16 10$ Ms. Heather Coats NCDENR Division of Coastal Management"N�Nn,t 127 Cardinal Drive Extension Wilmington, NC 28405 Re: CAMA Permit #91-96 Letter of Refinement Request to Build a Temporary 25 space asphalt parking lot outside of the 30' Marina Buffer and partially within the 75' Marina AEC at Deep Point Marina, 1301 Ferry Road, Southport, NC Dear Ms. Coats: Included are five 24" x 36" copies of drawing Cl-Deep Point Marina Harbour Master Temporary) Parking Lot, dated & sealed 3-2-15, for the Bald Head Island Limited, LLC owned Deep Point Marina. As we have spoken, we are approved by both by CAMA and Stormwater SW8-951012 for 7500 sf of building roofiine in the gross area landward of the retaining wall that is along the 30' marina buffer line. As it works out, including the entrance and the potential exit, the asphalt lot is tributary to 3 stormwater drainage basins. The largest part of the temporary lot, in drainage basin DB17A, has 7146 sf of Allowable BUA. As drawn, including a 4" rock perimeter and 1' entrance curb, we are proposing using 7140 sf of that allowed amount. The entranceway is in drainage basin DB 25-1, which has an allowable BUA of 39,537 sf, mostly for the future hotel and restaurant. With curbing I have designated 620 sf impervious, which is less than the 1100 sf that was tributary to DB25-1 frome one of the original 50'x50' roofiines. And lastly, there is 30 sf exit slab of 8"-10" thick concrete concrete in DB17, which includes the existing marina parking lot, the "BHI oval" and the Harbour Master Store. This is in lieu of a 105 sf entrance walk for the still future 7500 sf building. Within the three areas, my total is 7140 + 620 +30 = 7790 sf. A mere 0.6% of the 1,208,772 sf of Built Upon Area Permitted for this mainland departure point/Parking Facility for the Bald Head Island Ferry. Cl has plenty of background information, but I am also including one copy of 4 pages of the December 17, 2008 Stormwater Permit Modification so that you can verity my Drainage Basin 17, 17A and 25-1 numbers. I will be using the same Cl drawing for a stormwater plan revision if you or Stormwater/DWQ deem it necessary. Respectfully, Bruce Marek, P.E. For Bald Head Island Limited, LLC Planning Dept. Enclosures cc: 11m Henry, Director, BHI Planning & Development Ben Traynham, Harbor Master �,,•`� 2QQo ES§IOiy�')'q /J SEAL 15684 = ..FiyGI...... ly 1 C EIV WILM NIG ON, NC MAR U I "' MAR 0 3 20t Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality December 17, 2008 Mr. Stephen 0. Robertson, Chief Operating Officer Bald Head Island Limited, LLC P.O. Box 3069 RECEIVED Bald Head Island, NC 28461 MAR 16 20 Subject: Stormwater Permit No. SW8 951012 Modification Deep ` t° twn xa High Density Project Brunswick County Dear Mr. Robertson The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for Deep Point Marina on December 16, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 951012 Modification for the construction of the subject project. This permit modifies and replaces all previous permits and revisions issued for this project prior to this date. This permit shall be effective from the date of issuance until February 15, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215, Sincerely, Georgette Scott Stormwater Supervisor Division of Water Quality GDS/arl: S:\WQS\STORMWATER\PERMIT\951012Mod.dec08 cc: Karen Valiquett, P.E., WK Dickson R Co., Inc. Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Division of Coastal Management Linda Lewis Wilmington Regional Office Central Files t j� ✓YB�NfN/!//a RECEIVE North Carolina Division of Water Quality l27 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 d�'WwgNG7 Wilmington Regional Office Inirnet: svwsv.ncsvalergqaitvorg Fax (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50%Recydedlf0%Post Consumer Paper State Stormwater Management Systems Permit No SW8 951012 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY RECEDED STATE STORMWATER MANAGEMENT PERMIT MAN 1 B 205 HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Stephen O. Robertson and Bald Head Island Limited, LLC Deep Point Marina Bald Head Island, Brunswick County FOR THE construction, operation and maintenance of two (2) wet detention ponds, twenty-four (24) infiltration basins and six (6) infiltration trenches, in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrulesl and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 15, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 (24 infiltration basins), Section 1.8 (6 infiltration trenches) and Section 1.9 (2 wet detention ponds) on pages 3 and 4 of this permit. The total BUA for this project is 1,208,772 square feet. 3. The tract will be limited to the amount of built -upon area indicated on pages 3 and 4 of this permit, and per approved plans. There is no allotment for future built -upon area. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. This protect proposes that some of the basins will be interconnected and work together T provide the required minimum storage volumes. The storage volume provided is based on a controlling elevation which is the highest common elevation shared by the basins in that system prior to overflow. No storage credit is given for volume stored in the pi D lot. 3CM 4VILMINGTOK N Page 2 of 10 MAR 0 3 2015 State Stormwater Management Systems kCt,I,,,.o Permit No SW8 951012 Moditicatian, w 7. The following design criteria have been provided in the infiltration basins and must`Ub maintained at design conditions: Combined Storage In Resins 14 2.3. #A,10,11812 Infiltra0on Basins Units Bait 1A Bain 2 Basin 3 Beam 9A B pn Bain 4 Basin 7 a, Drainaae Area Acres 234 1.61 Im 1.53 1.55 1 1.70 1 275 1.34 A5 onsfte fir 101747 55943 60116 65530 67491 1 74084 1 119797 58301 19W o8aile b. Total BUA fir 38684 53M4 47047 NONE 1 23M I 55i80 1 61476 1 7fi041 I40382 9008 c. Desi n Storm d.BasIn In Fl 2.0 2.0 2.0 2.0 &0 3.0 20 1.0 1.8 ib a. Bottom Elevation FMSL 16.0 18A %o 1 16.0 1 15 1 18 1 17.0 18.0 18.0 I. Bottom surface Area fit 310 449 36 aw 11 OMB T 7908 2808 955 Bypass Weir Elw. FMSL 1&0 18.0 1&0 I 18.0 18.0 TO 18.0 19.8 17.6 h. Permitted Slor. Vd. W 28502 8088 1 2270 I 13293 f3927 10112 18118 14582 2447 L Type of SO WA Wando FIne Ssnd 1. Mellon Rate k. SHWT (Whr FMSL 1 .0 1 12.0 13.0 20.0 14.0 12A 14.0 13.0 14.0 13.0 L Draw Dann The Hrs 38 34 90 2 38 14 3 4 3 m.RecSlreendlaverBasin NIA mWndKeaWmWAreWCPF17 n. stream Index No. WA 1 1&8&3.5 0. classification 1 WA I .sc, Infi tlon Basins Units Basin 13 Bain 14A Bain 17 BeNn Bala Bain Bain 20 Badn21 Bain 23a 17A 10 19 aDrainage Area Acres 0.60 1 .43 1.89 1 .21 1 2.20 4.39 1.64 0.10 0.fil Onsite ftt -ti-851 18471 82125 1 9335 1 95966 1 191281 80021 4351 19846 ofiate b.Total BUA nr ft= 18867 1 3479 1 80487 1 7146 NDNE 55114 107449 44619 1127 5817 0.005190 tom d. Basin DeDIh In R 3.94 1 1.0 2 0 1 3.5 3.0 1 5.3 4.0 3b 1.0 0.8 a. Botom Elevation FMSL 13.0 16.10 10.0 9b 4A 7.0 5A 1&0 17.0 L BoVanSudeceArea ft' 459 691 6197 514b 783 5�6 1219 195 1326 a. Bypass Weir Elev FMSL 1&94 1 17.0 1 12.0 1 13A 1 9.3 11.0 fib 19.0 VA h. Pemdlled Stor. Vol. fP 7800 1 2751 1 16061 1 Win I T5958 30624 11460 398 1585 I. Typo of Solt WA WarMo Fine Sad 1. Infillra0on Rate k.SFIWT FMSL FM 20.0 11.0 12.0 8.0 8.0 2.0 6.0 20 16.0 14.0 I. Draw Dmwr Time Fka 12A 2.0 3b 4 21 5.4 11.0 2.0 7.0 mRecSOeandPoverBasin WA ResUkted AreafCPF17 n. Stream index No. WA 18$63.5 a. amsiftcaffon . WA I 1W RECEIVED DCM WILMINGMN, N' MAR 0 3 Z015 Page 3 of 10 State Stormwater Management Systems Permit No SW8 951012 Modification Infiltration Basins Units Basin 24 Basin 25.1 Basin 25 2 Basin 25.3 Basin 25-4 Be51n3l a. Drain a Area Acres 0.57 0.41 0.62 .13 0AU 17553 0.53 23211 Onsile ft2 24641 1 81339 1 26915 5580 outs b. Total BUA ftr ft2 19472 1 39537 14619 NONE 2366 12600 11609 C .Desl n Storm d. Basin De III In Ft 2.0 2.0 2.5 3.0 1.0 2A 4.8 e. Bottom El ad FMSL 7A 7.0 18.5 15.0 7.0 990 4.0 11 f. Bottom Sudac I Area ft= 2239 4077 602 440 9.1 8.8 B Weir Elev. FMSL 9.0 5727 9.0 1 10902 21.0 3723 16.0 . 1 6139 301 2 970 h. Permitted Stor. Vol. fts wando Flne Sand I. Type of Soil NIA WIIWlion Rate k. SHW7 INhr FMSL 6.0 4.0 16.5 '0•0 12.0 2.0 1 2.0 I. Draw Down Time Hrs 2.8 1 2.8 1 7.2 2 �0 m.RecStrewMverBasin WA Soul 1�d� CPF17 n. Stream Index No. WA 188-8841.5 o. Water Body ClassY. I NIA I Sc. 8. The following design criteria have been provided in the infiltration trenches and must be maintained at design conditions: tion Trenches Units Trench 5 Trench 14 Trench 15 Trench 16 Trench 27 Trench 30 a Area: Arras 1W5 0.57 0.62 0.59 0.607 0.46 ite: ft 46,807 24,928 27,065 25,804 22,091 19,669 site: f 0 0 0 0 0 0 mpervious Surfaces ft 34,173 20,859 16,410 24,914 5,968 4,964 ite: ft 34,173 20,859 16,410 24,914 5,968 4,964 ite: C f 0 0 0 00 n Storm: Inches 3.0 h Dimensionsgth 146 88 130 1th Feet 125 Feet 608 38ight Feet 1.92 1.67 2.67 2.67 t.92 1.92 e. Perforated Pipe Diameter: Inches 15' 122 24' 24' 15' 15' Length Feet 3,497 2,850 846 1,224 682 577 f. Bottom Elevation: FMSL 17.09 14.07 13.26 13.07 10.0 11.0 g. Storage Elevation: FMSL 19.01 15.74 15.93 15.74 11.92 12.92 h. Permitted Storage Volume: ft 8,470 5,072 4,199 6,123 1,654 1,395 i. Type of Soil: Wando Ftne Sand J. Expected Infiltration Rate: In/hr 20 k. SHWT: FMSL 15 12 11 1 11 8 9 i. Time to Draw Down: Days 1.3 1.1 2 1 2 1.3 1.3 Receiving Stream/ Southport Restricted Area I CPF17 M. River Basin: n. Stream Index Number: 18 883.2 o. Classification of Water Body: Sc' . RECEIVED DCM WILMINGTON. "' Page 4 of 10 MAR 0 3 2015 �00 y 7 y 1 128'8"x4' Bottom Width=514.5 sf x 3.5' Depth=1801 sf Permitted Vol. 1 con)lIl IIZLiII I I CCJI IIl CI1 LI71 I LI 11 1 1 1 1- 1 W ` New Location for ' FE Infiltration Basin #17A ` T T T 1 r------------ 126t Jf Z !♦^ DB 17A 9335 sf Area 1 ` 7146 sf Allowed BUA 1 ` Original Drainage Basin 17A Premise t T TI 1 ~------------ e� „T� 7 no LT�1T Y®VT 0.'Y! T/6WY..' K'Y♦1 Infiltration Basin #17 Drainage Basin }_ 25-1:61,339 sf Allowed BUA 1 .4. 39,537 sf 1 (Includes_, 1 "� Future Hotel & { Restaurant) Drain Inlets 00 to Infiltration o Basin 25-1 �i I JT� a i Sidewalk: 165.58'3 w Para wllel to Ret Wsl Lin , Design Plans: 165.4' Red Items are Changes 34 space paved parking lot DB 17 82,125 sf Area lowed BUA 60, 87 s L:.'^;YJ N 4!:i>'��•'\eThw�a� .YOU'•fI: 'r: � ) 17 A hlt 11 '8 wrok a xi ti g p r i to 7500 sf Building N rma Proposed Temporary 25 � pc asp atlo 0 1 8' Sp of 10 '8 w oc ( o s l a cons ructed In future STONE NETAMM WAIL. AT W 0" Blla{D TOP EIEV - 10.6 t Wood Falk EL-6.67t D1 BLK D7 EL=5.63'* J. C -4— Bldg Fo 4 11 :� 1100 sf 0 Oct .. - 625, ot ' + 30t nth `o w rem 30 sf on 105 s DE A AEC Crete Harbour ards4. ` Master the 105 sf Building g 17 ,li• & Pool 30' MARINA BUFFER 2p. qD: �. *. aLA T®T -cYi T/eil TCYl Deep Point Marina Scale: V-40' When Printed on REQUEST TO BUILD TEMPORARY 25 SPACE ASPHALT PARKING LOT IN LIEU OF PERMITTED 7500 SF OF BUILDING ROOFLINE(S) Google Earth Screen Capture: Marina Retainiing Wall to Exist Parking Sidewalk: Structure 10 Design Plans: 65.4't (Pere to Wall) 1100 sf Roofprint DB 17 in DB 25-1 DB 17 DB 17 r--165' t CAMA 7500 sf Mixed Use Bldg—. .0. — _ — r — — — — — W 50 noor — — — — — i Or CAMk Orig CAMA Orig C A -fit 4ctur� 1 NI Structure 11 Structur`-1.2- \y /� Three 50x50' TDB 5-1 X Roofline Areas = Blue Dashed Line 7500 sf is 7500 Architect ! 1_ Roofline DB 17A -+r1W 30' MARINA BUFFER i From Stormwater SW8-951012 Mod(2008): Three 50'x5O'Roofline Bldgs= 7500 sf CAMA 91-96 Permit (Structures 10-12) now 7500 sf "Architect Shaped Roof" Drainage Basin 17A Boundary (Magenta Dashed) 9335 sf, 7146 sf Allowable BUA (Temporary) Parking lot design is for 6980 sf of asphalt pavement in DB17A. Proposed DB17A BUA is 7140 sf with 4" rock perimer + 1' curb at entranceway as indicated. NOTE: Upper Left Boundary follows one of original 45' Angle Hip Lines Drainage Basin 25-1 (61,339 sf) is to left of DB 17A DB 25-1 has an allowable BUA of 39,537 sf, which includes the future hotel and restaurant. 1100 sf of Structure 10 Roofline is in DB 25-1 Proposed DB25-1 564 sf of asphalt entrance way (620 sf BUA with 1' Concrete Curb) is in lieu of the 1100 sf Future Mixed Use Building Roofline. DB 17 includes the existing Harbour Master Parking Lot, Turnaround "BHI Oval" and Store. Drainage Area DB17 = 82,125 sf, with 60,487 sf Allowed BUA. Entire Harbour Master Complex is not yet built. There is a 30t sf connection piece from the parking lot to the oval. This is proposed as 8"-10" thick concrete, with removable bollards, to allow boat trailer or emergency vehicle drive thru access. Drawing shows the 30 sf as a "swap" from a (future) building entrance walkway. PARKING LOT INCLUDING CURB, ROCK PERIMETER AND CONCRETE = 620 SF + 7140 SF + 30 SF = 7790 SF o`PSH CAgo N O'pF ESSip., !i2 .; QP �y SEAL 3�z _ 15684 T MARINA CAMA 91-96 Letter of Refinement Dwg. STORMWATER SW8-951012 Mod Plan Revision Dwg. MARCH 2. 2015 6l rek! P.E. C1 — DEEP POII P.O. Box 3069 Bald Head Island 28416 HARBOUR MASTER TEMP RFC,E/VT�o r�1dg 7 INC MAR 0 3 2015