HomeMy WebLinkAbout91-96 Letter of Refinement 10/22/2007 Bald Head Island Limited LLCNCDENR
North Carolina Department of Environment and N
Division of Coastal Managemen
Michael F. Easley, Governor James H. Gregson, Director WON ecretary
October 22, 2007 UST 2 6 z007
Mr. Bruce Marek
PO Box 3069 Mgtallead City DCM
Bald Head Island, NC 28461
Dear Mr. Marek:
This is with reference to your request to modify State Permit #91-96, which was issued to Bald Head Island,
Limited on June 3, 1996. It expires on 12/31/07. The action proposed in your submittal is to construct a ferry lift within
Slip G3 of Deep Point Marina, adjacent to the Cape Fear River, in Southport, Brunswick County. As stated, the ferry
lift would consist of two fixed maintenance piers, measuring 95' in length, 6 concrete pilings and the lifting mechanism.
The northern pier would measure 12' in width and the southern pier would measure 8' in width, as shown on the plans.
This authorization does not include any development landward of the bulkhead. Upon reviewing the submittal and
contacting our Major Permits Processing Coordinator, I have determined that the proposed action is consistent with
existing State rules and regulations and is in keeping with the original purpose and intent of the permit.
I hereby submit this Letter of Refinement authorizing the modification of State Permit #91-96, as described in
your letter and plans dated October 9, 2007. By copy of this letter we are also notifying the U. S. Army Corps of
Engineers of our action.
If you have any questions concerning the above or if I can be of any other assistance, please advise.
incerely,
Steven H. Everhart, PhD
District Manager
cc: Dave Timpy, COE
Linda Lewis, DWQ
Wayne Strickland, LPO
Wilmington Files
127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845
Phone: (910) 796-7215\ FAX: 910-395-3964 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Bruce Marek, P.E.
P. O. Box 3069
Bald Head Island, NC 28461
910-457-7517
October 9, 2007
Ms. Heather Coats
NCDENR Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: CAMA Permit #91-96 Request for Letter of Refinement for Ferry "Lift" Morehead GitY 9CM
Dear Ms. Coats:
Bald Head Island Limited, LLC has asked me to request a Letter of Refinement for a fixed boat (ferry)
lift for inclusion in CAMA Permit #91-96, Deep Point Marina. Ever since my February 23, 2000
marina/slips drawing, I have been showing a boat maintenance "slip", between a fixed pier and a
floating or fixed pier. (May 22, 2000 CAMA Minor Mod). We have been discussing for years on how to
create a boat lift to enable Marine Maintenance to change props or shafts without having to spend a
minimum of three days time to send a vessel up the river to Wilmington for a haulout. One day up,
one (minimum) repair day, one day back.
In conjunction with the pile driving for the Passenger Ferry Terminal, I have procured six additional 75'
long concrete piles, which will be embedded approximately 18' to 20' into the bottom of the marina.
These six piles (three along each side of the slip, will be incorporated into fixed maintenance piers.
One will be 12' wide, the other 8' to 10' wide. The fixed piers will provide lateral support for the 75'
"lift" piles. See included drawings. The intent is to purchase a similar mechanism to a 100 to 200 ton
marine travel lift, but primarily only for the hoisting mechanisms/straps. Closer spaced pier piles are also
required.
There will be aluminum or steel I -Beams that provide support between the piles C-B & B-A, and across
the slip at the A -A Piles. We have included a photo of what a typical moving marine travel lift looks
like. Ours will not have wheels. We also intend to have some sort of safety beams that are rotated or
otherwise set into place across the slip once the vessel is lifted. I will be discussing this aspect of the
project with various travel lift manufacture's to see how to best handle our lifting needs.
The pile contractor for the ferry terminal will be at Deep Point in the next week or two. We would like
to have this requested Letter of Refinement in a timely manner so that he can drive the 6 lift piles while
he has his big barge mounted crane mobilized at the marina.
Included are 5 sheets each of two drawings, 11"x17" dated & sealed 10-9-07. These are conceptual
more so than final placement drawings. If you have any questions and/or comments, please call me
at 910-457-7517 or cell 228;, � � floc; you in advance for attention to this matter.
Respectfully,
SEAL QD
�1564 l / RECEIVED
Bruce Marek, P.E. ' ' ' DCM WILMINGTON, NC
For Bald Head Island Likk-!, P
E J.MP , OCT 0 9 Z007
cc: Jim Henry, Direcror,'9HI UCCC Manning &Development,
Woody Fulton, Director of Operations, Bald Head Island Limited, LLC
M. Kent Mitchell, CEO, Bald Head Island Limited, LLC
Claude McKernan, BHI Transportation (Ferry) Manager
- STlIP. RawFUMF 1�Q1
1114
TA3R
ELEC PMM
13048
(D LIP
f,6
U
E�
0 Fo —
a o
IWEST CURBSIDE PECK - U P
z105
CE
5
:
IIu1A■ Iiilrr� iliullr iil Ylli rlrYiir iilYYr riiYllr iliYlir i1rYHi iilYYi rliuiii
C.5
)
Cross
Section A -A
Pilings set 1 foot
fr orrl bulkhead
Land face to allow
for concrete
whalers.
1'
MLW 0'
— 4'
-10' 1 1
I I
+-�- 10 FT
1 1
1 1
I I
II
Existing
bottom depression
I i
1 1
1 !
!1
1 I
I 1
I I
I I
! I
l 1
I 1
1 I
1 1
-24' Max^
Bulkhead Reinforcement Pion (loot to Scale)
5,66± FMSL —
1'
MLW 0'
SECURITY 11
cum 1
T-p .CUR+',
1110
iYu Y1lr ill
VEST ENTRY
SEATING AREA + 7`-6'
1106 1101
E.T OFFICE 1
+ 4'-V
Ina
1117 11
r .
A1F
CD11CIMME
+ 7_6`
Hoe
'�� rilYili Ili
} TRAt1S17' A!EA
ELEV
I
0 0 0 0 0 0 0 \
EAS T CURBSIDE P I C x- U P
1108
RAGGAM RACKS
a
2 3 4 5 6 7 N \
9 \
o
Ilea YQp is
34fBox 4 `a
JtIIY aWNER? �S
1 Y J a o \ 0 `
I rflir r11YfIM - - A rlriiiri I 1M'E 'iSi Iliiii rilYlir iYllr IOIir� illurli II SE0JRE rliHur iilYrir o
InlYrlrr i/i }tn�
1124 Rr 3
i
i
� P
' I 1 o r y6• ty. '1Rf,,
III o o !�.lj
V 02
fi Initial Repair T
40± Feet
Nt
--. a
BAGGAGE HlLDIRG
AREA ¢4F II�
1125'
2
/ 4f �dF
00,16
a
'— >0 e 11
:v
Area of Land —Side construction Along Bullhead 2uo:- Feet
Reinforcement Location Plan
Front Elevation
D
(5) Propos d pressure treated pilings.
/- Prop sed 12' x 12' concrete whalers
on
Proposed large
rip -rap rocks.
I
1 i
1 1
—
1 I I
1 1 1
1 I 1
1 I 1
I 1 1
I I 1
I I I
36 inch
I I 1
I concrete
I I I
sheet pile
I (existing)
I I t
I 1 1
I 1 1
I 1 1
I 1 1
I I 1
I I 1
1
I I
1 V !
1 1
1 1
1 1
1 1
I 1
I I
i l
1 1 wit -
rip -rap
I I fill material_..
&Nr Wfr/� f k 9'V tM
Existing bbitom MtIJQn. V Af � M�
I I contour "depression". IJ '/."
I 1 I I (((
' *4 `
F
r� f
I 411
.g
y'C T F o `, A#* y*,
w d a
,,
1%41
'•'4
Q
Z0 0 20 40
SC ALE; 1 ' = ?0'
1) INITIAL REINFORCEMENT TO BE DONEALONG 40f FEET AS
SHOWN.
2) REQUIREMENT FOR ADDITIONAL REINFORCEMENT SHALL
BE DECIDED AS LAND -SIDE CONSTRUCTION PROCEEDS
ALONG THE BULKHEAD.
ILKHEAD.
REVISION DATES
ISSUE
12.04-07
BULKHEAD
REINFORCEMENT
LETTER OF REFINEMENT
FOR: Bald Head Island
Planning r.
DEC 1 7 2007
Mereheac, C;t
yC
``F,,IIIIl11/►,,,
GARp4��%,,
0Qo��ssio;y9C 9
G�-<
444.i,,..
BRUCE MAREK, P.E.
P.O. BOX 3069 BALD HEAD ISLAND,
NORTH CAROLINA 28461
(910) 457.7517
DEEP POINT MARINA
SOUTHPORT, NC
BULKHEAD
REINFORCEMENT
i 2007
REC EIi, L--
DCM WILMINGTON, NC
SITE PLAN
V_S 112" 3'-9 114" Y-11 112" 3'-2 114"
(2) 2X6 RAILS LAG SCREWED TO EUSTING POSTS
PLUS 2X6 TOP FLAT RAIL LAG SCREWED STRUCTURE.
THIS WILL BE TEMPORARY SAFETY BARRIER
? li
A2
i
2x4 BLOCKING TYP.
2x 10
(7) NEW PILES 12" 0, 30 FEET LONG;TOP OPILE TO
Al - (2) 2X12 BOLTED TO PILES; TOP EVEN VITH BULK
A2 - (2) 2X12 BOLTED TO PILES; TOP EVEN VITH BULKHEAD CAP
A3 - (2) 2X12 BOLTED TO PILES; TOP 2-1/2" EELOW BULKHEAD CAP
A4 - (2) 2X12 BOLTED TO PILES; TOP 5-1/2" EELOW BULKHEAD CAP
A5 - (4) 2X12'S DOUBLE STACKED & BOLTECTO EXISTING STRUCTURE. SEE DETAIL.
ALL LUMBER TO BE SYP-PT #2 OR BETTER
NOTE; ALL DIMENSIONS TO CENTER OF NEV.PILES.
FROM WATER SIDE FACE OF BULKHB�D CAP. 4 0 4
OR FROM CENTER OF EXISTING PILES.
SCALE: 1/4" = 1 '0"
PILE & GIRDER PLAN
GENERAL NOTES
1) ALL FASTENERS AND HANGRES TO BE HOT DIPPED GALVANIZED OR BETTER.
2) ALTERNATE SIZE LUMBER MAY BE USED IF AVAILABLE, UPON APPROVAL BY ENGINEER.
3) ALL DECK BOARDS TO BE SCREWED TO FRAMING.
(4) 2X6 LAG SCREWED
TO EXISTING POSTS TO
REPLACE CABLE RAILING
NOT TO SCALE
DISCONNECT AND REMOVE EXISTING
ELECTRICAL CABLE BETWEEN 3RD &
5TH RAIL POST.
CUT AND REMOVE EXISTING
3-PIECE RAILING BETWEEN 3RD &
4TH RAIL POST.
FLUSH -CUT UPPER BAND JOIST
BETWEEN 3RD & 4TH RAIL POST.
REWORK CABLE RAILING AS NEEDED
2x14 CURB OVERHANGING BULKHEAD CAP
LAG SCREWED TO 2x10 BLOCKING
2x 1 O BLOCKING TYP.
AT ALTERNATE BAYS ,
717
--4X6
\.
POSTS TYP.
t
BOLTED TO FRAMING
(4) 2X6 LAG SCREWED
! L 2x # O @ i 6" O.C. TYP.
— (2) 2x10 BOLTED TO PILES
TO PILES OR POSTS TO
FORM RAILING BOTH SIDES
SEE SECTIONS FOR DETAILS
(6) JOIST HANGERS TYP.
2x 10 C 16" O.C. CUT TO WEDGE SHAPE
TO MATCH EXISTING DECK SLOPE
THIS AREA TO BE FLAT & LEVEL
2x 10 @ 16" O.C. CUT TO WEDGE SHAPE
\ TO MATCH EXISTING DECK SLOPE
THIS AREA TO SLOPE DOWN FROM
NEW FLAT AREA TO EXISTING FLAT AREA
(4) 2X6 LAG SCREWED
TO EXISTING POSTS TO
REPLACE CABLE RAILING
0
k" AUSL
n
FRAMING PLAN
NOTES: 1) ALL DECK BOARDS TO BE 2X6
2) ALL LUMBER TO BE SYP•PT tt2
8 0 _
SCALE: 1 /8"
SITE
BALD HEAD
ISLAND MARINA
GREEN TEAL
TRAIL
WEST BALD
HEAD WYND\4
NORTH BALD
HEAD WYND
NOTTO SCALE
t
VICINITY MAP.BALD D ISLAND
COUNTY,BRUNSWICK
(NOT TO
REVISION DATES
ISSUE
11.13-07
DELL -
FOR: Bald Head Island
Plana
�� o,g,, Dept.
"PtN •CAiq���,,®
`�•20 ��ESStpj,;. 2
i SEAL
s
15684 1 /
'i�i4 NGIN��•' � • f
e r e c N
BRUCE MAREK, P.E.
P.O. BOX 3069 BALD HEAD ISLAND,
NORTH CAROUNA 28461
(910) 457.751 i'
DEEP POINT MARINA
SOUTHPORT, NC
P11V 7,
'CONTRACTOR ]LANDING
TEMPORARY WALKWAY
\Nov.
SHEET "I
DCM W11 nnlN.10-70N, NC
N O V 1 9 Z007